CN208996441U - Building hoistway form frame system with material distributing machine - Google Patents
Building hoistway form frame system with material distributing machine Download PDFInfo
- Publication number
- CN208996441U CN208996441U CN201821807619.3U CN201821807619U CN208996441U CN 208996441 U CN208996441 U CN 208996441U CN 201821807619 U CN201821807619 U CN 201821807619U CN 208996441 U CN208996441 U CN 208996441U
- Authority
- CN
- China
- Prior art keywords
- operation layer
- layer
- hoistway
- material distributing
- template
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Types And Forms Of Lifts (AREA)
Abstract
The utility model discloses the building hoistway form frame systems with material distributing machine, and it is climb operation layer below template operation layer that it is reinforcing bar operation layer above template operation layer that including the lattice frame operation layer that several layers are distributed up and down, lattice frame operation layer, which includes template operation layer,;Cloth machine base is fixed on the platform of the reinforcing bar operation layer of top layer, and material distributing machine is installed on cloth machine base;Falsework is set in template operation layer, the template of face hoistway inner wall is fixedly connected with outside falsework, mould crossbeam is moved back in fixation on the platform of template operation layer bottom, moves back setting on mould crossbeam and moves back mode-gear, moves back mould rack gear and be fixedly connected with falsework;Support rod is set in the climb operation layer of top layer, and the top of support rod is fixedly connected with the platform of template operation layer bottom surface, and creeping formwork mechanism is also set up on support rod.The utility model puts material distributing machine to solve the problems, such as that hoistway construction in the prior art needs to occupy tower crane and repeatedly hangs switch, realizes the release tower crane working time, improves the purpose of construction efficiency.
Description
Technical field
The utility model relates to hoistway construction fields, and in particular to the building hoistway form frame system with material distributing machine.
Background technique
Elevator shaft is the space of carriage and counterweight or cylinder plunger movement, this space is with well pit
Bottom, well enclosure and hoistway top are boundary.Hoistway is to be made of for the space of elevator operation well enclosure, bottom plate and top plate, is used
Add reinforced concrete circle beam or whole reinforced concrete structures, intensity should meet elevator loading amount and the specification of normal speed is wanted
It asks.Elevator weight sensor and carriage are arranged in it, should suitably divulge information, should be arranged the various openings used for maintenance etc. and headspace and
Pit.The harm that may cause to prevent elevator from rushing to summit, elevator will stay between ladder top and hoistway top plate when rising to maximum layer
There is a space, there is a headroom height accordingly, size is determined that general low speed ladder is greater than 4.5m by elevator speed;It is middle and high
Fast ladder is 5-6m.Its interior Dangerous Place should set alarm bell device.National standard GB7025-86 be " elevator major parameter and car hoistway computer room
Form and size " in give tunnel dimension corresponding to elevator standard major parameter, it further provides that elevator shaft horizontal size
It is the minimum headroom size measured with plummet.The tolerance value of hoistway are as follows: the hoistway to height≤30m is 0~+25mm;It is right
30m < height < 60m hoistway is 0~+35mm;It is 0~+50m to 60m < height < 90m hoistway.Since tunnel dimension is opposite
It is narrow, operation is poured for the multilayer inside hoistway in the prior art, needs to occupy tower crane and repeatedly hangs switch and put material distributing machine, not only
It is a large amount of to occupy the tower crane working time, also result in integral construction inefficiency.
Utility model content
The purpose of this utility model is to provide the building hoistway form frame systems with material distributing machine, to solve well in the prior art
Road construction needs to occupy tower crane and repeatedly hangs the problem of switch puts material distributing machine, realizes the release tower crane working time, improves construction efficiency
Purpose.
The utility model is achieved through the following technical solutions:
Building hoistway form frame system with material distributing machine, the lattice frame operation layer including distribution above and below hoistway and several layers,
Platform is set between adjacent two layers lattice frame operation layer, and the lattice frame operation layer includes template operation layer, on template operation layer
The lattice frame operation layer of side is reinforcing bar operation layer, and the lattice frame operation layer below template operation layer is climb operation layer;Top layer
Reinforcing bar operation layer platform on fix cloth machine base, material distributing machine is installed on cloth machine base;It is set in the template operation layer
Falsework is set, the template of face hoistway inner wall is fixedly connected with outside falsework, fixation is moved back on the platform of template operation layer bottom
Mould crossbeam, it is described to move back on mould crossbeam setting and move back mode-gear, further include with it is described move back that mode-gear is meshed move back mould rack gear, it is described to move back
The long axis of mould rack gear moves back mould rack gear and is fixedly connected with falsework perpendicular to hoistway inner wall;It is set in the climb operation layer of top layer
Support rod is set, the top of the support rod is fixedly connected with the platform of template operation layer bottom surface, and the bottom end of the support rod passes through
Wall-attached supporting seat is detachably connected with hoistway inner wall, and creeping formwork mechanism is also set up on the support rod.
Aiming at the problem that construction of hoistway in the prior art needs to occupy tower crane and repeatedly hangs switch and put material distributing machine, the utility model
It is proposed the building hoistway form frame system with material distributing machine, this system include several layers up and down be distributed lattice frame operation layer, adjacent two
Platform is set between layer lattice frame operation layer, places to stand with operating personnel for equipment and construct.Lattice frame operation layer is divided into
Template operation layer, reinforcing bar operation layer, climb operation layer.Wherein template operation layer is located at intermediate position, molded for building structure,
Move back modulo operation;All lattice frame operation layers above template operation layer are reinforcing bar operation layer, for reinforcing bar binding operation;Template
All lattice frame operation layers below operation layer are climb operation layer, are torn open for wall-attached supporting seat peace, system climb operation.It is most upper
Cloth machine base is fixed on the platform of the reinforcing bar operation layer of layer, therefore cloth machine base is located at the most top of all lattice frame operation layers
Material distributing machine is installed on cloth machine base by portion.Specifically, material distributing machine selects different model according to actual demands of engineering, it is mounted directly
On cloth machine base, material distributing machine is integrated in this form frame system, is climbed with form frame system, avoids traditional construction mode from needing more
Secondary occupancy tower crane hangs switch and puts material distributing machine, effectively improves construction site tower crane utilization rate, improves construction efficiency.In template operation layer
Falsework is set, the template of face hoistway inner wall is fixedly connected with outside falsework, is fixed on the platform of template operation layer bottom
Move back mould crossbeam, it is described to move back setting on mould crossbeam and move back mode-gear, further include with it is described move back that mode-gear is meshed move back mould rack gear, it is described
The long axis of mould rack gear is moved back perpendicular to hoistway inner wall, mould rack gear is moved back and is fixedly connected with falsework.Therefore mode-gear is moved back by driving
Rotation moves back mould rack gear and moves linearly toward or away from the direction of hoistway inner wall to drive, and moves back mould rack gear towards leaning on
The direction of nearly hoistway inner wall is mobile, then realizes die closing operation, otherwise the direction for moving back mould rack gear away from hoistway inner wall is mobile, then
Modulo operation is moved back in realization.The climb operation layer of top layer is first climb operation layer below template operation layer, in
Support rod is set, and the top of support rod is fixedly connected with the platform of template operation layer bottom surface, and the bottom end of support rod passes through attached wall branch
Seat is detachably connected with hoistway inner wall, and creeping formwork mechanism is also set up on the support rod.To realize under conventional operating condition, by attached
Wall support is provided lower support by support rod and is consolidated, and when needing to climb entire form frame system, dismantles wall-attached supporting seat and hoistway
Connection between inner wall drives support rod uplink by creeping formwork mechanism, to push the template operation layer of top, reinforcing bar operation layer total
With moving up, whole creeping formwork operation is realized.Wherein creeping formwork mechanism uses creeping formwork mechanism in the prior art, does not do herein superfluous
It states.The utility model solves the problems, such as that hoistway construction needs to occupy tower crane and repeatedly hangs switch in the prior art and puts material distributing machine, makes
Material distributing machine is integrated in this form frame system, climb with form frame system, traditional construction mode avoided to need repeatedly to occupy tower crane and hang
Switch puts material distributing machine, effectively improves construction site tower crane utilization rate, improves construction efficiency.
Further, the upright bar for connecting upper lower platform is respectively provided in all lattice frame operation layers, the platform includes mutual
Vertical transverse horizontal beam, vertical equity beam and the steel springboard above transverse horizontal beam, vertical equity beam;It is described vertical
Bar, transverse horizontal beam are bolted between vertical equity beam.The upper layer and lower layer platform of lattice frame operation layer in this programme
Between connected by upright bar, every layer of platform all includes orthogonal transverse horizontal beam, vertical equity beam and is located at lateral water
Steel springboard above flat-topped ridge, vertical equity beam, platform can customize different sizes according to actual demands of engineering, meet various sizes
Hoistway construction needs, and provides adequately operation for operating personnel and puts space to good use.
Preferably, the creeping formwork mechanism includes guide rail, connects hydraulic climbing device, the hydraulic climbing device energy on guide rail
Enough to move along guide rail, hydraulic climbing device is connect with support rod.
Preferably, the mould rack gear that moves back is fixedly connected with falsework by connector along one end of long axis direction, is another
End is connect with telescopic supporting rod, and the telescopic supporting rod is connect far from the one end for moving back mould rack gear with falsework.Pass through connector
So that falsework is directly with moving and being moved for mould rack gear is moved back, wherein without any driving member, compared to the prior art
The middle mode being driven using great number of driving mechanism can significantly improve molding, the efficiency for moving back mould, reduce unnecessary mill
Damage reduces installation difficulty.The both ends of telescopic supporting rod respectively with move back mould rack gear, falsework is connect, provide skewed horizontal load, simultaneously
So that the pulling force or thrust to template are more uniform, the success rate for significantly improving molding, moving back mould.
Preferably, catching device is set between the bottom end and following platform of the support rod.It is practical that this is improved by catching device
Novel work safety reduces security risk.
Preferably, anti-dumping idler wheel, the anti-dumping idler wheel are also set up on the outside of the bottom platform of the climb operation layer of top layer
It is contacted with hoistway inner wall.During entire form frame system climbs, anti-dumping idler wheel is rolled in hoistway inner wall always, to protect always
It holds tangent with hoistway inner wall, can ensure that entire form frame system keeps flat with hoistway inner wall by two opposite anti-dumping idler wheels
Row, that is, guarantee the vertical of this form frame system, avoids that skew influence top operation occurs during climbing.
The utility model compared with prior art, has the following advantages and benefits:
Building hoistway form frame system of the utility model with material distributing machine, template operation layer is located at intermediate position, for building
Modulo operation is moved back in structure molding;All lattice frame operation layers above template operation layer are reinforcing bar operation layer, are bound for reinforcing bar
Operation;All lattice frame operation layers below template operation layer are climb operation layer, for wall-attached supporting seat peace to be torn open, system is climbed
Operation.Cloth machine base is fixed on the platform of the reinforcing bar operation layer of top layer, therefore cloth machine base is located at all lattice frames behaviour
Make the top of layer, material distributing machine is installed on cloth machine base.The utility model solves hoistway construction in the prior art and needs to account for
The problem of switch puts material distributing machine is repeatedly hung with tower crane, so that material distributing machine is integrated in this form frame system, climbs, keeps away with form frame system
Exempt from traditional construction mode and need repeatedly to occupy tower crane to hang switch and put material distributing machine, effectively improves construction site tower crane utilization rate, improve
Construction efficiency.
Detailed description of the invention
Attached drawing described herein is used to provide to further understand the utility model embodiment, constitutes the one of the application
Part does not constitute the restriction to the utility model embodiment.In the accompanying drawings:
Fig. 1 is the elevational schematic view of the utility model specific embodiment;
Fig. 2 is the partial enlarged view in Fig. 1 at A;
Fig. 3 is the elevation of the climb operation layer of top layer in the utility model specific embodiment.
Label and corresponding parts title in attached drawing:
1- template operation layer, 2- reinforcing bar operation layer, 3- climb operation layer, 4- hoistway, 5- falsework, 6- template, 7- are moved back
Mould crossbeam, 8- move back mode-gear, and 9- moves back mould rack gear, 10- cloth machine base, 11- material distributing machine, 12- support rod, 13- wall-attached supporting seat,
14- upright bar, 15- guide rail, 16- connector, 17- hydraulic climbing device, 18- telescopic supporting rod, 19- transverse horizontal beam, 20- are longitudinal
Horizontal beam, 21- steel springboard, 22- catching device, 23- anti-dumping idler wheel.
Specific embodiment
For the purpose of this utility model, technical solution and advantage is more clearly understood, below with reference to embodiment and attached drawing,
The utility model is described in further detail, and the exemplary embodiment and its explanation of the utility model are only used for explaining this
Utility model is not intended to limit the scope of the present invention.
Embodiment 1:
Building hoistway form frame system with material distributing machine as shown in Figure 1 to Figure 3, including hoistway 4 and several layers are divided up and down
The lattice frame operation layer of cloth, platform is arranged between adjacent two layers lattice frame operation layer, and the lattice frame operation layer includes template behaviour
Make layer 1, the lattice frame operation layer of 1 top of template operation layer is reinforcing bar operation layer 2, the lattice frame operation of 1 lower section of template operation layer
Layer is climb operation layer 3;Cloth machine base 10 is fixed on the platform of the reinforcing bar operation layer 2 of top layer, is pacified on cloth machine base 10
Fill material distributing machine 11;Falsework 5 is set in the template operation layer 1,4 inner wall of face hoistway is fixedly connected with outside falsework 5
Template 6, it is fixed on the platform of 1 bottom of template operation layer to move back mould crossbeam 7, it is described to move back setting on mould crossbeam 7 and move back mode-gear 8, also wrap
Include with it is described move back that mode-gear 8 is meshed move back mould rack gear 9, the long axis for moving back mould rack gear 9 moves back mould tooth perpendicular to 4 inner wall of hoistway
Item 9 is fixedly connected with falsework 5;Support rod 12 is set in the climb operation layer 3 of top layer, the top of the support rod 12 with
The platform of 1 bottom surface of template operation layer is fixedly connected, and the bottom end of the support rod 12 can by wall-attached supporting seat 13 and 4 inner wall of hoistway
Dismantling connection also sets up creeping formwork mechanism on the support rod 12.Totally five layers of lattice frame operation layer in the present embodiment, wherein upper two layers
For reinforcing bar operation layer 2, lower two layers is climb operation layer 3, and intermediate one layer is template operation layer 1.
Embodiment 2:
Building hoistway form frame system with material distributing machine as shown in Figure 1 to Figure 3, on the basis of embodiment 1, all lattices
The upright bar 14 for connecting upper lower platform is respectively provided in frame operation layer, the platform includes orthogonal transverse horizontal beam 19, longitudinal direction
Horizontal beam 20 and the steel springboard 21 above transverse horizontal beam 19, vertical equity beam 20;The upright bar 14, transversely and horizontally
It is bolted between beam 19, vertical equity beam 20.The creeping formwork mechanism includes guide rail 15, is connected on guide rail 15 hydraulic
Climbing device 17, the hydraulic climbing device 17 can be moved along guide rail 15, and hydraulic climbing device 17 is connect with support rod 12.
It is described move back mould rack gear 9 be fixedly connected by connector 16 with falsework 5 along one end of long axis direction, the other end and retractable support
Bar 18 connects, and the telescopic supporting rod 18 is connect far from the one end for moving back mould rack gear 9 with falsework 5.The bottom of the support rod 12
Catching device 22 is set between end and following platform.Anti-dumping rolling is also set up on the outside of the bottom platform of the climb operation layer 3 of top layer
Wheel 23, the anti-dumping idler wheel 23 is contacted with 4 inner wall of hoistway.
Above-described specific embodiment, to the purpose of this utility model, technical scheme and beneficial effects carried out into
One step is described in detail, it should be understood that being not used to limit the foregoing is merely specific embodiment of the present utility model
Determine the protection scope of the utility model, within the spirit and principle of the utility model, any modification for being made equally is replaced
It changes, improve, should be included within the scope of protection of this utility model.
Claims (6)
1. the building hoistway form frame system with material distributing machine, the lattice frame operation being distributed up and down including hoistway (4) and several layers
Layer, platform is set between adjacent two layers lattice frame operation layer, which is characterized in that the lattice frame operation layer includes template operation layer
(1), the lattice frame operation layer above template operation layer (1) is reinforcing bar operation layer (2), the lattice frame below template operation layer (1)
Operation layer is climb operation layer (3);Cloth machine base (10), material distributing machine are fixed on the platform of the reinforcing bar operation layer (2) of top layer
Material distributing machine (11) are installed on pedestal (10);Falsework (5) are set in the template operation layer (1), falsework (5) is fixed outside
The template (6) of face hoistway (4) inner wall is connected, fixation is moved back mould crossbeam (7) on the platform of template operation layer (1) bottom, described to move back
Mode-gear (8) are moved back in setting on mould crossbeam (7), further include with it is described move back that mode-gear (8) is meshed move back mould rack gear (9), it is described to move back
The long axis of mould rack gear (9) moves back mould rack gear (9) and is fixedly connected with falsework (5) perpendicular to hoistway (4) inner wall;Top layer climbs
Support rod (12) are set in lift operations layer (3), the platform on the top and template operation layer (1) bottom surface of the support rod (12) is fixed
Connection, the bottom end of the support rod (12) are detachably connected by wall-attached supporting seat (13) and hoistway (4) inner wall, the support rod
(12) creeping formwork mechanism is also set up on.
2. the building hoistway form frame system according to claim 1 with material distributing machine, which is characterized in that all lattice frame operations
The upright bar (14) for connecting upper lower platform is respectively provided in layer, the platform includes orthogonal transverse horizontal beam (19), Zong Xiangshui
Flat-topped ridge (20) and the steel springboard (21) above transverse horizontal beam (19), vertical equity beam (20);The upright bar (14),
Transverse horizontal beam (19), vertical equity beam are bolted between (20).
3. the building hoistway form frame system according to claim 1 with material distributing machine, which is characterized in that creeping formwork mechanism packet
It includes guide rail (15), connects hydraulic climbing device (17) on guide rail (15), the hydraulic climbing device (17) can be along guide rail
(15) mobile, hydraulic climbing device (17) is connect with support rod (12).
4. the building hoistway form frame system according to claim 1 with material distributing machine, which is characterized in that described to move back mould rack gear
(9) it is fixedly connected by connector (16) with falsework (5) along one end of long axis direction, the other end and telescopic supporting rod (18)
Connection, the telescopic supporting rod (18) connect far from the one end for moving back mould rack gear (9) with falsework (5).
5. the building hoistway form frame system according to claim 1 with material distributing machine, which is characterized in that the support rod (12)
Bottom end and following platform between be arranged catching device (22).
6. the building hoistway form frame system according to claim 1 with material distributing machine, which is characterized in that the behaviour that climbs of top layer
Make to also set up on the outside of the bottom platform of layer (3) anti-dumping idler wheel (23), the anti-dumping idler wheel (23) contacts with hoistway (4) inner wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821807619.3U CN208996441U (en) | 2018-11-02 | 2018-11-02 | Building hoistway form frame system with material distributing machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821807619.3U CN208996441U (en) | 2018-11-02 | 2018-11-02 | Building hoistway form frame system with material distributing machine |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208996441U true CN208996441U (en) | 2019-06-18 |
Family
ID=66806183
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821807619.3U Active CN208996441U (en) | 2018-11-02 | 2018-11-02 | Building hoistway form frame system with material distributing machine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208996441U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109235872A (en) * | 2018-11-02 | 2019-01-18 | 四川省第六建筑有限公司 | Building hoistway form frame system with material distributing machine |
EP4328168A1 (en) * | 2022-08-24 | 2024-02-28 | OTIS Elevator Company | Lifting device for building steel structure hoistway and method for building steel structure hoistway |
-
2018
- 2018-11-02 CN CN201821807619.3U patent/CN208996441U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109235872A (en) * | 2018-11-02 | 2019-01-18 | 四川省第六建筑有限公司 | Building hoistway form frame system with material distributing machine |
EP4328168A1 (en) * | 2022-08-24 | 2024-02-28 | OTIS Elevator Company | Lifting device for building steel structure hoistway and method for building steel structure hoistway |
US11993485B2 (en) | 2022-08-24 | 2024-05-28 | Otis Elevator Company | Lifting device for building steel structure hoistway and method for building steel structure hoistway |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102677889B (en) | System for alternatively supporting whole lifting steel platform formwork by steel column casing rack and construction method | |
CN106437130A (en) | Inner roof external climbing type formwork construction platform for super high-rise building construction | |
CN109235872A (en) | Building hoistway form frame system with material distributing machine | |
CN208996441U (en) | Building hoistway form frame system with material distributing machine | |
CN109973112B (en) | Super-large-dip-angle narrow-space tunnel anchor cable saddle gantry system and installation method thereof | |
CN101435268B (en) | Stretching device of case beam in case | |
CN2923635Y (en) | Single-column towing type elevator | |
CN108286332A (en) | A kind of concrete of crossing soars aloft beam from climbing monoblock type bylinder system and construction method | |
CN204625045U (en) | A kind of steel structure hoisting door shaped stent formula hanging apparatus | |
CN110565937A (en) | Door type integral lifting steel platform | |
CN116838083A (en) | Integral climbing steel platform formwork and climbing method thereof | |
CN206815943U (en) | A kind of pole upside-down mounting group founds lifting device | |
CN111392589B (en) | Application method of attached lifting and transporting device for dismantling concrete support beam | |
CN213475232U (en) | Automatic installation equipment of construction protection network | |
CN107724235A (en) | A kind of bridge-collision-avoidance wall Safety operation platform | |
CN211257773U (en) | Door type integral lifting steel platform | |
CN211447761U (en) | Electric creeping formwork device for building construction | |
CN209799408U (en) | rail-mounted vertical transportation mechanism for unit plate | |
CN110748140A (en) | Track beam hanging basket special for stepped curtain wall | |
CN206033090U (en) | Crowd's hoist device | |
CN111305539A (en) | Integrated system for hard protection and crane in core barrel of super high-rise building | |
CN220202481U (en) | Bridge construction cushion cap operation platform | |
CN212982143U (en) | Cable breakage-proof device of elevator | |
CN205077876U (en) | Machine and stressing jack linkage are worn to restraint by prestress wire | |
CN216240384U (en) | Operation platform assembly with ladder stand suitable for steel structure high altitude installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |