A kind of indoor and outdoor decoration device
Technical field
The utility model belongs to metope processing unit field, specifically a kind of indoor and outdoor decoration device.
Background technique
There are mainly two types of the modes plastered at present to wall, and a kind of for traditional artificial plastering mode, this is just needed
A large amount of time, a large amount of plasterer are added significantly to plastering cost;Another way is exactly by the way of mechanical to wall
Face is plastered, and existing machinery wall plastering machine utilizes two parallel column guide rods, and mechanical float rises along column guide rod
Decline can be only done the problem of slurry delivery sprays upper wall to plaster to metope, because there are air in mortar, so that
There are bubbles for inside after wall is spread in painting, and because the presence of metope bubble easily reduces the service life of mortar attachment metope, therefore also need
It is compacted squeeze out in bubble, and it is still necessary to be accomplished manually for the processes such as mortar surface Troweling press finishing at present.Wall on automatic plastering at present
Equipment generally require in advance by mortar modulate complete, then by mortar be injected into equipment or equipment by mortar sucking then
It is sprayed on metope, the amount for the mortar modulated in advance is difficult number according to specific needs to control, and is easy to appear the ash of modulation
The deficiency of slurry or the situation of surplus are unfavorable for fitting up the efficient completion of work, are also easy to the waste for resource occur, traditional plastering
Machine is only capable of completing the smearing of indoor or outer outdoor lower height metope, it is difficult to realize the smearing work of high-storey exterior wall.
Utility model content
The utility model provides a kind of indoor and outdoor decoration device, to solve defect in the prior art.
The utility model is achieved by the following technical programs:
A kind of indoor and outdoor decoration device, including the first transverse slat open up circular hole among the first transverse slat top surface, are fixedly mounted in circular hole
Vertical staving, staving upper end opening open up first through hole among staving bottom surface, pass through sealing bearing installation the in first through hole
One vertical tube, the upper end of the first vertical tube are equipped with the second transverse slat, and the lower end of the first vertical tube is equipped with third transverse slat, and the second transverse slat and third are horizontal
It being fixedly connected between plate and the first transverse slat by side plate, the upper end of the first vertical tube is flexibly connected with the second transverse slat bottom surface bearing, the
It is equipped with the first vertical pivot in one vertical tube, is flexibly connected between the upper end of the first vertical pivot and the upper end of the first vertical tube by bearing, third
Opening up the second through-hole among transverse slat top surface, the lower end of the first vertical pivot passes through the lower part for being located at third transverse slat after the second through-hole, and first
The side of vertical pivot and the second through-hole bearing active link, the second through-hole of third transverse slat top is equipped with the second vertical pivot, the second vertical pivot
Bearing active link at the top of lower end and third transverse slat, fixed suit first gear on the second vertical pivot, fixed suit on the first vertical pivot
Second gear, second gear engage cooperation with first gear, and the upper end of the second vertical pivot is fixed to be set with third gear, the first vertical tube
Lower end the 4th gear of fixed suit, third gear engage cooperation with the 4th gear, and vertical electricity is fixedly mounted in third transverse slat bottom
Machine, the lower end of the first vertical pivot the 5th gear of fixed suit, the 6th gear of fixed suit on the output shaft of motor, the 6th gear and the
The engagement cooperation of five gears, the first vertical tube are located at the intracorporal portion perimeter of bucket and are equipped with the first helical blade, the first helical blade and the
One vertical tube is structure as a whole, and the first vertical tube side opens up multiple equally distributed third through-holes, passes through sealing in third through-hole
Horizontal axis is installed in bearing activity, and the first bevel gear is fixedly mounted in the inner end of horizontal axis, the position of corresponding first bevel gear on the first vertical pivot
It sets and the second bevel gear is fixedly mounted, the second bevel gear is engaged with corresponding first bevel gear to be cooperated, and the outer end periphery of horizontal axis is solid
Dingan County fills several equally distributed stirring sheets, and the side of second the first vertical tube of transverse slat bottom surface opens up fourth hole, in fourth hole
Regulation the second vertical tube of installation, is fixedly mounted hopper at the top of the second transverse slat, and hopper bottom opens up discharge hole, the upper end of the second vertical tube with
The lower end of discharge hole is fixedly connected with Ei, is equipped with third vertical pivot, the upper end bearing holder (housing, cover) encapsulation ring of third vertical pivot, lantern ring in the second vertical tube
It is fixedly connected between side and hopper top by connection frame, the 7th gear, the first vertical tube is fixedly mounted in the lower end of third vertical pivot
Upper end eighth gear is fixedly mounted, the 7th gear engages cooperation with eighth gear, and third vertical pivot is located at the portion in the second vertical tube
Exceptionally the second helical blade is fixedly mounted in week, and the second helical blade is structure as a whole with third vertical pivot, the first transverse slat two sides of the bottom
Symmetrical to be fixedly mounted traverse rod, traverse rod bottom is coupled sliding block, and slider bottom is equipped with slanting first electric telescopic rod, and first
It is equipped with transverse tube at the lower end of electric telescopic rod, is fixedly connected at the top of transverse tube with the motion bar lower end of the first electric telescopic rod, transverse tube
Positioned at the rear end lower of the first transverse slat, link block is fixedly mounted in traverse rod right end lower part, logical between sliding block and corresponding link block
It crosses the first spring to be fixedly connected, the fixed suit elliptical ring in position of the height of transverse tube is corresponded on the first vertical tube, transverse tube front side is intermediate
Riser is fixedly mounted in place, and elliptical ring outer ring and riser are engaged close to the side of the first vertical tube, and staving lower end surface two sides are opened
If slurry outlet, it is fixedly connected by hose between slurry outlet lower end and transverse tube top, is connected to inside the lower end of hose and transverse tube,
Slanting plastering plate is fixedly mounted in the bottom of transverse tube, and transverse tube bottom opens up several equally distributed leak holes, and leak hole is located at plastering plate
Top, the first transverse slat, the second transverse slat and third transverse slat both ends pilot sleeve is fixedly mounted, be equipped in pilot sleeve vertical
Screw rod, positioned at lower side two pilot sleeves lower end be equipped with inner thread sleeve, the upper end of inner thread sleeve with it is corresponding
Pilot sleeve bottom end bearing is flexibly connected, and inner thread sleeve cooperates with corresponding screw flight, the fixed peace in the lower end of the first vertical pivot
Drive sprocket is filled, the fixed suit driven sprocket in the lower end of inner thread sleeve, two pass through between driven sprocket and drive sprocket
It is driven chain link, automatic water inflow device is set at staving upper port.
A kind of indoor and outdoor decoration device as described above, the automatic water inflow device include third vertical tube, the 4th vertical pivot, the
Three helical blades, annulus, sliding sleeve, two struts, two second springs, water inlet pipe, the 9th gear, the upper end of third vertical tube and the
Two transverse slat bottoms are fixedly connected, and the side of third vertical tube opens up inlet opening by place near to the upper end, the outer end of inlet opening and water inlet pipe
One end is fixedly connected, and the 4th vertical pivot is located inside third vertical tube, the upper end of the 4th vertical pivot and the second transverse slat bottom bearing activity chain
It connects, annulus is fixedly mounted on third vertical tube inner wall at lower end, and sliding sleeve is set on the 4th vertical pivot, and two struts are fixed respectively
Two sides inside third vertical tube lower end are installed, one end of strut is fixedly connected with third vertical tube inner wall, the other end and cunning of strut
It is fixedly connected by second spring between the lower end of set, the 9th gear is fixedly mounted on the lower end of the 4th vertical pivot, the 9th gear
Cooperation is engaged with eighth gear, third helical blade is fixedly mounted on the upper end of the 4th vertical pivot.
A kind of indoor and outdoor decoration device as described above, the rear end front and rear sides of the third transverse slat are fixedly mounted second
Electric telescopic rod installs lower compression roller between the rear end of the motion bar of two second electric telescopic rods.
A kind of indoor and outdoor decoration device as described above, third is fixedly mounted in the rear end front and rear sides of second transverse slat
Electric telescopic rod installs pressure roller between the rear end of the motion bar of two second electric telescopic rods.
A kind of indoor and outdoor decoration device as described above, the downside installation finishing board and finishing roller of the lower compression roller.
The utility model has the advantages that: the utility model is suitable for the wall plastering process during indoor and outdoor decoration, can
To be automatically performed the modulation and plastering of mortar, the modulation of mortar carries out simultaneously with plastering process, and the mortar for modulating completion can be with horse
On be applied on metope, mortar with it is how many adjust how much, can be to avoid the waste of mortar, and the modulation of the utility model mortar
Speed is directly proportional to speed is smeared, and structure is simple and ingenious, and the high-efficient automatic for realizing plastering process carries out.The utility model
In two screw rods upper and lower ends by scaffold carry out position fixation, the length of screw rod can be according to required smearing
The height of metope replaced, using the raw materials such as cement powder required for modulation mortar are put into first before the utility model
Into hopper, then motor works, and motor drives the first vertical axis, and the first vertical pivot, which is engaged by two gears with first gear, matches
Crossed belt moves the rotation of the second number axis, and the second number axis engages cooperation with the 4th gear by third gear and drives vertical tube rotation, and vertical tube is logical
It crosses the 7th gear and engages cooperation drive third vertical axis with eighth gear, third number axis is by driving the rotation of the second helical blade
Raw material in hopper can be transported in staving by the second vertical tube, automatic water inflow device is filled the water into staving at this time, due to
Transmission ratio between transmission ratio between two gears and first gear and third gear and the 4th gear is different, so the first vertical pivot
It is different from the revolving speed of vertical tube, it can be matched by the second bevel gear with the engagement of corresponding first bevel gear by first vertical pivot of design
Crossed belt moves horizontal axis rotation, and horizontal axis drives stirring sheet to rotate around it, and the raw material into staving is mixed with water through horizontal axis and stirring sheet
Stirring under can quickly be modulated into mortar, mortar slowly moves down during being stirred with the first helical blade of rotation,
The mortar moved down is pressed into transverse tube by slurry outlet and hose, and the mortar into transverse tube can be uniformly from multiple leak holes
Outflow, the mortar of outflow uniformly drop on plastering plate, and mortar is flowed down along plastering plate, by adjusting the first electric telescopic rod
Length adjustment good the distance between plastering plate and metope, the first vertical pivot passes through drive sprocket, driven sprocket and transmission at the same time
The cooperation of chain can drive two inner thread sleeves while rotate, and not be able to rotate since two screw rods are fixed, in screw thread
Cooperate lower two inner thread sleeves that can push the first transverse slat, the second transverse slat, third transverse slat and the part being installed on it edge simultaneously
Screw rod moves up, and plastering plate moves up therewith can uniformly be applied to the mortar continuously outflowed on metope;It is same with this
Shi Shuguan can be driven by the cooperation of elliptical ring, riser, traverse rod, sliding block, the first electric telescopic rod, link block and the first spring
Transverse tube does small distance reciprocating movement along its length, and plastering plate moves, and the reciprocating movement of left and right directions small distance is conducive to
Mortar more smoothly slides from plastering plate, can help plastering plate is more uniform mortar is applied on wall, passes through this
The automatic operating of wall plastering may be implemented in utility model, due to the screw rod in the utility model length there is no limit and can
With replacement, the utility model is mounted on exterior walls of buildings, after replacing the longer screw rod of length, it is only necessary to constantly into hopper
The lighter dry material of additional mass, the utility model can complete the automatic painting dauber of the exterior wall mortar in higher building
Make, smearing height is higher, is that traditional mortar smearing equipment cannot accomplish.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment
Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is
Some embodiments of the utility model, for those of ordinary skill in the art, in the premise of not making the creative labor property
Under, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the structural schematic diagram of the utility model;Fig. 2 is the left view of Fig. 1;Fig. 3 is I partial enlargement of Fig. 1
Figure;Enlarged drawing of the Fig. 4 along the cross-sectional view of the line A-A of Fig. 1;Fig. 5 is II partial enlarged view of Fig. 1;Fig. 6 is III of Fig. 1
Partial enlarged view;Fig. 7 is IV partial enlarged view of Fig. 2.
Specific embodiment
It is practical new below in conjunction with this to keep the objectives, technical solutions, and advantages of the embodiments of the present invention clearer
Attached drawing in type embodiment, the technical scheme in the utility model embodiment is clearly and completely described, it is clear that is retouched
The embodiment stated is the utility model a part of the embodiment, instead of all the embodiments.Based on the implementation in the utility model
Example, every other embodiment obtained by those of ordinary skill in the art without making creative efforts belong to
The range of the utility model protection.
A kind of indoor and outdoor decoration device opens up circular hole 2 among first transverse slat, 1 top surface as shown, including the first transverse slat 1, circle
It is fixedly mounted vertical staving 3 in hole 2,3 upper end opening of staving opens up first through hole 4 among 3 bottom surface of staving, in first through hole 4
The first vertical tube 5 is installed by sealing bearing, the upper end of the first vertical tube 5 is equipped with the second transverse slat 6, and the lower end of the first vertical tube 5 is equipped with the
Three transverse slats 7 are fixedly connected between second transverse slat 6 and third transverse slat 7 and the first transverse slat 1 by side plate, the upper end of the first vertical tube 5 with
Second transverse slat, 6 bottom surface bearing is flexibly connected, and is equipped with the first vertical pivot 8, the upper end of the first vertical pivot 8 and the first vertical tube 5 in the first vertical tube 5
Upper end between be flexibly connected by bearing, open up the second through-hole 9 among 7 top surface of third transverse slat, the lower end of the first vertical pivot 8 passes through
It is located at the lower part of third transverse slat 7,9 bearing active link of the first vertical pivot 8 and the second through-hole, 7 top of third transverse slat after second through-hole 9
The side of second through-hole 9 is equipped with the second vertical pivot 10, the lower end of the second vertical pivot 10 and 7 top bearing active link of third transverse slat, the
It is fixed on two vertical pivots 10 to be set with first gear 11, fixed suit second gear 12, second gear 12 and the first tooth on the first vertical pivot 8
11 engagement cooperation of wheel, the fixed suit third gear 13 in the upper end of the second vertical pivot 10, lower end the 4th tooth of fixed suit of the first vertical tube 5
Wheel 14, third gear 13 engage cooperation with the 4th gear 14, and vertical motor 15 is fixedly mounted in 7 bottom of third transverse slat, and first is perpendicular
The lower end of axis 8 the 5th gear 16 of fixed suit, the 6th gear 17 of fixed suit on the output shaft of motor 15, the 6th gear 17 and the
The engagement cooperation of five gears 16, the first vertical tube 5 are located at the portion perimeter in staving 3 equipped with the first helical blade 18, the first helical-blade
Piece 18 is structure as a whole with the first vertical tube 5, and 5 side of the first vertical tube opens up multiple equally distributed third through-holes 19, third through-hole
Horizontal axis 20 is installed by sealing bearing activity in 19, the first bevel gear 21, the first vertical pivot 8 is fixedly mounted in the inner end of horizontal axis 20
The position of upper the first bevel gear of correspondence 21 is fixedly mounted the second bevel gear 22, the second bevel gear 22 and corresponding first bevel gear
Several equally distributed stirring sheets 23 are fixedly mounted in 21 engagement cooperations, the outer end periphery of horizontal axis 20, and 6 bottom surface first of the second transverse slat is perpendicular
The side of pipe 5 opens up fourth hole 24, the second vertical tube 25 of regulation installation in fourth hole 24, is fixedly mounted at the top of the second transverse slat 6
Hopper 26,26 bottom of hopper open up discharge hole 27, and the upper end of the second vertical tube 25 is fixedly connected with Ei with the lower end of discharge hole 27, and second
Third vertical pivot 28, the upper end bearing holder (housing, cover) encapsulation ring 29 of third vertical pivot 28,26 top of 29 side of lantern ring and hopper are equipped in vertical tube 25
Between be fixedly connected by connection frame 30, the 7th gear 31 is fixedly mounted in the lower end of third vertical pivot 28, and the upper end of the first vertical tube 5 is solid
Dingan County fills eighth gear 32, and the 7th gear 31 engages cooperation with eighth gear 32, and third vertical pivot 28 is located in the second vertical tube 25
The second helical blade 50 is fixedly mounted in portion perimeter, and the second helical blade 50 is structure as a whole with third vertical pivot 28, the first transverse slat 1
Two sides of the bottom are symmetrically fixedly mounted traverse rod 33, and 33 bottom of traverse rod is coupled sliding block 34, and 34 bottom of sliding block is equipped with slanting the
One electric telescopic rod 35 is equipped with transverse tube 36,36 top of transverse tube and the first electric telescopic rod at the lower end of first electric telescopic rod 35
35 motion bar lower end is fixedly connected, and transverse tube 36 is located at the rear end lower of the first transverse slat 1, and 33 right end lower part of traverse rod, which is fixedly mounted, to be connected
Block 37 is connect, is fixedly connected by the first spring 58 between sliding block 34 and corresponding link block 37, corresponds to transverse tube on the first vertical tube 5
The fixed suit elliptical ring 38 in the position of 36 height, 36 front side middle of transverse tube are fixedly mounted riser 39,38 outer ring of elliptical ring with
Riser 39 is engaged close to the side of the first vertical tube 5, and 3 lower end surface two sides of staving open up slurry outlet 40,40 lower end of slurry outlet
It is fixedly connected, is connected to inside the lower end of hose 41 and transverse tube 36, the bottom of transverse tube 36 by hose 41 between 36 top of transverse tube
Slanting plastering plate 42 is fixedly mounted in portion, and 36 bottom of transverse tube opens up several equally distributed leak holes 43, and leak hole 43 is located at plastering plate
Pilot sleeve 44, pilot sleeve 44 is fixedly mounted in the both ends on 42 top, the first transverse slat 1, the second transverse slat 6 and third transverse slat 7
Interior to be equipped with vertical screw rod 59, the lower end positioned at two pilot sleeves 44 of lower side is equipped with inner thread sleeve 45, inner screw sheath
The upper end of cylinder 45 is flexibly connected with corresponding 44 bottom end bearing of pilot sleeve, and inner thread sleeve 45 is matched with corresponding 59 screw thread of screw rod
It closing, drive sprocket 46 is fixedly mounted in the lower end of the first vertical pivot 8, and the lower end of inner thread sleeve 45 is fixed to be set with driven sprocket 47,
It is connected between two driven sprockets 47 and drive sprocket 46 by transmission chain 48, automatic water inflow device is set at 3 upper port of staving
49.The utility model is suitable for the wall plastering process during indoor and outdoor decoration, can be automatically performed the modulation of mortar and smear
The modulation of ash, mortar carries out simultaneously with plastering process, and the mortar for modulating completion can be applied on metope at once, and mortar is used more
How much is few tune, can be to avoid the waste of mortar, and the modulating speed of the utility model mortar is directly proportional to speed is smeared, structure
Simple and ingenious, the high-efficient automatic for realizing plastering process carries out.The upper and lower ends of two screw rods 59 in the utility model
The fixation of position is carried out by scaffold, the length of screw rod 59 can carry out more according to the height of the metope of required smearing
It changes, is put into hopper 26 using the raw materials such as cement powder required for mortar will be modulated before the utility model first, it is then electric
Machine 15 works, and motor 16 drives the rotation of the first vertical pivot 8, and the first vertical pivot 8 engages mating band with first gear 11 by two gears 12
Dynamic second number axis 10 rotation, the second number axis 10 engage cooperation with the 4th gear 14 by third gear 13 and vertical tube 5 are driven to rotate, erect
Pipe 5 engage cooperation with eighth gear 32 by the 7th gear 31 and third vertical pivot 28 is driven to rotate, and third number axis 28 passes through drive the
Raw material in hopper 26 can be transported in staving 3 by the rotation of two helical blades 50 by the second vertical tube 25, at this time automatic feeding water
Device 49 is filled the water into staving 3, due to the transmission ratio and third gear 13 and the 4th tooth between two gears 12 and first gear 11
Transmission ratio between wheel 14 is different, so the first vertical pivot 8 is different from the revolving speed of vertical tube 5, can be led to by first vertical pivot of design 8
Cross the second bevel gear 22 and corresponding first bevel gear 21 engagement cooperation drive horizontal axis 20 rotate, horizontal axis 20 drive stirring sheet 23 around
It is rotated, and the raw material into staving 3 is mixed with water by can quickly be modulated into ash under horizontal axis 20 and the stirring of stirring sheet 23
Slurry, mortar slowly moves down during being stirred with the first helical blade 18 of rotation, the mortar moved down by slurry outlet 40 with
Hose 41 is pressed into transverse tube 36, and the mortar into transverse tube 36 can uniformly be flowed out from multiple leak holes 43, the ash of outflow
Slurry uniformly drops on plastering plate 42, and mortar is flowed down along plastering plate 42, by adjusting the length tune of the first electric telescopic rod 35
The distance between whole good plastering plate 42 and metope, the first vertical pivot 8 passes through drive sprocket 46, driven sprocket 47 and transmission at the same time
The cooperation of chain 48 can drive two inner thread sleeves 45 while rotate, and not be able to rotate since two screw rods 59 are fixed,
It can push the first transverse slat 1, the second transverse slat 6, third transverse slat 7 being threadedly engaged lower two inner thread sleeves 45 and be installed on it
Part is moved up along screw rod 59 simultaneously, and plastering plate 42 moves up therewith can uniformly be applied to the mortar continuously outflowed
On metope;Vertical tube 5 passes through elliptical ring 38, riser 39, traverse rod 33, sliding block 34, the first electric telescopic rod 35, link block at the same time
37 and first the cooperation of spring 58 transverse tube 36 can be driven to do small distance reciprocating movement along its length, plastering plate 42 moves therewith
Dynamic, the reciprocating movement of left and right directions small distance is conducive to mortar and more smoothly slides from plastering plate 42, can help plastering plate 42
More uniform is applied to mortar on wall, and the automatic operating of wall plastering may be implemented by the utility model, due to
There is no limit and can replace for the length of screw rod 59 in the utility model, and the utility model is mounted on exterior walls of buildings,
After replacing the longer screw rod 59 of length, it is only necessary to the lighter dry material of additional mass, the utility model constantly into hopper 26
The automatic smearing work of the exterior wall mortar in higher building can be completed, smearing height is higher, is that traditional mortar is smeared
What equipment cannot accomplish.
Specifically, as shown, automatic water inflow device 49 described in the present embodiment is perpendicular including third vertical tube the 491, the 4th
Axis 492, third helical blade 493, annulus 494, the strut 496, two of sliding sleeve 495, two second spring 497, water inlet pipe 498,
9th gear 499, the upper end of third vertical tube 491 are fixedly connected with 6 bottom of the second transverse slat, and the side of third vertical tube 491 is close to upper
Inlet opening 51 is opened up at end, the outer end of inlet opening 51 is fixedly connected with one end of water inlet pipe 498, and the 4th vertical pivot 492 is located at third
Inside vertical tube 491, the upper end of the 4th vertical pivot 492 and 6 bottom bearing active link of the second transverse slat, annulus 494 are fixedly mounted on the
At lower end, sliding sleeve 495 is set on the 4th vertical pivot 492 three vertical tubes, 491 inner wall, and two struts 496 are fixedly mounted respectively
One end of two sides inside three vertical tubes, 491 lower end, strut 496 is fixedly connected with 491 inner wall of third vertical tube, strut 496 it is another
End is fixedly connected with second spring 497 is passed through between the lower end of sliding sleeve 495, and the 9th gear 499 is fixedly mounted on the 4th vertical pivot
492 lower end, the 9th gear 499 engage cooperation with eighth gear 32, and third helical blade 493 is fixedly mounted on the 4th vertical pivot
492 upper end.Engaging cooperation the 4th vertical pivot 492 can be driven to rotate by eighth gear 32 and the 9th gear 499, the 4th is perpendicular
Axis 492 is by driving the rotation of third helical blade 493 water in water inlet pipe 498 can be drawn into third vertical tube 491, third
Hydraulic pressure in vertical tube 491, which increases, can push sliding sleeve 495 to move down, when the upper end of sliding sleeve 495 is separated with annulus 494, water
It can flow out into from the gap between 494 inner ring of upper end and annulus of sliding sleeve 495 into staving 3, be mentioned for being made for mortar
It supplies water when the stalling of the 4th vertical pivot 492, hydraulic pressure reduces in third vertical tube 491, sliding sleeve under the action of two second spring 497
495 resets are extend into inside annulus 494, and the gap between 495 outer ring of sliding sleeve and annulus 494 is closed, and water can be blocked to continue
It is flowed out from the lower end of third vertical tube 491, the feed rate and the utility model of automatic water inflow device 49 can be made by the design
The speed of operation is directly proportional, realizes the automation that water supplies during mortar is made by cleverly Machine Design.
Specifically, as shown, the second electricity is fixedly mounted in the rear end front and rear sides of third transverse slat 7 described in the present embodiment
Telescopic rod 52 is moved, lower compression roller 53 is installed between the rear end of the motion bar of two second electric telescopic rods 52.It can by lower compression roller 53
To roll the mortar being applied on metope, the bubble in mortar is squeezed out, the length by adjusting the second electric telescopic rod 52 can be with
The distance between lower compression roller 53 and metope are adjusted, guarantees to complete to roll mortar when mortar thickness difference.
Further, as shown, third is fixedly mounted in the rear end front and rear sides of the second transverse slat 7 described in the present embodiment
Electric telescopic rod 54 installs pressure roller 55 between the rear end of the motion bar of two second electric telescopic rods 54.Work as the utility model
When moving down, third electric telescopic rod 54 extends, and can roll the mortar being applied on metope again by upper pressure roller 55, squeeze again
Remaining bubble in mortar out, and can further improve the flatness of metope.
Further, as shown, the downside installation finishing board 56 and finishing roller of lower compression roller 53 described in the present embodiment
57.The extra mortar of metope can be wiped off by finishing board 56, be then compacted the mortar on metope again by modifying roller 57, mentioned
The flatness of high metope.
Finally, it should be noted that above embodiments are only to illustrate the technical solution of the utility model, rather than its limitations;
Although the utility model is described in detail with reference to the foregoing embodiments, those skilled in the art should understand that:
It is still possible to modify the technical solutions described in the foregoing embodiments, or part of technical characteristic is carried out etc.
With replacement;And these are modified or replaceed, various embodiments of the utility model technology that it does not separate the essence of the corresponding technical solution
The spirit and scope of scheme.