CN209025322U - A kind of fibre reinforced composites linked system based on cement base cementing medium - Google Patents

A kind of fibre reinforced composites linked system based on cement base cementing medium Download PDF

Info

Publication number
CN209025322U
CN209025322U CN201821569748.3U CN201821569748U CN209025322U CN 209025322 U CN209025322 U CN 209025322U CN 201821569748 U CN201821569748 U CN 201821569748U CN 209025322 U CN209025322 U CN 209025322U
Authority
CN
China
Prior art keywords
anchor pole
grout sleeve
full grout
fibre reinforced
reinforced composites
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821569748.3U
Other languages
Chinese (zh)
Inventor
方志
方胜
单韧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUBEI PROVINCIAL COMMUNICATIONS INVESTMENT GROUP Co.,Ltd.
Hunan University
Original Assignee
Hunan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan University filed Critical Hunan University
Priority to CN201821569748.3U priority Critical patent/CN209025322U/en
Application granted granted Critical
Publication of CN209025322U publication Critical patent/CN209025322U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model provides a kind of fibre reinforced composites linked system based on cement base cementing medium, including full grout sleeve, grout hole and plasma discharge hole are equipped at the top of full grout sleeve, full grout sleeve inner wall is equipped with shear connector, it is inserted with the first anchor pole and the second anchor pole respectively in full grout sleeve, it is set with outside first anchor pole for stopping the first seal that stream of slurry goes out in full grout sleeve, it is set with outside second anchor pole for stopping the second seal that stream of slurry goes out in full grout sleeve, the first anchor pole and the second anchor pole are made of fibre reinforced composites;The utility model connects fibre reinforced composites, and safer and more reliable, efficient and easy to operate, durability is good, applicability is wide, engineering practicability is strong.

Description

A kind of fibre reinforced composites linked system based on cement base cementing medium
Technical field
The utility model relates to the interconnection techniques of fibre reinforced composites, are bonded more particularly to one kind based on cement base The fibre reinforced composites linked system of medium.
Background technique
Grout sleeve connection type original is used to solve reinforcing bar connectivity problem, and principle is that principal rod is worn from sleeve both ends open Enter sleeve inner, the strength cement-based grouting material of microdilatancy is perfused between principal rod and sleeve, the connection of principal rod can be completed.It connects The mechanism connect is to be enhanced itself and stress by the confinement effect of sleeve and the micro-expansion characteristics itself having by grouting material Positive acting power between on the inside of muscle, sleeve, the frictional force generated by the positive force and rough surface, to transmit stress.Make at present Sleeve grouting material mostly using ordinary cement slurry as cementing medium, prepare, using simplicity and with good by ordinary cement slurry Stability and durability, but its adhesion strength is lower causes anchorage length too long, and concrete castability is limited by particle size.
In order to meet modern structure to large span, towering, heavily loaded and job development under severe conditions needs, with steel Muscle is compared, and fibre reinforced composites FRP (Fiber Reinforced Polymer) is big, steady with its lightweight, high-strength, specific modulus Qualitative good, corrosion resistance and it is applied to the features such as durability is good, thermal expansion coefficient and concrete are close more and more widely each In kind engineering structure.Wherein, fibrous material includes carbon fiber, glass fibre, aramid fiber, is referred to as CFRP (Carbon Fiber Reinforced Polymer)、GFRP(Glass Fiber Reinforced Polymer)、AFRP(Aramid Fiber Reinforced Polymer).However, FRP material cannot be as reinforcing bar using welding or straight screw sleeve connection Etc. traditional mechanical connection manner, therefore it is badly in need of a kind of reliable connection type and solves its connectivity problem.
A kind of patent document " rock anchor based on Fiber Reinforced Polymer Anchors Yu ultrahigh-performance cement-based bond-anchorage medium The preparation method of system " (CN102493451B) disclose it is a kind of based on Fiber Reinforced Polymer Anchors and ultrahigh-performance cement-based The preparation method of the rock anchor system of bond-anchorage medium, the preparation method include following implementation steps: Step 1: determining anchor pole material Material and anchoring bond medium;Step 2: design anchoring system;Step 3: anchorage anchoring rod both ends;Step 4: anchor pole dispatches from the factory It examines;Step 5: rock anchor system in-site installation;Step 6: anchor pole tensioning;Step 7: sealing off and covering anchorage.Since rock anchor system of the present invention is adopted Use fiber reinforced plastic rod as anchor pole, Cement-base material with ultra-high performance as both ends cementing medium, using the group specially designed Anchor anchorage designs anchorage-tapered cap assembly in lower end with being used as ground upper end anchorage, anchor pole, has played the excellent of two kinds of high performance materials Different feature overcomes existing rock anchor system Structural Endurance Problem as caused by steel bar corrosion, injecting cement paste aging.But the device Structure is complicated, and implementation process is cumbersome, is mainly used in rock anchor system, and application range has limitation.
Utility model content
In order to solve the problems existing in the prior art, that the utility model proposes a kind of structures is simple, durability is good, safe and efficient The fibre reinforced composites linked system based on cement base cementing medium.
The utility model includes full grout sleeve, and grout hole and plasma discharge hole are equipped at the top of the full grout sleeve, described complete Grout sleeve inner wall is equipped with shear connector, is inserted with the first anchor pole and the second anchor pole, first anchor respectively in the full grout sleeve It is set with outside bar for stopping the first seal that stream of slurry goes out in full grout sleeve, is set with outside second anchor pole for hindering The second seal that stream of slurry goes out in full grout sleeve is kept off, first anchor pole and the second anchor pole are by fibre reinforced composites It is made.
Further, the depth of shear connector distance between full grout sleeve inner wall and the first anchor pole or the second anchor pole Half.
Further, the shear connector is symmetrical on full grout sleeve inner wall, and along full grout sleeve axial direction Equipped with several columns.
Further, the first seal and second seal are fixedly mounted respectively on the first anchor pole and the second anchor pole, Also have the function of limiting anchorage length.
Further, the first seal and second seal outer diameter are greater than full grout sleeve internal diameter.
Further, the axis of the full grout sleeve, the first anchor pole and the second anchor pole is overlapped.
Further, the grout hole and plasma discharge hole are respectively close to full grout sleeve both ends.
Further, there are certain gap between first anchor pole and the second anchor pole, the gap is greater than two anchor poles The larger value of diameter.
The utility model also provides a kind of fibre reinforced composites linked system implementation based on cement base cementing medium Method, comprising the following steps:
1) type and specification as the first anchor pole of connecting object and the second anchor pole determine according to actual needs;
2) raw material and proportion of slurry determine according to actual needs;
3) anchorage length according to the specification of the first anchor pole of step 1) and the second anchor pole and its in the slurry, is selected matched Full grout sleeve specification;
4) the first anchor pole and the second anchor pole are inserted into from full grout sleeve both ends respectively, by anchorage length requirement in step 3) It is fixed in full grout sleeve, and full grout sleeve is sealed respectively with first seal and second seal;
5) slurry is poured into the full grout sleeve of step 4) by grout hole, vibrate slurry, arranges to slurry from plasma discharge hole Terminate to be in the milk when out;
6) the full grout sleeve for completing grouting to step 5) conserves, and reaches desired strength to it.
Further, the full grout sleeve, the first anchor pole and the second anchor pole are horizontally mounted.
Further, the slurry is starched as made from Reactive Powder Concrete or high-densit ultra-fine grain material and swelling agent Material siccative is made by adding water and stirring.
Further, the design length of full grout sleeve is determined also according to the different type of slurry.
Reactive Powder Concrete RPC (Reactive Powder Concrete) system is based on maximum closely knit in the utility model A kind of ultra-high performance concrete that topology degree is prepared, principle are by improving the fineness of its component and activity, reducing internal lack It falls into, to obtain the maximum load capacity and excellent durability that are determined by its component material.Compared with normal concrete, RPC is not Containing coarse aggregate (raw material average grain diameter is at 0.1 μm between 1.0mm), in addition, the addition of steel fibre, ultra-fine grain silicon ash and stone The use of English powder, so that its compression strength (100-180MPa can reach higher containing steel fibre) with superelevation and higher anti- Thus tensile strength, good toughness, excellent durability, RPC are also considered as cement-based material of new generation, related RPC material National standard " Reactive Powder Concrete " (GB/T 31387-2015) has been issued and implemented.
High-densit ultra-fine grain material DSP (Densified Small Particles) uses original in the utility model Reason is (1- to be differed between two kinds of particles using the gap between ultra-fine grain (such as silicon ash) filling bulky grain (such as cement granules) 2 orders of magnitude), the voidage of material is greatly reduced, to reach closestpacking state.It is in the milk compared to common cement-base Material has many advantages, such as that low water binder ratio, intensity are high, durability is good, stability is good, and has preferable workability.
The utility model compared with the existing technology, the advantage is that:
1, the utility model is used with lightweight, high-strength, specific modulus is big, stability is good, corrosion resistance and durability are good, hot The fibre reinforced composites for the features such as coefficient of expansion and concrete are close can satisfy large span, towering, heavily loaded and disliking The needs of development under the conditions of bad;Use the Cement-base material with ultra-high performance-of actual application prospect great in civil engineering Reactive Powder Concrete or the equal cloth material of high-densit ultra-fine grain make material internal by improving the fineness and activity of component Defect is preferably minimized, and can get the maximum load capacity and excellent durability determined by its component material, has intensity high, tough Property big and good durability distinguishing feature.Fibre reinforced composites and Reactive Powder Concrete or high-densit ultra-fine grain is equal Cloth material in conjunction with and form advanced fiber reinforced composites connection structure and have advantage functions reliably and efficiently, applicability is wide, work Journey is practical.
2, the utility model integrated fiber enhances the characteristics of composite material and Cement-base material with ultra-high performance, redesigns fine Dimension enhancing composite material linked system, including full grout sleeve, full grout sleeve top is equipped with grout hole and plasma discharge hole, complete to be in the milk Sleeve lining is equipped with shear connector, is inserted with the first anchor pole and the second anchor pole in full grout sleeve respectively, use is set with outside the first anchor pole In stopping the first seal that stream of slurry goes out in full grout sleeve, it is set with outside the second anchor pole for stopping full grout sleeve entoplasm The second seal that stream goes out, the first anchor pole and the second anchor pole are made of fibre reinforced composites, which overcomes fibre It cannot lacking using traditional mechanical connection manner such as welding or straight screw sleeve connection in dimension enhancing composite material connection procedure Point, and structure is simple, it is convenient to operate;Cooperate Cement-base material with ultra-high performance as cementing medium, obtain higher adhesion strength, The anchorage length of the first anchor pole and the second anchor pole is reduced, and then reduces the design length of sleeve, full grout sleeve can be direct Select the various model sleeves on existing market, without being specifically designed, save the cost.
3, the utility model is using fibre reinforced composites as the first anchor pole and the second anchor pole, ultrahigh-performance cement-based The cementing medium of material-Reactive Powder Concrete or the equal cloth material of high-densit ultra-fine grain as sleeve, so that the utility model Connect that safer and more reliable, efficient while easy to operate, durability is good, applicability is wide, engineering practicability is strong;Sleeve connection is set Setting sealing element has the function of sealing and fastening positioning, be conducive to the utility model connection procedure connecting object to just, simultaneously It is equipped with shear connector in full grout sleeve, when the shearing that linked system is subject to is excessive, shear connector can guarantee slurry and full grouting Sleeve will not occur to slide greatly, guarantee stability, and be able to carry out fracture, elimination shearing, and then protect its of the utility model His component, extends the service life of the utility model.
Detailed description of the invention
It, below will be to needed in embodiment description in order to illustrate more clearly of the technical solution of the utility model Attached drawing is briefly described, it should be apparent that, be described below in the attached drawing of related the utility model be only the utility model Some embodiments for those of ordinary skill in the art without creative efforts, can also basis These attached drawings obtain other attached drawings.
FIG. 1 is a schematic structural view of the utility model.
1 full grout sleeve in the figure, 2 grout holes, 3 plasma discharge holes, 4 shear connectors, 5 first anchor poles, 6 second anchor poles, 7 slurries, 8 first seals, 9 second seals.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Detailed description, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole implementation Example.Based on the embodiments of the present invention, those of ordinary skill in the art institute without making creative work The every other embodiment obtained, fall within the protection scope of the utility model.
As shown in Figure 1, the utility model includes full grout sleeve 1,2 He of grout hole is equipped at the top of the full grout sleeve 1 Plasma discharge hole 3, complete 1 inner wall of grout sleeve are equipped with shear connector 4, are inserted with the first anchor pole 5 and the in the full grout sleeve 1 respectively Two anchor poles 6, first anchor pole 5 is set with outside for stopping the first seal 8 that slurry 7 flows out in full grout sleeve 1, described It is set with outside second anchor pole 6 for stopping the second seal 9 that slurry 7 flows out in full grout sleeve 1,5 He of the first anchor pole Second anchor pole 6 is made of fibre reinforced composites.
The utility model is used with lightweight, high-strength, specific modulus is big, stability is good, corrosion resistance and durability are good, heat is swollen The fibre reinforced composites for the features such as swollen coefficient and concrete are close can satisfy large span, towering, heavily loaded and severe Under the conditions of development needs;First anchor pole 5 and the second anchor pole 6 are made of fibre reinforced composites, the utility model Overcoming cannot be using traditional mechanical connection such as welding or straight screw sleeve connection in fibre reinforced composites connection procedure The shortcomings that mode, and structure is simple, it is convenient to operate;Full grout sleeve 1 can directly select the various model sets on existing market Cylinder, without being specifically designed, save the cost;Sleeve connection setting sealing element has the function of sealing and fastening positioning, it is therefore prevented that slurry The leakage of material 7, be conducive to the utility model connection procedure connecting object is equipped with shear connector to just, while in full grout sleeve 1 4, when the shearing that the utility model is subject to is excessive, shear connector 4 can guarantee that big cunning will not occur for slurry 7 and full grout sleeve 1 It moves, guarantees stability, and be able to carry out fracture, eliminate shearing, and then protect the other component of the utility model, it is practical to extend this Novel service life.
The depth of the shear connector 4 between complete 1 inner wall of grout sleeve and the first anchor pole 5 or the second anchor pole 6 distance one Half, the depth for being equivalent to shear connector 4 takes the half of headroom in full grout sleeve 1, shear connector 4 and the first anchor pole 5 or the second anchor pole 6 Between have gap, be conducive to flowing of the slurry 7 in full grout sleeve 1, facilitate slurry 7 to filling out inside full grout sleeve 1 It fills, not will cause and fill incomplete situation generation, reduce internal flaw, keep the stability and safety of the utility model Property.
The shear connector 4 is symmetrical on complete 1 inner wall of grout sleeve, and if being equipped with along complete 1 axial direction of grout sleeve Dry column, multiple shear connectors 4, which are arranged, can guarantee that slurry 7 will not occur to slide greatly with full grout sleeve 1, guarantee stability, and have Conducive to the effect shearing for eliminating each position, enhances protecting effect, improve the durability of the utility model.
The first seal 8 and 9 outer diameter of second seal are greater than complete 1 internal diameter of grout sleeve, facilitate 8 He of first seal Sealing of the second seal 9 to full grout sleeve 1 can be simultaneously reached restriction and state the first anchor pole 5 and the anchoring of the second anchor pole 6 is long The effect of degree.
The first seal 8 and second seal 9 are fixedly mounted respectively on the first anchor pole 5 and the second anchor pole 6, are also had The effect for limiting anchorage length, is conducive to the positioning of the first anchor pole 5 and the second anchor pole 6.
The axis of the full grout sleeve 1, the first anchor pole 5 and the second anchor pole 6 is overlapped, and is equivalent to full grout sleeve 1, first The center of circle of the cross section of anchor pole 5 and the second anchor pole 6 is located along the same line, and maintains pair between the utility model connecting object Plus effect keeps the utility model more stable, and durability is more preferable.
The grout hole 2 and plasma discharge hole 3 ensure that slurry 7 in filling process respectively close to complete 1 both ends of grout sleeve Density reduces internal flaw.
There are certain gap between first anchor pole 5 and the second anchor pole 6, gap should be greater than the larger of two bolt diameters Value, i.e. gap are greater than the maximum value of the diameter of the first anchor pole 5 or the second anchor pole 6, are conducive to slurry 7 in full grout sleeve 1 Filling enhances the active force that slurry 7 suffered by the first anchor pole 5 and the second anchor pole 6 generates, makes the safer stabilization of the utility model.
The diameter of first anchor pole 5 and the second anchor pole 6 may be the same or different, and be conducive to select appropriate size The first anchor pole 5 and the second anchor pole 6, expand the scope of application, choose the anchor pole of suitable specification, saved cost.
The utility model also provides a kind of fibre reinforced composites linked system implementation based on cement base cementing medium Method, comprising the following steps:
1) type and specification as the first anchor pole 5 of connecting object and the second anchor pole 6 determine according to actual needs;
2) raw material and proportion of slurry 7 determine according to actual needs;
3) matched according to the specification and its anchorage length in slurry 7, selection of step 1) the first anchor pole 5 and the second anchor pole 6 1 specification of full grout sleeve of set;
4) the first anchor pole 5 and the second anchor pole 6 are inserted into from complete 1 both ends of grout sleeve respectively, by anchorage length in step 3) It is required that be fixed in full grout sleeve 1, and with first seal 8 and second seal 9 full grout sleeve 1 is carried out respectively close Envelope;
5) slurry 7 is poured into the full grout sleeve 1 of step 4) by grout hole 2, vibrate slurry 7, to slurry 7 from plasma discharge Hole 3 terminates to be in the milk when being discharged;
6) the full grout sleeve 1 for completing grouting to step 5) conserves, and reaches desired strength to it.
The full grout sleeve 1, the first anchor pole 5 and the second anchor pole 6 are horizontally mounted, and are conducive to slurry 7 to full grouting set Cylinder 1 grouting treatment, avoid grouting it is non-uniform happen, reduce the internal flaw of the utility model.
The slurry 7 slurry siccative as made from Reactive Powder Concrete or high-densit ultra-fine grain material and swelling agent leads to It crosses to add water and stir and be made.
The utility model uses Cement-base material with ultra-high performance-activity powder of the great actual application prospect in civil engineering Last concrete or the equal cloth material of high-densit ultra-fine grain drop the defect of material internal by improving the fineness and activity of component To most bottom, can get the maximum load capacity and excellent durability determined by its component material, have that intensity is high, toughness is big and The good distinguishing feature of durability;Using fibre reinforced composites as the first anchor pole 5 and the second anchor pole 6, cooperate very-high performance The cementing medium of cement-based material-Reactive Powder Concrete or the equal cloth material of high-densit ultra-fine grain as sleeve connection, so that The utility model is safer and more reliable, efficient, at the same it is easy to operate, durability is good, applicability is wide, engineering practicability is strong
The design length of full grout sleeve 1 determines that the utility model selects very-high performance also according to the different type of slurry 7 The cementing medium of cement-based material-Reactive Powder Concrete or the equal cloth material of high-densit ultra-fine grain as sleeve connection, can be with Anchorage length is reduced, and then reduces sleeve design length, save the cost.
Basic principles, main features, and advantages of the present invention has been shown and described above.Current row The technical staff of industry is described in above embodiments and description it should be appreciated that the present utility model is not limited to the above embodiments Only illustrate the principles of the present invention, the utility model can also on the premise of not departing from the spirit and scope of the utility model There are various changes and modifications, these various changes and improvements fall within the scope of the claimed invention.The utility model is wanted Protection scope is asked to be defined by appended claims and its equivalent.

Claims (8)

1. a kind of fibre reinforced composites linked system based on cement base cementing medium, which is characterized in that including being in the milk entirely Sleeve (1), full grout sleeve (1) top are equipped with grout hole (2) and plasma discharge hole (3), and full grout sleeve (1) inner wall is set Have shear connector (4), is inserted with the first anchor pole (5) and the second anchor pole (6), first anchor pole respectively in the full grout sleeve (1) (5) first seal (8) for stopping full grout sleeve (1) interior slurry (7) to flow out, second anchor pole (6) are set with outside It is set with the second seal (9) for stopping full grout sleeve (1) interior slurry (7) to flow out, first anchor pole (5) and the outside Two anchor poles (6) are made of fibre reinforced composites.
2. as described in claim 1 based on the fibre reinforced composites linked system of cement base cementing medium, feature exists In the length of the shear connector (4) is equal to the outer diameter that full grout sleeve (1) internal diameter subtracts the first anchor pole (5) or the second anchor pole (6) Half.
3. as described in claim 1 based on the fibre reinforced composites linked system of cement base cementing medium, feature exists In the shear connector (4) is symmetrical on full grout sleeve (1) inner wall, and along full grout sleeve (1) if axial direction is equipped with Dry column.
4. as described in claim 1 based on the fibre reinforced composites linked system of cement base cementing medium, feature exists In the first seal (8) and second seal (9) outer diameter are greater than full grout sleeve (1) internal diameter.
5. as described in claim 1 based on the fibre reinforced composites linked system of cement base cementing medium, feature exists In the first seal (8) and second seal (9) are respectively and fixedly installed on the first anchor pole (5) and the second anchor pole (6).
6. as described in claim 1 based on the fibre reinforced composites linked system of cement base cementing medium, feature exists In the axis of the full grout sleeve (1), the first anchor pole (5) and the second anchor pole (6) is overlapped.
7. as described in claim 1 based on the fibre reinforced composites linked system of cement base cementing medium, feature exists In the grout hole (2) and plasma discharge hole (3) are respectively close to full grout sleeve (1) both ends.
8. as described in claim 1 based on the fibre reinforced composites linked system of cement base cementing medium, feature exists In there are gap between first anchor pole (5) and the second anchor pole (6), the gap is greater than the larger value of two bolt diameters.
CN201821569748.3U 2018-09-26 2018-09-26 A kind of fibre reinforced composites linked system based on cement base cementing medium Active CN209025322U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821569748.3U CN209025322U (en) 2018-09-26 2018-09-26 A kind of fibre reinforced composites linked system based on cement base cementing medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821569748.3U CN209025322U (en) 2018-09-26 2018-09-26 A kind of fibre reinforced composites linked system based on cement base cementing medium

Publications (1)

Publication Number Publication Date
CN209025322U true CN209025322U (en) 2019-06-25

Family

ID=66904250

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821569748.3U Active CN209025322U (en) 2018-09-26 2018-09-26 A kind of fibre reinforced composites linked system based on cement base cementing medium

Country Status (1)

Country Link
CN (1) CN209025322U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110656733A (en) * 2019-10-09 2020-01-07 上海建工二建集团有限公司 Pre-grouting type full-grouting sleeve structure and construction method
CN111608708A (en) * 2020-04-21 2020-09-01 中交四公局第一工程有限公司 Device for expanding, digging and pre-reinforcing lateral surrounding rock of tunnel
CN113982664A (en) * 2021-10-26 2022-01-28 中冶沈勘工程技术有限公司 Bonding type fiber anchor rod connecting sleeve and fiber anchor rod connecting method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110656733A (en) * 2019-10-09 2020-01-07 上海建工二建集团有限公司 Pre-grouting type full-grouting sleeve structure and construction method
CN111608708A (en) * 2020-04-21 2020-09-01 中交四公局第一工程有限公司 Device for expanding, digging and pre-reinforcing lateral surrounding rock of tunnel
CN113982664A (en) * 2021-10-26 2022-01-28 中冶沈勘工程技术有限公司 Bonding type fiber anchor rod connecting sleeve and fiber anchor rod connecting method
CN113982664B (en) * 2021-10-26 2024-04-09 中冶沈勘工程技术有限公司 Bonding type fiber anchor rod connecting sleeve and fiber anchor rod connecting method

Similar Documents

Publication Publication Date Title
CN109057170A (en) A kind of fibre reinforced composites linked system and implementation method based on cement base cementing medium
CN209025322U (en) A kind of fibre reinforced composites linked system based on cement base cementing medium
CN106699077B (en) A kind of assembled architecture bar connecting sleeve grouting material
CN104514572A (en) Rod body connecting device, anchor rod and manufacturing method thereof
CN110156397A (en) A kind of high-strength and high ductility Self-leveling lightweight aggregate concrete and its preparation method
CN206512588U (en) A kind of T-shaped steel tube confinement reinforced concrete bridge pier beam-column connection of assembled
CN108547291A (en) A kind of herring-bone form basalt fibre anchor system and its anchoring process
CN102493451B (en) Preparation method of rock bolt system based on fiber reinforced plastic bolt and ultrahigh-performance cement-based bonding and anchoring medium
CN208857720U (en) A kind of prestressing force metal composite muscle reinforcement bridge structure
CN110467391A (en) Bridge connecting sewing concrete special powder, its preparation and construction method
CN207228402U (en) The reinforced concrete shear wall of built-in prestress steel diagonal brace
CN113958344B (en) High-strength heat-insulation support structure for deep well high-temperature roadway and construction method
CN104829186A (en) Preparation method of heat-repairing concrete containing asphalt aggregate
CN105350641B (en) Suitable for the framework column connected node and its construction technology of prefabrication and assembly construction building
CN110485276A (en) A kind of combined anti-seismic pier stud and its without templating construction method
CN103044010B (en) Anti-permeability and anti-freezing-thawing composite wearproof lining material and preparation method
CN103073244A (en) Bamboo fiber concrete and preparation method thereof
CN103360005A (en) Sprayed concrete
CN105672312B (en) Using the cabin formula anchor and construction method of fibre reinforced composites
CN112608122B (en) Micro-expansive epoxy emulsion modified self-compacting concrete for composite lining structure
CN103774791A (en) FRP bar connection device, connection method and anchor rod
CN201459931U (en) Fiber grouting sleeve connecting joint
CN114538865B (en) Anti-seepage leak-stopping material and preparation method thereof
CN207829927U (en) A kind of block assembly formula allows pressure hollow grouting anchor
CN109723079A (en) A kind of prefabricated wind power foundation of ultra-high performance concrete

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Fang Zhi

Inventor after: Pei Bingzhi

Inventor after: Fang Sheng

Inventor after: Shan Ren

Inventor before: Fang Zhi

Inventor before: Fang Sheng

Inventor before: Shan Ren

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210128

Address after: Yuelu District City, Hunan province 410082 Changsha Lushan Road No. 1 Hunan University

Patentee after: HUNAN University

Patentee after: HUBEI PROVINCIAL COMMUNICATIONS INVESTMENT GROUP Co.,Ltd.

Address before: Yuelu District City, Hunan province 410082 Changsha Lushan Road No. 1 Hunan University