CN208996431U - Combined operating platform in elevator - Google Patents

Combined operating platform in elevator Download PDF

Info

Publication number
CN208996431U
CN208996431U CN201821525121.8U CN201821525121U CN208996431U CN 208996431 U CN208996431 U CN 208996431U CN 201821525121 U CN201821525121 U CN 201821525121U CN 208996431 U CN208996431 U CN 208996431U
Authority
CN
China
Prior art keywords
girder
angle steel
lower support
bearing
welded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821525121.8U
Other languages
Chinese (zh)
Inventor
张苏玲
张小刚
贺俊芳
刘利军
安凯锋
温凯
董贵红
张澄
赵静
胡玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Second Construction Group Co Ltd
Original Assignee
Shanxi Second Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Second Construction Group Co Ltd filed Critical Shanxi Second Construction Group Co Ltd
Priority to CN201821525121.8U priority Critical patent/CN208996431U/en
Application granted granted Critical
Publication of CN208996431U publication Critical patent/CN208996431U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

Combined operating platform in elevator, suitable for operation in rectangular well hole building field;It is made of two girders, several secondary beams, two bearing diagonals, ropes;Several secondary beams are equidistant and parallel and are connected between two girders, and two bearing diagonals are connected between a girder and lower support, are connected with rope between lower support and another girder;The girder is made of angle steel, connecting plate, support plate, hanging ring, and hanging ring is bolted with angle steel, and angle steel and support plate are welded and welded with connecting plate;Secondary beam is bolted with girder, and bearing diagonal is hinged by pin with girder, and bearing diagonal is hinged by pin with lower support.The utility model easy construction, it is easy for installation, effective guarantee personnel safety is operated most importantly on this platform, a comfortable workbench is provided, while can be repeatedly used in turn, component and spare and accessory parts production are simple, it is economical durable, reduce construction cost.

Description

Combined operating platform in elevator
Technical field
The utility model belongs to building field, the operating platform of the well in-cavity construction personnel suitable for rectangle cartridge type construction.
Background technique
The Jing Dong of rectangle cartridge type construction is elevator and lifting means principal mode in current building, well in-cavity construction when institute The operating platform security reliability set up is directly concerning the life security of construction worker.Following two is used under normal circumstances Method does operating platform:
1, steel pipe type scaffold building is generallyd use, takes and tears intricate operation open, risk is larger, and the platform set up is born Load is largely limited.Fixed platform can only be generally set up into, needs manually to take repeatedly and tear open.Steel pipe used is buckled Part and manually put into more, the phenomenon that cross-operation happens occasionally.
2, using the molding operating platform of steel welding system, be welded into one more heavy, when promotion to the collision of shaft in wall, Friction phenomenon is more, works the finished product protection of structure not easy to control.It has some limitations.
Summary of the invention
The utility model provides Combined operating platform in dismountable power supply for construction stair shaft, which is promoted, set up Securely and reliably, secondary use is not influenced according to hole size assembly spreading, the short rear welding of sanction.It can repeatedly be used in turn.
Combined operating platform in elevator, it is characterized in that by two girders, several secondary beams, two bearing diagonals, ropes Composition.
Several secondary beams are equidistant and parallel and are connected between two girders, two bearing diagonals be connected to a girder with Between lower support, rope is connected between lower support and another girder.
The girder is made of angle steel, connecting plate, support plate, hanging ring, and hanging ring is bolted with angle steel, angle steel and branch Fagging welding is simultaneously welded with connecting plate;
Secondary beam is bolted with girder, and bearing diagonal is hinged by pin with girder, and bearing diagonal and lower support are cut with scissors by pin It connects.
The utility model dismounting, fastening are convenient, and rod piece is readily transported after removing, and pin connection can also be realized between rod piece Rotation is promoted and is installed convenient for platform.
The multi-layer board rear surface that tiles on platform is smooth, and personnel are safe when engineering construction operates, comfortable, and multi-layer board dismounts It is nimble, it can repeatedly be used in turn.
The utility model makes one to feel safe in engineering construction operation and comfortably, go back while meeting using function Safety net can be hung in mesa base, eliminated safe hidden trouble.
Detailed description of the invention
Fig. 1 is the main view of the utility model.
Fig. 2 is the top view of Fig. 1.
Fig. 3 is the left view of Fig. 1.
Fig. 4 is the structure chart of the utility model middle girder.
Fig. 5 is the top view of Fig. 4.
Fig. 6 is the structure chart of secondary beam in the utility model.
Fig. 7 is the top view of Fig. 6.
Fig. 8 is the structure chart of bearing diagonal in the utility model.
Fig. 9 is the top view of Fig. 8.
Figure 10 is the lower structure chart supported in the utility model.
Figure 11 is the top view of Figure 10.
In figure, 1, girder;2, connecting plate;3, support plate;4, connection ring;5, hanging ring;6, connector;7, secondary beam;8, lower branch Support;9, bearing diagonal;11, hinged ear;12, angle steel;15, bolt;16, rope.
Specific embodiment
Shown in Fig. 1, Fig. 2, Fig. 3, Combined operating platform in elevator, the secondary beam 7, two of You Lianggen girder 1,6 is tiltedly propped up Support 9, rope 16 form.
6 secondary beams 7 are equidistant and parallel and are connected between two girders 1, two bearing diagonals 9 be connected to a girder with Between lower support 8, rope 16 is connected between lower support 8 and another girder.
Shown in Fig. 4, Fig. 5, the girder 1 is made of angle steel, connecting plate 2, support plate 3, hanging ring 5, and hanging ring 5 passes through with angle steel Bolt 15 connects, and angle steel and support plate 3 are welded and welded with connecting plate 2;Girder 1 is welded to connect ring 4.
Secondary beam 7 is connect with girder 1 by bolt 15, and bearing diagonal 9 is hinged by pin with girder 1, and bearing diagonal and lower support are logical It is hinged to cross pin;
Shown in Fig. 6, Fig. 7, the secondary beam 7 is a bar, and connector 6, the setting connection of connector 6 is arranged in the both ends of secondary beam 7 Hole.
Shown in Fig. 8, Fig. 9, the bearing diagonal is a bar, is made of square steel.Connector is arranged in the both ends of bearing diagonal, even Connecting hole is arranged in connector.
Shown in Figure 10, Figure 11, the lower support is made of angle steel.Lower supporting welding connection ring 4 and hinged ear 11, rope 15 one end are connect with connection ring 4, and 15 other end of rope is connect with the connection ring 4 of girder 1.
The hinged ear 11 is made of two blocks of steel plates, and two blocks steel plate is parallel and two blocks of steel plates are equipped with connecting hole.

Claims (1)

1. Combined operating platform in elevator, it is characterized in that by two girders, several secondary beams, two bearing diagonals, rope group At;Several secondary beams are equidistant and parallel and are connected between two girders, and two bearing diagonals are connected to a girder and lower branch Between support, rope is connected between lower support and another girder;The girder is by angle steel, connecting plate, support plate, hanging ring group At hanging ring is bolted with angle steel, and angle steel and support plate are welded and welded with connecting plate;Secondary beam and girder are connected by bolt It connects, bearing diagonal is hinged by pin with girder, and bearing diagonal is hinged by pin with lower support.
CN201821525121.8U 2018-09-18 2018-09-18 Combined operating platform in elevator Active CN208996431U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821525121.8U CN208996431U (en) 2018-09-18 2018-09-18 Combined operating platform in elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821525121.8U CN208996431U (en) 2018-09-18 2018-09-18 Combined operating platform in elevator

Publications (1)

Publication Number Publication Date
CN208996431U true CN208996431U (en) 2019-06-18

Family

ID=66800468

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821525121.8U Active CN208996431U (en) 2018-09-18 2018-09-18 Combined operating platform in elevator

Country Status (1)

Country Link
CN (1) CN208996431U (en)

Similar Documents

Publication Publication Date Title
CN112177309A (en) Assembled protection platform used in building elevator shaft
CN208996431U (en) Combined operating platform in elevator
CN207191310U (en) One kind is used for ship plank construction portable unit
CN201116261Y (en) Tool type safety shackle for hanging steel crane beam
CN211173170U (en) A appurtenance for girder steel installation
CN105019360B (en) A kind of construction method based on high-altitude crawler crane trestle
CN202990406U (en) Bowl buckle type scaffold
CN206530032U (en) Scaffold can be moved integrally
CN101818576B (en) Safe escape device for ultra-high-rise building core tube construction
CN204040442U (en) A kind of integral lifting elevator hoistways operating platform
CN201756401U (en) Snap for lifting
CN209652976U (en) Fashioned iron Force transmission parts
CN202577927U (en) Suspended basket for assembling honeycomb grid column structural steel framework
CN220705245U (en) A safety protection canopy for curtain installation
CN207348447U (en) A kind of scaffold lifting is early to tear system open
CN201778498U (en) Safe escape device for super-high-rise building core wall construction
CN100513290C (en) C-shaped recessed suspending protector of rack bolt and construction method
CN212837557U (en) Combined crawling ladder convenient for installing and welding double-steel-plate box type steel plate wall steel beams
CN212671301U (en) Movable construction safety steel stair for assembly type building stairwell
CN214611153U (en) Be used for boiler soot blower to overhaul lifting device
CN211899767U (en) Steel member safety protection structure
CN220058759U (en) Part component suitable for mounting machine steel platform of residential building
CN213087495U (en) Stair entrance to a cave safety protective guard between construction layer
CN217149905U (en) Make things convenient for portable operation platform of bridge construction
CN212984583U (en) Modular stub splicing assembly type construction platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant