CN208996475U - A kind of anchor ear correcting structure of steel column installation - Google Patents

A kind of anchor ear correcting structure of steel column installation Download PDF

Info

Publication number
CN208996475U
CN208996475U CN201821475486.4U CN201821475486U CN208996475U CN 208996475 U CN208996475 U CN 208996475U CN 201821475486 U CN201821475486 U CN 201821475486U CN 208996475 U CN208996475 U CN 208996475U
Authority
CN
China
Prior art keywords
steel column
wedge
anchor ear
level tray
correcting structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821475486.4U
Other languages
Chinese (zh)
Inventor
王庆伟
张永庆
段常智
孙光磊
张瑞强
张有奇
尹绪禄
李冲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Erjian Group Steel Structure Co
Henan DR Construction Group Co Ltd
Original Assignee
Henan Erjian Group Steel Structure Co
Henan DR Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Erjian Group Steel Structure Co, Henan DR Construction Group Co Ltd filed Critical Henan Erjian Group Steel Structure Co
Priority to CN201821475486.4U priority Critical patent/CN208996475U/en
Application granted granted Critical
Publication of CN208996475U publication Critical patent/CN208996475U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of anchor ear correcting structure of steel column installation, including upper steel column and the lower steel column being overlapped with upper steel column lower end, anchor ear is installed on the upper end of the upper and lower steel column in the lower end of upper steel column, vertical wedge is uniformly installed with along its excircle on anchor ear, the wedge that note is located at anchor ear on upper steel column is wedge I, the wedge that note is located at anchor ear on lower steel column is wedge II, level tray I is installed in the lower edge of wedge I, level tray II is installed in the upper edge of wedge II corresponding with about I wedge, jack is placed on level tray II, the mandril of jack setting is towards level tray I.Screw block carrier is set in such a way that anchor ear replaces welding at present, be easy for installation and removal means for correcting;The screw block carrier of setting and wedge spot welding facilitate the position of adjustment screw block carrier, consequently facilitating the check point of adjustment steel column.

Description

A kind of anchor ear correcting structure of steel column installation
Technical field
The utility model relates to the devices that verticality in multilayer, high-rise steel structure engineering steel column installation process corrects, specifically It is related to a kind of anchor ear correcting structure of steel column installation.
Background technique
In multilayer, high-rise steel structure construction, welding steel tray support hydraulic jack is mostly used to correct steel column greatly Verticality, first steel plate pallet and wedge needs are securely welded on steel column, have certain damage to base material in this way;In addition it welds Screw block carrier and the wedge use being connected on steel column also need to cut away later, not only increase material loss and increase not Few labour cost.
Summary of the invention
In view of the deficiencies of the prior art, the utility model provides a kind of anchor ear correcting structure of steel column installation.
A kind of anchor ear correcting structure of steel column installation, including upper steel column and the lower steel column being overlapped with the upper steel column lower end, It is characterized by: anchor ear is installed on the lower end of the upper steel column and on the upper end of the lower steel column, at described armful Vertical wedge is uniformly installed on hoop along its excircle, the wedge that note is located at the anchor ear on the upper steel column is wedge I, note The wedge of the anchor ear is wedge II on the lower steel column, is installed with level tray I in the lower edge of the wedge I, The upper edge of the wedge II corresponding with about I wedge is installed with level tray II, puts on the level tray II It is equipped with jack, the mandril of the jack setting is towards the level tray I.
Further are as follows: the wedge I and wedge II are right-angled trapezium, and the level tray I is located at the straight of the wedge I On the arm of angle, the level tray II is located on the right-angle side of the wedge II.
Further are as follows: the anchor ear includes two pieces of arc panels being oppositely arranged, and is installed at the both ends of the arc panel Connecting plate is equipped with bolt on the connecting plate.That is, encircling two pieces of arc panels on steel column, by bolt by two pieces of arcs The connecting plate of shape plate junction is fixed together.
Further are as follows: 1 point of the level tray is welded on the wedge I, and 1 point of the level tray is welded in the wedge On II.
Further are as follows: be installed with peg on the surface of the upper steel column and lower steel column, be located at anchor ear on the upper steel column Upper edge be resisted against on the peg, the lower edge of anchor ear is resisted against on the peg on the lower steel column.
Further are as follows: the position on the upper steel column positioned at the anchor ear upper edge is installed with baffle, in the lower steel Position on column positioned at the anchor ear lower edge is installed with baffle.
The utility model has the beneficial effects that screw block carrier is arranged in such a way that anchor ear replaces welding at present, facilitate peace Assembly and disassembly means for correcting;The screw block carrier of setting and wedge spot welding facilitate the position of adjustment screw block carrier, consequently facilitating Adjust the check point of steel column.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the present invention looks up structural representation of anchor ear in the utility model.
In figure, 1, anchor ear;21, wedge I;22, wedge II;31, level tray I;32, level tray II;4, connecting plate; 5, bolt;6, jack;71, upper steel column;72, lower steel column;8, peg or baffle;9, weld seam.
Specific embodiment
It elaborates with reference to the accompanying drawing to the utility model.It should be noted that a left side in the example of the utility model, In, the positional terms such as right, upper and lower, be only relative concept or be to refer to the normal operating condition of product each other, without answering This is considered restrictive.
First embodiment: a kind of anchor ear correcting structure of steel column installation, as shown in Figure 1, include upper steel column 71 and with it is described The lower steel column 72 that upper 71 lower end of steel column is overlapped, on the lower end of the upper steel column 71 and on the upper end of the lower steel column 72 It is installed with anchor ear, is uniformly installed with vertical wedge along its excircle on the anchor ear 1, note is located at institute on the upper steel column 71 The wedge for stating anchor ear 1 is wedge I 21, and the wedge that note is located at the anchor ear 1 on the lower steel column 72 is wedge II 22, described oblique The lower edge of iron I 21 is installed with level tray I 31, in the upper edge of the wedge II 22 corresponding with about I 21 wedge It is installed with level tray II 32, jack 6, the mandril court that the jack 6 is arranged are placed on the level tray II 32 To the level tray I 31.
Wherein, the wedge I 21 and wedge II 22 are right-angled trapezium, and the level tray I 31 is located at the wedge I 21 Right-angle side on, the level tray II 32 is located on the right-angle side of the wedge II 22.As shown in connection with fig. 2, the anchor ear 1 wraps Two pieces of arc panels being oppositely arranged are included, connecting plate 4 is installed at the both ends of the arc panel, is worn on the connecting plate 4 There is bolt 5.The middle part point of the level tray I 31 is welded on the wedge I 21, and the middle part point of the level tray II 32 is welded in On the wedge II 22.It is installed with peg 8 on the surface of the upper steel column 71 and lower steel column 72, is located on the upper steel column 71 The upper edge of anchor ear 1 is resisted against on the peg 8, and the lower edge of anchor ear 1 is resisted against the peg 8 on the lower steel column 72 On.In addition, the shapes such as circle, rectangle, abnormal shape, level tray I 31 can be designed as according to steel column of different shapes in the anchor ear 1 Fan-shaped, rectangle can be designed as according to 1 shape of anchor ear with level tray II 32.
Second embodiment, other technical characteristics are upper in the upper steel column 71 in the case where being identical with the first embodiment It is installed with baffle 8 in the position of 1 upper edge of anchor ear, the position of 1 lower edge of anchor ear is located on the lower steel column 72 It is installed with baffle 8.
Working principle of the utility model is: upper steel column 71 lifts in place, the interim otic placode in upper 71 root of steel column, top cable wind rope After equal work, whether meet related specification requirement with 71 verticality of steel column in measuring instrument (theodolite, total station) measurement, It needs to correct as deviation is larger, then records measurement result and deviation azimuth;
It is fitted in it on upper steel column 71 and lower steel column 72 with bolt 5 separated anchor ear 1, to connecting steel column 71 and lower steel The weld seam 9 of column 72.Pay attention to the position of level tray on anchor ear 1, to keep an orientation with upper 71 perpendicularity deviation position of steel column, Otherwise it needs to readjust.
After 1 orientation of anchor ear etc. is adjusted, starting fastening bolt 5 makes anchor ear 1 closely hold upper steel column 71 and lower steel column tightly 72, if relying only on frictional force between anchor ear 1 and steel column, timing jack 6 may be insufficiently resistant to the thrust of anchor ear 1. Reinforced concrete column is such as encountered, therefore class formation is in being wrapped in by armored concrete, steel column surface can design peg 8, can use Peg 8 come help anchor ear resist jack 6 thrust;Exposed steel-frame structure is such as encountered, because of steel column smooth surface, needs to weld Temporary baffle 8 come help anchor ear resist jack 6 thrust, spot welding meet demand between temporary baffle 8 and steel column.
Then hydraulic jack 6 is put in level tray II 32, starts slowly pressurization, measure steel column 71 in pressurization Verticality, until upper 71 verticality of steel column is met the requirements;But the actually general very little of 71 perpendicularity deviation of steel column, along with correction Position will slightly make the perpendicularity deviation of steel column 71 be transferred to the opposite or other orientation of jack 6 accidentally in root, Spare 6 pallet of jack and the cooperation of spare wedge can be used at this time to complete the multi-party bit correction of steel column.
The basic principles and main features of the present invention and the advantages of the present invention have been shown and described above.Current row The technical staff of industry is described in above embodiments and description it should be appreciated that the present utility model is not limited to the above embodiments Only illustrate the principles of the present invention, on the premise of not departing from the spirit and scope of the utility model, the utility model is also It will have various changes and improvements, these various changes and improvements fall within the scope of the claimed invention.The utility model Claimed range is defined by the appending claims and its equivalent thereof.

Claims (6)

1. a kind of anchor ear correcting structure of steel column installation, including upper steel column and the lower steel column being overlapped with the upper steel column lower end, It is characterized in that: anchor ear is installed on the lower end of the upper steel column and on the upper end of the lower steel column, in the anchor ear On be uniformly installed with vertical wedge along its excircle, the wedge that note is located at the anchor ear on the upper steel column is wedge I, remembers position In the anchor ear on the lower steel column wedge be wedge II, be installed with level tray I in the lower edge of the wedge I, with The upper edge of the corresponding wedge II of about I wedge is installed with level tray II, places on the level tray II There is a jack, the mandril of the jack setting is towards the level tray I.
2. a kind of anchor ear correcting structure of steel column installation according to claim 1, it is characterised in that: the wedge I and tiltedly Iron II is right-angled trapezium, and the level tray I is located on the right-angle side of the wedge I, and the level tray II is located at described On the right-angle side of wedge II.
3. a kind of anchor ear correcting structure of steel column installation according to claim 2, it is characterised in that: the anchor ear includes two The arc panel that block is oppositely arranged is installed with connecting plate at the both ends of the arc panel, is equipped with bolt on the connecting plate.
4. a kind of anchor ear correcting structure of steel column installation according to claim 3, it is characterised in that: the level tray I Point is welded on the wedge I, and 1 point of the level tray is welded on the wedge II.
5. according to claim 1 to the anchor ear correcting structure that a kind of steel column described in any claim in 4 is installed, feature exists In: it is installed with peg on the surface of the upper steel column and lower steel column, the upper edge of anchor ear is resisted against on the upper steel column On the peg, the lower edge of anchor ear is resisted against on the peg on the lower steel column.
6. according to claim 1 to the anchor ear correcting structure that a kind of steel column described in any claim in 4 is installed, feature exists In: the position on the upper steel column positioned at the anchor ear upper edge is installed with baffle, and described embrace is located on the lower steel column The position of hoop lower edge is installed with baffle.
CN201821475486.4U 2018-09-10 2018-09-10 A kind of anchor ear correcting structure of steel column installation Active CN208996475U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821475486.4U CN208996475U (en) 2018-09-10 2018-09-10 A kind of anchor ear correcting structure of steel column installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821475486.4U CN208996475U (en) 2018-09-10 2018-09-10 A kind of anchor ear correcting structure of steel column installation

Publications (1)

Publication Number Publication Date
CN208996475U true CN208996475U (en) 2019-06-18

Family

ID=66800151

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821475486.4U Active CN208996475U (en) 2018-09-10 2018-09-10 A kind of anchor ear correcting structure of steel column installation

Country Status (1)

Country Link
CN (1) CN208996475U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110984400A (en) * 2019-12-20 2020-04-10 浙江精工钢结构集团有限公司 Hoop type steel frame installation tool and installation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110984400A (en) * 2019-12-20 2020-04-10 浙江精工钢结构集团有限公司 Hoop type steel frame installation tool and installation method

Similar Documents

Publication Publication Date Title
CN209636806U (en) A kind of steel support structure
CN102433841A (en) Method for installing abnormal-shape curve steel box girder
US9556607B2 (en) Method for constructing cylindrical tank
CN110847169A (en) Construction method of steel pipe pile steel trestle
CN106351462A (en) Temporary steel pipe supported prestressed reinforcement structure and construction method thereof
CN208996475U (en) A kind of anchor ear correcting structure of steel column installation
CN111255138A (en) Construction method of continuous multi-span large-span high-altitude aluminum alloy latticed shell structure
CN103495793A (en) Improved construction method for hoisting and welding large-tonnage cast steel component complex joints
CN205743048U (en) Correction positioner installed by a kind of curtain wall large-size column
JP6644657B2 (en) Temporary sleepers for shield tunnel construction
CN210829303U (en) Combined tool type inner supporting steel ring for tunnel
RU147876U1 (en) METAL STRUCTURE BEAM REPAIR Lining
CN110953000B (en) Temporary prestress supporting mechanism of shield tunnel and construction method
KR102045025B1 (en) Roundness Maintaining Device of Large Cylindrical Structure and Manufacturing Method Thereof
CN204024084U (en) Easy unloading type triangular pipe truss just spells moulding bed
JPH10153015A (en) Main column member replacement construction method for steel tower
CN212733648U (en) Strong steel column butt joint straightening device
CN203320420U (en) Temporary locking structure for corrugated steel webs of steel and concrete combined box girder
CN110172878B (en) Ground transportation rail installation method
CN209741592U (en) Rail device of smoke prevention and dust control vehicle on top of coke oven
US9279244B1 (en) Apparatus for supporting stay-in-place metal decking forms
CN211113201U (en) Self-stabilizing lattice type supporting system
CN113431339A (en) Supporting-free mounting process for three-section column umbrella-shaped overhanging component
CN207567998U (en) A kind of composite structure of steel plate shear force wall and steel column
CN207093102U (en) A kind of asymmetric trouble hole supporting construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant