CN211037474U CN201921825468.9U CN201921825468U CN211037474U CN 211037474 U CN211037474 U CN 211037474U CN 201921825468 U CN201921825468 U CN 201921825468U CN 211037474 U CN211037474 U CN 211037474U
Authority
CN
China
Prior art keywords
curtain wall
sealing strip
vertical frame
mounting
side end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921825468.9U
Other languages
Chinese (zh)
Inventor
孙娜
张声勇
张继龙
张贤伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Hualinda Decoration Design Engineering Co ltd
Original Assignee
Shenzhen Hualinda Decoration Design Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Hualinda Decoration Design Engineering Co ltd filed Critical Shenzhen Hualinda Decoration Design Engineering Co ltd
Priority to CN201921825468.9U priority Critical patent/CN211037474U/en
Application granted granted Critical
Publication of CN211037474U publication Critical patent/CN211037474U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

本实用新型涉及建筑幕墙技术领域,特别涉及一种用于安装单元式幕墙的安装结构,所述安装结构包括龙骨架和幕墙板,幕墙板的两侧均固定连接有两个相互平行的侧端板,龙骨架包括竖直架,两个侧端板分别通过螺栓固定连接在两个相邻的竖直架上,所述侧端板与竖直架相对的侧壁上开设有凹槽,凹槽沿平行于竖直架的长度方向设置,在竖直架上固定设置有凸块,凸块与凹槽插接配合。本实用新型实现了提高幕墙安装结构的防水能力。

Figure 201921825468

The utility model relates to the technical field of building curtain walls, in particular to an installation structure for installing a unitized curtain wall. The installation structure comprises a dragon frame and a curtain wall board. Two sides of the curtain wall board are fixedly connected with two mutually parallel side ends. Plate, the dragon frame includes a vertical frame, the two side end plates are respectively connected to two adjacent vertical frames by bolts, and the side wall opposite to the vertical frame is provided with a groove, and the concave The groove is arranged parallel to the length direction of the vertical frame, and the vertical frame is fixedly provided with a convex block, and the convex block is inserted and matched with the groove. The utility model realizes the improvement of the waterproof capability of the curtain wall installation structure.

Figure 201921825468

Description

一种用于安装单元式幕墙的安装结构An installation structure for installing a unitized curtain wall

技术领域technical field

本实用新型涉及建筑幕墙技术领域,特别涉及一种用于安装单元式幕墙的安装结构。The utility model relates to the technical field of building curtain walls, in particular to an installation structure for installing a unitized curtain wall.

背景技术Background technique

幕墙是建筑物的外墙护围,是仅起到装饰作用的轻质墙体,在安装幕墙单元时,相邻的幕墙单元之间、以及幕墙单元与龙骨架之间会形成安装缝,为了防止雨水从安装缝内进入到幕墙内侧,进而使得建筑物本体受到雨水侵蚀,因此需要将安装缝进行密封,现有连接处用密封胶进行密封。The curtain wall is the outer wall of the building, and it is a lightweight wall that only plays a decorative role. When installing curtain wall units, installation joints will be formed between adjacent curtain wall units and between the curtain wall units and the dragon skeleton. In order to prevent rainwater from entering the inside of the curtain wall from the installation seam, the building body will be eroded by rainwater, so the installation seam needs to be sealed, and the existing joints are sealed with sealant.

上述现有技术的不足之处在于,密封胶在长期日晒雨淋后容易发生开裂等情况,进而使得其密封效果大大降低,使得雨水通过安装缝进入到建筑物本体内。The disadvantage of the above-mentioned prior art is that the sealant is prone to cracking after long-term exposure to sunlight and rain, thereby greatly reducing its sealing effect, allowing rainwater to enter the building body through the installation seam.

实用新型内容Utility model content

本实用新型的目的是提供了一种用于安装单元式幕墙的安装结构,实现了提高幕墙安装结构的防水能力。The purpose of the utility model is to provide an installation structure for installing a unitized curtain wall, so as to improve the waterproof capability of the curtain wall installation structure.

本实用新型的上述实用新型目的是通过以下技术方案得以实现的:The above-mentioned utility model purpose of the present utility model is achieved through the following technical solutions:

一种用于安装单元式幕墙的安装结构,所述安装结构包括龙骨架和幕墙板,幕墙板的两端均固定连接有两个相互平行的侧端板,龙骨架包括竖直架,两个侧端板分别通过螺栓固定连接在两个相邻的竖直架上,所述侧端板与竖直架相对的侧壁上开设有凹槽,凹槽沿平行于竖直架的长度方向设置,在竖直架上固定设置有凸块,凸块与凹槽插接配合。An installation structure for installing a unitized curtain wall, the installation structure includes a dragon frame and a curtain wall panel, two side end panels parallel to each other are fixedly connected at both ends of the curtain wall panel, the dragon frame includes a vertical frame, two The side end plates are respectively fixed and connected to two adjacent vertical frames by bolts, the side walls opposite to the side end plates and the vertical frames are provided with grooves, and the grooves are arranged along the length direction parallel to the vertical frames The vertical frame is fixedly provided with a convex block, and the convex block is inserted and matched with the groove.

通过采用上述技术方案,安装幕墙板时,将凸块与凹槽插接配合,然后将凸块与凹槽的边沿通过密封胶密封,密封胶对雨水起到阻挡作用,使得雨水不易进入到凸块与凹槽的缝隙之间,同时由于凸块与凹槽之间的缝隙呈沿折弯状,即使雨水透过密封胶进入到凸块与凹槽之间折弯状的缝隙,即使得雨水不易进入到幕墙板的内侧,因此使得幕墙板的防水能力得到提升。By adopting the above technical solution, when installing the curtain wall panel, the bumps and grooves are inserted and matched, and then the edges of the bumps and the grooves are sealed with sealant, and the sealant acts as a barrier against rainwater, making it difficult for rainwater to enter the bumps. Between the gap between the block and the groove, and because the gap between the bump and the groove is in a curved shape, even if the rainwater enters the bent gap between the bump and the groove through the sealant, even the rain It is not easy to enter the inner side of the curtain wall panel, so the waterproof ability of the curtain wall panel is improved.

本实用新型进一步设置为:所述凸块的水平截面为W形,凹槽水平的截面为与凸块插接配合的W形。The utility model is further provided that: the horizontal cross section of the protruding block is W-shaped, and the horizontal cross-section of the groove is W-shaped which is inserted and matched with the protruding block.

通过采用上述技术方案,由于凸块和凹槽为相适配的W形结构,因此凸块与凹槽之间的缝隙为W形的往复回路,雨水很难沿水平方向穿过凸块与凹槽之间的往复回路,因此使得幕墙板的防水能力得到提高。By adopting the above technical solution, since the bumps and the grooves are of a W-shaped structure, the gap between the bumps and the grooves is a W-shaped reciprocating circuit, and it is difficult for rainwater to pass through the bumps and the grooves in the horizontal direction. There is a reciprocating circuit between the grooves, so the waterproof ability of the curtain wall panel is improved.

本实用新型进一步设置为:所述安装结构包括密封条,密封条设置在竖直架上,密封条的两侧分别与连接在同一竖直架上的两个侧端板抵接,所述密封条为弹性材质。The utility model is further provided as follows: the installation structure comprises a sealing strip, the sealing strip is arranged on the vertical frame, the two sides of the sealing strip are respectively abutted with two side end plates connected to the same vertical frame, and the sealing strip The strips are of elastic material.

通过采用上述技术方案,所述密封条为弹性材质,因此密封条对相邻侧端板之间的缝隙起到良好的填充效果,安装密封条时,将密封条与侧端板之间通过密封胶密封,雨水经过幕墙板之间的间隙时,首先会经过密封条与侧端板之间的间隙,使得雨水不易直接进入到侧端板与竖直架之间的缝隙内,同时侧端板通过L形片和螺栓固定连接在竖直架上,L形片相互垂直的两个平面分别通过螺栓固定连接在侧端板和竖直架上,因此L形片与侧端板之间的连接处很难注入密封胶,通过将弹性密封条密封在L形片上方,因此使得雨水不易进入到L形片与侧端板之间的衔接缝内,因此实现了提高幕墙板的防水性能。By adopting the above technical solution, the sealing strip is made of elastic material, so the sealing strip has a good filling effect on the gap between the adjacent side end plates. When installing the sealing strip, the sealing strip and the side end plate are sealed When the rainwater passes through the gap between the curtain wall panels, it will first pass through the gap between the sealing strip and the side end plate, so that the rainwater is not easy to directly enter the gap between the side end plate and the vertical frame. It is fixedly connected to the vertical frame by the L-shaped piece and bolts, and the two planes of the L-shaped piece that are perpendicular to each other are respectively connected to the side end plate and the vertical frame by bolts, so the connection between the L-shaped piece and the side end plate is It is difficult to inject sealant at the place where the elastic sealing strip is sealed above the L-shaped sheet, so it is difficult for rainwater to enter the joint between the L-shaped sheet and the side end panel, thus improving the waterproof performance of the curtain wall panel.

本实用新型进一步设置为:密封条与侧端板相对的侧壁上开设有插接槽,在侧端板的外侧壁上固定设置有插接块,插接块与插接槽沿水平方向插接配合。The utility model is further configured as follows: the side wall opposite the sealing strip and the side end plate is provided with a plug-in slot, the outer side wall of the side end plate is fixedly provided with a plug-in block, and the plug-in block and the plug-in groove are inserted in the horizontal direction. Match up.

通过采用上述技术方案,由于插接槽与插接块沿水平方向插接配合,因此密封条与侧端板之间的缝隙为折弯状的间隙,因此即使幕墙进入到密封条与侧端板之间的间隙,也不易穿过密封条与侧端板之间的折弯状的间隙,因此使得雨水不易进入到侧端部与竖直架之间,即增强了幕墙板的防水性。By adopting the above technical solution, since the insertion slot and the insertion block are inserted and matched in the horizontal direction, the gap between the sealing strip and the side end plate is a bent gap, so even if the curtain wall enters the sealing strip and the side end plate The gap between them is also difficult to pass through the bent gap between the sealing strip and the side end plate, so it is difficult for rainwater to enter between the side end part and the vertical frame, that is, the waterproofness of the curtain wall plate is enhanced.

本实用新型进一步设置为:竖直架上固定连接固定卡块,所述固定卡块为上端为开口状的等腰梯形结构,密封条下端为与其相适配的等腰梯形结构。The utility model is further arranged as follows: the vertical frame is fixedly connected with a fixed block, the fixed block is an isosceles trapezoid structure with an open upper end, and the lower end of the sealing strip is a matching isosceles trapezoid structure.

通过采用上述技术方案,安装密封条时,由于密封条为弹性材质,因此将其下端挤压,使其能够进入到固定卡块内,将密封条通过若干个固定卡块固定后,密封条的外侧壁与幕墙板的外侧壁处于同一平面上,然后将密封条与幕墙板之间的间隙通过密封胶密封,即达到了将密封条进一步固定在幕墙板上的功能。By adopting the above technical solution, when the sealing strip is installed, since the sealing strip is made of elastic material, the lower end of the sealing strip is squeezed so that it can enter the fixed block. The outer side wall and the outer side wall of the curtain wall panel are on the same plane, and then the gap between the sealing strip and the curtain wall panel is sealed by the sealant, that is, the function of further fixing the sealing strip on the curtain wall panel is achieved.

本实用新型进一步设置为:幕墙板包括上端面和下端面,下端面向下凸出形成遮挡沿,下端面除遮挡沿以为的部分为拼接面,上端面具有与遮挡沿和拼接面相适配的结构。The utility model is further arranged as follows: the curtain wall panel comprises an upper end surface and a lower end surface, the lower end surface protrudes downward to form a shielding edge, the part of the lower end surface except the shielding edge is a splicing surface, and the upper end surface has a matching structure with the shielding edge and the splicing surface .

通过采用上述技术方案,上、下幕墙板拼接对齐后,遮挡沿会将上、下幕墙板之间的拼接缝变成上下高度不同的曲面,因此使得雨水不易穿过遮挡沿的拼接缝进入到幕墙板内侧,因此增强了安装结构的防水能力。By adopting the above technical solution, after the upper and lower curtain wall panels are spliced and aligned, the splicing seam between the upper and lower curtain wall panels will be turned into a curved surface with different upper and lower heights, thus making it difficult for rainwater to pass through the splicing seam of the shading edge into the inner side of the curtain wall panel, thus enhancing the waterproof capability of the installation structure.

本实用新型进一步设置为:拼接面上固定设置有竖直向下的凸起。The utility model is further arranged as follows: a vertical downward protrusion is fixedly arranged on the splicing surface.

通过采用上述技术方案,上、下幕墙板拼接对齐后,凸块插入到位于其下方幕墙板的拼接面上,凸块与拼接面向适配,因此使得上、下幕墙板之间的连接稳定性增强,同时凸起与下端面之间的缝隙为折弯状,因此使得雨水不易穿过凸起进入到幕墙板内侧。By adopting the above technical solution, after the upper and lower curtain wall panels are spliced and aligned, the bump is inserted into the splicing surface of the curtain wall panel below it, and the bump is adapted to the splicing face, so the connection between the upper and lower curtain wall panels is stable. At the same time, the gap between the protrusion and the lower end surface is bent, so it is difficult for rainwater to pass through the protrusion and enter the inner side of the curtain wall panel.

本实用新型进一步设置为:在幕墙板外侧壁上涂设有防水涂料The utility model is further arranged as follows: the outer side walls of the curtain wall panels are coated with waterproof paint

通过采用上述技术方案,防水涂料经固化后形成的防水薄膜具有一定的延伸性、弹塑性、抗裂性、抗渗性及耐候性,能起到防水、防渗和保护作用,因此增强了幕墙板的防水性能,使得雨水不易进入到幕墙内侧的建筑物内。By adopting the above technical solutions, the waterproof film formed by the curing of the waterproof coating has certain elongation, elasto-plasticity, crack resistance, impermeability and weather resistance, and can play the role of waterproof, anti-seepage and protection, thus enhancing the curtain wall The waterproof performance of the board makes it difficult for rainwater to enter the building on the inner side of the curtain wall.

综上所述,本实用新型具有以下技术效果:To sum up, the utility model has the following technical effects:

1、 通过采用竖直架与端板侧壁插接配合的结构,实现了使得雨水穿过竖直架与侧端板之间缝隙的功能;1. By adopting the structure in which the vertical frame and the side wall of the end plate are inserted and matched, the function of making the rainwater pass through the gap between the vertical frame and the side end plate is realized;

2、 通过采用密封条的结构,使得雨水不易进入到竖直架与侧端板之间缝隙的功能;2. By adopting the structure of the sealing strip, it is difficult for rainwater to enter the gap between the vertical frame and the side end plate;

3、 通过采用固定卡块的结构,实现了增强密封条连接稳定性的功能。3. The function of enhancing the connection stability of the sealing strip is realized by adopting the structure of the fixed block.

附图说明Description of drawings

图1是本实施例的三维立体示意图;1 is a three-dimensional schematic diagram of the present embodiment;

图2是图1中局部A的放大示意图;Fig. 2 is the enlarged schematic diagram of part A in Fig. 1;

图3是突出幕墙板上端面和下端面的局部剖面示意图;Fig. 3 is a partial cross-sectional schematic diagram of the upper end face and the lower end face of the protruding curtain wall;

图4是突出密封条与固定卡块安装的局部三维立体示意图。FIG. 4 is a partial three-dimensional perspective view of the installation of the protruding sealing strip and the fixing block.

图中,1、龙骨架;11、竖直架;111、凸块;112、固定卡块;2、幕墙板;21、侧端板;211、凹槽;212、插接块;22、上端面;23、下端面;231、遮挡沿;232、拼接面;233、凸起;3、密封条;31、插接槽。In the figure, 1, dragon frame; 11, vertical frame; 111, convex block; 112, fixed block; 2, curtain wall panel; 21, side end plate; 211, groove; 212, plug-in block; 22, upper end face; 23, lower end face; 231, blocking edge; 232, splicing surface; 233, protrusion; 3, sealing strip; 31, insertion groove.

具体实施方式Detailed ways

如图1所示,本实用新型介绍了一种用于安装单元式幕墙的安装结构,所述安装结构包括龙骨架1、幕墙板2和密封条3,龙骨架1包括竖直架11,幕墙板2通过螺栓固定连接在两个相邻的竖直架11上,幕墙板2与竖直架11沿水平方向插接配合,密封条3安装在相邻的两个幕墙板2的竖直侧壁之间。密封条3设置在相邻的两个幕墙板2之间,因此对幕墙板2与竖直架11之间的间隙起到密封作用,幕墙板2与竖直架11插接配合,因此使得雨水不易穿过幕墙板2与竖直架11之间缝隙,使得雨水不易进入到幕墙板2的内侧壁,因此提高了幕墙板2的防水能力。As shown in FIG. 1, the present utility model introduces an installation structure for installing a unitized curtain wall. The installation structure includes a dragon frame 1, a curtain wall panel 2 and a sealing strip 3. The dragon frame 1 includes a vertical frame 11, and the curtain wall The panel 2 is fixedly connected to the two adjacent vertical frames 11 by bolts, the curtain wall panel 2 and the vertical frame 11 are inserted and matched in the horizontal direction, and the sealing strip 3 is installed on the vertical side of the two adjacent curtain wall panels 2 between the walls. The sealing strip 3 is arranged between the two adjacent curtain wall panels 2, so it has a sealing effect on the gap between the curtain wall panels 2 and the vertical frame 11. It is not easy to pass through the gap between the curtain wall panel 2 and the vertical frame 11 , so that the rainwater is not easy to enter the inner side wall of the curtain wall panel 2 , thus improving the waterproof capability of the curtain wall panel 2 .

如图2所示,所述幕墙板包括侧端板21,如图4所示,侧端板21固定连接在幕墙板2的一侧侧壁上,两个侧端板21固定连接在幕墙板2的两端,所述侧端板21与竖直架11相对的侧壁上开设有凹槽211,凹槽211沿平行于竖直架11的长度方向设置,在竖直架11上固定设置有凸块111,凸块111与凹槽211插接配合。安装幕墙板2时,将凸块111与凹槽211插接配合,然后将凸块111与凹槽211的边沿通过密封胶密封,密封胶对雨水起到阻挡作用,使得雨水不易进入到凸块111与凹槽211的缝隙之间,同时由于凸块111与凹槽211之间的缝隙呈沿折弯状,即使雨水透过密封胶进入到凸块111与凹槽211之间折弯状的缝隙,即使得雨水不易进入到幕墙板2的内侧,因此使得幕墙板2的防水能力得到提升。为了进一步增强凸块111与凹槽211之间的防水性能,所述凸块111的水平截面为W形,凹槽211水平的截面为与凸块111插接配合的W形,由于凸块111和凹槽211为相适配的W形结构,因此凸块111与凹槽211之间的缝隙为W形的往复回路,雨水很难沿水平方向穿过凸块111与凹槽211之间的往复回路,因此使得幕墙板2的防水能力得到提高。As shown in FIG. 2, the curtain wall panel includes side end panels 21. As shown in FIG. 4, the side end panels 21 are fixedly connected to one side wall of the curtain wall panel 2, and the two side end panels 21 are fixedly connected to the curtain wall panel. 2, grooves 211 are formed on the side walls of the side end plate 21 opposite to the vertical frame 11. The grooves 211 are arranged along the length direction parallel to the vertical frame 11 and are fixedly arranged on the vertical frame 11. There are bumps 111 , and the bumps 111 are inserted and matched with the grooves 211 . When installing the curtain wall panel 2, plug the bump 111 with the groove 211, and then seal the edges of the bump 111 and the groove 211 with sealant, which blocks rainwater, making it difficult for rainwater to enter the bump. 111 and the gap between the groove 211, and because the gap between the bump 111 and the groove 211 is in a bent shape, even if the rainwater enters the bent shape between the bump 111 and the groove 211 through the sealant. The gap makes it difficult for rainwater to enter the inner side of the curtain wall panel 2 , so that the waterproof capability of the curtain wall panel 2 is improved. In order to further enhance the waterproof performance between the bumps 111 and the grooves 211 , the horizontal cross-section of the bumps 111 is W-shaped, and the horizontal cross-section of the grooves 211 is a W-shaped plug-fit with the bumps 111 . The groove 211 is a W-shaped structure, so the gap between the bump 111 and the groove 211 is a W-shaped reciprocating loop, and it is difficult for rainwater to pass through the gap between the bump 111 and the groove 211 in the horizontal direction. The reciprocating circuit, therefore, the waterproof ability of the curtain wall panel 2 is improved.

如图3所示,密封条3的两侧分别与连接在同一竖直架11上的两个侧端板21抵接,所述密封条3为弹性材质。由于密封条3为弹性材质,因此密封条3对相邻侧端板21之间的缝隙起到良好的填充效果,安装密封条3时,将密封条3与侧端板21之间通过密封胶密封,雨水经过幕墙板2之间的间隙时,首先会经过密封条3与侧端板21之间的间隙,使得雨水不易直接进入到侧端板21与竖直架11之间的缝隙内,同时侧端板21通过L形片和螺栓固定连接在竖直架11上,L形片相互垂直的两个平面分别通过螺栓固定连接在侧端板21和竖直架11上,因此L形片与侧端板21之间的连接处很难注入密封胶,通过将弹性密封条3密封在L形片上方,因此使得雨水不易进入到L形片与侧端板21之间的衔接缝内,因此实现了提高安装结构的防水性能。As shown in FIG. 3 , two sides of the sealing strip 3 are respectively in contact with the two side end plates 21 connected to the same vertical frame 11 , and the sealing strip 3 is made of elastic material. Since the sealing strip 3 is made of elastic material, the sealing strip 3 has a good filling effect on the gap between the adjacent side end plates 21. When installing the sealing strip 3, pass the sealant between the sealing strip 3 and the side end plates 21. Sealing, when the rainwater passes through the gap between the curtain wall panels 2, it will first pass through the gap between the sealing strip 3 and the side end plate 21, so that it is not easy for rainwater to directly enter the gap between the side end plate 21 and the vertical frame 11. At the same time, the side end plate 21 is fixedly connected to the vertical frame 11 through L-shaped pieces and bolts, and the two planes of the L-shaped pieces that are perpendicular to each other are fixed to the side end plate 21 and the vertical frame 11 through bolts respectively. Therefore, the L-shaped piece It is difficult to inject sealant into the joint with the side end plate 21. By sealing the elastic sealing strip 3 above the L-shaped piece, it is difficult for rainwater to enter the joint between the L-shaped piece and the side end plate 21. Therefore, it is achieved to improve the waterproof performance of the mounting structure.

如图4所示,为了进一步增强密封条3与侧端板21之间的连接强度,密封条3与侧端板21相对的侧壁上开设有插接槽31,在侧端板21的外侧壁上固定设置有插接块212,插接块212与插接槽31沿水平方向插接配合。由于插接槽31与插接块212沿水平方向插接配合,因此密封条3与侧端板21之间的缝隙为折弯状的间隙,因此即使幕墙进入到密封条3与侧端板21之间的间隙,也不易穿过密封条3与侧端板21之间的折弯状的间隙,因此使得雨水不易进入到侧端部与竖直架11之间,即增强了幕墙板2的防水性。As shown in FIG. 4 , in order to further enhance the connection strength between the weather strip 3 and the side end plate 21 , the side wall opposite the weather strip 3 and the side end plate 21 is provided with an insertion groove 31 . A plug-in block 212 is fixedly arranged on the wall, and the plug-in block 212 is plug-fitted with the plug-in groove 31 along the horizontal direction. Since the insertion groove 31 and the insertion block 212 are inserted in the horizontal direction, the gap between the sealing strip 3 and the side end plate 21 is a bent gap, so even if the curtain wall enters the sealing strip 3 and the side end plate 21 The gap between them is also not easy to pass through the bent gap between the sealing strip 3 and the side end plate 21, so it is difficult for rainwater to enter between the side end part and the vertical frame 11, that is, the protection of the curtain wall plate 2 is enhanced. Waterproof.

密封条3可以粘设在竖直架11上或者是采用卡接的方式,由于粘胶经日积月累其粘性可能降低,进而使得密封条3容易脱落,当所密封条3位于较高处时,高空作业对密封条3继续补粘比较繁琐,因此本实用新型采用上述第二种方式,将密封条3卡接在竖直架11上。如图4所示,竖直架11上固定连接固定卡块112,所述固定卡块112为上端为开口状的等腰梯形结构,密封条3下端为与其相适配的等腰梯形结构。安装密封条3时,由于密封条3为弹性材质,因此将其下端挤压,使其能够进入到固定卡块112内,将密封条3通过若干个固定卡块112固定后,密封条3的外侧壁与幕墙板2的外侧壁处于同一平面上,然后将密封条3与幕墙板2之间的间隙通过密封胶密封,即达到了将密封条3进一步固定在幕墙板2上的功能。The sealing strip 3 can be glued on the vertical frame 11 or can be snap-connected. Since the viscosity of the adhesive may decrease over time, the sealing strip 3 is easy to fall off. It is cumbersome to continue adhering the sealing strip 3 , so the present invention adopts the above-mentioned second method to clamp the sealing strip 3 on the vertical frame 11 . As shown in FIG. 4 , a fixed block 112 is fixedly connected to the vertical frame 11 , the fixed block 112 is an isosceles trapezoid structure with an open upper end, and the lower end of the sealing strip 3 is a matching isosceles trapezoid structure. When installing the sealing strip 3, since the sealing strip 3 is made of elastic material, the lower end of the sealing strip 3 is squeezed so that it can enter the fixing block 112. After the sealing strip 3 is fixed by several fixing The outer side wall and the outer side wall of the curtain wall panel 2 are on the same plane, and then the gap between the sealing strip 3 and the curtain wall panel 2 is sealed by the sealant, that is, the function of further fixing the sealing strip 3 on the curtain wall panel 2 is achieved.

如图3所示,所述幕墙板2包括上端面22、下端面23,下端面23向下凸出形成遮挡沿231,下端面23除遮挡沿231以为的部分为拼接面232,拼接面232上固定设置有竖直向下的凸起233,上端面22具有与遮挡沿231和拼接面232相适配的结构。上、下幕墙板2拼接对齐后,遮挡沿231会将上、下幕墙板2之间的拼接缝变成上下高度不同的曲面,因此使得雨水不易穿过遮挡沿231的拼接缝进入到幕墙板2内侧,因此增强了安装结构的防水能力。上、下幕墙板2拼接对齐后,凸块111插入到位于其下方幕墙板2的拼接面232上,凸块111与拼接面232向适配,因此使得上、下幕墙板2之间的连接稳定性增强,同时凸起233与下端面23之间的缝隙为折弯状,因此使得雨水不易穿过凸起233进入到幕墙板2内侧。As shown in FIG. 3 , the curtain wall panel 2 includes an upper end surface 22 and a lower end surface 23. The lower end surface 23 protrudes downward to form a shielding edge 231. The part of the lower end surface 23 except the shielding edge 231 is a splicing surface 232. The splicing surface 232 A vertical downward protrusion 233 is fixedly arranged on the upper surface, and the upper end surface 22 has a structure adapted to the shielding edge 231 and the splicing surface 232 . After the upper and lower curtain wall panels 2 are spliced and aligned, the shielding edge 231 will turn the splicing seam between the upper and lower curtain wall panels 2 into curved surfaces with different upper and lower heights, thus making it difficult for rainwater to enter through the splicing seam of the shielding edge 231. The inner side of the curtain wall panel 2, thus enhancing the waterproof capability of the installation structure. After the upper and lower curtain wall panels 2 are spliced and aligned, the protruding block 111 is inserted into the splicing surface 232 of the curtain wall panel 2 below it, and the protruding block 111 is adapted to the splicing surface 232, so that the connection between the upper and lower curtain wall panels 2 is made. The stability is enhanced, and at the same time, the gap between the protrusion 233 and the lower end surface 23 is bent, so it is difficult for rainwater to pass through the protrusion 233 and enter the inner side of the curtain wall panel 2 .

在幕墙板2外侧壁上涂设有防水涂料,防水涂料经固化后形成的防水薄膜具有一定的延伸性、弹塑性、抗裂性、抗渗性及耐候性,能起到防水、防渗和保护作用,因此增强了幕墙板2的防水性能,使得雨水不易进入到幕墙内侧的建筑物内。A waterproof coating is applied on the outer side wall of the curtain wall panel 2, and the waterproof film formed by the curing of the waterproof coating has certain elongation, elasto-plasticity, crack resistance, impermeability and weather resistance, and can play the role of waterproof, anti-seepage and Therefore, the waterproof performance of the curtain wall panel 2 is enhanced, so that the rainwater is not easy to enter into the building inside the curtain wall.

本实用新型的工作原理为:The working principle of the utility model is:

安装幕墙板2时,将凸块111与凹槽211插接配合,然后将凸块111与凹槽211的边沿通过密封胶密封,密封胶对雨水起到阻挡作用,使得雨水不易进入到凸块111与凹槽211的缝隙之间,同时由于凸块111与凹槽211之间的缝隙呈沿折弯状,即使雨水透过密封胶进入到凸块111与凹槽211之间折弯状的缝隙,即使得雨水不易进入到幕墙板2的内侧,安装密封条3时,由于密封条3为弹性材质,因此将其下端挤压,使其能够进入到固定卡块112内,将密封条3通过若干个固定卡块112固定后,密封条3的外侧壁与幕墙板2的外侧壁处于同一平面上,同时使插接块212与插接槽31沿水平方向插接配合,然后将密封条3与幕墙板2之间的间隙通过密封胶密封,因此实现了提高幕墙板2的防水能力的功能。When installing the curtain wall panel 2, plug the bump 111 with the groove 211, and then seal the edges of the bump 111 and the groove 211 with sealant, which blocks rainwater, making it difficult for rainwater to enter the bump. 111 and the gap between the groove 211, and because the gap between the bump 111 and the groove 211 is in a bent shape, even if the rainwater enters the bent shape between the bump 111 and the groove 211 through the sealant. The gap, even if the rainwater is not easy to enter the inner side of the curtain wall panel 2, when the sealing strip 3 is installed, since the sealing strip 3 is made of elastic material, the lower end of the sealing strip 3 is squeezed so that it can enter the fixing block 112, and the sealing strip 3 After being fixed by several fixing blocks 112, the outer side wall of the sealing strip 3 and the outer side wall of the curtain wall panel 2 are on the same plane, and at the same time, the plug-in block 212 and the plug-in slot 31 are inserted and matched in the horizontal direction, and then the sealing strip The gap between 3 and the curtain wall panel 2 is sealed by the sealant, so the function of improving the waterproof ability of the curtain wall panel 2 is realized.

本具体实施例仅仅是对本实用新型的解释,其并不是对本实用新型的限制,本领域技术人员在阅读完本说明书后可以根据需要对本实施例做出没有创造性贡献的修改,但只要在本实用新型的权利要求范围内都受到专利法的保护。This specific embodiment is only an explanation of the present utility model, and it is not a limitation of the present utility model. Those skilled in the art can make modifications to the present embodiment without creative contribution as needed after reading this specification, but as long as the utility model is used in the present invention All new types of claims are protected by the patent law.

Claims (8)

1. The utility model provides a mounting structure for installing unitized curtain wall, mounting structure includes keel frame (1) and curtain wall board (2), two side end plate (21) that are parallel to each other of the equal fixedly connected with in both ends of curtain wall board (2), keel frame (1) is including vertical frame (11), and two side end plate (21) are respectively through bolt fixed connection on two adjacent vertical frame (11), its characterized in that, seted up on the lateral wall that side end plate (21) are relative with vertical frame (11) recess (211), and recess (211) are along the length direction setting that is on a parallel with vertical frame (11), and fixed being provided with lug (111) on vertical frame (11), lug (111) and recess (211) cooperation of pegging graft.
2. The mounting structure for mounting the unitized curtain wall as claimed in claim 1, wherein the horizontal cross-section of said projection (111) is W-shaped, and the horizontal cross-section of said recess (211) is W-shaped for mating with the projection (111).
3. The mounting structure for mounting the unitized curtain wall according to claim 1, wherein the mounting structure comprises a sealing strip (3), the sealing strip (3) is arranged on a vertical frame (11), two sides of the sealing strip (3) are respectively abutted against two side end plates (21) connected to the same vertical frame (11), and the sealing strip (3) is made of an elastic material.
4. The mounting structure for mounting the unitized curtain wall as claimed in claim 3, wherein the side wall of the sealing strip (3) opposite to the side end plate (21) is provided with an insertion groove (31), the outer side wall of the side end plate (21) is fixedly provided with an insertion block (212), and the insertion block (212) is inserted and matched with the insertion groove (31) along the horizontal direction.
5. The mounting structure for mounting the unitized curtain wall as claimed in claim 3, wherein the vertical frame (11) is fixedly connected with a fixing block (112), the fixing block (112) is of an isosceles trapezoid structure with an open upper end, and the lower end of the sealing strip (3) is of an isosceles trapezoid structure matched with the sealing strip.
6. The mounting structure for mounting the unitized curtain wall according to claim 1, wherein the curtain wall panel (2) comprises an upper end surface (22) and a lower end surface (23), the lower end surface (23) protrudes downward to form a shielding edge (231), the part of the lower end surface (23) except the shielding edge (231) is a splicing surface (232), and the upper end surface (22) has a structure matched with the shielding edge (231) and the splicing surface (232).
7. The mounting structure for mounting the unitized curtain wall according to claim 6, wherein the splice surface (232) is fixedly provided with a vertically downward projection (233).
8. A mounting structure for mounting a unitized curtain wall according to claim 1, wherein a waterproof paint is applied to the outer side wall of the curtain wall panel (2).
CN201921825468.9U 2019-10-26 2019-10-26 An installation structure for installing a unitized curtain wall Expired - Fee Related CN211037474U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921825468.9U CN211037474U (en) 2019-10-26 2019-10-26 An installation structure for installing a unitized curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921825468.9U CN211037474U (en) 2019-10-26 2019-10-26 An installation structure for installing a unitized curtain wall

Publications (1)

Publication Number Publication Date
CN211037474U true CN211037474U (en) 2020-07-17

Family

ID=71562593

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921825468.9U Expired - Fee Related CN211037474U (en) 2019-10-26 2019-10-26 An installation structure for installing a unitized curtain wall

Country Status (1)

Country Link
CN (1) CN211037474U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN119411733A (en) * 2025-01-08 2025-02-11 浙江焱木科技有限公司 Curtain wall and assembly method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN119411733A (en) * 2025-01-08 2025-02-11 浙江焱木科技有限公司 Curtain wall and assembly method thereof

Similar Documents

Publication Publication Date Title
RU2008136623A (en) CORNER EXTERNAL WALL DETAIL, ANGULAR EXTERNAL WALL DESIGN OF THE BUILDING IN WHICH THIS PART IS USED, AND METHOD OF INSTALLING THIS DESIGN
CN105525709B (en) Curtain wall waterproof structure and GRC curtain wall panels and curtain walls with waterproof structure
CN111075311B (en) Nail-free and glue-free skylight and manufacturing method thereof
CN211037474U (en) An installation structure for installing a unitized curtain wall
CN205259367U (en) Unit glass curtain wall's joint strip
CN110984408B (en) A sealing device between external wall panels for assembled buildings
CN205259410U (en) A joint strip for unit glass curtain wall
CN116677111B (en) A unit curtain wall drainage system
CN105155691A (en) Waterproof sealing structure of metal rock wool sandwich board outer wall and construction method for waterproof sealing structure
CN205530853U (en) Curtain waterproof construction and have GRC curtain board and curtain of waterproof construction
CN211735833U (en) Sealing device between external wall boards for assembly type building
CN211572167U (en) A water-conducting curtain wall installation structure
CN211007230U (en) Staggered gradual change unit type curtain wall splicing structure
CN108691379A (en) One kind being used for the anti-wall fern in plug-in type curtain wall panel junction and connection component
CN210659846U (en) Tile type and corner tile type drainage flashing board
CN211622018U (en) Waterproof sealing structure between curtain wall panels
CN208508839U (en) A kind of photovoltaic module waterproof assembling structure
CN205778380U (en) A kind of section bar adhesive tape sealing member
CN216865630U (en) An anti-shedding curtain wall structure
CN218292299U (en) A building waterproof sealing device
CN204252733U (en) Be with the body of wall of the window that detachably wafts
CN210685011U (en) Four-side matchboard vertical arrangement board butt joint system
CN210685725U (en) A leak-proof aluminum alloy door and window
CN222009472U (en) Basement daylighting well based on architectural design
CN217480542U (en) Mounting member of glass curtain wall backing plate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200717