CN208996257U - Prefabricated panel - Google Patents

Prefabricated panel Download PDF

Info

Publication number
CN208996257U
CN208996257U CN201821250087.8U CN201821250087U CN208996257U CN 208996257 U CN208996257 U CN 208996257U CN 201821250087 U CN201821250087 U CN 201821250087U CN 208996257 U CN208996257 U CN 208996257U
Authority
CN
China
Prior art keywords
concrete
concrete panel
ontology
panel ontology
reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821250087.8U
Other languages
Chinese (zh)
Inventor
苏程祥
许根才
胡伟政
海东风
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Elite Architectural Co Ltd
Original Assignee
Elite Architectural Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Elite Architectural Co Ltd filed Critical Elite Architectural Co Ltd
Priority to CN201821250087.8U priority Critical patent/CN208996257U/en
Application granted granted Critical
Publication of CN208996257U publication Critical patent/CN208996257U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The utility model relates to a kind of prefabricated panels, it includes concrete panel ontology and concrete-bar component, the width of concrete panel ontology is in 400mm or more, concrete-bar component is embedded in concrete panel ontology, concrete-bar component includes horizontal reinforcement and longitudinal reinforcement, the horizontal reinforcement both ends are straight reinforcing bar, stretch out outside at left and right sides of concrete panel ontology, and the diameter of horizontal reinforcement is 8mm or more.The utility model prefabricated panel is in the case where every installation parameter meets construction quality requirement, straight line muscle is set by protruding bar, can be reduced template deformation, it is conveniently stripped, reduce spillage, facilitate construction, accelerate wallboard installation speed, very big economic benefit can be generated, also, since template open area is small, the influence to formwork structure intensity is reduced, its durability is improved, achievees the purpose that save template.

Description

Prefabricated panel
Technical field
The utility model relates to a kind of architectural precast, especially a kind of prefabricated panel.
Background technique
Existing prefabricated panel protruding bar is band crotch form.When prefabricated panel protruding bar is bar with hooked end, Its side form must slot, and otherwise can not demould.
After side form fluting, it can be blocked with foamed material.Since prefabricated panel is made on flowing water line platform , platform can vibrate automatically, and foamed material is easy to fall off when vibrating, and generate spillage.
After side form fluting, its own rigidity reduces, it is easy to generate moderate finite deformation, it is therefore necessary to one is welded at the top of side form Root channel steel virtually increases template cost.Meanwhile when being welded with channel steel, since weld stress side form bottom can be also deformed, It also can spillage.
Prefabricated panel protruding bar band crotch form, can also cause very big trouble to construction: 1) template construct is time-consuming;2) Demoulding is difficult, because template is easy to be deformed when demoulding;3) be inconvenient to construct, because must will cut before prefabricated panel lifting In place, the protruding bar with crotch is easy to fight with it (is easy phase to the reinforcement installation of power wall edge member between prefabricated panel Mutually hook), it is necessary at the scene by the first bending outward of the protruding bar of prefabricated panel, it just can be carried out wallboard lifting.
Utility model content
The purpose of this utility model is to provide a kind of simple and reasonable for structure, save template, reduces template deformation, conveniently It demoulds, reduces spillage, facilitate construction, accelerate wallboard installation speed, the prefabricated panel of very big economic benefit can be generated, to overcome The deficiencies in the prior art.
Purpose of the utility model is realized as follows:
A kind of prefabricated panel, including concrete panel ontology and concrete-bar component, the width of concrete panel ontology is in 400mm More than, concrete-bar component is embedded in concrete panel ontology, and concrete-bar component includes horizontal reinforcement and longitudinal reinforcement, characterized in that The horizontal reinforcement both ends be straight reinforcing bar, stretch out it is outer at left and right sides of concrete panel ontology, the diameter of horizontal reinforcement be 8mm with On.
The purpose of this utility model can also be solved using following technical measures:
As more specific scheme, at least front and rear sides are respectively equipped with more horizontal steel in the concrete panel ontology Muscle, horizontal reinforcement vertical arrangement.
As further embodiment, the longitudinal reinforcement is U-shaped, and open end extends to lower end in concrete panel ontology, Closed end stretches out concrete panel bodies top;The longitudinal reinforcement lateral arrangement has more, at least part longitudinal reinforcement Front and rear sides are connected with lacing wire, lacing wire both ends band coupler body, and coupler body catches on longitudinal reinforcement.
As further embodiment, the concrete-bar component further includes wall connecting reinforcing bar, and wall connecting reinforcing bar is straight reinforcing bar, Its lower end is inserted into concrete panel ontology, and concrete panel bodies top is stretched out in upper end.
As further embodiment, the concrete panel body top surface is equipped with fitting-type face.
As further embodiment, in the concrete panel ontology, lower end, which is embedded with, is vertically connected with grout sleeve.
As further embodiment, shearing resistance concave face is equipped at left and right sides of the concrete panel ontology.
As further embodiment, lower part is also embedded with more horizontal point arranged up and down in the concrete panel ontology Cloth muscle.
As further embodiment, the concrete panel ontology internal upper part is also embedded with beam and indulges muscle.
The beneficial effects of the utility model are as follows:
(1) the utility model prefabricated panel is in the case where every installation parameter meets construction quality requirement, by overhanging steel Muscle is set as straight line muscle, can be reduced template deformation, it is conveniently stripped, reduce spillage, facilitate construction, accelerate wallboard installation speed, energy Very big economic benefit is generated, also, since template open area is small, reduces the influence to formwork structure intensity, it is resistance to improve its Expenditure achievees the purpose that save template;
(2) template of corresponding prefabricated panel left and right sides only needs out the circular hole of 2mm bigger than horizontal reinforcement diameter, so as to Overhanging section of horizontal reinforcement passes through, and does not need to be welded with reinforcement channel steel since open area is small, on side form, can save a large amount of templates, It will not be deformed because of weld stress, continue spillage (this structure spillage amount very little, and cement mortar itself can be by water Gap plugging between flat reinforcing bar and circular hole);
(3) when lifting by crane prefabricated panel, overhanging section of horizontal reinforcement between prefabricated panel will not fight mutually, can accelerate wallboard Installation speed.
Detailed description of the invention
Fig. 1 is an embodiment of the present invention schematic view of the front view.
Fig. 2 is Fig. 1 perspective structure schematic diagram.
Fig. 3 is the A-A schematic cross-sectional view of Fig. 1.
Fig. 4 is the B-B schematic cross-sectional view of Fig. 1.
Specific embodiment
The utility model is further described with reference to the accompanying drawings and embodiments.
Referring to FIG. 1 to FIG. 4, a kind of prefabricated panel, including concrete panel ontology 2 and concrete-bar component, concrete walls In 400mm or more, concrete-bar component is embedded in concrete panel ontology 2 width of plate ontology 2, and concrete-bar component includes horizontal reinforcement 1 and longitudinal reinforcement 3,1 both ends of horizontal reinforcement are straight reinforcing bar, outer, the horizontal reinforcement that stretches out 2 left and right sides of concrete panel ontology 1 diameter is 8mm or more.
At least front and rear sides are respectively equipped with more horizontal reinforcements 1 in the concrete panel ontology 2, and horizontal reinforcement 1 is vertical Arrangement.
The longitudinal reinforcement 3 is U-shaped, and open end extends to lower end in concrete panel ontology 2, and closed end stretches out concrete 2 top of wallboard body;3 lateral arrangement of longitudinal reinforcement has more, and the front and rear sides of at least part longitudinal reinforcement 3 are connected with Lacing wire 8,8 both ends of lacing wire band coupler body, coupler body catch on longitudinal reinforcement 3.
The concrete-bar component further includes wall connecting reinforcing bar 4, and wall connecting reinforcing bar 4 is straight reinforcing bar, and coagulation is inserted into lower end In native wallboard body 2,2 top of concrete panel ontology is stretched out in upper end.
2 top surface of concrete panel ontology is equipped with fitting-type face 21.
Lower end, which is embedded with, in the concrete panel ontology 2 is vertically connected with grout sleeve 6.
Shearing resistance concave face 22 is equipped at left and right sides of the concrete panel ontology 2.
Lower part is also embedded with more horizontal distribution muscle 7 arranged up and down in the concrete panel ontology 2.
2 internal upper part of concrete panel ontology is also embedded with beam and indulges muscle 5.

Claims (7)

1. a kind of prefabricated panel, including concrete panel ontology and concrete-bar component, the width of concrete panel ontology 400mm with On, concrete-bar component is embedded in concrete panel ontology, and concrete-bar component includes horizontal reinforcement and longitudinal reinforcement, characterized in that institute It states horizontal reinforcement both ends to be straight reinforcing bar, stretch out outside at left and right sides of concrete panel ontology, the diameter of horizontal reinforcement is 8mm or more;
The concrete-bar component further includes wall connecting reinforcing bar, and wall connecting reinforcing bar is straight reinforcing bar, and concrete panel is inserted into lower end In ontology, concrete panel bodies top is stretched out in upper end;
Lower end, which is embedded with, in the concrete panel ontology is vertically connected with grout sleeve.
2. prefabricated panel according to claim 1, it is characterised in that: at least front and rear sides in the concrete panel ontology It is respectively equipped with more horizontal reinforcements, horizontal reinforcement vertical arrangement.
3. prefabricated panel according to claim 1, it is characterised in that: the longitudinal reinforcement is U-shaped, and open end extends to mixed Lower end in solidifying soil wallboard body, closed end stretch out concrete panel bodies top;The longitudinal reinforcement lateral arrangement has more, until The front and rear sides of few a part of longitudinal reinforcement are connected with lacing wire, lacing wire both ends band coupler body, and coupler body catches on longitudinal reinforcement.
4. prefabricated panel according to claim 1, it is characterised in that: the concrete panel body top surface is equipped with fitting-type Face.
5. prefabricated panel according to claim 1, it is characterised in that: be equipped at left and right sides of the concrete panel ontology anti- Cut concave face.
6. prefabricated panel according to claim 1, it is characterised in that: lower part is also embedded in the concrete panel ontology More horizontal distribution muscle arranged up and down.
7. prefabricated panel according to claim 1, it is characterised in that: the concrete panel ontology internal upper part is also embedded with Beam indulges muscle.
CN201821250087.8U 2018-08-04 2018-08-04 Prefabricated panel Expired - Fee Related CN208996257U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821250087.8U CN208996257U (en) 2018-08-04 2018-08-04 Prefabricated panel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821250087.8U CN208996257U (en) 2018-08-04 2018-08-04 Prefabricated panel

Publications (1)

Publication Number Publication Date
CN208996257U true CN208996257U (en) 2019-06-18

Family

ID=66796913

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821250087.8U Expired - Fee Related CN208996257U (en) 2018-08-04 2018-08-04 Prefabricated panel

Country Status (1)

Country Link
CN (1) CN208996257U (en)

Similar Documents

Publication Publication Date Title
CN105569224B (en) Concrete filled steel tube edge constraint overlaps monoblock type shear wall and preparation and installation method
CN207616844U (en) Foundation platform precast concrete side form and molding machine
CN207959612U (en) A kind of frame, shear wall cast-in-place structural fill wall with assembled light
CN205742641U (en) The prefabricated overlaid plate type shear wall structure that the dislocation of a kind of innovative panellised wall connects
CN206233596U (en) Building block exterior wall constructional column concrete casting device
CN206752735U (en) Precast shear wall insert-type steel board connecting structure
CN204098486U (en) The concrete of building basement roof ater-casting hangs mould
CN207032862U (en) A kind of combined steel hangs mould
CN208441304U (en) A kind of LH assembled cast-in-place concrete shear wall is with exempting from demoulding shell
CN201762856U (en) Stripping-free formwork for engineering
CN208996257U (en) Prefabricated panel
CN206941959U (en) A kind of reinforced beam cavity body structure
CN205712565U (en) A kind of prefabricated two-sided wall
CN105041340A (en) Structure and construction method for increasing arch crown concrete pouring speed in tunnel engineering
CN206319404U (en) A kind of building precast exterior sheathing
CN205777505U (en) Beam-ends sealing off and covering anchorage concrete construction typified form
CN207376661U (en) A kind of plugging structure of poured band of outer wall of basement
CN207348280U (en) A kind of novel precast floor slab
CN205530819U (en) Steel frame structure of embedded precast concrete shear force wall bending resistance simultaneously
CN206267351U (en) A kind of inclined hole grouting shear wall of in-line
CN209353775U (en) A kind of concrete appearance defect processing repair outfit
CN204941567U (en) A kind of structure accelerating construction of tunnel vault pouring concrete speed
CN208918032U (en) Building concrete shear wall reserved opening plugging structure
CN206360077U (en) A kind of precast reinforced concrete structure
CN208633518U (en) Prestressed concrete laminated floor slab hangs mould pouring construction structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190618

Termination date: 20210804