CN208965825U - Novel T-shaped curtain wall construction system - Google Patents

Novel T-shaped curtain wall construction system Download PDF

Info

Publication number
CN208965825U
CN208965825U CN201821225452.XU CN201821225452U CN208965825U CN 208965825 U CN208965825 U CN 208965825U CN 201821225452 U CN201821225452 U CN 201821225452U CN 208965825 U CN208965825 U CN 208965825U
Authority
CN
China
Prior art keywords
installation
connector sleeve
sleeve core
curtain wall
positioning pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821225452.XU
Other languages
Chinese (zh)
Inventor
周元杰
曾西宝
胡细爱
陈建军
钟颖跃
洪圜翔
徐婷婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Guang Tian Founder Co Construction Group Co Ltd
Original Assignee
Shenzhen Guang Tian Founder Co Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Guang Tian Founder Co Construction Group Co Ltd filed Critical Shenzhen Guang Tian Founder Co Construction Group Co Ltd
Priority to CN201821225452.XU priority Critical patent/CN208965825U/en
Application granted granted Critical
Publication of CN208965825U publication Critical patent/CN208965825U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model discloses a kind of Novel T-shaped curtain wall construction system, the Novel T-shaped curtain wall construction system includes column, crossbeam and connector sleeve core, column is in hollow setting, the column has the installation side of place horizontally, the installation side is convexly equipped with installation protrusion, the installation side has provided mounting hole in the position for being equipped with the installation protrusion, crossbeam extends transversely and has the installation end of the one end being located in transverse direction, the installation end extends to the installation side, the crossbeam has the installation cavity for extending transversely through the installation end, connector sleeve core is fixedly arranged on the installation cavity, and the connector sleeve core close to the column one end be equipped with can elastic telescopic positioning pin, the positioning pin and the mounting hole secure fit.The utility model is intended to improve existing defect when T-type curtain wall construction system is using T-steel in the prior art.

Description

Novel T-shaped curtain wall construction system
Technical field
The utility model relates to curtain wall technology field, in particular to a kind of Novel T-shaped curtain wall construction system.
Background technique
Curtain wall industry is very fast in China's development, and China has become the highest country of curtain wall annual output in the world.It is existing T-type curtain wall construction system use T-steel system mostly, which generally includes secure bond together extremely A few column and at least one crossbeam, wherein the column and crossbeam are all made of T-steel, and T-steel include a wing plate and One web, the mode for generalling use welding procedure or the connection that is spirally connected are fixed.
When using welding procedure, in welding process due to equipment, material, technique and operation etc., so that being formed Weld seam the defects of having crack, slag inclusion, stomata, overlap, when welding is easy to produce deformation, is unable to reach quality requirement, reduces The work quality and service life of structure.
When by the way of the connection that is spirally connected, component requirement on machining accuracy is high when due to being threadedly coupled, and is bolted necessary Aperture, reduces the intensity in section, also will cause stress concentration, and the stress of each bolt is unable to reach substantially uniformity in Bolt Unanimously, part bolt may also can shift to an earlier date fatigue fracture, cause damages.And high-strength bolt due to the loss of tensile stress or is applied Working hour is defective in quality, will lead to the rubbing surface changing of the relative positions, changes the stress of structure, causes the danger of unstability.
Further, T-steel is also existing defects in manufacture link, since steel construction is easy to produce in wet condition Corrosion, causing paint layer from surface to fall off influences service performance, and surface lacquer processing it is rough will affect room effect, can not be each Aspect meets user demand.
Utility model content
The main purpose of the utility model is to propose a kind of Novel T-shaped curtain wall construction system, it is intended to improve T in the prior art Existing defect when type curtain wall construction system is using T-steel.
To achieve the above object, the utility model proposes a kind of Novel T-shaped curtain wall construction system, comprising:
Column is in hollow setting, and the column has the installation side of place horizontally, and the installation side is convexly equipped with peace Protrusion is filled, the installation side has provided mounting hole in the position for being equipped with the installation protrusion;
Crossbeam, extends transversely and has the installation end of the one end being located in transverse direction, and the installation end extends to the peace Side is filled, the crossbeam has the installation cavity for extending transversely through the installation end;And
Connector sleeve core, is fixedly arranged on the installation cavity, and be equipped with can bullet for one end close to the column of the connector sleeve core Property flexible positioning pin, the positioning pin and the mounting hole secure fit.
Preferably, the height of the installation protrusion is H, 4mm≤H≤5mm;And/or
The installation protrusion is set to the inside of the installation side.
Preferably, the column includes the first pillar segment and the second pillar segment of subsection setup along longitudinal direction, and described first The installation side of pillar segment and the second pillar segment is equipped with the installation protrusion and the mounting hole;
The crossbeam includes the first crossbeam section and second cross beam section of subsection setup along longitudinal direction, the peace of the first crossbeam section Dress end extends to first pillar segment, and the installation end of the second cross beam section extends to second pillar segment, and described first Beam segments and the second cross beam section are equipped with the installation cavity;
The positioning pin includes the first positioning pin and the second positioning pin;
The connector sleeve core includes the first connector sleeve core and the second connector sleeve core, and the first connector sleeve core is fixedly arranged on institute The installation cavity of first crossbeam section is stated, the second connector sleeve core is fixedly arranged on the installation cavity of the second cross beam section, institute The first connector sleeve core is stated equipped with first positioning pin, the second connector sleeve core is equipped with second positioning pin, and described first Positioning pin and second positioning pin peace with the mounting hole of first pillar segment, second pillar segment respectively Fill hole secure fit.
Preferably, the first crossbeam section and the second cross beam section are in T set up of character patt ern jointly;
The first connector sleeve core and the second connector sleeve core are in be staggered.
Preferably, the stagger angle of the first connector sleeve core and the second connector sleeve core be α, 85 °≤α≤95 °.
Preferably, α is 90 °.
Preferably, first pillar segment is equipped with buckle closure far from one end of second pillar segment;
First pillar segment is laterally extended to form stage portion close to one end of second pillar segment, the stage portion with There is the installation gap for installing hollow glass along longitudinal direction between the buckle closure.
Preferably, the pressing plate for crimping the hollow glass is installed on the buckle closure.
Preferably, the buckle closure is equipped with the first mounting groove, and the notch of first mounting groove is arranged inwardly;
The pressing plate snapping to first mounting groove, the pressing plate is equipped with the second mounting groove, second mounting groove Notch be arranged upward, first seal is installed, the first seal and the hollow glass in second mounting groove It abuts.
Preferably, the column further includes third pillar segment, the third pillar segment from first pillar segment along longitudinal direction Direction extends, and the third pillar segment has the installation side, and the installation side is equipped with second seal, and described second is close Sealing is abutted with the side of the hollow glass.
The utility model is equipped with installation protrusion by the installation side of column, and installation side is in the position for being equipped with installation protrusion Through being equipped with mounting hole, connector sleeve core close to one end of column be equipped with can elastic telescopic positioning pin, positioning pin and mounting hole are solid Fixed cooperation, so can locally increase the thickness of the junction of positioning pin and column, improve stability and bearing capacity.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor Under, the structure that can also be shown according to these attached drawings obtains other attached drawings.
Fig. 1 is the stereopsis of an embodiment of the part-structure of Novel T-shaped curtain wall construction system provided by the utility model Figure;
Fig. 2 is the stereoscopic schematic diagram of Fig. 1 part-structure;
Fig. 3 is the cross-sectional view of Novel T-shaped curtain wall construction system in Fig. 1;
Fig. 4 is the enlarged diagram in Fig. 3 at A;
Fig. 5 is the enlarged diagram in Fig. 3 at B;
Fig. 6 is the cross-sectional view at another visual angle of Novel T-shaped curtain wall construction system in Fig. 3.
Drawing reference numeral explanation:
The embodiments will be further described with reference to the accompanying drawings for the realization, functional characteristics and advantage of the utility model aim.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describing, it is clear that described embodiment is only a part of the embodiment of the utility model, rather than all Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creative work premise Under every other embodiment obtained, fall within the protection scope of the utility model.
It is to be appreciated that if related in the utility model embodiment directionality instruction (such as upper and lower, left and right, it is preceding, Afterwards ...), then directionality instruction is only used for explaining opposite between each component under a certain particular pose (as shown in the picture) Positional relationship, motion conditions etc., if the particular pose changes, directionality instruction is also correspondingly changed correspondingly.
In addition, if relating to the description of " first ", " second " etc. in the utility model embodiment, " first ", " the Two " etc. description is used for description purposes only, and is not understood to indicate or imply its relative importance or is implicitly indicated meaning The quantity of the technical characteristic shown." first " is defined as a result, the feature of " second " can explicitly or implicitly include at least one A this feature.It in addition, the technical solution between each embodiment can be combined with each other, but must be with ordinary skill Based on personnel can be realized, this technical side will be understood that when the combination of technical solution appearance is conflicting or cannot achieve The combination of case is not present, also not within the protection scope of the requires of the utility model.
The utility model provides a kind of Novel T-shaped curtain wall construction system, please refers to Fig.1 to Fig.3, the Novel T-shaped curtain wall knot Construction system 100 includes column 1, crossbeam 2 and connector sleeve core 3, and column 1 is in hollow setting, and the column 1 has place horizontally Installation side, the installation side be convexly equipped with installation protrusion 14, it is described installation side be equipped with it is described installation protrusion 14 position It sets and has provided mounting hole;Crossbeam 2 extends transversely and has the installation end of the one end being located in transverse direction, and the installation end extends to The installation side, the crossbeam 2 have the installation cavity 23 for extending transversely through the installation end;Connector sleeve core 3 is fixedly arranged on the peace Behave affectedly 23, and one end close to the column 1 of the connector sleeve core 3 be equipped with can elastic telescopic positioning pin 4, the positioning pin 4 with the mounting hole secure fit.
In the prior art, when using welding procedure, due to originals such as equipment, material, technique and operations in welding process Cause, so that the weld seam the defects of having crack, slag inclusion, stomata, overlap formed, when welding, is easy to produce deformation, is unable to reach matter Amount requires, and reduces the work quality and service life of structure;When by the way of the connection that is spirally connected, structure when due to being threadedly coupled Part requirement on machining accuracy is high, is bolted necessary aperture, reduces the intensity in section, also will cause stress concentration, and Bolt In the stress of each bolt be unable to reach that substantially uniformity is consistent, and part bolt may also can shift to an earlier date fatigue fracture, cause damages.And it is right It is defective in quality when loss or construction of the high-strength bolt due to tensile stress, it will lead to the rubbing surface changing of the relative positions, change the stress of structure State causes the danger of unstability.
And the utility model is equipped with installation protrusion 14 by the installation side of column 1, installation side is being equipped with installation protrusion 14 position run through be equipped with mounting hole, connector sleeve core 3 close to one end of column 1 be equipped with can elastic telescopic positioning pin 4, positioning pin 4 with mounting hole secure fit, so can locally increase the thickness of the junction of positioning pin 4 and column 1, improve stability and Bearing capacity.
Referring to Fig. 4, the installation protrusion 14 is H in the height that protrudes out of transverse direction relative to side wall, protrusion 14 is installed Protrude out height it is blocked up, will increase manufacturing process, the narrow effect for not having improving stability and bearing capacity, it is preferable that 4mm≤ H≤5mm.Alternatively, installation protrusion 14 is set to the inside of the installation side.
In order to guarantee the continuity and flatness of upper and lower level curtain wall, aesthetics is increased, the column 1 includes dividing along longitudinal direction The first pillar segment 11 and the second pillar segment 12 of section setting, the installation side of first pillar segment 11 and the second pillar segment 12 It is equipped with the installation protrusion 14 and the mounting hole;
The crossbeam 2 includes the first crossbeam section 21 and second cross beam section 22 of subsection setup along longitudinal direction, the first crossbeam The installation end of section 21 extends to first pillar segment 11, and the installation end of the second cross beam section 22 extends to second column Section 12, the first crossbeam section 21 and the second cross beam section 22 are equipped with the installation cavity 23;The positioning pin 4 includes first Positioning pin 41 and the second positioning pin 42;The connector sleeve core 3 includes the first connector sleeve core 31 and the second connector sleeve core 32, institute The installation cavity 23 that the first connector sleeve core 31 is fixedly arranged on the first crossbeam section 21 is stated, the second connector sleeve core 32 is fixedly arranged on The installation cavity 23 of the second cross beam section 22, the first connector sleeve core 31 are equipped with first positioning pin 41, and described the Two connector sleeve cores 32 are equipped with second positioning pin 42, first positioning pin 41 and second positioning pin 42 respectively with it is described The mounting hole secure fit of the mounting hole of first pillar segment 11, second pillar segment 12.
In order to increase structural stability and torsional property, referring to Fig. 2, the first crossbeam section 21 and second cross Beam section 22 is in T set up of character patt ern jointly;The first connector sleeve core 31 and the second connector sleeve core 32 are in be staggered.Described One positioning pin 41 be it is multiple, the multiple first positioning pin 41 is distributed along the vertical direction, and the multiple first positioning pin 41 is located at (such as the first positioning pin 41 is 2, and the second positioning pin 42 is 1, and 3 pins are in triangle for the two sides of second positioning pin 42 Shape is laid).In the present embodiment, the stagger angle of the first connector sleeve core 31 and the second connector sleeve core 32 be α, 85 ° ≤ α≤95 °, it is preferable that α is 90 °.
Hollow glass 200 in order to facilitate the installation of, please refer to Fig. 5 and Fig. 6, and first pillar segment 11 is vertical far from described second One end of shell of column 12 is equipped with buckle closure 5;First pillar segment 11 is laterally extended shape close to one end of second pillar segment 12 There is the clipping room for installing hollow glass 200 along longitudinal direction at stage portion 111, between the stage portion 111 and the buckle closure 5 Gap.
In order to guarantee installation ground stability, referring to Fig. 5, being equipped on the buckle closure 5 for crimping the hollow glass 200 pressing plate 6.The buckle closure 5 is equipped with the first mounting groove 51, and the notch of first mounting groove 51 is arranged inwardly;The pressing plate 6 Snapping to first mounting groove 51, the pressing plate 6 is equipped with the second mounting groove 61, and the notch of second mounting groove 61 is upward It is arranged, first seal 7 is installed in second mounting groove 61, the first seal 7 is abutted with the hollow glass 200 (in the present embodiment, which is EPDM adhesive tape).In this way, waterproofness can be improved.
The column 1 further includes third pillar segment 13, the third pillar segment 13 from first pillar segment 11 along longitudinal direction Direction extends, and the third pillar segment 13 has the installation side, and the installation side is equipped with second seal 8 (in this reality Apply in example, which is foam rods), the second seal 8 is abutted with the side of the hollow glass 200.
Novel T-shaped curtain wall construction system 100 provided by the utility model is opened up in advance on column 1 and is used for during installation The mounting hole for installing the first positioning pin 41 and the second positioning pin 42 installs EPDM adhesive tape at the second mounting groove 61;On crossbeam 2 Notch is milled, the first connector sleeve core 31 and the second connector sleeve core 32 are fixed on to the installation of first crossbeam section 21 with countersunk self-tapping screw In chamber 23 and the installation cavity of second cross beam section 22 23;Pass through (2 first the second positioning pins of positioning pin 41 and 1 of positioning pin 4 again 42) the first connector sleeve core 31 and the second connector sleeve core 32 are respectively corresponded and is connect with the first pillar segment 11 and the second pillar segment 12; Hollow glass 200 is installed, the end installation rubber washer of hollow glass 200 is simultaneously abutted with the side of third pillar segment 13, in The periphery of empty glass 200 is equipped with foam rods, stamps silicone weatherproof sealant, silicone weather resistant sealing to be beaten in the outside of foam rods Glue is complete to install fixation clip 6 by stainless steel outer-hexagonal hook bolt, finally installs buckle closure 5,5 adhesive tape notch of buckle closure need to be pre-installed EPDM adhesive tape.
The above is only the preferred embodiments of the utility model, and therefore it does not limit the scope of the patent of the utility model, all Under the utility model design of the utility model, equivalent structure made based on the specification and figures of the utility model becomes It changes, or directly/be used in other related technical areas indirectly and be included in the scope of patent protection of the utility model.

Claims (10)

1. a kind of Novel T-shaped curtain wall construction system characterized by comprising
Column is in hollow setting, and the column has the installation side of place horizontally, and it is convex that the installation side is convexly equipped with installation Portion, the installation side have provided mounting hole in the position for being equipped with the installation protrusion;
Crossbeam, extends transversely and has the installation end of the one end being located in transverse direction, and the installation end extends to the installation side Portion, the crossbeam have the installation cavity for extending transversely through the installation end;And
Connector sleeve core, is fixedly arranged on the installation cavity, and one end close to the column of the connector sleeve core be equipped with can elasticity stretch The positioning pin of contracting, the positioning pin and the mounting hole secure fit.
2. Novel T-shaped curtain wall construction system as described in claim 1, which is characterized in that the height of the installation protrusion is H, 4mm≤H≤5mm;And/or
The installation protrusion is set to the inside of the installation side.
3. Novel T-shaped curtain wall construction system as described in claim 1, which is characterized in that the column includes being segmented along longitudinal direction The installation side of the first pillar segment and the second pillar segment being arranged, first pillar segment and the second pillar segment is equipped with described Protrusion and the mounting hole are installed;
The crossbeam includes the first crossbeam section and second cross beam section of subsection setup along longitudinal direction, the installation end of the first crossbeam section First pillar segment is extended to, the installation end of the second cross beam section extends to second pillar segment, the first crossbeam Section and the second cross beam section are equipped with the installation cavity;
The positioning pin includes the first positioning pin and the second positioning pin;
The connector sleeve core includes the first connector sleeve core and the second connector sleeve core, and the first connector sleeve core is fixedly arranged on described the The installation cavity of one beam segments, the second connector sleeve core are fixedly arranged on the installation cavity of the second cross beam section, and described One connector sleeve core is equipped with first positioning pin, and the second connector sleeve core is equipped with second positioning pin, first positioning Pin and second positioning pin mounting hole with the mounting hole of first pillar segment, second pillar segment respectively Secure fit.
4. Novel T-shaped curtain wall construction system as claimed in claim 3, which is characterized in that the first crossbeam section and described the Two beam segments are in T set up of character patt ern jointly;
The first connector sleeve core and the second connector sleeve core are in be staggered.
5. Novel T-shaped curtain wall construction system as claimed in claim 4, which is characterized in that the first connector sleeve core and described The stagger angle of second connector sleeve core be α, 85 °≤α≤95 °.
6. Novel T-shaped curtain wall construction system as claimed in claim 5, which is characterized in that α is 90 °.
7. Novel T-shaped curtain wall construction system as claimed in claim 3, which is characterized in that first pillar segment is far from described One end of second pillar segment is equipped with buckle closure;
First pillar segment is laterally extended to form stage portion close to one end of second pillar segment, the stage portion with it is described There is the installation gap for installing hollow glass along longitudinal direction between buckle closure.
8. Novel T-shaped curtain wall construction system as claimed in claim 7, which is characterized in that be equipped on the buckle closure for pressing Connect the pressing plate of the hollow glass.
9. Novel T-shaped curtain wall construction system as claimed in claim 8, which is characterized in that the buckle closure is equipped with the first mounting groove, The notch of first mounting groove is arranged inwardly;
The pressing plate snapping to first mounting groove, the pressing plate is equipped with the second mounting groove, the slot of second mounting groove Mouth is arranged upward, first seal is equipped in second mounting groove, the first seal is abutted with the hollow glass.
10. Novel T-shaped curtain wall construction system as claimed in claim 7, which is characterized in that the column further includes third column Section, the third pillar segment are extendd in the longitudinal direction from first pillar segment, and the third pillar segment has the installation side Portion, the installation side are equipped with second seal, and the second seal is abutted with the side of the hollow glass.
CN201821225452.XU 2018-07-31 2018-07-31 Novel T-shaped curtain wall construction system Active CN208965825U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821225452.XU CN208965825U (en) 2018-07-31 2018-07-31 Novel T-shaped curtain wall construction system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821225452.XU CN208965825U (en) 2018-07-31 2018-07-31 Novel T-shaped curtain wall construction system

Publications (1)

Publication Number Publication Date
CN208965825U true CN208965825U (en) 2019-06-11

Family

ID=66749405

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821225452.XU Active CN208965825U (en) 2018-07-31 2018-07-31 Novel T-shaped curtain wall construction system

Country Status (1)

Country Link
CN (1) CN208965825U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110528749A (en) * 2019-06-17 2019-12-03 深圳广田集团股份有限公司 A kind of silent crossbeam of curtain wall and upright post connection structure for exempting from connector
CN110792216A (en) * 2019-10-31 2020-02-14 深圳广田方特科建集团有限公司 Small-section T-shaped beam pin shaft type connecting structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110528749A (en) * 2019-06-17 2019-12-03 深圳广田集团股份有限公司 A kind of silent crossbeam of curtain wall and upright post connection structure for exempting from connector
CN110792216A (en) * 2019-10-31 2020-02-14 深圳广田方特科建集团有限公司 Small-section T-shaped beam pin shaft type connecting structure

Similar Documents

Publication Publication Date Title
CN101302782B (en) Dried hanging thermal insulation decorative curtain wall and mounting process thereof
CN208965825U (en) Novel T-shaped curtain wall construction system
CN101881059B (en) Folding fan-shaped hyperboloidal unit-type building curtain wall system and a construction method thereof
CN105839917B (en) A kind of construction method of all-steel mold plate fair-faced concrete exposed joint strip and its outseam
CN102494191A (en) Installation method of arc cable tray
CN209413081U (en) A kind of large-span glass curtain wall
CN208267185U (en) Open cell formula stone curtain wall
CN206337690U (en) A kind of glass assemblies corner connecting structure
CN207794459U (en) A kind of curtain wall goes out roof waterproof connected structure
CN205189124U (en) Super large span air film building cable device
CN109039230A (en) A kind of photovoltaic module waterproof assembling structure
CN205777513U (en) A kind of all-steel mold plate fair-faced concrete exposed joint strip
CN201416221Y (en) Folding fan and hyperboloid unit building curtain wall system
CN108468399A (en) Dislocation curtain wall closing in system and installation method up and down
CN209413199U (en) A kind of assembled energy-saving curtain skeleton system facilitating installation
CN112575949A (en) Multifunctional daylighting roof system with internal sunshade, bulletproof, cleaning and lighting functions
CN206122097U (en) A scraper mechanism for LED wafer fixing glue dish
CN109680814A (en) A kind of assembled architecture peripheral structure connects three alveolitoid sealing joint strips and its construction technology
CN105155691B (en) Metal rockwool sandwich board external wall waterproof sealing structure and its construction method
CN206625461U (en) Curtain wall daylighting roof construction
CN213418329U (en) Dry-hanging decorative plate
CN205330020U (en) Roof waterproof type daylighting tile
CN211037474U (en) A mounting structure for installing unitized curtain wall
CN218714019U (en) Anti-aging rubber waterstop
CN219196337U (en) Splicing seam structure of waterproof layer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant