Curtain wall installing structure Download PDFInfo
- Publication number
- CN208981585U CN208981585U CN201821630019.4U CN201821630019U CN208981585U CN 208981585 U CN208981585 U CN 208981585U CN 201821630019 U CN201821630019 U CN 201821630019U CN 208981585 U CN208981585 U CN 208981585U
- Authority
- CN
- China
- Prior art keywords
- connector
- curtain wall
- sliding
- connection component
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
The utility model relates to install curtain wall technology field, uneven problem is easy for curtain wall surface, provide a kind of curtain wall installing structure, the technical solution is as follows: including fixed skeleton, first connection component, curtain wall panel and the second connection component, first connection component includes the first connector and the second connector, first connector is fixed on fixed skeleton, second connector is slidably connected on the first connector, first connector is equipped with the first driving assembly that the second connector of driving slides along the vertical direction, second connection component is movable towards the direction vertical with curtain wall panel along the second connector, second connector is equipped with movable second driving assembly of the second connection component of driving and fixes the fixing piece of the second connection component position.By adjusting the relative position between the second connection component and the second connector, so that the position of fixed skeleton and curtain wall panel is adjusted, so that the surface between adjacent curtain wall panel flushes.
Description
Technical field
The utility model relates to install curtain wall technology field, more specifically, it relates to a kind of curtain wall installing structure.
Background technique
Curtain wall is the exterior wall enclosure of building, and not load-bearing is hung up as curtain, therefore also known as " curtain wall ", it is modern
Large-scale and skyscraper commonly has the lightweight wall of decorative effect.
Traditional curtain wall is usually the position for first passing through accurate measurement and calculating to determine fixed skeleton, then passes through note
Curtain wall panel is directly paved on fixed skeleton by the mode of glue.But during injecting glue is mated formation, since injecting glue is to pass through
What manual operation was completed, the thickness of injecting glue can not be precisely extremely completely the same, so that the thickness for the curtain wall panel mated formation is difficult to
It is completely secured completely the same, and then is difficult to ensure that the surface between adjacent curtain wall panel flushes, is easy to appear the surface meeting of curtain wall
Situation that is uneven and influencing beauty, still there is improved space.
Utility model content
In view of the deficienciess of the prior art, having the purpose of this utility model is to provide a kind of curtain wall installing structure
The advantages of curtain wall surface flushes.
To achieve the above object, the utility model provides following technical solution:
A kind of curtain wall installing structure, including be installed on building masonry wall fixation skeleton, be fixed on fixed skeleton
First connection component, curtain wall panel and the second connection component being fixed on curtain wall panel, first connection component include
First connector and the second connector, first connector are fixed on fixed skeleton, and the second connector sliding connects
It is connected on the first connector, second connector slides along the vertical direction, and first connector is equipped with driving second and connects
First driving assembly of fitting sliding, second connection component are detachably connected with the second connector, the second connection group
For part along the second connector towards the direction activity vertical with curtain wall panel, second connector is equipped with the second connection component of driving
Movable second driving assembly is additionally provided with the fixing piece for fixing the second connection component position on second connector.
By adopting the above technical scheme, by the way that the second connection component to be connect with the second connector, and pass through the second driving group
Part drives the second connection component towards the direction activity vertical with curtain wall panel to adjust the position of the second connection component, to adjust
The position for saving the curtain wall panel being fixedly connected with the second connection component, so that the table on the surface of curtain wall panel and adjacent curtain wall panel
Face flushes, then curtain wall panel is fixed on the second connector by fixing piece, so that the surface of curtain wall flushes, reduces curtain
Wall surface will appear uneven and influence beautiful situation;In addition, when there are deviations for the size of curtain wall panel, in vertical direction
On adjacent curtain wall panel between there are when gap, drive the second connector along the first connector perpendicular by the first driving assembly
Histogram upward sliding reduces adjacent curtain in the vertical direction to adjust the position of the curtain wall panel being fixed on the second connector
There can be the case where gap between shingle nail, so that being bonded between adjacent curtain wall panel in the vertical direction, reduce curtain wall face
Plate can lead to the unbalance stress with the second connector due to the shaking occurred under the effect of gravity on vertical direction there are gap,
So that the case where junction of curtain wall panel and the second connector is easily broken off, be conducive to extend the second connector uses the longevity
Life;It is detachable by the second connection component and the second connector so that curtain wall panel is detachable, convenient for curtain wall panel installation and
Disassembly.
Preferably, first connector is the first fixed block, and the one end of first fixed block far from fixed skeleton is recessed
The first sliding groove having for the sliding of the second connector is fallen into, second connector is protruding with first close to one end of the first connector and slides
Block, the shape size in section of the section with first sliding groove in the horizontal direction of first sliding block in the horizontal direction are consistent.
By adopting the above technical scheme, section of section and first sliding groove in the horizontal direction by the first sliding block in the horizontal direction
The shape size in face is consistent, so that the two sides of the second connector in the horizontal direction are abutted with first sliding groove, so that the second connection
The glide direction of part is unique, reduces the case where the second connector can shift in sliding process, and then is conducive to keep curtain
The case where stability that shingle nail moves along the vertical direction, reducing the position of curtain wall panel can shift.
Preferably, first driving assembly includes along the vertical direction through the first threaded hole of the first sliding block and with the
The first bolt that one threaded hole is threadedly coupled.
By adopting the above technical scheme, by rotating the first bolt, so that sliding block slides along the vertical direction, to drive second
Connector slides along the vertical direction, easy to operate, while by the threaded connection of the first threaded hole and the first bolt, utilizing spiral shell
The self-locking function of line, so that the position between the first bolt and the first sliding block is relatively fixed, so that the second connector is not allowed
It is easily subjected to displacement, so that curtain wall panel is less likely to occur to be displaced, so that the position of curtain wall panel is stablized, reduces curtain wall panel
Position the case where shifting.
Preferably, the second connector boring, second connector far from the open at one end of the first connector,
Second driving assembly includes the sliding shoe being slidably connected to inside the second connector and drives sliding shoe along the vertical direction
The actuator of sliding, second connection component include the second fixed block being fixed on curtain wall panel, second fixed block
Close to the side of sliding shoe, recess has the groove chimeric with sliding shoe along the vertical direction, and the sliding shoe and groove are close to first
The side of connector is inclined-plane setting, when the sliding shoe slides into the highest position of level height, the bottom of sliding shoe
Not less than the top of groove.
By adopting the above technical scheme, sliding shoe is driven to slide towards the direction of the second fixed block by actuator, so that sliding
The inclined-plane of motion block is abutted with the inclined-plane of groove, by the inclined-plane of sliding shoe to the impetus on the inclined-plane of groove, so that second is solid
Block is determined along the direction activity perpendicular to curtain wall panel, so that the position of curtain wall panel is adjusted, so that between adjacent curtain wall panel
Surface flushes, reduce the surface between adjacent curtain wall panel can there is a situation where it is uneven;Meanwhile passing through sliding shoe and groove
It is chimeric so that the position of curtain wall panel is tentatively fixed.
Preferably, the actuator includes the second bolt being rotatablely connected with sliding shoe far from groove one end, and described second
One end that bolt is connect with sliding shoe is fixedly connected with fixture block, and recess has the card slot for fixture block insertion on the sliding shoe, described
The top of second the second connector of bolt-through, second connector runs through to have along the vertical direction to be connect with the second bolt thread
The second threaded hole.
By adopting the above technical scheme, by rotating the second bolt, so that the second bolt is vertically moving, pass through fixture block
Connection so that sliding shoe slides along the vertical direction with the second bolt synchronous, and then drive the sliding of the second fixed block to adjust curtain wall
The position of panel, it is easy to operate;Made by the threaded connection of the second bolt and the second threaded hole using the self-locking function of screw thread
The position for obtaining the second bolt is relatively fixed, so that the position of sliding shoe and the second fixed block is relatively stable, so that
The position of curtain wall panel is relatively fixed, reduces the case where curtain wall panel can shift.
Preferably, the bolt head of first bolt and the second bolt is placed in the first connection component along the vertical direction
The same side.
By adopting the above technical scheme, the first connection component edge is placed in by the bolt head of the first bolt and the second bolt
The same side of vertical direction, so that the operating position of adjusting position is close, convenient for operation.
Preferably, the fixing piece is spring, and the fixing piece is fixedly connected on the second connector and the interior of face that be open
On wall.
By adopting the above technical scheme, when the second fixed block passes through the internal activity of promotion the second connector of direction of sliding shoe
When with adjusting position, one end meeting compressed spring of second fixed block far from curtain wall panel, so that spring has the second fixed block
Towards the motive force in curtain wall panel direction, so that the position of the second fixed block is fixed, so that the position of curtain wall panel
It is fixed.
Preferably, the bottom of second fixed block is protruding with the second sliding block, and the inner wall depression of second connector has
For the second sliding slot of the second sliding block sliding.
By adopting the above technical scheme, it is slided by the second sliding block along second sliding slot, is connect convenient for the second fixed block with second
Part connection, it is easy to operate, while making the link position of the second fixed block and the second connector unique, it is convenient for groove and sliding shoe
Alignment, reduce the case where position of groove and sliding shoe is staggered and can not adjust the position of curtain wall panel.
Preferably, the fixture block is rubber sheet gasket.
By adopting the above technical scheme, by the setting of rubber sheet gasket, rubber sheet gasket is conducive to the second bolt of buffering and is driving
To the detrimental effect of sliding shoe during sliding shoe sliding, reduces by the second bolt to the detrimental effect of sliding shoe, be conducive to prolong
The service life of long sliding shoe.
Preferably, the section of second fixed block along the vertical direction is consistent with the shape size that the second connector is open.
By adopting the above technical scheme, the shape being open by the section of the second fixed block along the vertical direction with the second connector
In the same size, so that the second fixed block is when slipping into inside the second connector, each side wall of the second fixed block is with second
Each side wall of connector opening abuts, so that the link position of the second fixed block and the second connector is unique, it is fixed convenient for second
The connection of block and the second connector, while being aligned convenient for groove and the position of sliding shoe, reduce the position of groove and sliding shoe
The case where being staggered and the position of curtain wall panel can not be adjusted.
In conclusion the utility model has the following beneficial effects:
1. by adjusting the relative position between the second connection component and the second connector, to adjust fixed skeleton and curtain
The position of shingle nail, so that the surface between adjacent curtain wall panel flushes, reducing curtain wall surface will appear uneven and influences
Beautiful situation;
2. it is solid to adjust to drive the second connector to slide in the vertical direction along the first connector by the first driving assembly
Due to the position of the curtain wall panel on the second connector, gap can be had by reducing between adjacent curtain wall panel in the vertical direction
The case where;
3. it is detachable by the second connection component and the second connector, so that curtain wall panel is detachable, it is convenient for curtain wall panel
Installation and removal;
4. drive the second connector to adjust the position of curtain wall panel by the first bolt, using the self-locking function of screw thread,
So that the second connector is less likely to occur to be displaced, so that curtain wall panel is less likely to occur, so that the position of curtain wall panel is steady
Calmly, the case where reducing the position of curtain wall panel can shift.
Detailed description of the invention
Fig. 1 is the overall structure diagram of curtain wall installing structure in the utility model;
Fig. 2 is the schematic diagram of internal structure of curtain wall installing structure in the utility model;
Fig. 3 is the enlarged diagram in the portion A in Fig. 2.
In figure: 1, fixed skeleton;2, curtain wall panel;3, the first connection component;31, the first connector;311, first is fixed
Block;312, first sliding groove;313, third threaded hole;32, the second connector;321, the first sliding block;322, fixing piece;323, movable
Frame;324, second sliding slot;325, third sliding slot;4, the second connection component;41, the second fixed block;42, the second sliding block;5, first
Driving assembly;51, the first bolt;52, the first threaded hole;6, the second driving assembly;61, actuator;611, the second bolt;612,
Second threaded hole;613, fixture block;62, groove;63, sliding shoe;631, third sliding block;632, card slot.
Specific embodiment
With reference to the accompanying drawings and embodiments, the utility model is described in further detail.
A kind of curtain wall installing structure, referring to Fig. 1, Fig. 2 and Fig. 3, including the fixation skeleton being installed on building masonry wall
1, the first connection component 3, curtain wall panel 2 and the second company being fixedly connected with curtain wall panel 2 being fixedly connected with fixed skeleton 1
Connected components 4, the first connection component 3 include the first connector 31 and the second connector 32, and the second connection component 4 is connect with second
Part 32 is detachably connected, and along the direction activity vertical with curtain wall panel 2, the second connector 32 is equipped with to be driven the second connection component 4
Dynamic movable second driving assembly 6 of second connection component 4 and the fixing piece 322 for the position for fixing the second connection component 4.
Referring to fig. 2 and Fig. 3, in a rectangular parallelepiped shape, the first connector 31 is fixedly connected fixed skeleton 1 with fixation skeleton 1, the
A connection piece 31 is placed in the middle position of fixed skeleton 1 along its length.In the present embodiment, the first connector 31 is first solid
Determine block 311, the first fixed block 311 is in a rectangular parallelepiped shape.The wherein one side wall of first fixed block 311 is fixedly connected with fixed skeleton 1,
Another side wall with fixed 1 face of skeleton of first fixed block 311 is slidably connected with the second connector 32.In the present embodiment,
Second connector 32 is activity box 323, and the section of activity box 323 is in the shape of a " convex ".
Referring to fig. 2 and Fig. 3, the first fixed block 311 have first sliding groove 312 far from the side recess of fixed skeleton 1, activity
Frame 323 is protruding with the first sliding block 321 close to one end of the first fixed block 311, and the first sliding block 321 is slided along first sliding groove 312, the
The shape size in section of the section with first sliding groove 312 in the horizontal direction of one sliding block 321 in the horizontal direction is consistent.
Referring to fig. 2 and Fig. 3, the first driving assembly 5 that driving activity box 323 slides is additionally provided on the first fixed block 311.
First driving assembly 5 includes along the vertical direction through the first threaded hole 52 on the first sliding block 321, and the first threaded hole 52 is placed in
The middle position of first sliding block 321 along its length.First threaded hole 52 is threaded with the first bolt 51.First bolt, 51 edge
Vertical direction extends, and the both ends of the first bolt 51 extend through the roof and bottom wall of the first fixed block 311, the first fixed block
311 roof and bottom wall, which is provided with third threaded hole 313, to be run through for the first bolt 51, and the bolt head of the first bolt 51 is placed in the
The top of one fixed block 311.
Referring to fig. 2 and Fig. 3,323 boring of activity box, the section of hollow parts is in the shape of a " convex ", and activity box 323 is remote
It is open at one end from the first fixed block 311.In the present embodiment, fixing piece 322 is spring, and fixing piece 322 is fixedly connected on work
Dynamic frame 323 on the inner wall of one end of the first fixed block 311, prolong along the length direction of activity box 323 by the length of fixing piece 322
It stretches, in the present embodiment, fixing piece 322 is parallel along the vertical direction to be equipped with two, two equal face activity box 323 of fixing piece 322
Opening.
Referring to fig. 2 and Fig. 3, in the present embodiment, the second connection component 4 is the second fixed block 41, the second fixed block 41
It is fixedly connected on curtain wall panel 2, the second fixed block 41 is placed in the center of curtain wall panel 2.Second fixed block 41 is in rectangular
Body shape.The width and height that the width and height of second fixed block 41 are open with activity box 323 are consistent.Second fixed block 41
Bottom be protruding with the second sliding block 42 far from one end of curtain wall panel 2, recess has sliding for second in the bottom interior wall of activity box 323
The second sliding slot 324 that block 42 slides.
Referring to fig. 2 and Fig. 3, the second driving assembly 6 include the sliding shoe 63 being slidably connected in activity box 323 and drive
The actuator 61 that dynamic sliding shoe 63 slides, sliding shoe 63 along the vertical direction on section it is trapezoidal, 63 area of sliding shoe is biggish
One end is placed in top.Sliding shoe 63 slides along the vertical direction, and sliding shoe 63 is placed in the convex portion of activity box 323.Sliding shoe
63 top is protruding with third sliding block 631, and being recessed on the two sides inner wall of 323 convex portion of activity box has for 631 edge of third sliding block
The third sliding slot 325 of vertical direction sliding.The length of third sliding slot 325 is consistent with the height of 323 convex portion of activity box.
Referring to fig. 2 and Fig. 3, the top of the second fixed block 41 have and sliding shoe 63 far from a concave end of curtain wall panel 2
The shape size of chimeric groove 62, groove 62 is consistent with the shape size of sliding shoe 63, and the biggish one end of 62 area of groove is set
In top.
Referring to fig. 2 and Fig. 3, actuator 61 include the second bolt 611.Second bolt 611 is rotationally connected with sliding shoe 63
Top, the second bolt 611 is fixedly connected with fixture block 613 close to one end of sliding shoe 63.The top depression of sliding shoe 63 has confession
The card slot 632 that fixture block 613 is embedded in, fixture block 613 and the second bolt 611 are placed in card slot close to the end of 63 one end of sliding shoe
In 632.In the present embodiment, fixture block 613 is rubber sheet gasket.Second bolt 611 extends along the vertical direction, and the second bolt 611 is remote
The top of activity box 323 is run through in one end from sliding shoe 63, and the top of activity box 323 is provided with for the second bolt 611 perforative the
Two threaded holes 612.The bolt head of second bolt 611 is placed in the top of activity box 323, and the length of the second bolt 611 compares activity box
323 height is high.
The operating condition and principle of the present embodiment are as follows:
When installing curtain wall panel 2, by the second fixed block 41 for will being fixedly connected with curtain wall panel 2 far from curtain wall panel
2 one end is filled in the opening of activity box 323, slides the second sliding block 42 along second sliding slot 324, so that the second fixed block
41 towards activity box 323 internal slide so that inclined-plane of the groove 62 far from 2 side of curtain wall panel and sliding shoe 63 are far from activity
The inclined-plane alignment of the opening of frame 323 side.
By rotating the second bolt 611, so that the direction that the second bolt 611 is vertically oriented to sliding shoe 63 is slided to drive cunning
Motion block 63 is vertically oriented to the sliding of groove 62, so that the inclined-plane of sliding shoe 63 is abutted with the inclined-plane of groove 62, and pushes second to fix
Block 41 adjusts the position of curtain wall panel 2 along the direction sliding vertical with curtain wall panel 2, meanwhile, in 41 direction of the second fixed block
During fixing piece 322 slides, second one end of fixed block 41 far from curtain wall panel 2 can compress fixing piece 322, so that fixed
Part 322 has the thrust being open towards activity box 323 to the second fixed block 41, so that the position of the second fixed block 41 is solid
It is fixed, so that the position of curtain wall panel 2 is fixed, so that the surface between adjacent curtain wall panel 2 flushes, reduce the meeting of curtain wall surface
Occur uneven and influences beautiful situation.
After the second fixed block 41 is fixed on activity box 323, exist when between adjacent curtain wall panel 2 in the vertical direction
When gap, by rotating the first bolt 51, slide activity box 323 along the vertical direction, to make the second fixed block 41 and curtain
Shingle nail 2 is slided along the vertical direction to adjust the position of curtain wall panel 2 in the vertical direction simultaneously, is reduced in the vertical direction
The case where there are gaps between adjacent curtain wall panel 2 is reduced so that being bonded between adjacent curtain wall panel 2 in the vertical direction
Curtain wall panel 2 understands the presence due to gap and the shaking on vertical direction occurs under the effect of gravity, and then leads to curtain wall panel 2
Junction between the second fixed block 41 is unstable, so that the junction between curtain wall panel 2 and the second fixed block 41 is easy
The case where fracture, is conducive to extend the service life of the second fixed block 41.
Shape by section of the section with first sliding groove 312 in the horizontal direction of the first sliding block 321 in the horizontal direction is big
It is small consistent, so that activity box 323 is unique along the glide direction of the first fixed block 311, so that activity box 323 is always along the vertical direction
Sliding reduces the case where activity box 323 can shift in sliding process, to reduce second fixed with activity box 323
The case where fixed block 41 and 2 position of curtain wall panel fixed with the second fixed block 41 can shift.
The sliding of activity box 323 is driven by the cooperation of the first threaded hole 52 and the first bolt 51 and passes through the second screw thread
The cooperation driving sliding shoe 63 of hole 612 and the second bolt 611 slides, using the self-locking function of screw thread so that activity box 323 with
And the position of sliding shoe 63 is relatively fixed, so that the position of the second fixed block 41 and curtain wall panel 2 is relatively fixed, reduces
The case where position of curtain wall panel 2 can shift.
By the bolt head of the first bolt 51 and the second bolt 611 be respectively placed in the first fixed block 311 top and
The top of activity box 323, so that the operating position for adjusting 2 position of curtain wall panel is close, convenient for operation.
Pass through the setting and the second fixed block 41 of second sliding slot 324 and the second sliding block 42 section along the vertical direction and work
The shape size that dynamic frame 323 is open is consistent, slides into activity box 323 convenient for the second fixed block 41 along second sliding slot 324, so that the
Link position of two fixed blocks 41 between the activity glide direction and the second fixed block 41 and fixed frame of fixed frame is unique, just
In the connection of the second fixed block 41 and activity box 323, while the alignment on the inclined-plane convenient for the inclined-plane and sliding shoe 63 of groove 62,
It reduces groove 62 and sliding shoe 63 is staggered and leads to not the case where adjusting the position of curtain wall panel 2.
It is the setting of rubber sheet gasket by fixture block 613, advantageously reduces damage of second bolt 611 to sliding shoe 63 and make
With being conducive to extend the service life of sliding shoe 63.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability
Field technique personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but
As long as all by the protection of Patent Law in the scope of the claims of the utility model.
Claims (10)
1. a kind of curtain wall installing structure, it is characterized in that: including the fixation skeleton (1) being installed on building masonry wall, being fixed on
Determine the first connection component (3), curtain wall panel (2) and the second connection component being fixed on curtain wall panel (2) on skeleton (1)
(4), first connection component (3) includes the first connector (31) and the second connector (32), first connector
(31) it is fixed on fixed skeleton (1), second connector (32) is slidably connected on the first connector (31), and described second
Connector (32) slides along the vertical direction, and first connector (31) is equipped with the first of driving the second connector (32) sliding
Driving assembly (5), second connection component (4) are detachably connected with the second connector (32), second connection component (4)
Along the second connector (32) towards vertical with curtain wall panel (2) direction activity, second connector (32) is equipped with driving the
Movable second driving assembly (6) of two connection components (4) is additionally provided on second connector (32) and fixes the second connection component
(4) fixing piece (322) of position.
2. curtain wall installing structure according to claim 1, it is characterized in that: first connector (31) is the first fixed block
(311), first fixed block (311) has for the second connector (32) sliding far from a concave end of fixed skeleton (1)
One sliding slot (312), second connector (32) are protruding with the first sliding block (321), institute close to the one end of the first connector (31)
It is consistent with the shape size in section of first sliding groove (312) in the horizontal direction to state the section of the first sliding block (321) in the horizontal direction.
3. curtain wall installing structure according to claim 2, it is characterized in that: first driving assembly (5) includes along vertical
The first bolt that direction is run through first threaded hole (52) of the first sliding block (321) and is threadedly coupled with the first threaded hole (52)
(51)。
4. curtain wall installing structure according to claim 3, it is characterized in that: second connector (32) boring, institute
The second connector (32) are stated far from the open at one end of the first connector (31), second driving assembly (6) includes being slidably connected
The actuator (61) that sliding shoe (63) and driving sliding shoe (63) inside the second connector (32) slide along the vertical direction,
Second connection component (4) includes the second fixed block (41) being fixed on curtain wall panel (2), second fixed block (41)
Close to the side of sliding shoe (63), recess has the groove chimeric with sliding shoe (63) (62) along the vertical direction, the sliding shoe (63)
And groove (62) is inclined-plane setting close to the side of the first connector (31), when the sliding shoe (63) slides into horizontal height
When spending highest position, the bottom of sliding shoe (63) is not less than the top of groove (62).
5. curtain wall installing structure according to claim 4, it is characterized in that: the actuator (61) includes and sliding shoe (63)
Far from groove (62) one end rotation connection the second bolt (611), second bolt (611) connect with sliding shoe (63) one
End is fixedly connected with fixture block (613), and recess has a card slot (632) for fixture block (613) insertion on the sliding shoe (63), and described the
Two bolts (611) run through the top of the second connector (32), and second connector (32) is run through along the vertical direction to be had and second
The second threaded hole (612) that bolt (611) is threadedly coupled.
6. curtain wall installing structure according to claim 5, it is characterized in that: first bolt (51) and the second bolt
(611) bolt head is placed in the same side of the first connection component (3) along the vertical direction.
7. curtain wall installing structure according to claim 6, it is characterized in that: the fixing piece (322) is spring, the fixation
Part (322) is fixedly connected on the second connector (32) and is open on the inner wall of face.
8. curtain wall installing structure according to claim 4, it is characterized in that: the bottom of second fixed block (41) is protruding with
Second sliding block (42), the inner wall depression of second connector (32) have the second sliding slot (324) for the second sliding block (42) sliding.
9. curtain wall installing structure according to claim 5, it is characterized in that: the fixture block (613) is rubber sheet gasket.
10. curtain wall installing structure according to claim 4, it is characterized in that: second fixed block (41) is along the vertical direction
Section it is consistent with the shape size that the second connector (32) is open.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821630019.4U CN208981585U (en) | 2018-09-30 | 2018-09-30 | Curtain wall installing structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821630019.4U CN208981585U (en) | 2018-09-30 | 2018-09-30 | Curtain wall installing structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208981585U true CN208981585U (en) | 2019-06-14 |
Family
ID=66786688
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821630019.4U Expired - Fee Related CN208981585U (en) | 2018-09-30 | 2018-09-30 | Curtain wall installing structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208981585U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110821009A (en) * | 2019-11-20 | 2020-02-21 | 武汉昕亿佳节能新材料有限公司 | Curtain wall structure |
CN111622393A (en) * | 2020-05-18 | 2020-09-04 | 浙江奥腾建设工程有限公司 | Building glass curtain wall mounting structure and construction method thereof |
CN112411823A (en) * | 2020-11-09 | 2021-02-26 | 安徽恒信建设工程管理有限公司 | Building curtain wall |
-
2018
- 2018-09-30 CN CN201821630019.4U patent/CN208981585U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110821009A (en) * | 2019-11-20 | 2020-02-21 | 武汉昕亿佳节能新材料有限公司 | Curtain wall structure |
CN111622393A (en) * | 2020-05-18 | 2020-09-04 | 浙江奥腾建设工程有限公司 | Building glass curtain wall mounting structure and construction method thereof |
CN112411823A (en) * | 2020-11-09 | 2021-02-26 | 安徽恒信建设工程管理有限公司 | Building curtain wall |
CN112411823B (en) * | 2020-11-09 | 2021-12-28 | 安徽恒信建设工程管理有限公司 | Building curtain wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208981585U (en) | Curtain wall installing structure | |
CN202866072U (en) | Slippage preventing back bolt dry hanging system | |
CN103216069B (en) | Floor or wallboard clamping assembly | |
CN102359213B (en) | Wind load resistant connector for unitized curtain walls | |
CN210597778U (en) | Mounting structure of glass curtain wall | |
CN205314449U (en) | Building decorative board dogging formula connecting device | |
CN208363534U (en) | A kind of connecting bracket body component for construction site | |
CN110042994A (en) | A kind of quick levelling adjustment structure and inner corner trim integrated morphology | |
CN107060548B (en) | Improved structure of lower pulley block of sliding door | |
CN111636641B (en) | Assembly type wallboard mounting structure and wallboard mounting method | |
CN208473060U (en) | A kind of metal curtain wall | |
CN206941912U (en) | A kind of building decoration curtain wall | |
CN206625432U (en) | Adjustable type lightgage steel joist | |
CN204754147U (en) | Wall plastering machine secondary leveling device | |
CN110725448B (en) | Glass curtain wall structure and disassembling and assembling method | |
CN208563685U (en) | A kind of curtain wall installing structure | |
CN208563679U (en) | A kind of fixed system of the aluminum facade bump of bumps moulding | |
CN207228536U (en) | A kind of dry-hanging installation structure for vertical faces of stone materials | |
CN219138099U (en) | Suspension type stone curtain wall mounting structure | |
CN206110421U (en) | Stone material curtain adjustable combination pendant is hung futilely to back of body bolt formula | |
CN206737710U (en) | A kind of energy saving door and window glass gasket | |
CN217998547U (en) | Efficient mounting structure for building curtain wall | |
CN218578746U (en) | Advance brick conveying equipment | |
CN221118897U (en) | Building curtain wall mounting and fixing support | |
CN215484000U (en) | Architectural decoration furred ceiling based on BIM technique |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190614 Termination date: 20210930 |
|
CF01 | Termination of patent right due to non-payment of annual fee |