CN209010992U - A kind of bridge construction Hanging Basket - Google Patents
A kind of bridge construction Hanging Basket Download PDFInfo
- Publication number
- CN209010992U CN209010992U CN201821437504.XU CN201821437504U CN209010992U CN 209010992 U CN209010992 U CN 209010992U CN 201821437504 U CN201821437504 U CN 201821437504U CN 209010992 U CN209010992 U CN 209010992U
- Authority
- CN
- China
- Prior art keywords
- hanging basket
- truss
- pontic
- shaft
- upper beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of bridge construction Hanging Baskets, two pairs of tracks symmetrical laying is equipped with Rhombic Truss above pontic upper beam two sides, track, and the bottom of truss is equipped with coasting mechanism, traveling wheel including connecting one both ends of shaft one and shaft of two side slides, and traveling wheel is driven by motor one and is moved forward;The front end of truss is equipped with preceding upper beam, interior nose girder is fixed between pontic upper beam and pontic underbeam, the bottom of pontic underbeam is equipped with Hanging Basket, one end of Hanging Basket is run through through rear suspension bar two and is hung on pontic underbeam, the premenstrual sunpender two of the other end of Hanging Basket is hung at preceding upper beam, the top of truss is also provided with the hanging basket mechanism of lifting Hanging Basket, ropewinder including shaft two and positioned at two both ends of shaft, and shaft two drives rotation by motor two to go up and down Hanging Basket, the utility model has many advantages, such as that Forward is quick and convenient, lifting is time saving and energy saving.
Description
Technical field
The utility model relates to building machinery fields, and in particular to a kind of bridge construction Hanging Basket.
Background technique
Since the rigidity of structure of gerber beam is big, deformation is small, expansion joint is few and drives a vehicle many advantages, such as steady comfortable, this
In highway in China and railway bridge using more and more extensive, Hanging Basket is the capital equipment of cantilever construction for kind of beam type structure.Hanging Basket
It is overall pulling down, integral installation, Hanging Basket needs to keep balancing in hoisting process, and existing Hanging Basket needs two elevators in lifting
Machine and at least three bit manipulation workers cooperation could complete work, and not only higher cost, also time-consuming and laborious, while existing Hanging Basket is preceding
Forward Driven by Hydraulic Cylinder is mostly used during moving greatly, Hanging Basket integrally moves ahead after a distance, and forward hydraulic cylinder needs to relocate, and increases
Workload is added, has designed that a kind of lifting is time saving and energy saving, convenient bridge construction Hanging Basket is asked rapidly to cope with these for Forward thus
Topic.
Summary of the invention
The purpose of this utility model is to provide a kind of liftings, and time saving and energy saving, Forward facilitates bridge construction Hanging Basket rapidly,
To solve the problems mentioned in the above background technology.
To achieve the above object, the utility model provides the following technical solutions: a kind of bridge construction Hanging Basket, including pontic
Upper beam, pontic underbeam, track, coasting mechanism, truss, rear anchor beam, rear anchor pole, preceding upper beam, interior nose girder, Hanging Basket, hanging basket mechanism,
Two pairs of Orbital Symmetries are layed in pontic upper beam two sides, and Rhombic Truss is equipped with above the track, and the bottom of truss is fixed to be connected
It is connected to the coasting mechanism being equipped with track;The rear end of the truss is equipped with rear anchor beam, and rear anchor beam is equipped with anchoring truss
The front end of the rear anchor pole of rear end, the truss is equipped with preceding upper beam, is fixedly installed between the pontic upper beam and pontic underbeam
The interior nose girder of internal membrane and teleblem is set up, one end of interior nose girder is run through through rear suspension bar one and is hung on the pontic upper beam, interior
The premenstrual sunpender one of the other end of nose girder is hung at the preceding upper beam, and the bottom of the pontic underbeam is equipped with Hanging Basket, and the one of Hanging Basket
End is run through through rear suspension bar two and is hung on the pontic underbeam, and the premenstrual sunpender two of the other end of Hanging Basket is hung at the preceding upper cross
Beam, the top of the truss are also provided with the hanging basket mechanism of lifting Hanging Basket;
The coasting mechanism includes a pair of of front-slider and a pair of of rear slider on the track, between the front-slider with after
It is connected to shaft one through bearing holder (housing, cover) between sliding block, the both ends of shaft one are arranged with traveling wheel, set between two rear sliders
There is integral type connecting cross beam, the bottom of connecting cross beam is fixedly installed with motor one, and the output shaft key connection of motor one has driving tooth
Wheel one, the outer surface of the shaft one is arranged with the driven gear one engaged with driving gear one;
The hanging basket mechanism includes the fixed block being bolted at the top of truss, is connected between two fixed blocks through institute
The shaft two of fixed block is stated, is symmetrically arranged with ropewinder on shaft two, the upper surface of one of them fixed block is equipped with electricity
Machine two, the output shaft key connection of motor two have driving gear two, and the end sleeve of the shaft two is equipped with to be engaged with driving gear two
Driven gear two.
Preferably, it is welded with L shape fixing piece on the truss, is provided with ladder shape along the fixing piece between two truss
Fixed frame.
Preferably, the two sides of the Hanging Basket are to have inverted V-shaped lanyard, and the two corners of Hanging Basket are fixed at the both ends of the lanyard,
The centre of the lanyard is connected with steel wire rope rolling, and the steel wire rope rolling detours and is accommodated in the ropewinder.
Preferably, the fixed block has extended transversely through inner hole, and interference fit has a rolling bearing in inner hole, rolling bearing it is interior
Circle is socketed with the shaft two.
Preferably, anchor pole is rear anchor finish rolling deformed bar after described, the preceding sunpender one, preceding sunpender two, rear suspension bar one, after
Sunpender two is tensioning finish rolling deformed bar.
Preferably, the motor one, motor two are around linear asynchronous motor.
Compared with prior art, the utility model has the beneficial effects that by setting shaft two and being located at two both ends of shaft
Ropewinder carry out Hanging Basket lifting, it can be achieved that lifting is sling simultaneously in Hanging Basket two sides, not needing more people to cooperate can be completed, time saving province
Power;It drives shaft two to rotate by motor two and drives ropewinder storage steel wire rope rolling to go up and down Hanging Basket, relative to traditional two groups of volumes
Raise machine work, save the cost;By the way that shaft one is arranged between sliding block, traveling wheel is arranged in one both ends of shaft, and traveling wheel is by motor
One driving Forward does not need repeatedly to relocate compared to the forward Driven by Hydraulic Cylinder Hanging Basket integral forward lead of tradition, and move forward side rapidly
Just.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model entirety;
Fig. 2 is the structural schematic diagram of the utility model coasting mechanism;
Fig. 3 is the structural schematic diagram of the utility model hanging basket mechanism.
In figure: anchor behind Bridge 1 body upper beam, Bridge 2 body underbeam, 3 tracks, 4 coasting mechanisms, 5 truss, 6 fixing pieces, 7 fixed frames, 8
Upper beam before anchor pole, 10 behind beam, 9, sunpender before nose girder, 12 Hanging Baskets, 13 hanging basket mechanisms, 14 lanyards, 15 steel wire rope rollings, 16 in 11
One, sunpender two, 18 rear suspension bars one, 19 rear suspension bars two, 401 front-sliders, 402 rear sliders, 403 connecting cross beams, 404 shafts before 17
One, 405 traveling wheels, 406 driven gears one, 407 motors one, 408 driving gears one, 131 shafts two, 132 ropewinders, 133 are consolidated
Determine block, 134 rolling bearings, 135 driven gears two, 136 motors two, 137 driving gears two.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-3 is please referred to, the utility model provides a kind of technical solution: a kind of bridge construction Hanging Basket, including on pontic
Beam 1, pontic underbeam 2, track 3, coasting mechanism 4, truss 5, rear anchor beam 8, rear anchor pole 9, preceding upper beam 10, interior nose girder 11, Hanging Basket
12, hanging basket mechanism 13,3 symmetrical laying of two pairs of tracks are equipped with Rhombic Truss 5 above 1 two sides of pontic upper beam, track 3, truss 5
Bottom is fixedly connected with the coasting mechanism 4 being equipped with track 3;The rear end of truss 5 is equipped with rear anchor beam 8, sets on rear anchor beam 8
There is the rear anchor pole 9 of anchoring 5 rear end of truss, the front end of truss 5 is equipped with preceding upper beam 10, between pontic upper beam 1 and pontic underbeam 2
It is fixedly installed with the interior nose girder 11 for setting up internal membrane and teleblem, one end of interior nose girder 11 is run through and is hung at through rear suspension bar 1
On pontic upper beam 1, the premenstrual sunpender 1 of the other end of interior nose girder 11 is hung at preceding upper beam 10, and the bottom of pontic underbeam 2 is equipped with
One end of Hanging Basket 12, Hanging Basket 12 is run through through rear suspension bar 2 19 and is hung on pontic underbeam 2, the premenstrual sunpender of the other end of Hanging Basket 12
2 17 are hung at preceding upper beam 10, and the top of truss 5 is also provided with the hanging basket mechanism 13 of lifting Hanging Basket 12;
Coasting mechanism 4 includes a pair of of front-slider 401 and a pair of of rear slider 402 on the track 3, between front-slider 401
Shaft 1 is connected to through bearing holder (housing, cover) between rear slider 402, the both ends of shaft 1 are arranged with traveling wheel 405, and two
Integral type connecting cross beam 403 is equipped between rear slider 402, the bottom of connecting cross beam 403 is fixedly installed with motor 1, motor
One 407 output shaft key connection has driving gear 1, and the outer surface of shaft 1 is arranged with engages with driving gear 1
Driven gear 1;
Hanging basket mechanism 13 includes being bolted to be connected between the fixed block 133 at 5 top of truss, two fixed blocks 133
Through the shaft 2 131 of fixed block 133, be symmetrically arranged with ropewinder 132 on shaft 2 131, one of fixed block 133 it is upper
End face is equipped with motor 2 136, and the output shaft key connection of motor 2 136 has driving gear 2 137, the end sleeve of shaft 2 131
Equipped with the driven gear 2 135 engaged with driving gear 2 137.
Further, it is welded with L shape fixing piece 6 on truss 5, is provided with ladder shape along fixing piece 6 between two truss 5 and consolidates
Determine frame 7, firm effect can be played to two truss 5.
Further, the two sides of Hanging Basket 12 are to have inverted V-shaped lanyard 14, and the two of Hanging Basket 12 are fixed at the both ends of lanyard 14
Angle, the centre of lanyard 14 are connected with steel wire rope rolling 15, and steel wire rope rolling 15 detours and is accommodated in ropewinder 132.
Further, fixed block 133 has extended transversely through inner hole, and interference fit has rolling bearing 134, rolling bearing in inner hole
134 inner ring and shaft 2 131 is socketed.
Further, rear anchor pole 9 be rear anchor finish rolling deformed bar, preceding sunpender 1, preceding sunpender 2 17, rear suspension bar 1,
Rear suspension bar 2 19 is tensioning finish rolling deformed bar.
Further, the motor 1, motor 2 136 are around linear asynchronous motor.
Working principle: starting slinging work to the utility model after the installation is completed, connects inverted V-shaped in the two sides of Hanging Basket 12
Lanyard 14 and after adjusting the equilibrium state of Hanging Basket 12, lanyard 14 is connected and fixed with steel wire rope rolling 15 by hook, by motor two
136 driving driving gears 2 137, driving gear 2 137 engage driven gear 2 135, and driven gear 2 135 drives shaft two
131 and ropewinder 132 rotated, ropewinder 132 and then store steel wire rope rolling 15 and be lifted Hanging Basket 12, increased to Hanging Basket 12
To pontic underbeam 2, by being hung on one side by being fixed on the rear suspension bar 2 19 of 2 inner bottom surface of pontic underbeam for Hanging Basket 12, and pass through
Jack pair rear suspension bar 2 19, which pre-tightens, to be fixed, the bottom of sunpender 2 17 before 12 another side of Hanging Basket is connected to, preceding sunpender 2 17
Top then carries out preload fixation by the jack that preceding 10 upper surface of upper beam is arranged, then starts follow-up work, when one rank of completion
Section pour work after, demoulding Forward is integrally carried out to the present apparatus, pass through 403 bottom of connecting cross beam install motor one drive
Master gear 1, the engagement of master gear 1 drive shaft 1 and 405 turns of traveling wheel from gear 1, from gear 1
Dynamic Forward, and then present apparatus Forward is promoted, the present apparatus is fixed after moving to the appropriate position, starts the molding of next stage
Pour work.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (6)
1. a kind of bridge construction Hanging Basket, including pontic upper beam (1), pontic underbeam (2), track (3), coasting mechanism (4), truss
(5), rear anchor beam (8), rear anchor pole (9), preceding upper beam (10), interior nose girder (11), Hanging Basket (12), hanging basket mechanism (13), feature
Be: two pairs of track (3) symmetrical layings are equipped with Rhombic Truss (5) above pontic upper beam (1) two sides, the track (3),
The bottom of truss (5) is fixedly connected with the coasting mechanism (4) being equipped with track (3);The rear end of the truss (5) is equipped with
Anchor beam (8) afterwards, rear anchor beam (8) be equipped with anchoring truss (5) rear end rear anchor pole (9), the front end of the truss (5) be equipped with before on
Crossbeam (10) is fixedly installed with the interior nose girder for setting up internal membrane and teleblem between the pontic upper beam (1) and pontic underbeam (2)
(11), one end of interior nose girder (11) is run through through rear suspension bar one (18) and is hung on the pontic upper beam (1), interior nose girder (11)
The premenstrual sunpender one (16) of the other end is hung at the preceding upper beam (10), and the bottom of the pontic underbeam (2) is equipped with Hanging Basket (12),
One end of Hanging Basket (12) is run through through rear suspension bar two (19) and is hung on the pontic underbeam (2), the other end warp of Hanging Basket (12)
Preceding sunpender two (17) is hung at the preceding upper beam (10), and the top of the truss (5) is also provided with hanging for lifting Hanging Basket (12)
Basket mechanism (13);
The coasting mechanism (4) includes a pair of of front-slider (401) and a pair of of rear slider (402) on track (3), before described
It is connected to shaft one (404) through bearing holder (housing, cover) between rear slider (402) between sliding block (401), the both ends of shaft one (404) cover
Equipped with traveling wheel (405), integral type connecting cross beam (403) are equipped between two rear sliders (402), connecting cross beam (403)
Bottom be fixedly installed with motor one (407), the output shaft key connection of motor one (407) has driving gear one (408), the axis
The outer surface of bar one (404) is arranged with the driven gear one (406) engaged with driving gear one (408);
The hanging basket mechanism (13) includes being bolted fixed block (133) at the top of truss (5), two fixed blocks (133) it
Between be connected with the shaft two (131) through the fixed block (133), ropewinder (132) are symmetrically arranged on shaft two (131),
The upper surface of one of them fixed block (133) is equipped with motor two (136), and the output shaft key connection of motor two (136) has
Driving gear two (137), the end sleeve of the shaft two (131) are equipped with the driven gear two engaged with driving gear two (137)
(135)。
2. bridge construction Hanging Basket according to claim 1, it is characterised in that: be welded with L shape on the truss (5) and fix
Part (6) is provided with ladder shape fixed frame (7) along the fixing piece (6) between two truss (5).
3. bridge construction Hanging Basket according to claim 1, it is characterised in that: the two sides of the Hanging Basket (12) are to have down
The two corners of Hanging Basket (12) are fixed at V-arrangement lanyard (14), the both ends of the lanyard (14), and the centre of the lanyard (14) is connected with steel
Silk rope rolling (15), the steel wire rope rolling (15) are detoured and are accommodated in the ropewinder (132).
4. bridge construction Hanging Basket according to claim 1, it is characterised in that: the fixed block (133) has extended transversely through
Inner hole, the interior interference fit of inner hole have rolling bearing (134), and the inner ring of rolling bearing (134) and the shaft two (131) are socketed.
5. bridge construction Hanging Basket according to claim 1, it is characterised in that: anchor pole (9) is rear anchor finish rolling spiral shell after described
Line reinforcing bar, the preceding sunpender one (16), preceding sunpender two (17), rear suspension bar one (18), rear suspension bar two (19) are tensioning finish rolling spiral shell
Line reinforcing bar.
6. bridge construction Hanging Basket according to claim 1, it is characterised in that: the motor one (407), motor two
It (136) is around linear asynchronous motor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821437504.XU CN209010992U (en) | 2018-09-03 | 2018-09-03 | A kind of bridge construction Hanging Basket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821437504.XU CN209010992U (en) | 2018-09-03 | 2018-09-03 | A kind of bridge construction Hanging Basket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209010992U true CN209010992U (en) | 2019-06-21 |
Family
ID=66832437
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821437504.XU Expired - Fee Related CN209010992U (en) | 2018-09-03 | 2018-09-03 | A kind of bridge construction Hanging Basket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209010992U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111926719A (en) * | 2020-08-11 | 2020-11-13 | 姬洋 | Hanging basket suspension mechanism for bridge construction |
-
2018
- 2018-09-03 CN CN201821437504.XU patent/CN209010992U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111926719A (en) * | 2020-08-11 | 2020-11-13 | 姬洋 | Hanging basket suspension mechanism for bridge construction |
CN111926719B (en) * | 2020-08-11 | 2021-04-13 | 永富建工集团有限公司 | Hanging basket suspension mechanism for bridge construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201943007U (en) | Constant amplitude frame beam crane capable of being used in combination with movable support frame | |
CN201143722Y (en) | Hydraulic integral assembling-disassembling type box beam steel external mold | |
CN206070371U (en) | A kind of hanging ladder for bridge maintenance | |
CN209010992U (en) | A kind of bridge construction Hanging Basket | |
CN209815481U (en) | Electromechanical device maintenance hoist and mount frame | |
CN201292212Y (en) | Centralized driven in and out kettle crane | |
CN208762892U (en) | A kind of section spelling symmetrical integral Bridge Erector of bridge construction | |
CN211498492U (en) | Bridge construction bridging machine with prevent that incline inclined to one side overhead traveling crane sideslip track | |
CN210508299U (en) | Concrete pouring operation rack for building floor slab | |
CN217026009U (en) | Converter integral pushing device | |
CN201722628U (en) | Bailey beam platform traveling mechanism | |
CN206328062U (en) | A kind of novel cantilever is hung | |
CN101942804A (en) | Bridge surface construction vehicle for high-speed railway | |
CN214611105U (en) | Steel construction shoulder pole roof beam that can hoist fast | |
CN213538692U (en) | Trolley for guardrail construction | |
CN201729578U (en) | Crown block for repairing in a workshop | |
CN210797292U (en) | Six-direction positioning and quick adjusting device for realizing prefabricated section beam | |
CN209193389U (en) | A kind of loop wheel machine structure of shield machine segment | |
CN201981485U (en) | Leg replacing mechanism for pier side bracket of bridge pier | |
CN201962609U (en) | Reversible bottom die structure of bridge making machine | |
CN113123804A (en) | Tunnel inner wall repairing method and device | |
CN220334501U (en) | Lifting device for bridge girder erection machine | |
CN204825674U (en) | Form removal machine | |
CN215907878U (en) | Novel hang cloth maintenance platform truck structure | |
CN219009740U (en) | Lifting walking frame for overhead rail |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190621 Termination date: 20210903 |