CN208932776U CN201821320948.5U CN201821320948U CN208932776U CN 208932776 U CN208932776 U CN 208932776U CN 201821320948 U CN201821320948 U CN 201821320948U CN 208932776 U CN208932776 U CN 208932776U
Authority
CN
China
Prior art keywords
berthing member
suspender
guide beam
berthing
pile cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821320948.5U
Other languages
Chinese (zh)
Inventor
卢玉荣
荣劲松
刘宇峰
刘任
梁鹏
陈鸣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Fourth Harbor Engineering Co Ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
CCCC Fourth Harbor Engineering Co Ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Fourth Harbor Engineering Co Ltd, No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical CCCC Fourth Harbor Engineering Co Ltd
Priority to CN201821320948.5U priority Critical patent/CN208932776U/en
Application granted granted Critical
Publication of CN208932776U publication Critical patent/CN208932776U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a kind of back-covered berthing member mounting device, it includes suspender, shoulder pole girder and guide beam, suspender includes the main beam of front and back two, vertical rack is set to two interior beams of two main beams and two jack stringers positioned at two outside of interior beam, interior beam and main beam limit the rectangle inside casing around outside berthing member, the guide beam includes at least two front end guide beams being located on preceding horizontal girder and the two sides guide beam being located on two jack stringers, front end guide beam and two sides guide beam are close to be elevated the front side and two sides of pile cover, a plurality of isometric wirerope is connected between shoulder pole girder lower part and suspender, shoulder pole girder top system has lifting wirerope to connect with lifting appliance.The utility model structure is simple, and anti-device for hoisting intensity, rigidity, stability are met the requirements, and without carrying out the cutting of pile cover reinforcing bar when use, directly counter can hang in place, guarantee the integrality of structure, be conducive to the monolithic stability of pile cover and berthing member.

Description

A kind of back-covered berthing member mounting device
Technical field
The utility model relates to the lifting of berthing member used in suspender technical field more particularly to Wharf Construction installations to fill It sets.
Background technique
According to dock structure situation, berthing member is normally at pile cover lower part, and absolute altitude is lower, and lower part is located at water level for a long time Below, it is more difficult to cast-in-place construction is carried out, so generally carrying out prefabricated installation.Since the main reinforcement of berthing member and the reinforcing bar of pile cover exist Intersect.According to the method installation that conventional side enters, pile cover reinforcing bar will be generated with berthing member main reinforcement to conflict, to guarantee that installation is suitable Benefit need to cut pile cover part reinforcing bar, carry out repair welding again after berthing member is installed.Steel of such method to pile cover Muscle destroys big, it is more difficult to guarantee welding quality, and welding point is relatively concentrated, it is unfavorable to pile cover overall structure.
Therefore, it is necessary to research and develop a kind of berthing member mounting device, installment work can be made conveniently, safely, fast, and not right Pile cover or berthing member reinforcing bar carry out cutting damage, are conducive to overall structure quality and construction speed.
Utility model content
The purpose of this utility model is to provide a kind of anti-device for hoisting for being easily installed berthing member, are suitable for section form For up big and down small berthing member.
To achieve the goals above, the utility model uses following technical scheme: a kind of back-covered berthing member installation Device comprising: suspender, shoulder pole girder and guide beam, the suspender include the main beam of front and back two, vertical rack set on two main cross Two interior beams of beam and two jack stringers on the outside of interior beam two, interior beam and main beam are limited around by ship structure Rectangle inside casing outside part, the guide beam include at least two front end guide beams being located on preceding horizontal girder and are located at two Two sides guide beam on jack stringer, front end guide beam and two sides guide beam are close to be elevated the front side and two sides of pile cover, shoulder pole A plurality of isometric wirerope is connected between beam lower part and suspender, shoulder pole girder top system has lifting wirerope to connect with lifting appliance.
Suspender is spliced using fashioned iron, and the side that preceding main beam is contacted with berthing member is welded with front end vertically downward Steel plate, the side that rear girder is contacted with berthing member are welded with the inclined-plane steel being arranged according to bevel angle on rear side of berthing member Plate.
The shoulder pole girder is Two bors d's oeuveres formed steel construction, if hinge of leaf spring up and down.
The guide beam be square steel, it is counter hang berthing member when make its be bonded corresponding position pile cover surface rise, guarantee It is in place accurate.
The utility model is suitable for the anti-installation hung method and carry out variable cross-section berthing member, and the utility model structure is simple, instead Device for hoisting intensity, rigidity, stability are met the requirements, and own wt is light, without carrying out the cutting of any pile cover reinforcing bar when use, It directly counter can hang in place, guarantee the integrality of structure, be conducive to the monolithic stability of pile cover and berthing member.The utility model passes through The up big and down small variable section structure form of berthing member, when lifting, generate upward frictional force to berthing member, reach lifting Purpose, the lifting method are suitable for the up big and down small berthing member of sectional dimension.
Detailed description of the invention
Fig. 1 is the front view of back-covered berthing member mounting device and berthing member.
Fig. 2 is the lateral plan of back-covered berthing member mounting device and berthing member.
Fig. 3 is the direction view of bowing of suspender and berthing member.
Fig. 4 is the perspective view of main beam before suspender.
Fig. 5 is the perspective view of main beam after suspender.
Fig. 6 is the direction view of bowing of shoulder pole girder.
Fig. 7 is the lateral view of shoulder pole girder.
Fig. 8 is that the berthing member and berthing member before installation install anti-device for hoisting side schematic view in place.
Fig. 9 is that the berthing member and berthing member before installation install anti-device for hoisting front schematic view in place.
Figure 10 is the side schematic view that berthing member is hung to pile cover front end.
Figure 11 is the front schematic view that berthing member is hung to pile cover front end.
Figure 12 is the side schematic view for the underface that berthing member is moved to pile cover preformed hole.
Figure 13 is the front schematic view for the underface that berthing member is moved to pile cover preformed hole.
Figure 14 is guide beam side schematic view in place.
Figure 15 is guide beam front schematic view in place.
Figure 16 is that berthing member is above mentioned to the side schematic view of design position.
Figure 17 is that berthing member is above mentioned to the front schematic view of design position.
Figure 18 is the side schematic view that berthing member is installed that rear berthing member installs anti-device for hoisting decentralization.
Figure 19 is the front schematic view that berthing member is installed that rear berthing member installs anti-device for hoisting decentralization.
Wherein, suspender 1, main beam 1.1, horizontal reacting force beam 1.2, skewback 1.3, stiffener 1.4, vertical panel 1.5, interior Stringer 1.6, jack stringer 1.7, Two bors d's oeuveres shoulder pole girder 2, lifting lug 2.1, shoulder pole girder stiffener 2.2, front end guide beam 3.1, two sides guiding Beam 3.2, wirerope 4, berthing member 5, pile cover 6.
Specific embodiment
The back-covered berthing member mounting device of the utility model, suspender, shoulder pole girder and guide beam, such as FIG. 1 to FIG. 3 institute Show, suspender is spliced using fashioned iron, is set in two of two main beams and is indulged including the main beam 1.1 of front and back two, vertical rack Beam 1.6 and two jack stringers 1.7 on the outside of interior beam two.Interior beam 1.6 and main beam are limited around berthing member 5 Outer rectangle inside casing.The forced position of suspender is former and later two main beams, and upward counter-force is provided by frictional force.To guarantee Berthing member does not generate destruction because of the friction of fashioned iron, the side welding steel of fashioned iron.As shown in Figures 4 and 5, preceding main beam The side contacted with berthing member is welded with front end vertical panel 1.5 vertically downward, what rear horizontal girder was contacted with berthing member Side is welded with the skewback 1.3 being arranged according to bevel angle on rear side of berthing member.It can be between steel facing and berthing member Rubber mat plate is further set, to protect the concrete surface of berthing member.
Guide beam is square steel structure, including at least two front end guide beams 3.1 being located on preceding horizontal girder and is located at Two sides guide beam 3.2 on two jack stringers, when berthing member above mentions guide beam can just with before pile cover, it is three left and right Side surface fitting, before pile cover, left and right three directions limit its position, only reserve rearward openings for pile cover pass in and out, to reach To the effect for limiting, being oriented to pile cover.A plurality of isometric wirerope 4, shoulder pole girder top are connected between shoulder pole girder lower part and suspender System has lifting wirerope to connect with lifting appliance.
As shown in Figure 6, Figure 7, shoulder pole girder is Two bors d's oeuveres formed steel construction, and length is bigger than the size of pile cover width direction, is guaranteed When berthing member ecto-entad is mobile, the wirerope of its underpart is not clashed with pile cover.Shoulder pole girder is equipped with up and down Hinge of leaf spring 2.1.
Back-covered berthing member mounting device when in use, is placed in flat by this back-covered berthing member mounting device first Whole flat surface, then lifts by crane berthing member, is placed on inside the rectangle inside casing of suspender.Then suspension centre is converted, is lifted by crane Back-covered berthing member mounting device slings it with 5 entirety of berthing member;Then it is put to 6 front lower portion of pile cover, slowly It moves inwardly into immediately below design position (pile cover preformed hole), as shown in Figure 10~Figure 13.Slowly lifting, make guide beam keep with Its corresponding pile cover side surface fitting, until design position is promoted to, as shown in Figure 14~Figure 17.
In entire implementation process, it can construct according to the process flow in each figure of Fig. 8~Figure 19:
(1) structural material is got out first, in accordance with the force request and design drawing of each component, and completes the process each component;
(2) as shown in Figure 8, Figure 9, anti-device for hoisting is placed in flat surface, then berthing member is hung to the rectangle of suspender Inside inside casing.
(3) as shown in Figure 10~Figure 11, berthing member is hung to pile cover front lower portion, and makes its main reinforcement lower than pile cover following table Face.
(4) as shown in Figure 12~Figure 13, berthing member is moved to the underface of pile cover preformed hole.
(5) as shown in Figure 14~Figure 15, berthing member is slowly above mentioned, and is accurately positioned, localization method is to make three faces Guide beam it is corresponding pile cover side surface fitting.
(6) as shown in Figure 16~Figure 17, guarantee that guide beam is adjacent to pile cover, and the slow berthing member that above mentions is to designing position It sets, it is immediately that its main reinforcement and pile cover reinforcement welding is secured behind repetition measurement position, complete installment work.
(7) as shown in Figure 18~Figure 19, anti-device for hoisting is integrally transferred, and shows pile cover range, is hung to flat surface, is prepared Carry out the installation of next berthing member.
It is fast that this anti-device for hoisting installs good berthing member effect, safe operation, speed of application, and without damaging any reinforcing bar, Structural intergrity is good.Reliable guarantee is provided for the safety, quality and progress of Wharf Construction.

Claims (4)

1. a kind of back-covered berthing member mounting device, characterized by comprising: suspender, shoulder pole girder and guide beam, the suspender Two interior beams of two main beams are set to including the main beam of front and back two, vertical rack and outside two of two outside of interior beam Stringer, interior beam and main beam limit the rectangle inside casing around outside berthing member, and the guide beam, which includes at least, to be located at Two front end guide beams on preceding horizontal girder and the two sides guide beam being located on two jack stringers, front end guide beam and two sides Guide beam is close to be elevated the front side and two sides of pile cover, and a plurality of isometric wirerope is connected between shoulder pole girder lower part and suspender, flat Spreader beam top system has lifting wirerope to connect with lifting appliance.
2. back-covered berthing member mounting device according to claim 1, it is characterised in that: suspender using fashioned iron splice and At the side that preceding main beam is contacted with berthing member is welded with front end steel plate vertically downward, and rear girder is contacted with berthing member Side be welded with the inclined-plane steel plate being arranged according to bevel angle on rear side of berthing member.
3. back-covered berthing member mounting device according to claim 1, it is characterised in that: the shoulder pole girder is Two bors d's oeuveres type Steel construction, if hinge of leaf spring up and down.
4. back-covered berthing member mounting device according to claim 1, it is characterised in that: the guide beam is square steel.
CN201821320948.5U 2018-08-15 2018-08-15 A kind of back-covered berthing member mounting device Active CN208932776U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821320948.5U CN208932776U (en) 2018-08-15 2018-08-15 A kind of back-covered berthing member mounting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821320948.5U CN208932776U (en) 2018-08-15 2018-08-15 A kind of back-covered berthing member mounting device

Publications (1)

Publication Number Publication Date
CN208932776U true CN208932776U (en) 2019-06-04

Family

ID=66717870

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821320948.5U Active CN208932776U (en) 2018-08-15 2018-08-15 A kind of back-covered berthing member mounting device

Country Status (1)

Country Link
CN (1) CN208932776U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115450173A (en) * 2022-09-27 2022-12-09 中交二航局第一工程有限公司 Installation device and construction method for seashore area berthing member

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115450173A (en) * 2022-09-27 2022-12-09 中交二航局第一工程有限公司 Installation device and construction method for seashore area berthing member

Similar Documents

Publication Publication Date Title
CN208932776U (en) A kind of back-covered berthing member mounting device
KR20190066241A (en) Gang form safety apparatus with integrated safety hook
CN203626278U (en) Protective structure for construction of internal core tube of high-rise building
CN107142954B (en) Steel hanging box lifting system for integral lifting and lifting method thereof
CN208166431U (en) A kind of bracket hoisting mechanism and Lift-on/Lift-off System
CN203097281U (en) Nuclear power station double-layer containment vessel hydraulic creeping formwork
CN107130786B (en) Construction lifting platform
CN201598570U (en) Cable-stayed bridge cableway erecting equipment
CN109680690A (en) Diaphram wall steel reinforcement cage merogenesis construction method for hanging under low-headroom condition
CN206986743U (en) A kind of fixed trestle navigable vertical lift device
CN206873475U (en) A kind of steel jacket box
CN105155832A (en) Hanging basket device and moving method thereof
CN211034868U (en) Steel reinforcement cage hoist device
CN210763974U (en) Be suitable for reverse construction method to get soil mouthful and pass suspension type electric hoist for material
CN211547739U (en) Supporting structure for rope saw static force cutting reinforced concrete inner support
CN104646995B (en) A kind of phytal zone quick positioning installation apparatus of barrier board and installation method
CN111411624B (en) Hoisting method for reinforcement cage of underground continuous wall in height-limited area
CN210117179U (en) Shock-proof type pump prying block hoisting system
CN208533474U (en) Hang the hanging basket system of position operation by the feet for induced joint
CN207032835U (en) A kind of construction lifting platform
CN206204760U (en) A kind of integral lifting movable trestle used in navigable waters
CN108083131B (en) Triangular truss type pile leg external hoisting device
KR20200046377A (en) Lifting Device and Method for Lifting using such Device
CN207243272U (en) Hoisting limiter weight, hoisting limiter and crane
CN205472362U (en) Superelevation layer construction internal climbing tower crane bottom protective platform with prevent function of toppling

Legal Events