CN208981342U - A kind of reinforcement structure in water conservancy construction cofferdam - Google Patents

A kind of reinforcement structure in water conservancy construction cofferdam Download PDF

Info

Publication number
CN208981342U
CN208981342U CN201821287118.7U CN201821287118U CN208981342U CN 208981342 U CN208981342 U CN 208981342U CN 201821287118 U CN201821287118 U CN 201821287118U CN 208981342 U CN208981342 U CN 208981342U
Authority
CN
China
Prior art keywords
steel plate
front spring
shaft part
rear steel
counterbore
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821287118.7U
Other languages
Chinese (zh)
Inventor
于兴华
曲卫东
罗上洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heilongjiang Water Conservancy And Hydropower Group Chong Chong Engineering Co Ltd
Original Assignee
Heilongjiang Water Conservancy And Hydropower Group Chong Chong Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Heilongjiang Water Conservancy And Hydropower Group Chong Chong Engineering Co Ltd filed Critical Heilongjiang Water Conservancy And Hydropower Group Chong Chong Engineering Co Ltd
Priority to CN201821287118.7U priority Critical patent/CN208981342U/en
Application granted granted Critical
Publication of CN208981342U publication Critical patent/CN208981342U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model discloses a kind of reinforcement structure in water conservancy construction cofferdam, including front spring and rear steel plate, front spring towards being provided with the first screw rod that several are in array-like distribution on the end face of rear steel plate side, steel plate is towards being provided with the second screw rod that several are in array-like distribution on the end face of front spring side afterwards, first screw rod is connect with the second screw rod by swivel nut, base plate is arranged below in front spring and rear steel plate, stiffening plate between front spring and rear steel plate spaced apart there are two being set above in the middle part of base plate, it is connected between stiffening plate and front spring and rear steel plate with hexagon socket head cap screw, the base plate both sides, which nail, connects ground, ceiling is equipped with above front spring and rear steel plate.It is equipped with ceiling above the utility model front spring and rear steel plate, can becalm and take shelter from rain, bottom supporting surface is big, it is not easy to be collapsed or be knocked over by wind, bottom block both sides are equipped with the nail of scalable caltrop, can hold ground.

Description

A kind of reinforcement structure in water conservancy construction cofferdam
Technical field
The utility model relates to cofferdam device technical field more particularly to a kind of reinforcement structures in water conservancy construction cofferdam.
Background technique
Cofferdam refers in hydraulic engineering construction, for the permanent water conservancy projects of construction, the provisional building enclosure built, Effect is to prevent water and soil from building position into building, so that in cofferdam internal drainage, excavation pit builds building;Mesh Preceding cofferdam knot generally comprises front spring and rear steel plate, and being provided with several on the end face towards rear steel plate side of front spring is in First screw rod of array-like distribution, rear steel plate is towards being provided with several on the end face of front spring side in the of array-like distribution Two screw rods, the first screw rod are connect with the second screw rod by swivel nut;However to have the shortcomings that grab ground intensity low in such cofferdam, is easy The phenomenon that now collapsing.A kind of water conservancy construction cofferdam reinforcement structure is disclosed in patent No. CN201720980290.X, including preceding Steel plate and rear steel plate, are provided with the first screw rod on the end face towards rear steel plate side of front spring, and rear steel plate is towards front spring one The second screw rod is provided on the end face of side, the first screw rod is connect with the second screw rod by swivel nut, and rear steel plate lower end is provided with bending Side is provided with several groups anchor pole group on bending edges, several pieces of stiffening plates, stiffening plate and anchor is provided between rear steel plate and bending edges Bar group is spaced apart, and each anchor pole group includes several bolt bodies, and the upper end of bolt body is provided with threaded shank, and threaded shank is living It is dynamic to be connected with nut through bending edges rear thread, several hangnails, bolt body and folding are provided on the lateral wall of bolt body Position limiting structure is provided between crimp;By using this structure, anchor pole is inserted into soil, so as to steel after improving The road holding of plate, and then can be avoided the phenomenon that the utility model collapses.But anchor pole is not easy to remove, and stiffening plate is set The position set is not easy to stack after making cofferdam demolition, occupies biggish area, since cofferdam does not have a rain-proof water installations, the first screw rod, Second screw rod and swivel nut easily get rusty, and reduce the cofferdam service life, and become unremovable.
Utility model content
The utility model will solve the above-mentioned problems of the prior art, provide a kind of reinforcement knot in water conservancy construction cofferdam Structure has rain-proof water installations, fixed, easy to assemble.
The utility model solves the technical solution of its technical problem use: the reinforcement structure in this water conservancy construction cofferdam, Including front spring and rear steel plate, it is provided with several on the end face towards rear steel plate side of the front spring and is distributed in array-like The first screw rod, it is described after steel plate towards being provided with the second spiral shell that several are in array-like distribution on the end face of front spring side Bar, first screw rod are connect with the second screw rod by swivel nut, and base plate, the bottom is arranged below in the front spring and rear steel plate Set in the middle part of seat board above there are two the stiffening plate positioned at front spring and rear steel plate between spaced apart, the stiffening plate and It is connected between front spring and rear steel plate with hexagon socket head cap screw, the base plate both sides, which nail, connects ground, the preceding steel Ceiling is equipped with above plate and rear steel plate, the ceiling both sides are equipped with fixed plate, the fixed plate and front spring and rear steel plate top Between to be bolted, the nail includes nail main body, and the nail lower body is cone-shaped structure, the nail main body It is equipped with the first counterbore, the nail main body wall of the first counterbore base is equipped with the second counterbore, is equipped with lock in first counterbore Core, the lock core are divided into the first shaft part, the second shaft part and third shaft part, first shaft part, the second shaft part and from top to bottom Three shaft part shaft part radiuses are sequentially reduced, and third shaft part section is ellipse, and third shaft part bottom is equipped with the sliding slot of ellipse, First counterbore is equipped with caltrop, and the caltrop structure is bulb and fine stern, is equipped between the bulb and the first counterbore multiple Position spring, is slidably connected between the bulb and sliding slot.
In order to further perfect, four node locations of the sliding slot ellipse are equipped with bayonet, and bayonet is ball cavity shape structure, Bayonet and bulb cooperate.
Further perfect, second shaft part is located in the first counterbore heavy platform, is provided with a circumferential above the second shaft part side wall Card slot is correspondingly provided with hook in the first counterbore heavy platform, is cooperatively connected between card slot and hook.
Further perfect, the first axle section is located at nail body upper, and the first shaft part side wall is equipped with through-hole.
The utility model has the advantages that: being equipped with ceiling above the utility model front spring and rear steel plate, can becalm It takes shelter from rain, prevents the first screw rod, the second screw rod and swivel nut from getting rusty and cause to be difficult to dismantle, the utility model front spring and rear steel plate bottom Inside is fixed on bottom block by way of hexagon socket head cap screw connection reinforcement plate, and bottom supporting surface expands, it is not easy to by wind Collapse or knock over, bottom block both sides are equipped with the nail of scalable caltrop, can hold ground, be not prone to tip over, and nail is equipped with logical Hole facilitates worker to reeve, and is pulled out.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the lock ground nail structure schematic diagram of the utility model;
Fig. 3 is the card slot and coupler construction schematic diagram of the utility model;
Fig. 4 is the caltrop structural schematic diagram of the utility model;
Fig. 5 is that the caltrop of the utility model stretches out operation schematic diagram;
Fig. 6 is that the caltrop of the utility model packs up schematic diagram.
Description of symbols: 1, ceiling, 2, fixed plate, 3, rear steel plate, the 4, second screw rod, 5, front spring, the 6, first screw rod, 7, swivel nut, 8, stiffening plate, 9, hexagon socket head cap screw, 10, base plate, 11, nail, 12, ground, 13, lock core, 14, through-hole, 15, One shaft part, the 16, first counterbore, the 17, second shaft part, 18, nail main body, 19, third shaft part, 20, card slot, 21, hook, 22, cunning Slot, 23, caltrop, 24, reset spring, the 25, second counterbore, 26, bulb, 27, fine stern, 28, bayonet.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawing:
Referring to attached drawing: the reinforcement structure in this water conservancy construction cofferdam in the present embodiment, including front spring 5 and rear steel plate 3, The front spring 5 towards being provided with the first screw rod 6 that several are in array-like distribution on the end face of rear 3 side of steel plate, it is described Steel plate 3 is towards being provided with the second screw rod 4 that several are in array-like distribution, first spiral shell on the end face of 5 side of front spring afterwards Bar 6 is connect with the second screw rod 4 by swivel nut 7, and base plate 10, the base plate is arranged below in the front spring 5 and rear steel plate 3 Stiffening plate 8 between front spring 5 and rear steel plate 3 spaced apart there are two being set above middle part, the stiffening plate 8 It being connect between front spring 5 and rear steel plate 3 with hexagon socket head cap screw 9, base plate both sides nail 11 is fixedly connected with ground 12, The front spring 5 and rear steel plate 3 are equipped with ceiling 1 above, and 1 both sides of ceiling are equipped with fixed plate 2, the fixed plate 2 and preceding steel To be bolted between 3 top of plate 5 and rear steel plate, the nail 11 includes nail main body 18, and 18 lower end of nail main body is Cone-shaped structure, the nail main body 18 are equipped with the first counterbore 16, set on 18 side wall of nail main body of 16 bottom of the first counterbore There is the second counterbore 25, is equipped with lock core 13 in first counterbore 16, the lock core 13 is divided into the first shaft part 15, second from top to bottom Shaft part 17 and third shaft part 19, first shaft part 15, the second shaft part 17 and 19 shaft part radius of third shaft part are sequentially reduced, institute 19 section of third shaft part is stated as ellipse, 19 bottom of third shaft part is equipped with the sliding slot 22 of ellipse, sets on first counterbore 16 There is caltrop 23,23 structure of caltrop is bulb 26 and fine stern 27, is equipped between the bulb 26 and the first counterbore 16 and resets bullet Spring 24 is slidably connected between the bulb 26 and sliding slot 22.
22 four node locations of ellipse of the sliding slot are equipped with bayonet 28, and bayonet 28 is ball cavity shape structure, bayonet 28 with Bulb 26 cooperates.
Second shaft part 17 is located in 16 heavy platform of the first counterbore, is provided with a circumferential card slot above 17 side wall of the second shaft part 20, hook 21 is correspondingly provided in 16 heavy platform of the first counterbore, is cooperatively connected between card slot 20 and hook 21.
First shaft part 15 is located above nail main body 18, and 15 side wall of the first shaft part is equipped with through-hole 14.
Mounting means: staff's first step passes through the first screw rod 6 on front spring 5 and rear steel plate 3 with the second screw rod 4 Swivel nut 7 connects, and ceiling 1 is then installed on front spring 5 and rear steel plate 3, and second step chooses suitable position and places bottom block 10, nail 11 is put on 10 both sides of bottom block, and nail 11 is knocked in the fixed bottom block 10 in ground, then one thin iron is taken to pass through nail Lock core 13 is rotated 90 degree by the through-hole 14 on 15 side wall of sub 11 13 first shaft part of lock core, and the bulb 26 of caltrop 23 is sliding in ellipse Slot 22 slides, and reset spring 24 compresses, and caltrop 23 stretches out 18 side wall of nail main body and is pierced into surrounding soil, and bulb 26 arrives adjacent bayonet A sound of click can be issued when 28, the component that the first step assembles is installed to above second step bottom block 10, front spring 5 by third step It is fixed on bottom block 10 by way of 9 connection reinforcement plate 8 of hexagon socket head cap screw with rear 3 bottom inside of steel plate.
There are also other embodiments for the utility model, such as by the shape of sliding slot 22 at rounded triangle or rounded square Three, four caltrops 23 can be arranged for such one week in shape, it might even be possible to and it is more, it also can be by the ball of sliding slot 22 and caltrop 23 Connection relationship between first 26 is equipped with sliding clamping, can thus save reset spring 24, simplifies structure.
Although the utility model is shown and described by reference to preferred embodiment, this profession is common Technical staff is it is to be appreciated that within the scope of the claims, can make various variation in form and details.

Claims (4)

1. a kind of reinforcement structure in water conservancy construction cofferdam, including front spring (5) and rear steel plate (3), the court of the front spring (5) The first screw rod (6) that several are in array-like distribution, described rear steel plate (3) court are provided on the end face of steel plate (3) side backward The second screw rod (4) that several are in array-like distribution, first screw rod (6) are provided on the end face of front spring (5) side It is connect with the second screw rod (4) by swivel nut (7), it is characterized in that: base plate is arranged below in the front spring (5) and rear steel plate (3) (10), adding between front spring (5) and rear steel plate (3) spaced apart there are two being set above in the middle part of the base plate Strong plate (8), the stiffening plate (8) are connect between front spring (5) and rear steel plate (3) with hexagon socket head cap screw (9), the base plate Both sides are fixedly connected ground (12) with nail (11), and the front spring (5) and rear steel plate (3) are equipped with ceiling (1) above, the top Canopy (1) both sides are equipped with fixed plate (2), are bolted between the fixed plate (2) and front spring (5) and rear steel plate (3) top, The nail (11) includes nail main body (18), and nail main body (18) lower end is cone-shaped structure, the nail main body (18) the first counterbore (16) being equipped with, nail main body (18) side wall of the first counterbore (16) bottom is equipped with the second counterbore (25), Lock core (13) are equipped in first counterbore (16), the lock core (13) is divided into the first shaft part (15), the second shaft part from top to bottom (17) successively subtract with third shaft part (19), first shaft part (15), the second shaft part (17) and third shaft part (19) shaft part radius Small, third shaft part (19) section is oval, sliding slot (22) of third shaft part (19) bottom equipped with ellipse, and described first Counterbore (16) is equipped with caltrop (23), and caltrop (23) structure is bulb (26) and fine stern (27), the bulb (26) and the Reset spring (24) are equipped between one counterbore (16), are slidably connected between the bulb (26) and sliding slot (22).
2. the reinforcement structure in a kind of water conservancy construction cofferdam according to claim 1, it is characterized in that: the sliding slot (22) is ellipse Round four node locations are equipped with bayonet (28), and bayonet (28) is ball cavity shape structure, and bayonet (28) and bulb (26) cooperate.
3. the reinforcement structure in a kind of water conservancy construction cofferdam according to claim 1, it is characterized in that: second shaft part (17) it is located in the first counterbore (16) heavy platform, is provided with a circumferential card slot (20), the first counterbore above the second shaft part (17) side wall (16) it is correspondingly provided in heavy platform hook (21), is cooperatively connected between card slot (20) and hook (21).
4. the reinforcement structure in a kind of water conservancy construction cofferdam according to claim 1, it is characterized in that: first shaft part (15) it is located at nail main body (18) above, the first shaft part (15) side wall is equipped with through-hole (14).
CN201821287118.7U 2018-08-10 2018-08-10 A kind of reinforcement structure in water conservancy construction cofferdam Expired - Fee Related CN208981342U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821287118.7U CN208981342U (en) 2018-08-10 2018-08-10 A kind of reinforcement structure in water conservancy construction cofferdam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821287118.7U CN208981342U (en) 2018-08-10 2018-08-10 A kind of reinforcement structure in water conservancy construction cofferdam

Publications (1)

Publication Number Publication Date
CN208981342U true CN208981342U (en) 2019-06-14

Family

ID=66781268

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821287118.7U Expired - Fee Related CN208981342U (en) 2018-08-10 2018-08-10 A kind of reinforcement structure in water conservancy construction cofferdam

Country Status (1)

Country Link
CN (1) CN208981342U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112555712A (en) * 2020-12-07 2021-03-26 江西瑞斯科救援科技有限公司 Construction lighting device with multi-angle adjustment function and adjustment method thereof
CN112878515A (en) * 2021-01-19 2021-06-01 东莞市建工集团有限公司 Waterproof construction method for base layer

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112555712A (en) * 2020-12-07 2021-03-26 江西瑞斯科救援科技有限公司 Construction lighting device with multi-angle adjustment function and adjustment method thereof
CN112878515A (en) * 2021-01-19 2021-06-01 东莞市建工集团有限公司 Waterproof construction method for base layer
CN112878515B (en) * 2021-01-19 2022-08-23 东莞市建工集团有限公司 Construction method for base waterproof

Similar Documents

Publication Publication Date Title
CN208981342U (en) A kind of reinforcement structure in water conservancy construction cofferdam
CN202323962U (en) Composite supporting structure of drainage pipe pile and soil nailing wall
CN202936798U (en) Double-row pile structure with prestress vertical anchor cables
CN207160037U (en) A kind of water conservancy construction cofferdam reinforcement structure
CN208266866U (en) A kind of wind resistance steady type guy anchor
CN207348259U (en) A kind of concrete filled steel tube and hollow steel bar combined concrete shear wall
CN205591507U (en) Scaffold frame of easily dismantling
CN212104156U (en) Building foundation pile
CN87201832U (en) Hollow bolt ball node
CN2828142Y (en) Wolf tooth bar building pile
CN220202583U (en) Anti-scouring structure for downhill slope
CN209082545U (en) Distribution steel pipe pole basis and distribution steel pipe pole
CN206768835U (en) Supporting construction
CN207047868U (en) A kind of pattern foundation pit supporting structure barricade
CN201943071U (en) Implantable steel tube anchor rod with stabs
CN214943065U (en) Foundation pit guardrail
CN216304633U (en) Anti-floating anchor rod
CN211851920U (en) Drainage device in coal mine goaf
CN213773715U (en) Municipal works ground rainwater seepage flow device
CN218292051U (en) Anti-floating anchor rod reinforcing structure for pile foundation engineering
CN210216414U (en) Electric power ground anchor
CN208918268U (en) A kind of reinforced concrete column concrete entirety assembly template
CN219622457U (en) Reinforced concrete base
CN209509225U (en) Anti-seepage heat preservation big-arch shelter wall
CN102425174A (en) Drainage tubular pile and soil nailing wall composite supporting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190614

CF01 Termination of patent right due to non-payment of annual fee