CN208981504U - A kind of archaized building structure - Google Patents
A kind of archaized building structure Download PDFInfo
- Publication number
- CN208981504U CN208981504U CN201821709694.6U CN201821709694U CN208981504U CN 208981504 U CN208981504 U CN 208981504U CN 201821709694 U CN201821709694 U CN 201821709694U CN 208981504 U CN208981504 U CN 208981504U
- Authority
- CN
- China
- Prior art keywords
- backup pad
- upper backup
- pouring
- cavity
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model discloses a kind of archaized building structures, it includes upper backup pad, and multiple pouring through slots are formed on upper backup pad, and the pouring cavity that pouring has in the middle part of through slot and the top surface for the lower bar beam that the bottom surface of upper backup pad is fixed with communicates;It is respectively and fixedly provided with connection bolt on the inner sidewall of the pouring cavity and bottom surface, the middle part and above section for connecting bolt, which are in, to be poured in cavity;It is fixed with connection bolt on the inner sidewall for pouring through slot, the middle part and above section for connecting bolt, which are in, to be poured in through slot;The top surface of the upper backup pad is fixed with multiple connection bolts, and the middle part and above section that connect bolt are in the top of upper backup pad.It using first decorate pour again by the way of made, it i.e. first will be fixed as the upper backup pad of decoration, lower bar beam etc., pouring reinforcement concrete is as load-carrying members again, so that decoration be completely combined with load-supporting part it is integral, it cooperates close, connecting bolt will not be exposed, greatly improves the hand service life.
Description
Technical field:
The utility model relates to building structure technology field, more specifically to a kind of archaized building structure.
Background technique:
Building is the product for having obvious characteristics of the times.With history society evolution, construction material is also with variation, such as Gu
Building bearing framework makes most of to be timber or brick, dead composition.
The requirement of modern architecture form fac-tor, framework makes most of to be reinforced concrete, and the load-bearing frame of pseudo-classic architecture also exists
It changes, large-scale pseudo-classic architecture, load-bearing frame is mostly reinforced concrete structure now, outer again after the requirement to reach beauty modelled after an antique
Adorn ancient architecture appearance wood component, such as purlin, beam, column, rafter, roof boarding.The component decorated afterwards is attached to reinforced concrete structure load-bearing
It is connect by built-in fitting with decoration on framework, there are more defects, if built-in connection position is difficult to be correctly aligned, built-in fitting
It is permanent poor that exposed corrosion causes, and shortens service life, and maximum defect be rear decoration and former main body load-carrying members not
It is completely closely sealed, cause overall geometry irregular, influence appearance, effect is poor.
Utility model content:
The purpose of the utility model is to overcome the deficiencies in the prior art, provide a kind of archaized building structure, it uses and first fills
The mode poured again is adornd to be made, i.e., first will be fixed as the upper backup pad of decoration, lower bar beam etc., then pouring reinforcement is mixed
Solidifying soil is used as load-carrying members, so that decoration is completely combined integral with load-supporting part, cooperation is close, and connecting bolt will not
It is exposed, the hand service life is greatly improved, and overall aesthetic effect is good.
The scheme that the utility model solves the technical problem is:
A kind of archaized building structure, it includes upper backup pad, and multiple pouring through slots are formed on upper backup pad, pours through slot
It is communicated with the pouring cavity having in the middle part of the top surface for the lower bar beam that the bottom surface of upper backup pad is fixed with;
It is respectively and fixedly provided with connection bolt on the inner sidewall of the pouring cavity and bottom surface, connects middle part and the above section of bolt
In pouring cavity;
It is fixed with connection bolt on the inner sidewall for pouring through slot, the middle part and above section for connecting bolt, which are in, to be poured
In through slot;
The top surface of the upper backup pad is fixed with multiple connection bolts, and the middle part and above section for connecting bolt are in upper branch
The top of fagging;
The top surface of the upper backup pad is poured through slot and is poured in cavity and poured armored concrete, all connection spiral shells
The middle part of bolt and above section are in armored concrete.
Annular stop portion is fixed in the middle part of the connection bolt, annular stop portion is pressed against the corresponding side for pouring cavity
Wall pours the bottom surface of cavity or the top surface of upper backup pad or pours on the side wall of through slot.
The upper backup pad is roof boarding, and roof boarding is oblique plate, and the end of bottom end is fixed with eaves board, the top of upper backup pad
The end for the armored concrete that face pours and the inner sidewall of eaves board are mutually fixed.
The lower bar beam is rafter, and lateral wall is equipped with stringer, and the end for the connection bolt for pouring the side of cavity is stretched
The lateral wall of bar beam is descended out and is fixed on stringer.
The top surface of the roof boarding, the inner sidewall for pouring cavity and the bottom for pouring cavity are respectively and fixedly provided with flexible waterproof layer.
The upper backup pad is made of multiple purlins that the bottom surface of horizontally disposed floor and floor is fixed with, the top of floor
Face has poured armored concrete, and the top surface of armored concrete is equipped with wood floor.
The lower bar beam be beam shape mould item, inside form pouring cavity.
The protrusion effect of the utility model is:
Compared with prior art, it using first decorate pour again by the way of made, i.e., first will be as the upper of decoration
Support plate, lower bar beam etc. are fixed, then pouring reinforcement concrete is as load-carrying members, so that decoration is tied completely with load-supporting part
Close integral, cooperation is close, and connection bolt will not be exposed, greatly improves the hand service life, and overall aesthetic effect is good.
Detailed description of the invention:
Fig. 1 is that the utility model produces the structural schematic diagram chosen outside eaves;
Fig. 2 is the structural schematic diagram of the utility model production beam slab;
Fig. 3 is the structural schematic diagram using this production method production pillar;
Fig. 4 is the structural schematic diagram for connecting bolt.
Specific embodiment:
Embodiment 1 is shown in that as shown in Figure 1 and Figure 4, a kind of archaized building structure, it includes upper backup pad 1, on upper backup pad 1
Form multiple pouring through slots 2, the top surface middle part for pouring the lower bar beam 3 that the bottom surface of through slot 2 and upper backup pad 1 is fixed with has
Pouring cavity 4 communicate;
It is respectively and fixedly provided with connection bolt 5 on the inner sidewall of the pouring cavity 4 and bottom surface, connects the middle part or more of bolt 5
It is partially in and pours in cavity 4;
Connection bolt 5 is fixed on the inner sidewall for pouring through slot 2, the middle part and above section for connecting bolt 5 are in
It pours in through slot 2;
The top surface of the upper backup pad 1 is fixed with multiple connection bolts 5, and the middle part and above section for connecting bolt 5 are in
The top of upper backup pad 1;
The top surface of the upper backup pad 1 is poured through slot 2 and is poured in cavity 3 and poured armored concrete 6, Suo Youlian
The middle part of connecting bolt 5 and above section are in armored concrete 6.
The middle part of the connection bolt 5 is fixed with annular stop portion 51, and annular stop portion 51 is pressed against corresponding pouring chamber
The side wall of body 4 pours the bottom surface of cavity 4 or the top surface of upper backup pad 1 or pours on the side wall of through slot 2.
The upper backup pad 1 is roof boarding, and roof boarding is oblique plate, and the end of bottom end is fixed with eaves board 11, upper backup pad 1
The end of armored concrete 6 that pours of top surface mutually fixed with the inner sidewall of eaves board 11.
The lower bar beam 3 is rafter, and lateral wall is equipped with stringer 7, pours the end of the connection bolt 5 of the side of cavity 4
Portion stretches out the lateral wall of lower bar beam 3 and is fixed on stringer 7.
The top surface of the roof boarding, the inner sidewall for pouring cavity 4 and the bottom for pouring cavity 4 are respectively and fixedly provided with flexible waterproof layer 8.
Its production method:
(1), roof boarding is first fixed, the bar beam 3 in the case where the bottom surface of roof boarding is fixed, the pouring through slot 2 and lower item having on roof boarding
The pouring cavity 4 having in ellbeam 3 communicates;
(2), it is fixedly connected with bolt 5 on the inner sidewall and bottom surface for pouring cavity 4, connects the middle part or more of bolt 5
It is partially in and pours in cavity 4;
It pours on the inner sidewall of through slot 2 and is fixedly connected with bolt 5, the middle part and above section for connecting bolt 5, which are in pour, to be led to
In slot 2;
The fixed multiple connection bolts 5 in the top surface of roof boarding, the middle part and above section that connect bolt 5 are in the top of roof boarding;
(3), armored concrete 6 is poured and is filled in the top surface of upper backup pad 1, pours through slot 2 and pour in cavity 4, Suo Youlian
The middle part of connecting bolt 6 and above section are in armored concrete 7, and armored concrete 7 forms reinforced concrete floor after solidifying.
Wherein, before step 2, top surface, pouring cavity in the fixed eaves board 11 in end of the bottom end of roof boarding, in roof boarding
4 inner sidewall and the bottom for pouring cavity 4 are laid with flexible waterproof layer 8;
Stringer 7 is set on the side lateral wall of lower bar beam, and the end for the connection bolt 5 for pouring the side of cavity 4 is stretched out
The lateral wall of lower bar beam 3 is simultaneously fixed on stringer 7.
Embodiment 2, see as shown in Figure 2 and Figure 4, the upper backup pad 1 by horizontally disposed floor 12 and floor 12 bottom
Multiple purlins 13 that face is fixed with form, and the top surface of floor 12 has poured armored concrete 6, and the top surface of armored concrete 6 is laid with
There is wood floor 9.
The lower bar beam 3 be beam shape mould item, inside form pour cavity 4.
Remaining is the same as embodiment 1;
Its production method:
It the following steps are included:
(1), upper backup pad 1 is first fixed, the bar beam 3 in the case where the bottom surface of upper backup pad 1 is fixed has on upper backup pad 1
The pouring cavity 4 that pouring has in through slot 2 and lower bar beam 3 communicates;
(2), it is fixedly connected with bolt 5 on the inner sidewall and bottom surface for pouring cavity 4, connects the middle part or more of bolt 5
It is partially in and pours in cavity 4;
It pours on the inner sidewall of through slot 2 and is fixedly connected with bolt 5, the middle part and above section for connecting bolt 5, which are in pour, to be led to
In slot 2;
The fixed multiple connection bolts 5 in the top surface of upper backup pad 1, the middle part and above section for connecting bolt 5 are in upper support
The top of plate 1;
(3), armored concrete 6 is poured and is filled in the top surface of upper backup pad 1, pours through slot 2 and pour in cavity 4, Suo Youlian
The middle part of connecting bolt 6 and above section are in armored concrete 7, and armored concrete 7 forms reinforced concrete floor after solidifying.
It after armored concrete 6 forms reinforced concrete floor after solidifying, is laid with wood floor 9 after step 3 on it.
And when making pillar, as shown in Figure 3 and Figure 4, it can will be fixedly connected on the inner sidewall of the hollow cylinder in middle part
Bolt 5, connect bolt 5 middle part and above section be in middle part it is hollow in, then pour armored concrete 7 so that company
The middle part of connecting bolt 5 and above section, which are in, pours in armored concrete 7, is solidified by armored concrete 7 and completes to fix.
Using the method for this implementation, i.e., using first decorate pour again by the way of made so that as the upper of decoration
The components such as support plate, lower bar beam and load-supporting part are completely combined integral, and cooperation is close, and connection bolt 5 will not be exposed,
The hand service life is greatly improved, and overall aesthetic effect is good.
Finally, embodiment of above is merely to illustrate the utility model, and it is not limitation of the utility model, related skill
The those of ordinary skill in art field can also make various changes in the case where not departing from the spirit and scope of the utility model
Change and modification, therefore all equivalent technical solutions also belong to the scope of the utility model, the patent protection model of the utility model
Enclosing should be defined by the claims.
Claims (7)
1. a kind of archaized building structure, it is characterised in that: it includes upper backup pad (1), and upper backup pad forms multiple pour on (1)
It fills through slot (2), what is had in the middle part of the top surface for the lower bar beam (3) that the bottom surface of pouring through slot (2) and upper backup pad (1) is fixed with pours
Cavity (4) are filled to communicate;
It is described pour cavity (4) inner sidewall and bottom surface on be respectively and fixedly provided with connection bolt (5), connect bolt (5) middle part and with
On be partially in pour cavity (4) in;
It is fixed with connection bolt (5) on the inner sidewall for pouring through slot (2), is connected at middle part and the above section of bolt (5)
In pouring through slot (2);
The top surface of the upper backup pad (1) is fixed with multiple connection bolts (5), connects at middle part and the above section of bolt (5)
In the top of upper backup pad (1);
The top surface of the upper backup pad (1) is poured in through slot (2) and pouring cavity (4) and has poured armored concrete (6), institute
The middle part and above section for having connection bolt (5) are in armored concrete (6).
2. a kind of archaized building structure according to claim 1, it is characterised in that: the middle part of connection bolt (5) is solid
Surely have annular stop portion (51), annular stop portion (51) are pressed against the corresponding side wall for pouring cavity (4) or pour cavity (4)
On the side wall of the top surface or pouring through slot (2) of bottom surface or upper backup pad (1).
3. a kind of archaized building structure according to claim 1, it is characterised in that: the upper backup pad (1) is roof boarding, is hoped
Plate is oblique plate, and the end of bottom end is fixed with eaves board (11), the armored concrete that the top surface of upper backup pad (1) pours
(6) end and the inner sidewall of eaves board (11) are mutually fixed.
4. a kind of archaized building structure according to claim 3, it is characterised in that: the lower bar beam (3) is rafter, outside
Side wall is equipped with stringer (7), and the lateral wall of lower bar beam (3) is stretched out in the end for pouring the connection bolt (5) of the side of cavity (4)
And it is fixed on stringer (7).
5. a kind of archaized building structure according to claim 3, it is characterised in that: cavity is poured in the top surface of the roof boarding
(4) bottom of inner sidewall and pouring cavity (4) is respectively and fixedly provided with flexible waterproof layer (8).
6. a kind of archaized building structure according to claim 1, it is characterised in that: the upper backup pad (1) is set by level
Multiple purlins (13) composition that the bottom surface of the floor (12) and floor (12) set is fixed with, the top surface of floor (12) has poured reinforcing bar
Concrete (6), the top surface of armored concrete (6) are equipped with wood floor (9).
7. a kind of archaized building structure according to claim 6, it is characterised in that: the lower bar beam (3) is Liang Xingmo
Item, inside form pour cavity (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821709694.6U CN208981504U (en) | 2018-10-22 | 2018-10-22 | A kind of archaized building structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821709694.6U CN208981504U (en) | 2018-10-22 | 2018-10-22 | A kind of archaized building structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208981504U true CN208981504U (en) | 2019-06-14 |
Family
ID=66788412
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821709694.6U Active CN208981504U (en) | 2018-10-22 | 2018-10-22 | A kind of archaized building structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208981504U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109138150A (en) * | 2018-10-22 | 2019-01-04 | 绍兴市园林建设有限公司 | A kind of archaized building structure and its manufacturing method |
-
2018
- 2018-10-22 CN CN201821709694.6U patent/CN208981504U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109138150A (en) * | 2018-10-22 | 2019-01-04 | 绍兴市园林建设有限公司 | A kind of archaized building structure and its manufacturing method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106088327A (en) | Manufacture method based on the assembling frame post that 3D prints | |
CN208792737U (en) | For hanging the detachable connecting part of external platform hanging girder steel | |
CN208981504U (en) | A kind of archaized building structure | |
CN107178173A (en) | A kind of concrete curtain wall plate being made up of cellular board component and preparation method | |
CN100558999C (en) | A kind of outer decoration and inner casting method outer wall heat-insulating wall body and job practices thereof | |
CN205475854U (en) | Roof beam wall composite external wall component | |
CN109138150A (en) | A kind of archaized building structure and its manufacturing method | |
CN207794658U (en) | The connection structure of steel column is connect on a kind of reinforced column | |
CN106401169A (en) | Aluminum alloy template assembling system for building | |
CN106182360A (en) | A kind of light-duty side form system produced for precast concrete wall panel | |
CN203961099U (en) | A kind of high strength hollow constructional column template brick and the constructional column of building thereof | |
CN207032468U (en) | Assembled architecture | |
CN202658765U (en) | Keel framework concrete anti-crack filling wall | |
CN106013773B (en) | A kind of assembly type inner-outer wall composite shuttering leakproof sizing device and construction method | |
CN208533894U (en) | A kind of lightweight precast concrete stair | |
CN203412312U (en) | Thermal-insulating integrated template wallboard construction building | |
CN208870191U (en) | A kind of novel fabricated reinforced concrete building | |
CN203320739U (en) | Formwork thermal insulation integrated wallboard and integrally-poured construction building | |
CN212295084U (en) | Archaize building structure uses improved generation bolt | |
CN217552661U (en) | Prefabricated finished product device for arc-shaped roof reinforcing and connecting plate | |
CN103741855B (en) | A kind of preparation method of composite light noggin piece | |
CN214195552U (en) | Combined core mould | |
CN206144132U (en) | Aluminum alloy template assembly system for building | |
CN102587493B (en) | A kind of Chinese style archaized architecture of clean steel reinforced concrete cast and construction method thereof | |
CN218814895U (en) | Prefabricated exterior wall cladding of parapet integration |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |