CN208994958U - Module lifts by crane component - Google Patents
Module lifts by crane component Download PDFInfo
- Publication number
- CN208994958U CN208994958U CN201821864175.7U CN201821864175U CN208994958U CN 208994958 U CN208994958 U CN 208994958U CN 201821864175 U CN201821864175 U CN 201821864175U CN 208994958 U CN208994958 U CN 208994958U
- Authority
- CN
- China
- Prior art keywords
- steel column
- plate
- side plate
- substrate
- lifting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 45
- 239000010959 steel Substances 0.000 claims abstract description 45
- 239000000758 substrate Substances 0.000 claims abstract description 16
- 239000000203 mixture Substances 0.000 claims abstract description 5
- 238000003466 welding Methods 0.000 claims abstract description 4
- 238000000034 method Methods 0.000 abstract description 5
- 238000010586 diagram Methods 0.000 description 9
- 238000009434 installation Methods 0.000 description 4
- 238000003491 array Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000003550 marker Substances 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model relates to boom hoisting field, especially modules to lift by crane component.The lifting component includes steel column, lifting lug, outer splice plate, interior splice plate, end board, bolt hole and wears groove, the steel column is one piece of substrate and two pieces of side plate compositions, the equal vertical welding of the tow sides of substrate is fixed with side plate, substrate and side plate form cross-shaped structure, there are four end boards for the end point welded connecting of steel column, end board is respectively welded on the substrate and side plate of steel column, four outer side edges of steel column, which are respectively perpendicular, is welded with outer splice plate, lifting lug is fixedly connected on two opposite outer splice plates, interior splice plate is fixedly connected on the side plate planar of steel column.The utility model is by that prevent the edge of a wing deformation of steel column during lifting by crane, and can serve as two fixed interconnecting pieces of lifting components linking in steel column end fixed charge method end plate.Again by the bolt of splice plate be detachably connected realize it is reusable, improve structural strength.
Description
Technical field
The utility model relates to boom hoisting field, especially modules to lift by crane component.
Background technique
Current assembled architecture is prevailing, and rod piece installation is installed at modularization, and following problem is exactly component substance
Just go up at geometry grade, the individual module on some mega projects, hoisting weight is to 800 tons, therefore, pacifies in promotional moduleization
Under the overall situation of dress, other than the requirement to Lifting implements, what the device of lifting point, scene were spliced on rod piece wants all items
It asks, recycling rate of waterused etc. proposes requirement.And the lifting component not met the requirements at present.
Utility model content
Technical problem to be solved by the utility model is: in order to solve technical problem described in background technique, this is practical
It is novel to provide a kind of module lifting component, by steel column end fixed charge method end plate, to prevent the edge of a wing of steel column during lifting
Deformation, and two fixed interconnecting pieces of lifting component linking can be served as.Reality is detachably connected by the bolt of splice plate again
It is existing reusable, improve structural strength.
The technical scheme adopted by the utility model to solve the technical problem is as follows:
A kind of module lifts by crane component, including steel column, lifting lug, outer splice plate, interior splice plate, end board, bolt hole and
Wears groove, the steel column are one piece of substrate and two pieces of side plate compositions, and the equal vertical welding of the tow sides of substrate is fixed with side plate, substrate
Cross-shaped structure is formed with side plate, the end point of steel column is welded to connect there are four end board, and end board is respectively welded
On the substrate and side plate of steel column, the wears groove for passing through interior splice plate is offered on the board of end, is opened on the board of end
Equipped with the bolt hole for being bolted other end boards, four outer side edges of steel column, which are respectively perpendicular, is welded with outer splicing
Plate is fixedly connected with lifting lug on two opposite outer splice plates, interior splice plate is fixedly connected on the side plate planar of steel column.
Specifically, the hole two sides of the lifting lug are equipped with lifting lug hole stiffening plate.
Specifically, the lifting lug is bolted to connection on outer splice plate.
Specifically, the interior splice plate is bolted to connection on the side plate planar of steel column.
The beneficial effects of the utility model are: the utility model provides a kind of module lifting component, by steel column end
Head fixed charge method end plate, preventing the edge of a wing deformation of steel column during lifting, and it is fixed to serve as two lifting components linkings
Interconnecting piece.Again by the bolt of splice plate be detachably connected realize it is reusable, improve structural strength.
Detailed description of the invention
The present invention will be further described with reference to the accompanying drawings and examples.
Fig. 1 is the structural schematic diagram of the utility model;
Structural schematic diagram when Fig. 2 is the utility model lifting module;
Fig. 3 is the structural schematic diagram of the steel column end of the utility model;
Fig. 4 is the structural schematic diagram of the end board of the utility model;
1. steel column in figure, 2. lifting lugs, 3. outer splice plates, splice plate in 4., 5. end boards, 6. bolts hole, 7. wears grooves,
8. lifting lug hole stiffening plate.
Specific embodiment
The utility model is described in further detail presently in connection with attached drawing.These attached drawings are simplified schematic diagram,
Only illustrate the basic structure of the utility model in a schematic way, therefore it only shows composition related with the utility model.
Fig. 1 is the structural schematic diagram of the utility model, structural schematic diagram when Fig. 2 is the utility model lifting module, Fig. 3
It is the structural schematic diagram of the steel column end of the utility model, Fig. 4 is the structural schematic diagram of the end board of the utility model.
A kind of module lifting component, including steel column 1, lifting lug 2, outer splice plate 3, interior splice plate 4, end board 5, bolt
Hole 6 and wears groove 7, the steel column 1 are one piece of substrate and two pieces of side plate compositions, and the equal vertical welding of the tow sides of substrate is fixed with side
Plate, substrate and side plate form cross-shaped structure, and there are four end board 5, end boards for the end point welded connecting of steel column 1
5 are respectively welded on the substrate and side plate of steel column 1, and the wears groove 7 for passing through interior splice plate 4, end are offered on end board 5
The bolt hole 6 for being bolted other end boards 5 is offered on portion's board 5, four outer side edges of steel column 1 are hung down respectively
It is directly welded with outer splice plate 3, lifting lug 2 is fixedly connected on the outer splice plate 3 of opposite two, is fixed on the side plate planar of steel column 1
It is connected with interior splice plate 4.The hole two sides of the lifting lug 2 are equipped with lifting lug hole stiffening plate 8.2 company of being bolted of lifting lug
It connects on outer splice plate 3.The interior splice plate 4 is bolted to connection on the side plate planar of steel column 1.
In conjunction with shown in attached drawing 1, attached drawing 2, attached drawing 3 and attached drawing 4, for the steel column 1 in installation module, because other girder steels exist
It is each attached to before factory on steel column 1, therefore finally in lifting operation finally at the scene, needs to bear the weight of entire module
Amount, therefore need to do following setting on mainly lifting steel column, first welds mounting end board 5 on 1 head of steel column.Steel column
1 end is cross, and four end boards 5 are separately fixed in four marker spaces of cross end.
The effect of four end boards 5 is first, prevents lifting component from, by external force, leading during lifting
The deformation of 1 flange plate of steel column is caused, to influence subsequent splicing.Second can serve as connection when two lifting component tandem arrays
Component, as long as lifting by crane the end board 5 that component phase note closes for two, is screwed into spiral shell by bolt during the assembly in later period
It achieves a fixed connection in keyhole 6, deviation would not occur in that position for saving module up and down.
In mainly lifting 1 two sides of steel column, two lifting lugs 2 are installed, this lifting lug 2 is particular in that, can repeat benefit
With, bolt hole and hole location on outer splice plate 3 are completely corresponding, and lifting installation is in place, the installation for other modules can be removed,
It should be noted that doing lifting lug hole stiffening plate 8 in the two sides of its lifting eye, prevent lifting lug hole from tearing during lifting, from
And cause safety accident.
Interior splice plate 4 is slid into from the wears groove 7 of end board 5, and is fixedly connected on interior splice plate 4 by bolt
On steel column 1.
It is enlightenment, through the above description, related work people with the above-mentioned desirable embodiment according to the utility model
Member can carry out various changes and amendments in the range of without departing from this item utility model technical idea completely.This item is real
It is not limited to the contents of the specification with novel technical scope, it is necessary to its technology is determined according to scope of the claims
Property range.
Claims (4)
1. a kind of module lifts by crane component, it is characterised in that: including steel column (1), lifting lug (2), outer splice plate (3), interior splice plate
(4), end board (5), bolt hole (6) and wears groove (7), the steel column (1) are one piece of substrate and two pieces of side plate compositions, substrate
The equal vertical welding of tow sides be fixed with side plate, substrate and side plate form cross-shaped structure, and the end point of steel column (1), which is welded, to be connected
It connects there are four end board (5), end board (5) is respectively welded on the substrate and side plate of steel column (1), end board
(5) it is offered on for the wears groove (7) across interior splice plate (4), end board offers on (5) for being bolted other
The bolt hole (6) of end board (5), four outer side edges of steel column (1), which are respectively perpendicular, to be welded with outer splice plate (3), opposite
It is fixedly connected with lifting lug (2) on two outer splice plates (3), interior splice plate (4) is fixedly connected on the side plate planar of steel column (1).
2. module according to claim 1 lifts by crane component, it is characterised in that: the hole two sides of the lifting lug (2), which are equipped with, hangs
Earhole stiffening plate (8).
3. module according to claim 1 lifts by crane component, it is characterised in that: the lifting lug (2) is bolted to connection
On outer splice plate (3).
4. module according to claim 1 lifts by crane component, it is characterised in that: the interior splice plate (4) is bolted
It is connected on the side plate planar of steel column (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821864175.7U CN208994958U (en) | 2018-11-13 | 2018-11-13 | Module lifts by crane component |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821864175.7U CN208994958U (en) | 2018-11-13 | 2018-11-13 | Module lifts by crane component |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208994958U true CN208994958U (en) | 2019-06-18 |
Family
ID=66807656
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821864175.7U Expired - Fee Related CN208994958U (en) | 2018-11-13 | 2018-11-13 | Module lifts by crane component |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208994958U (en) |
-
2018
- 2018-11-13 CN CN201821864175.7U patent/CN208994958U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103132458A (en) | Overall installation method of double-body separable combined beam | |
CN208994958U (en) | Module lifts by crane component | |
CN205112085U (en) | Hydraulic pressure centre form construction system | |
CN203755459U (en) | I-profile steel installation piece | |
CN102381438B (en) | Wholly lifting mounting method for wholly built upstairs stem section of large-size semi-submerged ship | |
CN201778497U (en) | Multi-section column aloft spliced temporary fixing device | |
CN204211393U (en) | A kind of wind-powered electricity generation lifts special arm head | |
CN207844882U (en) | Steel column and crane girder connecting structure | |
CN203740915U (en) | Gantry crane boom system mounting device | |
CN205858396U (en) | A kind of fully-mechanized mining working surface hydraulic support assembly platform | |
CN205222516U (en) | Stand and track crossbeam connection structure between assembled maintenance | |
CN209161320U (en) | A kind of tool part and the hoisting apparatus with it | |
CN208037823U (en) | A kind of hoisting fixture | |
CN102616681A (en) | Cargo boom root section and tower crane comprising same | |
CN104003327A (en) | Drag shovel multipurpose car and method for enabling underground support to enter cage | |
CN208327150U (en) | New engineering machinery repairs platform | |
CN202242846U (en) | Steel plate spring fixed end support | |
CN205132970U (en) | Removable stock structure of tower machine | |
CN105584939A (en) | Arm head special for wind power generator hoisting | |
CN202508790U (en) | Novel tower type crane attachment framework device | |
CN205839975U (en) | A kind of davit attachment structure of primary-secondary beam | |
CN201695946U (en) | Rotary drilling machine | |
CN105019556A (en) | Lap-joint structure assisting quick hoisting of high-rise steel beam, and application of lap-joint structure | |
CN205046544U (en) | Ram horn frame device and strong machine that rams by force | |
CN212802261U (en) | Crossbeam mosaic structure in honeycomb storehouse of living |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190618 |