CN208918758U - The attachment device of tower inner wall and bottom section control cabinet - Google Patents

The attachment device of tower inner wall and bottom section control cabinet Download PDF

Info

Publication number
CN208918758U
CN208918758U CN201821724803.1U CN201821724803U CN208918758U CN 208918758 U CN208918758 U CN 208918758U CN 201821724803 U CN201821724803 U CN 201821724803U CN 208918758 U CN208918758 U CN 208918758U
Authority
CN
China
Prior art keywords
hanging ring
platform
plate
hole
control cabinet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821724803.1U
Other languages
Chinese (zh)
Inventor
周伟
周水保
吕雪峰
李树安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU BAOLONG EQUIPMENT MANUFACTURING Co Ltd
Original Assignee
JIANGSU BAOLONG EQUIPMENT MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU BAOLONG EQUIPMENT MANUFACTURING Co Ltd filed Critical JIANGSU BAOLONG EQUIPMENT MANUFACTURING Co Ltd
Priority to CN201821724803.1U priority Critical patent/CN208918758U/en
Application granted granted Critical
Publication of CN208918758U publication Critical patent/CN208918758U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Physical Or Chemical Processes And Apparatus (AREA)

Abstract

The utility model relates to the attachment devices of tower inner wall and bottom section control cabinet.Its technical solution: the attachment device of tower inner wall and bottom section control cabinet, it includes platform hanging ring plate (2), 1# nut (3), hanging ring connecting plate (4), adjusting screw rod (5) and 1# plain cushion (6), it is characterized by: the platform hanging ring plate (2) is equipped with platform hanging ring plate through-hole (203), the platform hanging ring plate through-hole (203) welds 1# nut (3) below;The hanging ring connecting plate (4) is equipped with hanging ring connecting plate through-hole (401);The adjusting screw rod (5) sequentially passes through 1# plain cushion (6), hanging ring connecting plate through-hole (401), platform hanging ring plate through-hole (203) and 1# nut (3).After the utility model, facilitate installation, reduces gap.

Description

The attachment device of tower inner wall and bottom section control cabinet
Technical field
The utility model relates to the attachment devices of tower inner wall and bottom section control cabinet, and it is flat that it is suitable for tower barrel bottom section control cabinets It eliminates with cylinder inboard wall outside platform and prevents object every sky and people walks about the protection of fall safety.
Background technique
Tower is currently a kind of common green energy resource generating equipment, and tower is a kind of dynamic rolling in operation power generation process Dynamic equipment, for the tower generated energy designed at present all in 2MW or more, the height of tower is higher and higher, substantially at 80 meters or more.It is each Set tower power generation be transmitted outward by the bottom voltage control cabinet equipment put above of section platform courses cabinet platform, and tower according to Height and wind field traffic condition, generally are configured with 3~5 sections of towers, are connected with by the flange on every section of both sides.Each There is connecting flange on tower cylinder both sides, and the width of connecting flange has 200mm or so.So bottom section control cabinet platform outer diameter needs Depending on the section lower flange width size design of bottom.Otherwise, it is not placed into.Control cabinet platform is placed on bottom section in the following, making in this way There is the gap 200mm with bottom section cylinder inboard wall circumference at outside control cabinet platform, operator walks about on platform landing hidden danger. It is therefore desirable to be arranged attachment device between tower inner wall and bottom section control cabinet, eliminate outside the section cylinder control cabinet platform of bottom with The neutral gear of bottom section cylinder inboard wall, prevents that operator walks about the personal safety hidden danger of appearance and object falls phenomenon.
In place of the deficiencies in the prior art:
(1) original method is: otic placode with holes is welded above platform hanging ring plate, with the stud being welded on tower barrel bottom section inner wall It is bolted fixed.
Such structure be it is fixed, be unable to up and down adjustment.Because control cabinet platform is to be located in the mixed mud poured below On, mixed mud and control cabinet the platform production of pouring certainly exist certain production accumulated error, and it is flat always to will appear control cabinet Platen and original control cabinet platform hanging ring gap are larger, have arrived live more intractable.
Summary of the invention
The purpose of this utility model be in view of the deficiencies of the prior art, provide a kind of elimination tower barrel bottom section control cabinet platform with The attachment device in gap between tower inner wall, the purpose to be realized: one, facilitating installation, two, platform sheet separation it is easy to adjust, And beautiful and safety protective effect is good.
To achieve the above object, the utility model uses following technical scheme:
Tower inner wall and bottom section control cabinet attachment device comprising have platform hanging ring plate, 1# nut, hanging ring connecting plate, Adjusting screw rod and 1# plain cushion, it is characterised in that: the platform hanging ring plate is equipped with platform hanging ring plate through-hole, the platform hanging ring plate 1# nut is welded below through-hole;The hanging ring connecting plate is equipped with hanging ring connecting plate through-hole;The adjusting screw rod sequentially passes through 1# Plain cushion, hanging ring connecting plate through-hole, platform hanging ring plate through-hole and 1# nut, and the hanging ring connecting plate and platform hanging ring plate pass through tune Screw rod is saved to adjust.
As a kind of improvement of the utility model, be additionally provided between the platform hanging ring plate and hanging ring connecting plate 2# plain cushion and 2# nut;It is logical that the adjusting screw rod sequentially passes through 1# big flat washer, hanging ring connecting plate through-hole, 2# plain cushion, 2# nut, platform hanging ring plate Hole and 1# nut.
As a kind of improvement of the utility model, the platform hanging ring plate is that at least two sections of platform hanging ring plates are composed.
As a kind of improvement of the utility model, the hanging ring connecting plate through-hole is kidney slot.
As a kind of improvement of the utility model, the platform hanging ring plate is checkered steel plate, on the downside of the platform hanging ring plate Equipped with rubber slab.
It is after by adopting the above technical scheme the utility model has the advantages that
1, not only easy for installation using this design structure.In use, especially control cabinet platform and bottom surface platform hanging ring Gap between plate can be adjusted, until the clearance D needed can arbitrarily be adjusted to owner's needs, and also it is easy to adjust.
2,2# plain cushion and 2# nut are added.In this way, there are plain cushion in platform hanging ring plate top and bottom, when avoiding screw rod from twisting Block, the plain cushion and nut below hanging ring connecting plate can preferably play fixed function, reaction force avoided to cause platform hanging ring plate Bounce improves the force-bearing situation for welding weak spot between platform hanging ring plate and 1# nut, improves service life.
3, existing platform hanging ring plate is an entire plate, usually prefabricated in tower bottom in producer, when arriving in-site installation, Error caused by a variety of causes can not be overcome to influence, such as: the cubic deformation generated in cement casting process.The utility model by its At least two sections are modified to, and uses assembling structure.It, can be at entire tower installing engineering end by taking two sections of platform hanging ring plates as an example It carries out, it is convenient to be sent into inside tower from tower barrel bottom section door when needing to install, also, convenient for easy for installation inside cylinder. Even if control cabinet panel surface out-of-flatness, the platform hanging ring plate that muti-piece is composed adapts to the surface, it is ensured that clearance D conforms to It asks.
4, hanging ring connecting plate through-hole is fabricated to kidney slot, is conducive to eliminate platform hanging ring plate mismachining tolerance and avoids hanging ring Connecting plate and cylinder bottom section inner wall welding deformation can be adjusted in circumferencial direction and be produced due to various reasons to the adverse effect of installation Raw error, and it is easy to assembly.
5, because existing control cabinet panel peace platform hanging ring plate is usually checkered steel plate, gap is certainly existed therebetween. The main reason is that being impacted by checkered steel plate itself.Rubber slab is equipped on the downside of platform hanging ring plate, it may be assumed that pad between two platforms One rubber slab.In this way, can avoid the weak vibrations of cylinder, the slight frictional influence of the two is eliminated, effectively control gap.
Detailed description of the invention
Fig. 1 is the tower barrel bottom section schematic diagram with the utility model;
Fig. 2 is F-F schematic cross-section in Fig. 1;
Fig. 3 is the first schematic cross-section of E-E in Fig. 2;
Fig. 4 is the main view of component 4 in Fig. 3;
Fig. 5 is the top view of Fig. 4;
Fig. 6 is second of schematic cross-section of E-E in Fig. 2.
In figure:
1, tower barrel bottom section control cabinet platform;
2, platform hanging ring plate, 201, first segment platform hanging ring plate, 202, second segment platform hanging ring plate, 203, platform hanging ring plate Through-hole;
3,1# nut;
4, hanging ring connecting plate, 401, hanging ring connecting plate through-hole;
5, adjusting screw rod;
6,1# plain cushion;
7,2# plain cushion
8,2# nut;
9, rubber slab;
D, gap.
Specific embodiment
In the following with reference to the drawings and specific embodiments, the utility model is described in more detail.
Embodiment one
As shown in Fig. 2,4~6, the attachment device of tower inner wall and bottom section control cabinet comprising have platform hanging ring plate 2,1# Nut 3, hanging ring connecting plate 4, adjusting screw rod 5 and 1# plain cushion 6, in which:
Previous platform hanging ring plate 2 is equipped with platform hanging ring plate through-hole 203, and previous platform hanging ring plate through-hole 203 welds below 1# nut 3;
Aforementioned hanging ring connecting plate 4 is equipped with hanging ring connecting plate through-hole 401;
Aforementioned adjusting screw rod 5 sequentially passes through 1# plain cushion 6, hanging ring connecting plate through-hole 401, platform hanging ring plate through-hole 203 and 1# Nut 3, and aforementioned hanging ring connecting plate 4 and platform hanging ring plate 2 are adjusted by adjusting screw rod 5.
When tower installing engineering is carried out to latter end, there are between biggish between tower inner wall and tower barrel bottom section control cabinet 1 Gap.At this point, above-mentioned attachment device is mounted on tower inner wall, concrete mode: as shown in Fig. 1,2 and 6, by hanging ring connecting plate 4 are welded on tower inner wall.
When needing to adjust gap between tower inner wall and tower barrel bottom section control cabinet platform 1, adjusting screw rod 5 is rotated, platform is hung 2 energy foundation of ring flat-plate needs to move up and down.In this way, realizing the purpose for adjusting clearance D, and facilitate installation, gap easy to adjust.Gap D minimum is adjustable to zero.
Embodiment two
As shown in Figure 2-5, the attachment device of tower inner wall and bottom section control cabinet comprising have platform hanging ring plate 2,1# spiral shell Mother 3, hanging ring connecting plate 4,2# plain cushion 7,2# nut 8, adjusting screw rod 5 and 1# plain cushion 6, in which:
Previous platform hanging ring plate 2 is equipped with platform hanging ring plate through-hole 203, and previous platform hanging ring plate through-hole 203 welds below 1# nut 3;
Aforementioned hanging ring connecting plate 4 is equipped with hanging ring connecting plate through-hole 401;
2# plain cushion 7 and 2# nut 8 are provided between previous platform hanging ring plate 2 and hanging ring connecting plate 4;
Aforementioned adjusting screw rod 5 sequentially passes through 1# plain cushion 6, hanging ring connecting plate through-hole 401,2# plain cushion 7,2# nut 8, platform and hangs Ring flat-plate through-hole 203 and 1# nut 3, and aforementioned hanging ring connecting plate 4 and platform hanging ring plate 2 are adjusted by adjusting screw rod 5.
Platform hanging ring plate top and bottom are respectively provided with plain cushion, card when avoiding screw rod from twisting, plain cushion below hanging ring connecting plate and Nut can preferably play fixed function, and platform hanging ring plate is avoided to beat upwards.
Embodiment three
As a kind of improvement of the utility model embodiment one or two, as shown in Fig. 2, previous platform hanging ring plate 2 is by least Two sections of platform hanging ring plates are composed.By taking two sections of platform hanging ring plates as an example: previous platform hanging ring plate 2 is by first segment platform hanging ring plate 201 and second segment platform hanging ring plate 202 be composed.
Ring-plane structure is hung using multistage platform, it is convenient to be sent into inside tower from tower barrel bottom section door, also, when installation, energy Preferably overcome the problems, such as related platform plane out-of-flatness, is adjusted by each section of the related of platform hanging ring plate, reduce whole gap D。
Example IV
As a kind of improvement of the utility model embodiment one or two, as shown in Figure 4,5, aforementioned hanging ring connecting plate through-hole 401 be kidney slot.
When needing circumferencial direction to adjust, adjusting screw rod can move in kidney slot, and move with moving platform hanging ring plate.Such as This, eliminates platform hanging ring plate mismachining tolerance and is avoided hanging ring connecting plate with cylinder bottom section inner wall welding deformation to the unfavorable of installation It influences, the error generated due to various reasons can be adjusted in circumferencial direction, and easy to assembly.
Embodiment five
As a kind of improvement of the utility model embodiment one or two, as shown in fig. 6,
Previous platform hanging ring plate 2 is checkered steel plate, is equipped with rubber slab 9 on the downside of previous platform hanging ring plate 2.
Since checkered steel plate surface out-of-flatness itself can avoid cylinder by the way that rubber slab is arranged on the downside of platform hanging ring plate Weak vibrations, the slight frictional influence both eliminated, and effectively control clearance D.
The utility model is not limited to the above embodiments, and all technical solutions formed using equivalent replacement or equivalence replacement are belonged to In the range of the requires of the utility model protection.

Claims (5)

1. the attachment device of tower inner wall and bottom section control cabinet comprising have platform hanging ring plate (2), 1# nut (3), hanging ring connection Plate (4), adjusting screw rod (5) and 1# plain cushion (6), it is characterised in that: the platform hanging ring plate (2) is equipped with platform hanging ring plate through-hole (203), the platform hanging ring plate through-hole (203) welds 1# nut (3) below;The hanging ring connecting plate (4) connects equipped with hanging ring Fishplate bar through-hole (401);The adjusting screw rod (5) sequentially passes through 1# plain cushion (6), hanging ring connecting plate through-hole (401), platform hanging ring plate Through-hole (203) and 1# nut (3), and the hanging ring connecting plate (4) and platform hanging ring plate (2) are adjusted by adjusting screw rod (5).
2. the attachment device of tower inner wall according to claim 1 and bottom section control cabinet, it is characterised in that: the platform is hung 2# plain cushion (7) and 2# nut (8) are additionally provided between ring flat-plate (2) and hanging ring connecting plate (4);The adjusting screw rod (5) sequentially passes through 1# big flat washer (6), hanging ring connecting plate through-hole (401), 2# plain cushion (7), 2# nut (8), platform hanging ring plate through-hole (203) and 1# spiral shell Female (3).
3. the attachment device of tower inner wall according to claim 1 or 2 and bottom section control cabinet, it is characterised in that: described flat Platform hanging ring plate (2) is that at least two sections of platform hanging ring plates are composed.
4. the attachment device of tower inner wall according to claim 1 or 2 and bottom section control cabinet, it is characterised in that: described to hang Ring connecting plate through-hole (401) is kidney slot.
5. the attachment device of tower inner wall according to claim 1 or 2 and bottom section control cabinet, it is characterised in that: described flat Platform hanging ring plate (2) is checkered steel plate, is equipped with rubber slab (9) on the downside of the platform hanging ring plate (2).
CN201821724803.1U 2018-10-24 2018-10-24 The attachment device of tower inner wall and bottom section control cabinet Active CN208918758U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821724803.1U CN208918758U (en) 2018-10-24 2018-10-24 The attachment device of tower inner wall and bottom section control cabinet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821724803.1U CN208918758U (en) 2018-10-24 2018-10-24 The attachment device of tower inner wall and bottom section control cabinet

Publications (1)

Publication Number Publication Date
CN208918758U true CN208918758U (en) 2019-05-31

Family

ID=66710290

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821724803.1U Active CN208918758U (en) 2018-10-24 2018-10-24 The attachment device of tower inner wall and bottom section control cabinet

Country Status (1)

Country Link
CN (1) CN208918758U (en)

Similar Documents

Publication Publication Date Title
CN114776529A (en) Assembled wind power tower drum and assembling method thereof
CN208918758U (en) The attachment device of tower inner wall and bottom section control cabinet
CN209212031U (en) A kind of novel steel pipe pole equipped with telescoping mechanism
CN209144996U (en) A kind of connecting node of high deformability assembling frame Structure Beam-column
CN110029858A (en) Autonomous lifting and basis adjustment adapt to the communication pole of height
CN109779002A (en) Overall assembled framework house
CN104563349B (en) The attached steelframe of curtain wall back is installed on the connecting assembly in agent structure and installation method
CN210459269U (en) High-order tower trickle post
CN202296719U (en) Elevator counterweight framework convenient to mount
CN203441074U (en) Scaffold connecting device
CN209115905U (en) A kind of foundation bolt for vibratory equipment
CN207244470U (en) Truss is connected in a kind of bridge incremental launching construction between pier to pull-type attachment device
CN206607706U (en) A kind of drawing shore for shear wall construction
CN211499793U (en) Device for positioning wall column template and adjusting verticality
CN207016306U (en) A kind of outer elevator hoistways and wall body fixing device
CN206581398U (en) A kind of attachment structure of 3D building modules Z-type keel wall and beam
CN206436765U (en) A kind of stabilizer bushing mounting structure and automobile
CN210465727U (en) Tower meteorological monitoring device
CN208184104U (en) A kind of support formed steel construction
CN213236628U (en) A high convenience shock attenuation parallels for equipment fixing
CN218207370U (en) Screw limiting joint using anti-seismic support
CN203639105U (en) Suspension type temporary hoisting operation platform
CN216405465U (en) Hoisting machinery removes basis with monitoring structure
CN103601081A (en) Tower crane internal-climbing support system
CN211201332U (en) Connecting piece for connecting main rod and auxiliary rod in multifunctional comprehensive rod

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant