CN206625461U - Curtain wall daylighting roof construction - Google Patents
Curtain wall daylighting roof construction Download PDFInfo
- Publication number
- CN206625461U CN206625461U CN201720223906.9U CN201720223906U CN206625461U CN 206625461 U CN206625461 U CN 206625461U CN 201720223906 U CN201720223906 U CN 201720223906U CN 206625461 U CN206625461 U CN 206625461U
- Authority
- CN
- China
- Prior art keywords
- lighting roof
- plate
- roof plate
- lighting
- curtain wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 34
- 239000003292 glue Substances 0.000 claims description 7
- 239000000565 sealant Substances 0.000 description 6
- 229910000831 Steel Inorganic materials 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000012530 fluid Substances 0.000 description 2
- 239000006260 foam Substances 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 238000005452 bending Methods 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
Landscapes
- Roof Covering Using Slabs Or Stiff Sheets (AREA)
Abstract
A kind of curtain wall daylighting roof construction is the utility model is related to, including:Multiple the first lighting roof plates mutually spliced;Multiple the second lighting roof plates mutually spliced, are disposed adjacent with the first lighting roof plate and the absolute altitude of the second lighting roof plate is less than the absolute altitude of the first lighting roof plate, formed with the first vertical gap between the end of the second lighting roof plate and the first lighting roof plate;And it is installed in the end of the first lighting roof plate and the second lighting roof plate and closes the deflector in the first gap.The utility model is fixed on the end of the first lighting roof plate and the second lighting roof plate to close the gap using deflector, so as to which the rainwater fallen on lighting roof plate can flow out lighting roof plate along deflector, prevent rain leakage enters in building structure from damaging.
Description
Technical field
The realm of building construction is the utility model is related to, espespecially a kind of curtain wall daylighting roof construction.
Background technology
Curtain wall daylighting roof construction includes polylith lighting roof plate, the two neighboring frame structure for installing lighting roof plate
Height is not necessarily consistent, it is understood that there may be certain difference in height, gap be present between two neighboring frame structure, then such
Certain difference in height and gap space also occurs between the lighting roof plate installed in two neighboring frame structure.
On rainy day, gap space is flowed between the lighting roof plate that rainwater will be installed from two neighboring frame structure
In, the time is grown, and the rainwater in gap space, which will diffuse out, to penetrate into building structure, so as to cause certain damage to building structure
It is bad.
Utility model content
The defects of the purpose of this utility model is to overcome prior art, there is provided a kind of curtain wall daylighting roof construction, solve existing
Have in technology and seepage occur between the lighting roof plate installed in the two neighboring frame structure with difference in height, to building structure
The problem of causing certain damage.
Realizing the technical scheme of above-mentioned purpose is:
The utility model provides a kind of curtain wall daylighting roof construction, including:
Multiple the first lighting roof plates mutually spliced;
Multiple the second lighting roof plates mutually spliced, are disposed adjacent with the first lighting roof plate and described second adopts
The absolute altitude of spire plate is less than the absolute altitude of the first lighting roof plate, the second lighting roof plate and first lighting roof
Formed with the first vertical gap between the end of plate;And
It is installed in the end of the first lighting roof plate and the second lighting roof plate and closes between described first
The deflector of gap.
The beneficial effect of the utility model curtain wall daylighting roof construction:
Formed between second lighting roof plate of the utility model curtain wall daylighting roof construction and the end of the first lighting roof plate
There is the first vertical gap, leakage problems easily occur during the rainy day.First lighting roof plate and second are fixed on using deflector
The gap is closed in the end of lighting roof plate, so that the rainwater fallen on lighting roof plate can flow out along deflector
Lighting roof plate, prevent rain leakage enters in building structure from damaging.
The utility model curtain wall daylighting roof construction further improvement is that, the deflector include gear be located at described first
First connecting plate in gap and the second connecting plate being connected with first connecting plate, first connecting plate are adopted with described first
The end of spire plate is fixedly connected, and second connecting plate is placed on the second lighting roof plate and adopted with described second
The end of spire plate is fixedly connected.
The utility model curtain wall daylighting roof construction further improvement is that, it is logical that first connecting plate is interval with first
Hole, the end that first connecting plate is fixed on the first lighting roof plate by the first through hole is worn by the first bolt
Portion;
Second connecting plate is interval with the second through hole, and second through hole is worn by described second by the second bolt
Connecting plate is fixed on the end of the second lighting roof plate.
The utility model curtain wall daylighting roof construction further improvement is that, first connecting plate and first daylighting
The junction of the junction of top plate block, second connecting plate and the second lighting roof plate is equipped with waterproof layer.
The utility model curtain wall daylighting roof construction further improvement is that, the waterproof layer is made of marine glue.
Brief description of the drawings
Fig. 1 is the floor map of the utility model curtain wall daylighting roof construction.
Fig. 2 is the sectional view in A-A directions in Fig. 1.
Fig. 3 is the structural representation of the deflector of the utility model curtain wall daylighting roof construction.
Fig. 4 is the enlarged diagram of B in Fig. 1.
Embodiment
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Refering to Fig. 1, it is shown that the floor map of the utility model curtain wall daylighting roof construction.Refering to Fig. 2, it is shown that Fig. 1
The sectional view in middle A-A directions.With reference to shown in Fig. 1 and Fig. 2, the utility model curtain wall daylighting roof construction includes:Multiple mutually splicings
The first lighting roof plate 10, multiple the second lighting roof plates 20 and deflector 30 mutually spliced, wherein the second lighting roof
Plate 20 is disposed adjacent with the first lighting roof plate 10, and the absolute altitude of the second lighting roof plate 20 is less than the first lighting roof plate 10
Absolute altitude, formed with the first vertical gap, deflector between the end of the second lighting roof plate 20 and the first lighting roof plate 10
30 are installed in the end of the first lighting roof plate 10 and the second lighting roof plate 20 and close the first gap.The utility model
Formed with the first vertical gap, rain between second lighting roof plate of curtain wall daylighting roof construction and the end of the first lighting roof plate
It when leakage problems easily occur.Using deflector be fixed on the end of the first lighting roof plate and the second lighting roof plate come
The gap is closed, so as to which the rainwater fallen on lighting roof plate can flow out lighting roof plate along deflector, prevents rainwater from oozing
Leak into building structure and damage.
Refering to Fig. 3, it is shown that the structural representation of the deflector of the utility model curtain wall daylighting roof construction.With reference to Fig. 1 extremely
Shown in Fig. 3, according to the requirement of architectural design, understand on the roof of building structure formed with the not consistent adjacent structure of absolute altitude,
Need to install to form daylighting roof construction on these structures in subsequent construction, then daylighting roof construction is also just likewise formed with not
Consistent absolute altitude.Specifically, the first mounting structure 40 and the second mounting structure 50 are disposed adjacent, the mark of the second mounting structure 50
Height is in the absolute altitude of the first mounting structure 40, formed with vertical between the end of the first mounting structure 40 and the second mounting structure 50
Second gap.Need to install on the first mounting structure 40 when constructing curtain wall daylighting roof construction it is multiple mutually splice first adopt
Spire plate 10, multiple the second lighting roof plates 20 mutually spliced are installed on the second mounting structure 50.In this case,
Rainwater may be between the first lighting roof plate 10 and the second lighting roof plate 20 gap enter the first mounting structure 40 and the
In the second gap between two mounting structures 50, so as to destroy building structure.In the present embodiment, the first mounting structure 40
Formed with the second mounting structure 50 using concreting.
Refering to Fig. 4, it is shown that B enlarged diagram in Fig. 1.With reference to shown in Fig. 1 to Fig. 4, by the first lighting roof plate
During 10 are installed on the first mounting structure 40, first when constructing the first mounting structure 40 first in the first mounting structure 40
In set the first embedded board.In the present embodiment, the first embedded board is steel plate.Then the first keel frame is welded on the first embedded board
Frame 41, so as to which the first keel frame 41 is fixed on the first mounting structure 40, for subsequently pacifying on the first keel frame 41
Fill the first lighting roof plate 10.
The first secondary frame 42 is fixed on the first keel frame 41.Between two adjacent the first keel frames 41 are installed on
The first secondary frame 42 between the first lighting roof plate 10 is installed.
Specifically, the first secondary frame 42 is arranged on the first keel frame 41, by for installing the first adjacent lighting roof
Another first secondary frame 42 of plate 10 is arranged on the first keel frame 41, the two the first adjacent secondary pressing plates 43 of frame 42
Pressure sets connection, and pressing plate 43 is fixed on the first keel frame 41 using bolt, so as to realize in the first keel frame 41
The construction of the first secondary frame 42 of upper installation.
First structure glue 44 is coated with the first secondary frame 42, the first lighting roof plate 10 is placed on adjacent two first
Between secondary frame 42, and the end of the first lighting roof plate 10 is sticked on first structure glue 44, so as to by the first lighting roof plate
10 are fixed on the first keel frame 41.
On first keel frame 41, the first groove is formed between two neighboring first lighting roof plate 10, in the first groove
Provided with the first sealant 45.In the present embodiment, the first sealant is made of fluid sealant and foam rods.
Similarly, during the second lighting roof plate 20 is installed on the second mounting structure 50, first in construction the
First the second embedded board is set during two mounting structures 50 in the second mounting structure 50.In the present embodiment, the second embedded board is steel plate.
Then the second keel frame is welded on the second embedded board, so as to which the second keel frame is fixed on the second mounting structure 50,
For subsequently installing the second lighting roof plate 20 on the second keel frame.
The second secondary frame is fixed on the second keel frame.Second between two adjacent the second keel frames are installed on
Second lighting roof plate 20 is installed between secondary frame.
Specifically, the second secondary frame is arranged on the second keel frame, by for installing the second adjacent lighting roof plate
20 another second secondary frame is arranged on the second keel frame, and the two second adjacent secondary frames set connection with pressing plate pressure, adopt
Pressing plate is fixed on the second keel frame with bolt, applying for the second secondary frame is installed on the second keel frame so as to realize
Work.
The second structure glue is coated with the second secondary frame, the second lighting roof plate 20 is placed on to two adjacent the second secondary frames
Between, and the end of the second lighting roof plate 20 is sticked in the second structure glue, so as to which the second lighting roof plate 20 be fixed on
On second keel frame.
The second groove is formed on second keel frame, between two neighboring second lighting roof plate 20, is set in the second groove
There is the second sealant.In the present embodiment, the second sealant is made of fluid sealant and foam rods.
It is arranged on the first mounting structure 40 by the first lighting roof plate 10, is arranged on by the second lighting roof plate 20
After on second mounting structure 50, by deflector 30 be connected between the first lighting roof plate 10 and the second lighting roof plate 20 with
The first gap vertical between the first lighting roof plate 10 and the second lighting roof plate 20 is blocked, so as to solve the above problems.
Deflector 30 includes:Gear is located at first connecting plate 300 in the first gap and be connected with the first connecting plate 300 second
Connecting plate 301, the first connecting plate 300 are fixedly connected with the end of the first lighting roof plate 10, and the second connecting plate 301 is placed in second
It is fixedly connected on lighting roof plate 20 and with the end of the second lighting roof plate 20.
In the present embodiment, deflector 30 is formed using aluminium-plastic panel bending, the first connecting plate 300 and the second connecting plate 301
Angle be right angle.Deflector 30 is made according to the gradient of lighting roof.
During deflector 30 is arranged on into curtain wall daylighting roof construction, first is interval with the first connecting plate 300
Through hole, the end that the first connecting plate 300 is fixed on the first lighting roof plate 10 by first through hole is worn by the first bolt 302.
Second connecting plate 301 is interval with the second through hole, and wearing the second through hole by the second bolt 303 fixes the second connecting plate 301
It is tight so as to set and install by the gradient of the deflector 30 along curtain wall daylighting roof construction in the end of the second lighting roof plate 20
Gu and then the end of the first lighting roof plate 10 and the end of the second adjacent lighting roof plate 20 are connected with each other by deflector 30
Get up, prevent because the first gap between the second adjacent lighting roof plate 20 of the first lighting roof plate 10 be present, and occur
The problem of seepage.
Further, in the junction of the first connecting plate 300 and the first lighting roof plate 10, in the and of the second connecting plate 301
The junction of second lighting roof plate 20 is respectively provided with waterproof layer 80 and sealed.In the present embodiment, waterproof layer 80 uses waterproof
Glue is made, and prevents junction from Seepage occur.
The utility model curtain wall daylighting roof construction has the beneficial effect that:
Formed between second lighting roof plate of the utility model curtain wall daylighting roof construction and the end of the first lighting roof plate
There is the first vertical gap, leakage problems easily occur during the rainy day.First lighting roof plate and second are fixed on using deflector
The gap is closed in the end of lighting roof plate, be adopted so as to which the rainwater fallen on the lighting roof plate can flow out along deflector
Spire plate, prevent rain leakage enters in building structure from damaging.
The utility model is described in detail above in association with accompanying drawing embodiment, those skilled in the art can root
Many variations example is made to the utility model according to described above.Thus, some details in embodiment should not be formed to this practicality
New restriction, the utility model will be used as the scope of protection of the utility model using the scope that appended claims define.
Claims (5)
- A kind of 1. curtain wall daylighting roof construction, it is characterised in that including:Multiple the first lighting roof plates mutually spliced;Multiple the second lighting roof plates mutually spliced, are disposed adjacent and second lighting roof with the first lighting roof plate The absolute altitude of plate is less than the absolute altitude of the first lighting roof plate, the second lighting roof plate and the first lighting roof plate End between formed with the first vertical gap;AndIt is installed in the end of the first lighting roof plate and the second lighting roof plate and closes first gap Deflector.
- 2. curtain wall daylighting roof construction as claimed in claim 1, it is characterised in that the deflector includes gear and is located at described first First connecting plate in gap and the second connecting plate being connected with first connecting plate, first connecting plate are adopted with described first The end of spire plate is fixedly connected, and second connecting plate is placed on the second lighting roof plate and adopted with described second The end of spire plate is fixedly connected.
- 3. curtain wall daylighting roof construction as claimed in claim 2, it is characterised in thatFirst connecting plate is interval with first through hole, and wear the first through hole by the first bolt connects described first Plate is fixed on the end of the first lighting roof plate;Second connecting plate is interval with the second through hole, and wear second through hole by the second bolt connects described second Plate is fixed on the end of the second lighting roof plate.
- 4. curtain wall daylighting roof construction as claimed in claim 2, it is characterised in that first connecting plate and first daylighting The junction of the junction of top plate block, second connecting plate and the second lighting roof plate is equipped with waterproof layer.
- 5. curtain wall daylighting roof construction as claimed in claim 4, it is characterised in that the waterproof layer is made of marine glue.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720223906.9U CN206625461U (en) | 2017-03-09 | 2017-03-09 | Curtain wall daylighting roof construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720223906.9U CN206625461U (en) | 2017-03-09 | 2017-03-09 | Curtain wall daylighting roof construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206625461U true CN206625461U (en) | 2017-11-10 |
Family
ID=60211309
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720223906.9U Expired - Fee Related CN206625461U (en) | 2017-03-09 | 2017-03-09 | Curtain wall daylighting roof construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206625461U (en) |
-
2017
- 2017-03-09 CN CN201720223906.9U patent/CN206625461U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104818696A (en) | Method for manufacturing hydraulic engineering vertical waterstop structure | |
CN207228435U (en) | A kind of waterproof construction of type unitized curtain wall | |
CN206426543U (en) | Coiled material lock seaming structure and lock seaming coiled material | |
CN105525709A (en) | Waterproof structure for curtain wall as well as GRC (glass fiber reinforced concrete) curtain wall board and curtain wall with waterproof structure | |
CN106123376A (en) | Solar panels the linkage of side edge | |
CN206625461U (en) | Curtain wall daylighting roof construction | |
CN105227107A (en) | Solar photovoltaic assembly bridging type splicing hermetically-sealed construction | |
CN209924747U (en) | Window system with drainage and decoration functions | |
CN210887623U (en) | Waterproof structure of external wall panel | |
CN203347082U (en) | Energy-saving day-lighting roof capable of draining water structurally | |
CN107130744B (en) | Concatenation formula roof with waterproof function | |
CN211446883U (en) | Underground continuous wall antiseep connection structure | |
CN104533041A (en) | Novel GRC plate joint and processing method thereof | |
CN201826446U (en) | Flashing device for house | |
CN209211487U (en) | A kind of breast boards structure | |
CN203174910U (en) | Structural waterproof type flashing plate | |
CN211572029U (en) | Corrosion-resistant waterproof board | |
CN204940328U (en) | Assembled equipment foundation | |
CN207999172U (en) | A kind of mounting structure of the prefabricated window that floats | |
CN208571986U (en) | A kind of photovoltaic generating system | |
CN109403369A (en) | A kind of production method of breast boards structure and breast boards structure | |
CN205475282U (en) | Can assemble recoverable foundation ditch drainage and protective system | |
CN219411315U (en) | Waterproof structure of prefabricated link plate cross seam | |
CN202969752U (en) | Inclined roof daylighting roof draining structure | |
CN209874278U (en) | Waterproof roof of assembled integrated house |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171110 |
|
CF01 | Termination of patent right due to non-payment of annual fee |