CN208917841U - Gunite concrete mobile platform - Google Patents
Gunite concrete mobile platform Download PDFInfo
- Publication number
- CN208917841U CN208917841U CN201821495566.6U CN201821495566U CN208917841U CN 208917841 U CN208917841 U CN 208917841U CN 201821495566 U CN201821495566 U CN 201821495566U CN 208917841 U CN208917841 U CN 208917841U
- Authority
- CN
- China
- Prior art keywords
- mobile platform
- platform
- springboard
- slope protection
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Revetment (AREA)
Abstract
The utility model relates to the realm of building construction, specially gunite concrete mobile platform.Mobile platform is the whole triangular structure using I-steel production, upper plane is the platform of personnel's constructing operation, springboard is paved with above the I-steel of platform, construction personnel station works on springboard, safety net is installed in three faces above springboard, wirerope upper end is hung on the concrete balancing weight of slope protection top, and lower end connects chain block, and chain block is connected to mobile platform towards at the upper angle of slope protection by wirerope;Slideway is housed on slope protection, the pulley that can be slided along slideway is housed below mobile platform bevel edge I-steel.For the utility model as the mobile operation platform of gunite concrete, the scaffold problem of large area need to be set up by avoiding conventional gunite concrete operation, be easy to make, easy to operate, be can work normally in conventional slope surface, can be saved a large amount of costs of labor and time cost.
Description
Technical field
The utility model relates to the realm of building construction, specially gunite concrete mobile platform.
Background technique
Conventional construction of shotcrete platform is to set up steel pipe scaffold, and the method need to expend biggish man power and material,
And influence construction speed.In addition, can leave a large amount of hole after removing scaffold at concrete surface steel pipe extraction, separately need wave
Expense manpower is repaired.
Utility model content
In order to solve the above problem, it is simple to provide a kind of operation for the utility model, can improve the gunite concrete of construction efficiency
Mobile platform.
The utility model technical solution used for the above purpose is: gunite concrete mobile platform, feature
Be: mobile platform is the whole triangular structure using I-steel production, and upper plane is the platform of personnel's constructing operation, platform
I-steel above be paved with springboard, construction personnel station works on springboard, and safety net, wirerope are installed in three faces above springboard
Upper end is hung on the concrete balancing weight of slope protection top, and lower end connects chain block, and chain block is connected to mobile flat by wirerope
Platform is towards at the upper angle of slope protection;Slideway is housed on slope protection, the cunning that can be slided along slideway is housed below mobile platform bevel edge I-steel
Wheel.
The mobile platform material is No. 20 I-steel and No. 12 I-steel, the whole width 3m, high 2m of mobile platform.
The mobile platform uses 2 5t chain blocks.
The clump weight is 2 pieces of 6t concrete slabs.
The wirerope is 17.5 wirerope of φ.
The utility model proposes gunite concrete mobile platform, be hung under slope surface at 2m using crane, two sides under platform
Pulley is placed on iron plate track, and mobile platform is connect with clump weight, and clump weight is connect with mobile platform using wirerope solid
It is fixed.Construction personnel station after the completion of current work surface construction, pulls calabash using two 5t in carrying out construction of shotcrete on platform
Reed carries out decentralization 2m to platform, and carries out after spreading chain block gradually loose power to wirerope, so that wirerope stress again.It is whole
A operation does not influence the face of fulfiling assignment of having constructed, and avoids to carry out after the completion of traditional scaffold construction removing and still needs to repair
Frame pipe is the residual pores on concrete surface the problem of.The utility model is easy to make, easy to operate, can save a large amount of costs of labor with
Time cost.
Detailed description of the invention
Fig. 1 is the utility model agent structure schematic diagram;
Fig. 2 is the utility model main structure plan view;
Fig. 3 is the utility model wire line hitch structural schematic diagram;
Fig. 4 is the utility model pulley structure schematic diagram;
Fig. 5 is the utility model suspension centre schematic diagram;
Fig. 6 is the utility model application schematic diagram;
In figure: 1- concrete balancing weight, 2- wirerope, 3- chain block, 4- safety net, 5- pulley.
Specific embodiment
The present invention will be further described with reference to the accompanying drawing, but the utility model is not limited to specific embodiment.
Embodiment
As shown in Fig. 1,2,6, gunite concrete mobile platform, mobile platform is the whole triangle using I-steel production
Structure, upper plane are the platform 6 of personnel's constructing operation, and springboard is paved with above the I-steel of platform 6, and construction personnel stands on springboard
It works, safety net 4 is installed in three faces above springboard, and 2 upper end of wirerope is hung on slope protection top concrete balancing weight 1, and lower end connects
Connect chain block 3, chain block 3 is connected to mobile platform towards at the upper angle of slope protection by wirerope 2;Equipped with cunning on slope protection
Road, mobile platform bevel edge I-steel lower section is equipped with the pulley 5 that can be slided along slideway.
The mobile platform material is No. 20 I-steel and No. 12 I-steel, the whole width 3m, high 2m of mobile platform.
The mobile platform uses 2 5t chain blocks 3.
The clump weight 1 is 2 pieces of 6t concrete slabs.
The wirerope 2 is 17.5 wirerope of φ, as shown in figure 3, wire line hitch uses inverted U-shaped structure, after having locking
Securely it is not easy vibration feature.
The utility model overall weight about 3t, using the several suspension centres for being set to platform two sides suitable for reading in such as Fig. 5, using vapour
Vehicle hangs and can hang and transition.It is hung under slope surface at 2m using crane, two side rollers are placed on iron plate track under platform, will be moved
Moving platform is connect with clump weight, and clump weight and mobile platform are connected and fixed using wirerope.Construction personnel station on platform in carrying out
Construction of shotcrete after the completion of current work surface construction, carries out decentralization 2m to platform using two 5t chain blocks, and to steel
Cord carries out after spreading chain block gradually loose power, so that wirerope stress again.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201821495566.6U CN208917841U (en) | 2018-09-13 | 2018-09-13 | Gunite concrete mobile platform |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201821495566.6U CN208917841U (en) | 2018-09-13 | 2018-09-13 | Gunite concrete mobile platform |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN208917841U true CN208917841U (en) | 2019-05-31 |
Family
ID=66705352
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201821495566.6U Expired - Fee Related CN208917841U (en) | 2018-09-13 | 2018-09-13 | Gunite concrete mobile platform |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN208917841U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114382091A (en) * | 2022-02-25 | 2022-04-22 | 中国十九冶集团有限公司 | Foundation pit retaining wall anchor spraying method |
-
2018
- 2018-09-13 CN CN201821495566.6U patent/CN208917841U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114382091A (en) * | 2022-02-25 | 2022-04-22 | 中国十九冶集团有限公司 | Foundation pit retaining wall anchor spraying method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204249072U (en) | For stretch-draw and the baffle plate integrating device of precast beam stretch-draw | |
| CN201635020U (en) | Bridge floor dismantling crane for large and medium concrete bridges | |
| CN204199721U (en) | A kind of erecting device for factory building construction high and medium structure | |
| CN104975719A (en) | Novel material distribution device and construction method for pouring floor concrete by using same | |
| CN206562264U (en) | A kind of hanging device for transport outside high-rise building | |
| CN208917841U (en) | Gunite concrete mobile platform | |
| CN110872063A (en) | A kind of self-propelled rail crane and construction method for installing and dismantling bridge anti-collision guardrail formwork | |
| CN215368761U (en) | Subway station side wall large formwork moving device | |
| CN203795311U (en) | Multi-leg high pier and slip form construction device | |
| CN214658662U (en) | Core concrete cover plate construction operation platform | |
| CN206319311U (en) | Complex Soil layer depth covering groove Continuous compacting device | |
| CN211110768U (en) | A portable assembled multi-function pick rod system | |
| CN210594945U (en) | Movable hoisting operation frame for bridge floor wet joint construction | |
| CN108867399A (en) | Anchoring ring, pier body hoop unloading system and construction method thereof | |
| CN204959611U (en) | A lifting device for highway construction bridge railing base template | |
| CN207090836U (en) | It is a kind of for the installation of power station pipeline from climbing hoisting equipment | |
| CN213950418U (en) | Portable prefabricated plate hoist device | |
| CN213653209U (en) | An integrated construction activity platform for bridge flange plates | |
| CN107630550A (en) | Assembling scaffold with vertical transport function | |
| CN211078166U (en) | Pipeline vertical hoisting device | |
| CN210193201U (en) | A special fixture for hoisting prefabricated blocks for construction | |
| CN202156886U (en) | Hoisting system of tunnel lining trolley and tunnel lining trolley | |
| CN210979215U (en) | Tunnel small side wall walk-behind chisel bracket | |
| CN112095475A (en) | Assembly type construction platform and installation method thereof | |
| CN102277957B (en) | Overhaul platform of desulfurizing tower |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190531 |