CN209025070U - A kind of long prefabricated tubular pile of major diameter that classification promotes - Google Patents

A kind of long prefabricated tubular pile of major diameter that classification promotes Download PDF

Info

Publication number
CN209025070U
CN209025070U CN201821759096.XU CN201821759096U CN209025070U CN 209025070 U CN209025070 U CN 209025070U CN 201821759096 U CN201821759096 U CN 201821759096U CN 209025070 U CN209025070 U CN 209025070U
Authority
CN
China
Prior art keywords
pile
pile body
prefabricated tubular
sleeve
push rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201821759096.XU
Other languages
Chinese (zh)
Inventor
聂如松
冷伍明
杨奇
董俊利
魏广帅
徐方
赵春彦
程龙虎
杜市委
陈郗西
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central South University
Original Assignee
Central South University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central South University filed Critical Central South University
Priority to CN201821759096.XU priority Critical patent/CN209025070U/en
Application granted granted Critical
Publication of CN209025070U publication Critical patent/CN209025070U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model provides a kind of long prefabricated tubular pile of major diameter that classification promotes, including pile body and pile top setting up and down, the pile body includes the hollow pile body of more piece equal length, sleeve is set between pile top and pile body and adjacent pile body, the lower end of the sleeve is fixedly connected and is respectively saved in the movable insertion sleeve in lower end of pile body, and supporting point of the internal cavities platform as sinking thrust is arranged between adjacent pile body;Pile top and each section pile body are successively sunk in soil, it realizes the classification of prefabricated tubular pile is promoted using push rod and the shoulder that push rod lower end is arranged in, reach after predetermined depth in the cavity of prefabricated tubular pile casting concrete to complete the embedded work of entire prefabricated tubular pile.The utility model separates the end resistance that pile top is born with the pile side resistance that pile body is born, the larger pile side resistance that also entire pile body is born is divided into the lesser pile side resistance of multistage, limitation of the existing equipment in terms of prefabricated tubular pile construction depth is efficiently solved, to realize maximally utilizing for equipment.

Description

A kind of long prefabricated tubular pile of major diameter that classification promotes
Technical field
The utility model relates to prefabricated tubular pile technical field of construction, and in particular, to a kind of major diameter that classification promotes is long Prefabricated tubular pile.
Background technique
Now with the development of society, more and more fields need to construct using pile foundation, are such as used as earth-retaining branch Protection structure;As the ruggedized construction in the liquable soil layer in earthquake resistance and prevention area;As high-story house, high-rise structures and big ton The indispensable structure of the heavy single-storey factory building of position heavy duty crane;The building larger or more important as load on soft foundation The foundation structure of object.Be using the advantages of pile foundation: bearing capacity is higher, stability is good, biggish horizontal loading can be born and It is more uniform with lesser settling amount, bulk settling.
Existing pile foundation can be divided into prefabricated pile and bored concrete pile according to pile making method, wherein the existing pile of prefabricated pile Method mainly includes static pressure method, hammering method, implantation, middle pick method and vibratory drilling method.Static pressure method is the weight using Static pressure pile driver itself Prefabricated pile is pressed into underground by power effect, and noiseless generates during entire piling, but the equipment needed is more heavy, is not easy to move It is dynamic;Hammering method mainly carries out hammering repeatedly to stake top to prefabricated pile be sunk to, piling efficiency using diesel hammer or hydraulic hammer Height, but vibration is obvious in the construction process, noise is larger, while meeting disturbed strata is to influence environment;Implantation is answered in foreign countries With more, drill in the earth formation the simultaneously grout injection in hole by drilling machine, it finally again will be in whole implant holes of prefabricated pile;Vibration Dynamic method reduces the resistance between stake soil by the continuous vibration of vibration hammer, finally reaches the mesh of pile sinking under gravity 's.
However as the increase of skyscraper, static pressure method, hammering method, implantation and vibratory drilling method are no longer desirable for having The engineering construction of the prefabricated pile of major diameter (stake outer diameter >=800mm) and long length (stake long >=10m) feature, and middle pick is owned by France in non- Squeezing Soil Pile, work progress more environmental protection and the construction suitable for the hollow preformed pile to major diameter, therefore often adopted in engineering at present It is constructed with middle pick method to such prefabricated pile.But there is also the deficiencies of following aspect for middle pick method: since prefabricated pile is integrated Molding structure and volume be big, weight weight, and the construction system being related in pile driving process is numerous and jumbled, device therefor and consuming are constructed into This height, efficiency are lower, and the bearing capacity at end is reduced after pile, therefore the specification of applicable prefabricated pile is greatly limited System.
In conclusion the construction method of the prefabricated tubular pile long to length, diameter is big and device is needed to improve in industry, Under the premise of guaranteeing prefabricated quality of pile, the utilization rate of existing construction equipment is improved as far as possible and expands application range, to drop Low difficulty of construction.
Utility model content
Existing construction limitation can be broken through the purpose of this utility model is to provide one kind and meets long length large diameter pile foundation It is required that prefabricated tubular pile, to solve the problems, such as to propose in background technique.
To achieve the above object, the utility model provides a kind of long prefabricated tubular pile of major diameter that classification promotes, including upper The pile body and pile top of lower setting, the pile body is hollow structure and the pile body including more piece equal length, in the pile top and stake Sleeve is set between adjacent two pile body in body and pile body, and the lower end of the sleeve is using under the mode that is fixedly connected and each section pile body It holds in the movable insertion sleeve, supporting point of the internal cavities platform as sinking thrust is set between adjacent pile body;Pass through Push rod and the shoulder that the push rod lower end is arranged in realize that the classification to prefabricated tubular pile promotes, past after arrival predetermined depth Casting concrete is in the cavity of prefabricated tubular pile to complete the embedded work of entire prefabricated tubular pile.
In order to cooperate the classification to prefabricated tubular pile to promote, the push rod also uses subsection connecting structure, can be according to prefabricated pipe The real time length of stake is attached and dismantles, convenient for applying sinking thrust.When the push rod moves up and down inside pile body, institute It is in closed state to state shoulder, when the push rod is promoted to loading position, the shoulder in unfolded state and with it is perpendicular Histogram gives segmentation one downward thrust of pile body to an angle, by the interaction of shoulder and cavity platform.
Preferably, the cavity diameter of the pile body is from top to bottom to be gradually increased, and can be connected in the cavity of adjacent two pile body Place directly forms cavity platform.
Preferably, the cavity of the pile body is divided into first part, second part and third according to diameter change from top to bottom Part, wherein the inner and outer diameter difference of first part's highest point is 2a, and the inner and outer diameter difference of second part is fixed value 2b, third The inner and outer diameter difference of part lowest part matches for the size of 2c, the size of a, b, c and the pile body of actual use and push rod. It is highly preferred that the difference between a and c is 10~15cm.
Preferably, the pile top is the enclosed construction of cone.
Preferably, the internal diameter of the sleeve is greater than 0.5~2.0cm of outer diameter of the pile body.
Since sleeve will also sink to underground, excessive in order not to cause penetration resistance to increase, the outer diameter of the sleeve cannot mistake Greatly;The internal diameter of the sleeve can not be excessive, and otherwise the excessive effect for not having a section pile body on limit value instead in gap, is easy to lead Pile body lower end is caused phenomenon of press-offing occur;The internal diameter of the sleeve can not be too small, otherwise the too small insertion for being not easy to pile body in gap And installation.
Equally, the height of the sleeve should be arranged to match with the length of single-unit pile body, it is excessively high, it increases every Sinking power when the secondary progress pile sinking to merogenesis pile body, too low, the number of operations for causing classification to promote greatly increases, and process is numerous It is trivial and required construction requirement is not achieved.
The construction method of above-mentioned prefabricated tubular pile are as follows: the pile top of prefabricated tubular pile is sunk in soil using sinking apparatus, it will be prefabricated The pile body of tubular pole splits into the hollow pile body of more piece, realizes adjacent two pile body in the pile top and pile body and pile body by sleeve Between free-standing connection, are carried out by classification and is promoted so that prefabricated pipe for the pile top and each section pile body from the bottom to top using push rod Stake is gradually sunk, and continuous with prefabricated tubular pile sinks to increasing the pile body joint number of connection, when prefabricated tubular pile reaches the depth of construction After it is required that, the push rod and casting concrete are recycled to fill the gap between pile body.
Specific step is as follows for the construction method:
1) pile body of prefabricated tubular pile is split into the hollow pile body of more piece, internal cavities platform is set between adjacent two pile body In order to which push rod applies sinking thrust to pile body, the pile top of prefabricated tubular pile is sunk in soil using sinking apparatus;
2) sleeve is fixedly installed in the upper end of the pile top and the lower end of first segment pile body is inserted into the sleeve, directly It is completely attached to first segment pile body and the pile top, a sleeve is also fixedly installed in the upper end of first segment pile body and by the second section The lower end of pile body is inserted into the sleeve, the push rod is from top to bottom inserted into the cavity of pile body, using setting in the push rod The shoulder of lower end pushes pile top and the first and second section pile body gradually to sink;
3) with the continuous sinking of prefabricated tubular pile, third section, Section four ... are added one by one in the top of the second section pile body N-th section pile body, and the connection type between adjacent pile body is referring to step 2);
4) sinking construction of prefabricated tubular pile is operated are as follows: pile top of sinking again first closes the shoulder and by institute It states push rod to drop at pile top position, pushing directly on the push rod makes the pile top sink, and then successively sinks from top to bottom Each section pile body, promotes the push rod and the cavity that the shoulder is moved between the i-th section pile body and i+1 section pile body is flat On platform, the shoulder is unfolded, by the push rod by the i-th section pile body push down on to the pile top or the (i-1)-th section stake Body contact;
5) it after prefabricated tubular pile reaches the depth requirements of construction, closes the shoulder and takes out the push rod, pour Concrete is to fill the gap between pile body.
Wherein, the pile top needs to ensure to be reserved with partial sleeves above soil layer during sinking to next in order to install Save pile body;Single submergence depth, which need to be controlled, when carrying out to the pile top and sinking and operate is lower than the clear height of the sleeve at least 0.2m, to avoid occurring the case where sleeve is separated from each other with pile body in subsequent sinking watching.
Technical solution provided by the utility model at least has the following beneficial effects:
1, technical solution provided by the utility model solves deficiency existing for existing prefabricated pile pile making method (i.e. pile sinking is set Standby maximum power is difficult to length is long, volume is big, the prefabricated pile of weight weight is integrally depressed into projected depth), on the one hand by pile top The pile side resistance that the end resistance of receiving is born with pile body separates, the biggish stake on the other hand also bearing entire pile body Collateral resistance is separated into the lesser pile side resistance of multistage, can greatly reduce the resistance that each progradation need to overcome in this way, break Limitation of the existing equipment in terms of prefabricated tubular pile construction depth, realizes and maximally utilizes to equipment, also reduce and greatly enhance The difficulty of construction of degree, major diameter prefabricated tubular pile.
2, the utility model is arranged to the cavity of each section pile body to straighten gauge structure and from top to bottom be gradually increased, on the one hand It is stitched together by the biggish internal diameter in i+1 section pile body lower part and the i-th lesser internal diameter in section pile body top, forms one enough Big cavity platform plays and provides force point-supported effect for push rod, on the other hand at the minimum diameter of every section pile body The effect of contraction to push rod is played, leads to push rod buckling to prevent occurring eccentric force during piling, the structure for increasing push rod is steady It is qualitative.
Detailed description of the invention
It, below will be to required in embodiment description in order to illustrate more clearly of the technical scheme in the embodiment of the utility model Attached drawing to be used is briefly described, it should be apparent that, drawings discussed below is only some implementations of the utility model Example, for those of ordinary skill in the art, without creative efforts, can also obtain according to these attached drawings Obtain other attached drawings, in which:
Fig. 1 is the constructing structure figure in the preferred embodiment in the utility model 1 to pile top and first segment pile body;
Fig. 2 is in the preferred embodiment in the utility model 1 to the connection structure diagram of adjacent two pile body;
Fig. 3 is the A-A of single-unit pile body in Fig. 2 to structure sectional view;
Structural schematic diagram when Fig. 4 is shoulder unfolded state in the preferred embodiment in the utility model 1;
In figure: 1 pile top, 2 pile bodies, 3 sleeves, 4 push rods, 5 shoulders.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describing, it is clear that described embodiment is only a part of the embodiment of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work All other embodiment obtained, fall within the protection scope of the utility model.
Embodiment 1
Referring to figs. 1 to 4, a kind of long prefabricated tubular pile of major diameter that classification promotes, including pile body and pile top setting up and down 1, the pile body is adjacent in the pile top 1 with pile body and pile body for hollow structure and including the pile body of more piece equal length 2 Sleeve 3 is set between two pile bodies, and the lower end of the sleeve 3 is using the lower end of the mode that is fixedly connected and each section pile body movably from upper It is inserted into the sleeve 3, supporting point of the internal cavities platform as sinking thrust is set between adjacent pile body.
In the present embodiment, the pile top 1 is the enclosed construction of cone;The cavity diameter of the pile body 2 be by up to Under be gradually increased and be divided into first part, second part and Part III from top to bottom according to diameter change, wherein first part The inner and outer diameter difference of highest point is 2a, and the inner and outer diameter difference of second part is fixed value 2b, Part III lowest part it is inside and outside straight Diameter difference matches for the size of 2c, the size of a, b, c and the pile body 2 of actual use and push rod 4.The present embodiment utilizes adjacent The first part of two pile body junctions and Part III directly form cavity platform, and the difference between a and c is 10~15cm.
In the present embodiment, the internal diameter of the sleeve 3 is greater than the outer diameter 1cm of the pile body 2.
It is additionally provided with push rod 4 in the present embodiment, the lower end of the push rod 4 is provided with openable and closable shoulder 5, leads to It crosses the push rod 4 and shoulder 5 realizes that the classification to prefabricated tubular pile promotes, reach the cavity of past prefabricated tubular pile after predetermined depth Interior casting concrete is to complete the embedded work of entire prefabricated tubular pile.
The construction method of above-mentioned prefabricated tubular pile specifically comprises the following steps:
1) it is positioned using center point coordinate of the total station to prefabricated pile pile sinking position;
2) sinking apparatus is moved at pile sinking position, pile top 1 is connect and by sleeve 3 in first segment with first segment pile body The upper end of pile body connects sleeve 3, is then inserted into push rod 4 in the cavity of first segment pile body, using sinking apparatus by prefabricated tubular pile Pile top 1 and first segment pile body sink in soil, prevent from pile body occurs during the pile driving process by the constraint of limit value to push rod 4 inclined Position;
3) when first segment pile body is depressed at the upper end sleeve 3, the second section pile body is installed, recycles sinking apparatus by pile top 1 sinks with pile body 2, is promoted at the cavity platform that 4 to the first and second section pile body of push rod is generated due to gauge structure in becoming, utilizes exhibition The shoulder 5 opened advances downwardly prefabricated tubular pile;
4) step 3) is repeated, third section, Section four ... n-th are installed in the top of the second section pile body by sleeve 3 one by one Pile body is saved, and pushes the continuous sinking of entire prefabricated tubular pile by push rod 4;
5) sinking of prefabricated tubular pile is operated in step 4) are as follows: sinking pile top 1 again first closes the shoulder 5 And drop to the push rod 4 at 1 position of pile top, pushing directly on the push rod 4 makes the pile top 1 sink, then from top to bottom Ground successively sinks each section pile body, promotes the push rod 4 and the shoulder 5 is made to be moved to the i-th section pile body and the stake of i+1 section On cavity platform between body, the shoulder 5 is unfolded, by the push rod 4 by the i-th section pile body push down on to the stake Point 1 or the contact of the (i-1)-th section pile body;
6) after last time sinking prefabricated tubular pile, pile top 1 is more than target depth and makes each section pile body in sleeve using push rod 4 Interior connection is integral, closes shoulder 5 and takes out push rod 4, while being poured using concrete to prefabricated tubular pile cavity, with Fill the gap between pile body.
It should be noted that the pile top 1 need to ensure to be reserved with above soil layer during sinking to partial sleeves so as to In the next section pile body of installation;Carrying out to control single submergence depth when operation lower than the sleeve 3 to the pile top 1 Clear height 0.5m, to avoid occurring the case where sleeve is separated from each other with pile body in subsequent sinking watching.
In the present embodiment, first individually sink to pile top, only need to overcome end resistance at this time;Sink it in pile top Afterwards, cavity structure is formd in the soil body, only needs to overcome lesser stake side skin friction that merogenesis pile body sinks i.e. one by one at this time It can.On the one hand the construction method separates the pile side resistance that the end resistance that pile top is born is born with pile body;On the other hand Effectively separated by the whole pile side resistance that merogenesis pile body bears pile body, existing equipment can be broken and applied in prefabricated pile Limitation in terms of work depth is broken through under current plant capacity to realize maximally utilizing for existing sinking apparatus to prefabricated pipe The stake depth limit of sinking construction and the specification limit of acted on prefabricated tubular pile.
The above is only the preferred embodiment of the present invention, is not intended to limit the patent protection model of the utility model It encloses, for those skilled in the art, the present invention may have various modifications and changes.In the spirit of the utility model Within principle, any improvement made by using the description of the utility model and the drawings or equivalent replacement, directly or It is used in other relevant technical fields indirectly, should all include in the scope of patent protection of the utility model.

Claims (6)

1. a kind of long prefabricated tubular pile of major diameter that classification promotes, which is characterized in that including pile body and pile top (1) setting up and down, The pile body is hollow structure and the pile body (2) including more piece equal length, the phase in the pile top (1) with pile body and pile body Sleeve (3) are set between adjacent two pile bodies, the lower end of the sleeve (3) is movable using the lower end of the mode that is fixedly connected and each section pile body It is inserted into the sleeve (3), supporting point of the internal cavities platform as sinking thrust is set between adjacent pile body;Pass through push rod (4) and shoulder (5) of the setting in the push rod (4) lower end is realized and is promoted to the classification of prefabricated tubular pile, reaches pre- depthkeeping After degree in the cavity of prefabricated tubular pile casting concrete to complete the embedded work of entire prefabricated tubular pile.
2. the long prefabricated tubular pile of the major diameter for being classified propulsion according to claim 1, which is characterized in that the sky of the pile body (2) Chamber diameter is from top to bottom to be gradually increased, and can directly form cavity platform in the cavity junction of adjacent two pile body.
3. the long prefabricated tubular pile of the major diameter for being classified propulsion according to claim 2, which is characterized in that the sky of the pile body (2) Chamber is divided into first part, second part and Part III according to diameter change from top to bottom, wherein first part's highest point it is interior Overall diameter difference is 2a, and the inner and outer diameter difference of second part is fixed value 2b, and the inner and outer diameter difference of Part III lowest part is 2c, a, B, the size of c and the size of the pile body of actual use (2) and push rod (4) match.
4. the long prefabricated tubular pile of the major diameter for being classified propulsion according to claim 3, which is characterized in that the difference between a and c is 10~15cm.
5. the long prefabricated tubular pile of the major diameter for being classified propulsion described according to claim 1~any one of 4, which is characterized in that institute State the enclosed construction that pile top (1) is cone.
6. the long prefabricated tubular pile of the major diameter for being classified propulsion according to claim 5, which is characterized in that the sleeve (3) it is interior Diameter is greater than the 0.5~2.0cm of outer diameter of the pile body (2).
CN201821759096.XU 2018-10-29 2018-10-29 A kind of long prefabricated tubular pile of major diameter that classification promotes Withdrawn - After Issue CN209025070U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821759096.XU CN209025070U (en) 2018-10-29 2018-10-29 A kind of long prefabricated tubular pile of major diameter that classification promotes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821759096.XU CN209025070U (en) 2018-10-29 2018-10-29 A kind of long prefabricated tubular pile of major diameter that classification promotes

Publications (1)

Publication Number Publication Date
CN209025070U true CN209025070U (en) 2019-06-25

Family

ID=66907548

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821759096.XU Withdrawn - After Issue CN209025070U (en) 2018-10-29 2018-10-29 A kind of long prefabricated tubular pile of major diameter that classification promotes

Country Status (1)

Country Link
CN (1) CN209025070U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024562A (en) * 2018-10-29 2018-12-18 中南大学 A kind of long prefabricated tubular pile of major diameter and its construction method of classification propulsion

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024562A (en) * 2018-10-29 2018-12-18 中南大学 A kind of long prefabricated tubular pile of major diameter and its construction method of classification propulsion
CN109024562B (en) * 2018-10-29 2024-03-15 中南大学 Graded-propulsion large-diameter long prefabricated pipe pile and construction method thereof

Similar Documents

Publication Publication Date Title
CN109024562A (en) A kind of long prefabricated tubular pile of major diameter and its construction method of classification propulsion
CN100494581C (en) Pipe pile hole maker with concrete bottom sealing, pipe cover and wings and construction process thereof
CN103643682B (en) A kind of pre stressed empty piped piles foundation pit enclosure structure and construction method
CN103321234B (en) Constructing method of load-bearing structure built on high slope or geological complex area
CN107268604B (en) Construction system and construction method of hollow precast pile
CN110685698A (en) Climbing reverse construction method for newly building large-section tunnel in existing cavern side direction
CN108343450B (en) Novel pipe curtain method working well reinforcing structure and reinforcing method
CN105297717A (en) Composite foundation pile with lower portion enlarged diameter section and construction method of composite foundation pile
CN105649073A (en) Static root drilling type construction method for planting piles
CN103526781A (en) Integrated-tray, shock-insulation and reinforcing structure for historic building foundation and construction method thereof
CN104404956A (en) Construction method for pedestal piles
CN105369799A (en) Concrete precast pile of precast pile underground diaphragm wall and construction method of precast pile underground diaphragm wall
CN209025070U (en) A kind of long prefabricated tubular pile of major diameter that classification promotes
CN104594360A (en) Composite double-row pile foundation pit supporting structure
CN207739253U (en) Slip casting structure is surveyed at hammer piling and synchronous end in band shoe pipe pile end
CN207484290U (en) The hollow clump of piles anchorage of super-large diameter
CN100443673C (en) Method of construction
CN209523214U (en) A kind of assembly type wedge shape pile foundation mechanism
CN206233232U (en) A kind of upper and lower part expansion type soil cement is combined pile tube
CN203603176U (en) Historic building foundation overall tray shock insulating and reinforcing structure
CN207047834U (en) A kind of construction system of hollow preformed pile
CN206220121U (en) Assembled point anchor barricade
CN205329682U (en) What blade was expanded in area expands bottom tube stake
CN110792095B (en) Multi-pile bearing platform-spiral anchor composite foundation
CN205276289U (en) Prestressed concrete beam formula double row pile struts system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned