CN208933775U - Water-permeable brick wet-laying pavement - Google Patents
Water-permeable brick wet-laying pavement Download PDFInfo
- Publication number
- CN208933775U CN208933775U CN201821602414.1U CN201821602414U CN208933775U CN 208933775 U CN208933775 U CN 208933775U CN 201821602414 U CN201821602414 U CN 201821602414U CN 208933775 U CN208933775 U CN 208933775U
- Authority
- CN
- China
- Prior art keywords
- water
- permeable brick
- rhone
- course
- altar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model relates to water-permeable brick wet-laying pavements, and bed course is arranged on roadbed, and sidewalk base course is arranged on bed course, pre-buried limited block, rhone are arranged on sidewalk base course, pass through the fixed kerbstone of pre-buried limited block and altar stone;Drain hole is set on altar stone, anti-filter filler and geotextiles are set between rhone and drain hole;Sand bedding course and water-permeable brick are set on sidewalk base course;Using channel steel as template, channel steel outside setting support frame and soil nailing are fixed sidewalk base course;Compression bar, ballast, rhone press strip is arranged in sidewalk base course top, and altar stone position setting sizing punching block is reserved.The utility model can be effectively reduced engineering cost, accelerate speed of application, applied to can obtain preferable technical economic benefit in Practical Project.
Description
Technical field
The utility model relates to field of civil engineering, in particular to water-permeable brick wet-laying pavement, are suitable for water-permeable brick wet-laying
The construction on pavement.
Background technique
In recent years, open-road applications safety issue is increasingly becoming the main problem of highway construction, carries out the pavement of highway
It constructs and designs and be particularly important.
City pavement is the movable important generation place of citizen's daily behavior, and the construction of reasonable pavement is to improving city
Public space and construction livable community are significant.Pavement is one of important component of urban road, what it was designed
Rationally whether, construction quality quality, directly affect pedestrian walking convenience and safety.When pavement is because of originals such as ponding, mirinesss
When because of inconvenient walking, pedestrian will occupy driveway, and then will affect having a good transport and communication network for driveway.
Usually there are the following problems for traditional pavement construction: structure of sidewalk stability is poor, and lower part gap occurs and emits
Water;Speed of application is slow;Altar stone installation site, size disunity, aesthetic effect are poor.
Utility model content
The purpose of this utility model is to provide water-permeable brick wet-laying pavements, for asking for the traditional pavement construction of solution
Topic, meets the needs of structure construction.
In order to achieve the above technical purposes, the utility model uses following technical scheme:
Water-permeable brick wet-laying pavement, comprising: roadbed, bed course, sidewalk base course, pre-buried limited block, rhone, kerbstone,
Altar stone, anti-filter filler and geotextiles;The bed course is wherein set on the roadbed, the pavement is set on the bed course
The pre-buried limited block and rhone are arranged on the sidewalk base course for base, described in the pre-buried limited block limit is fixed
Kerbstone and the altar stone;Drain hole is set on the altar stone, the anti-filter is set between the rhone and the drain hole
Filler and the geotextiles.
In some embodiments, sand bedding course and water-permeable brick, the sand bedding course setting are set gradually on the sidewalk base course
On the rhone.
In some embodiments, for the sidewalk base course using channel steel as template, the channel steel includes framework of steel reinforcement, and
It is arranged on the sidewalk base course.
In some embodiments, setting support frame and soil nailing, the soil nailing fix support frame as described above outside the channel steel
On the bed course.
In some embodiments, compression bar, ballast, rhone press strip is arranged in the sidewalk base course top, wherein the pressure
Weight is placed on the compression bar, and the rhone press strip is placed on the rhone.
In some embodiments, the position setting sizing punching block of the altar stone is reserved.
In some embodiments, planting soil is planted between the altar stone, setting mortar is viscous in the side of the kerbstone
Layer is tied, with the fixation kerbstone.
In some embodiments, the position setting sizing punching block of the altar stone is reserved.
The utility model have the characteristics that and the utility model has the advantages that
(1) water-permeable brick lower part be arranged concrete base layer, improve base's stability, solve water-permeable brick lower part occur gap and
The problems such as mobile;
(2) ponding draining at pavement is prevented pavement to planting soil by water-permeable brick lower part setting sand bedding course and rhone
Ponding;
(3) setting sizing punching block carries out altar stone space to be preserved, extracts after concrete final set to the next position and constructs, and improves
Speed of application.
Detailed description of the invention
Fig. 1 is the structure chart on the water-permeable brick wet-laying pavement of an embodiment according to the present utility model.
Fig. 2 is the constructing structure figure on the water-permeable brick wet-laying pavement of an embodiment according to the present utility model.
In figure: 1. roadbeds;2. bed course;3. sidewalk base course;4. altar stone;5. pre-buried limited block;6. geotextiles;7. anti-filter is filled out
Material;8. rhone;9. sand bedding course;10. water-permeable brick;11. planting soil;12. drain hole;13. kerbstone;14. mortar bonding layer;
15. filleting body;16. road surface;17;Soil nailing;18. framework of steel reinforcement;19. punching block of being formed;20. rhone press strip;21. compression bar;22.
Ballast;23. kerbstone notch;24. channel steel;25. support frame.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art's every other embodiment obtained, all belongs to
In the range of the utility model protection.
It will be understood by those skilled in the art that in the exposure of the utility model, term " longitudinal direction ", " transverse direction ", "upper",
The orientation of the instructions such as "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom" "inner", "outside" or position are closed
System is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of describing the present invention and simplifying the description, without
It is that the device of indication or suggestion meaning or element must have a particular orientation, be constructed and operated in a specific orientation, therefore on
Stating term should not be understood as limiting the present invention.
It is understood that term " one " is interpreted as " at least one " or " one or more ", i.e., in one embodiment,
The quantity of one element can be one, and in a further embodiment, the quantity of the element can be it is multiple, term " one " is no
It can be interpreted as the limitation to quantity.
The construction technical requirements such as concreting repeat no more in the utility model embodiment, and emphasis illustrates that this is practical new
The embodiment of type is described in further detail with reference to the accompanying drawing and by embodiment to the utility model, and the explanation is not
It is confined to following embodiment.
As shown in Fig. 1~2, the water-permeable brick wet-laying structure of sidewalk figure of an embodiment according to the present utility model is demonstrated,
Water-permeable brick wet-laying pavement mainly includes roadbed 1, bed course 2, sidewalk base course 3, altar stone 4, pre-buried limited block 5, geotextiles
6, anti-filter filler 7, rhone 8, sand bedding course 9, water-permeable brick 10, planting soil 11, drain hole 12, kerbstone 13, mortar bonding layer 14,
Filleting body 15, road surface 16, soil nailing 17, framework of steel reinforcement 18, sizing punching block 19, rhone press strip 20, compression bar 21, ballast 22, curb
Stone cistern mouth 23, channel steel 24, support frame 25.
Bed course 2 is set on roadbed 1, sidewalk base course 3 is set on the bed course 2, is arranged on the sidewalk base course 3
At least one pre-buried limited block 5 and rhone 8, to pass through the fixed kerbstone 13 of the pre-buried limited block 5 and altar stone 4;The altar
Drain hole 12 is set on stone 4, anti-filter filler 7 and geotextiles 6 are set between the rhone 8 and the drain hole 12, by institute
The moisture for stating drain hole 12 is discharged by the rhone 8.
In addition, setting gradually sand bedding course 9 and water-permeable brick 10 on the sidewalk base course 3, the sand bedding course 9 is arranged in institute
It states on rhone 8, and forms kerbstone notch 23 on the sidewalk base course 3.
In order to which beauty considers, planting soil 11 is planted between the altar stone 4, the altar stone 4 is placed in two sides, the altar of two sides
Stone 4 is respectively provided with the drain hole 12, and the drain hole 12 and the rhone 8 communicate.
Mortar bonding layer 14 is set in the side of the kerbstone 13, with the fixation kerbstone 13, the kerbstone 13
Close to road surface 16, filleting body 15 is can be filled in the road surface 16.
In addition the sidewalk base course 3 is used as template using channel steel 24, and the channel steel 24 includes framework of steel reinforcement 18, and is set
It sets on the sidewalk base course 3, support frame 25 is set outside the channel steel 24 and soil nailing 17 is fixed, the soil nailing 17
Support frame as described above 25 is fixed on the bed course 2;In addition, 3 top of the sidewalk base course setting compression bar 21, ballast 22, row
Sink press strip 20, wherein the ballast 22 is pressed on the compression bar 21, the rhone press strip 20 is placed on the rhone
8, the position setting sizing punching block 19 of the altar stone 4 is reserved.
The utility model is not limited to above-mentioned preferred forms, anyone can obtain under the enlightenment of the utility model
Other various forms of products, however, make any variation in its shape or structure, it is all that there is same as the present application or phase
Approximate technical solution, all falls within the protection scope of the utility model.
Claims (8)
1. water-permeable brick wet-laying pavement characterized by comprising
Roadbed (1), bed course (2), sidewalk base course (3), pre-buried limited block (5), rhone (8), kerbstone (13), altar stone (4),
Anti-filter filler (7) and geotextiles (6);
Wherein it is arranged on the roadbed (1) bed course (2), the sidewalk base course (3), institute is set on the bed course (2)
It states and the pre-buried limited block (5) and rhone (8) is set on sidewalk base course (3), pre-buried limited block (5) limit is fixed
The kerbstone (13) and the altar stone (4);Drain hole (12) are set on the altar stone (4), the rhone (8) and described are let out
The anti-filter filler (7) and the geotextiles (6) are set between water hole (12).
2. water-permeable brick wet-laying according to claim 1 pavement, which is characterized in that on the sidewalk base course (3) successively
Sand bedding course (9) and water-permeable brick (10) are set, and the sand bedding course (9) is arranged on the rhone (8).
3. according to claim 1 or 2 any water-permeable brick wet-laying pavements, which is characterized in that the sidewalk base course (3)
It is used as template using channel steel (24), the channel steel (24) includes framework of steel reinforcement (18), and is arranged in the sidewalk base course (3)
On.
4. water-permeable brick wet-laying according to claim 3 pavement, which is characterized in that setting support outside the channel steel (24)
Support frame as described above (25) is fixed on the bed course (2) by frame (25) and soil nailing (17), the soil nailing (17).
5. water-permeable brick wet-laying according to claim 4 pavement, which is characterized in that sidewalk base course (3) top is set
Compression bar (21), ballast (22), rhone press strip (20) are set, wherein the ballast (22) is pressed on the compression bar (21), it is described
Rhone press strip (20) is placed on the rhone (8).
6. according to claim 1 or 2 any water-permeable brick wet-laying pavements, which is characterized in that the position of the altar stone (4)
Setting sizing punching block (19) is reserved.
7. according to claim 1 or 2 any water-permeable brick wet-laying pavements, which is characterized in that between the altar stone (4)
It plants planting soil (11), mortar bonding layer (14) is set in the side of the kerbstone (13), with the fixation kerbstone (13).
8. water-permeable brick wet-laying according to claim 5 pavement, which is characterized in that the position setting of the altar stone (4) is fixed
Fashioned iron mould (19) is reserved.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821602414.1U CN208933775U (en) | 2018-09-29 | 2018-09-29 | Water-permeable brick wet-laying pavement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821602414.1U CN208933775U (en) | 2018-09-29 | 2018-09-29 | Water-permeable brick wet-laying pavement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208933775U true CN208933775U (en) | 2019-06-04 |
Family
ID=66723023
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821602414.1U Expired - Fee Related CN208933775U (en) | 2018-09-29 | 2018-09-29 | Water-permeable brick wet-laying pavement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208933775U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110359366A (en) * | 2019-07-02 | 2019-10-22 | 中国公路工程咨询集团有限公司 | It is a kind of using the bridge drainage structure of pervious concrete and the calculation method of pervious concrete permeability rate |
-
2018
- 2018-09-29 CN CN201821602414.1U patent/CN208933775U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110359366A (en) * | 2019-07-02 | 2019-10-22 | 中国公路工程咨询集团有限公司 | It is a kind of using the bridge drainage structure of pervious concrete and the calculation method of pervious concrete permeability rate |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202898938U (en) | Seepage and drainage combined pavement structure for urban road and landscape road | |
CN206352331U (en) | The concave herbaceous field structure of sponge the idea of the city | |
CN108301293B (en) | Construction method of road surface water stabilization layer and auxiliary engineering | |
CN104313967B (en) | Row's water-seepage type is mated formation combining structure | |
CN109235179A (en) | A kind of guarantor's drainage pavement structure and its construction method reducing urban heat land effect | |
CN204125814U (en) | A kind of garden path structure | |
CN206736675U (en) | A kind of cell pavement | |
CN208933775U (en) | Water-permeable brick wet-laying pavement | |
CN202559206U (en) | Kerb system of road central reserve | |
CN109440554A (en) | A kind of assembled greening band structure and its construction method | |
CN108004866B (en) | Precast concrete road system and construction method | |
CN206368314U (en) | A kind of prefabricated interlocking pervious concrete brick mated formation for pavement | |
CN205115945U (en) | Double -deck synchronous surface dressing stress absorption structure | |
CN209602912U (en) | A kind of asphalt pavement road surface | |
CN209443368U (en) | The overhead anti-ponding structure in bridge floor edge | |
CN110172885A (en) | Highway Construction in Desert method | |
CN207944293U (en) | A kind of traffic lights grade crossing road surface | |
CN205741824U (en) | A kind of Pavement surface drainage system | |
CN105474942B (en) | The construction method on ground parking lawn | |
CN210238171U (en) | Pedestrian and vehicle road in park | |
CN209384055U (en) | A kind of logical village's Recycling Base cement concrete drainage pavement structure of low cost | |
CN208762819U (en) | Wisdom reservoir catchment system is descended in a kind of city on a large scale | |
CN209323289U (en) | A kind of assembled greening band structure | |
CN209686743U (en) | Precast stair connecting node | |
CN209669626U (en) | A kind of pervious concrete brick |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190604 Termination date: 20210929 |
|
CF01 | Termination of patent right due to non-payment of annual fee |