CN208917017U - Integrated treating device is given birth in sewage treatment materialization - Google Patents

Integrated treating device is given birth in sewage treatment materialization Download PDF

Info

Publication number
CN208917017U
CN208917017U CN201821399681.3U CN201821399681U CN208917017U CN 208917017 U CN208917017 U CN 208917017U CN 201821399681 U CN201821399681 U CN 201821399681U CN 208917017 U CN208917017 U CN 208917017U
Authority
CN
China
Prior art keywords
area
air
precipitation
flotation
settling zone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821399681.3U
Other languages
Chinese (zh)
Inventor
何旭红
周国峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu State Dna Releaxed Circular Dna Border Science And Technology Development Co Ltd
Original Assignee
Jiangsu State Dna Releaxed Circular Dna Border Science And Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu State Dna Releaxed Circular Dna Border Science And Technology Development Co Ltd filed Critical Jiangsu State Dna Releaxed Circular Dna Border Science And Technology Development Co Ltd
Priority to CN201821399681.3U priority Critical patent/CN208917017U/en
Application granted granted Critical
Publication of CN208917017U publication Critical patent/CN208917017U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to technical field of sewage, specifically, it is related to a kind of raw integrated treating device of sewage treatment materialization, the equipment is in turn divided into demulsification area, oil removal settling zone, the area PAC, the area PAM, release area, precipitation-air-flotation area, middle area, hydrolysis acidification area, catalytic oxidation area, sludge settling area and discharge recovery area along drainage flow direction by partition, and wherein oil removal settling zone and precipitation-air-flotation area share a floating oil collecting area.The raw integrated height of integrated treating device of sewage treatment materialization provided by the utility model, it is ingenious in design, oil removal settling zone and precipitation-air-flotation area share a floating oil collecting area and a mud-scraping apparatus, by installing two scraper plates on mud-scraping apparatus with achieve the purpose that oil removal settling zone and precipitation-air-flotation area synchronize deoil, the advantages of with saving energy consumption, reducing cost;Furthermore the treatment process of the equipment is comprehensive, has gathered mechanical, chemistry and micro-organism treatment process, treatment effect are splendid.

Description

Integrated treating device is given birth in sewage treatment materialization
Technical field
The utility model belongs to technical field of sewage, in particular to a kind of raw integrated place of sewage treatment materialization Manage device and processing method.
Background technique
With the continuous development of catering industry, influence of the discharge of sewage to ambient enviroment is increasingly severe.Each place Relevant rules and regulations are worked out all to determine the qualified discharge of sewage.Since sewage is mainly made of grease, additionally include Abundance of food residue needs to divide grease and residue to be respectively completed using different equipment mostly when to sewage treatment From, processing.So make sewage disposal device quantity more, energy consumption is larger, and technique is cumbersome, and treatment effect is sometimes not People's will to the greatest extent.
Utility model content
To solve drawbacks described above of the existing technology, the utility model provides a kind of raw integrated place of sewage treatment materialization Manage device.
The technical solution of the utility model is as follows:
The utility model provides a kind of raw integrated treating device of sewage treatment materialization, including dissolving, at above-mentioned sewage Demulsification area, oil removal settling zone, PAC are in turn divided into along drainage flow direction by partition inside the raw integrated treating device of reason materialization Area, the area PAM, release area, precipitation-air-flotation area, middle area, hydrolysis acidification area, catalytic oxidation area, sludge settling area and discharge recycling Area, wherein oil removal settling zone and precipitation-air-flotation area share a floating oil collecting area.
Demulsification divide into through the first overflow port connection first demulsification area and second demulsification area, first demulsification area be equipped with into The mouth of a river, the second demulsification area are connected to the second overflow port of oil removal settling zone.
The first outlet pipe is equipped in the middle part of oil removal settling zone, the oil removal settling zone inner wall positioned at the first outlet pipe top is equipped with Above-mentioned floating oil collecting area.
The area PAC is connected to by the first outlet pipe with oil removal settling zone.
The area PAM is connected to by third overflow port with the area PAC.
Release area is connected to by the 4th overflow port with the area PAM.
Precipitation-air-flotation area is connected to by the 5th overflow port with release area, and the second outlet pipe is equipped in the middle part of precipitation-air-flotation area, Precipitation-air-flotation area inner wall positioned at the second outlet pipe top is equipped with above-mentioned floating oil collecting area.
Middle area is connected to by the second outlet pipe with precipitation-air-flotation area.
Hydrolysis acidification area is connected to by the first overflow pipe with middle area, and is successively arranged exposure in hydrolysis acidification area from the bottom to top Device of air and hydrolysis filling.
Catalytic oxidation area is connected to by the second overflow pipe with hydrolysis acidification area, and is successively set from the bottom to top in catalytic oxidation area There are aerator and catalytic oxidation filler.
Sludge settling area is connected to by central draft tube with catalytic oxidation area, and central draft tube lower end is equipped with lower cone.
Discharge recovery area is connected to by overflow weir with sludge settling area, and is discharged and be additionally provided with refluxing opening on recovery area.
In addition, being additionally provided with mud-scraping apparatus on partition between oil removal settling zone and precipitation-air-flotation area.
In embodiment provided by the utility model, above-mentioned mud-scraping apparatus includes that mud scraper and interval are mounted on mud scraper shoe Two scraper plates taken, two scraper plates are respectively used to scrape the oil slick in oil removal settling zone and precipitation-air-flotation area in sewage level Into floating oil collecting area.
In embodiment provided by the utility model, above-mentioned aerator is perforated pipe.
In embodiment provided by the utility model, band is mounted in above-mentioned first demulsification area, the area PAC and the area PAM and is stirred Mix the blender of blade.
In embodiment provided by the utility model, above-mentioned first demulsification area, the second demulsification area, the area PAC, the area PAM, release Area and the bottom of discharge recovery area are equipped with drain.
In embodiment provided by the utility model, above-mentioned oil removal settling zone, floating oil collecting area, precipitation-air-flotation area, centre The bottom in pond and sludge settling area is equipped with mud discharging mouth.
The utility model has the advantages that the raw integrated height of integrated treating device of sewage treatment materialization provided by the utility model, ingenious in design, Oil removal settling zone and precipitation-air-flotation area share a floating oil collecting area and a mud-scraping apparatus, by installing two on mud-scraping apparatus A scraper plate with achieve the purpose that oil removal settling zone and precipitation-air-flotation area synchronize deoil, have and save energy consumption, reduce cost Advantage;Furthermore the treatment process of the equipment is comprehensive, has gathered mechanical, chemistry and micro-organism treatment process, treatment effect are splendid.
Detailed description of the invention
It, below will be to required in embodiment in order to illustrate more clearly of the technical solution of the utility model embodiment The attached drawing used is briefly described, it should be understood that the following drawings illustrates only some embodiments of the utility model, therefore not It should be considered as the restriction to range, for those of ordinary skill in the art, without creative efforts, It can also be obtained according to these attached drawings other relevant attached drawings.
The raw integrated treating device structure chart of Fig. 1 sewage treatment materialization provided by the utility model;
The raw integrated treating device stereo unfolding figure of Fig. 2 sewage treatment materialization provided by the utility model.
It is as shown in the figure: the raw integrated treating device of 100- sewage treatment materialization;1- dissolving;2- demulsification area;3- oil removal precipitating Area;The area 4-PAC;The area 5-PAM;6- discharges area;7- precipitation-air-flotation area;The middle area 8-;9- hydrolysis acidification area;10- catalytic oxidation area; 11- sludge settling area;12- discharges recovery area;13- floating oil collecting area;The first overflow port of 14-;The demulsification of 15- first area;16- second Be demulsified area;17- water inlet;The second overflow port of 18-;The first outlet pipe of 19-;20- third overflow port;The 4th overflow port of 21-;22- 5th overflow port;The second outlet pipe of 23-;The first overflow pipe of 24-;25- aerator;26- hydrolysis filling;27- catalytic oxidation is filled out Material;28- overflow weir;29- central draft tube;30- lower cone;31- refluxing opening;32- mud scraper;33- scraper plate;34- stirring blade; 35- blender;36- drain;37- mud discharging mouth;The second overflow pipe of 38-.
Specific embodiment
The present invention will be further described with reference to the accompanying drawings and examples.
It is practical below in conjunction with this to keep the purposes, technical schemes and advantages of the utility model embodiment clearer The technical solution in the utility model embodiment is clearly and completely described in attached drawing in novel embodiment, shows So, described embodiment is a part of embodiment of the utility model, rather than whole embodiments.Therefore, below To the detailed description of the embodiments of the present invention provided in the accompanying drawings be not intended to limit claimed it is practical new The range of type, but it is merely representative of the selected embodiment of the utility model.Based on the embodiment in the utility model, ability Domain those of ordinary skill every other embodiment obtained without creative efforts belongs to practical Novel protected range.
In the description of the present invention, it should be understood that indicating position or the term of positional relationship are based on attached drawing Shown in orientation or positional relationship, be merely for convenience of describing the present invention and simplifying the description, rather than indication or suggestion institute The equipment or element of finger must have a particular orientation, is constructed and operated in a specific orientation, therefore should not be understood as to this reality With novel limitation.
In the present invention unless specifically defined or limited otherwise, term " installation ", " connected ", " connection ", " Gu It is fixed " etc. terms shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral;It can be Mechanical connection, is also possible to be electrically connected;It can be directly connected, two can also be can be indirectly connected through an intermediary The interaction relationship of connection or two elements inside element.It for the ordinary skill in the art, can basis Concrete condition understands the concrete meaning of above-mentioned term in the present invention.
Embodiment:
As depicted in figs. 1 and 2, a kind of raw integrated treating device 100 of sewage treatment materialization is present embodiments provided, including molten Gas tank 1, above-mentioned sewage treatment materialization give birth to and are in turn divided into demulsification along drainage flow direction by partition inside integrated treating device 100 Area 2, oil removal settling zone 3, the area PAC 4, the area PAM 5, release area 6, precipitation-air-flotation area 7, middle area 8, hydrolysis acidification area 9, contact oxygen Change area 10, sludge settling area 11 and discharge recovery area 12, wherein oil removal settling zone 3 and precipitation-air-flotation area 7 share an oil slick and receive Collect area 13.
Demulsification area 2 divides the first demulsification area 15 and the second demulsification area 16 to be connected to through the first overflow port 14, the first demulsification area 15 are equipped with water inlet 17, and the second demulsification area 16 is connected to oil removal settling zone 3 through the second overflow port 18.In first demulsification area 15 Three-way cock is installed at water inlet 17, demulsifier and sewage can be added in the first demulsification area 15 simultaneously through three-way cock.
The first outlet pipe 19,3 inner wall of oil removal settling zone positioned at 19 top of the first outlet pipe are equipped in the middle part of oil removal settling zone 3 It is equipped with above-mentioned floating oil collecting area 13.
The area PAC 4 is connected to by the first outlet pipe 19 with oil removal settling zone 3.
The area PAM 5 is connected to by third overflow port 20 with the area PAC 4.
Release area 6 is connected to by the 4th overflow port 21 with the area PAM 5.
Precipitation-air-flotation area 7 is connected to by the 5th overflow port 22 with release area 6, and is equipped with second in the middle part of precipitation-air-flotation area 7 and is gone out Water pipe 23,7 inner wall of precipitation-air-flotation area positioned at 23 top of the second outlet pipe are equipped with above-mentioned floating oil collecting area 13.
Middle area 8 is connected to by the second outlet pipe 23 with precipitation-air-flotation area 7.
Hydrolysis acidification area 9 is connected to by the first overflow pipe 24 with middle area 8, and in hydrolysis acidification area 9 from the bottom to top successively Equipped with aerator 25 and hydrolysis filling 26.
Specifically, the type of hydrolysis filling 26 according to actual needs depending on.
Catalytic oxidation area 10 be connected to by the second overflow pipe 38 with hydrolysis acidification area 9, and catalytic oxidation area 10 it is interior by down toward On be successively arranged aerator 25 and catalytic oxidation filler 27.
Specifically, the type of catalytic oxidation filler 27 according to actual needs depending on.
Sludge settling area 11 is connected to by central draft tube 29 with catalytic oxidation area 10, and 29 lower end of central draft tube is equipped with Lower cone 30.The overflow weir 28 being connected with central draft tube 29, central draft tube are equipped with above the catalytic oxidation area 10 on side wall 29 settings are mainly worked as a buffer in 11 center of sludge settling area, the lower cone 30 of bottom mounting, prevent the dirt into the area The sludge of the area Shui Duigai bottom, which generates, directly to be impacted.
Discharge recovery area 12 is connected to by overflow weir 28 with sludge settling area 11, and is discharged and be additionally provided with reflux on recovery area 12 Mouth 31.
In addition, being additionally provided with mud-scraping apparatus on partition between oil removal settling zone 3 and precipitation-air-flotation area 7.
In the present embodiment, above-mentioned mud-scraping apparatus includes two that mud scraper 32 is mounted on 32 crawler belt of mud scraper with interval Scraper plate 33, two scraper plates 33 are respectively used to scrape the oil slick in oil removal settling zone 3 and precipitation-air-flotation area 7 in sewage level to floating In oil collection area 13.
In the present embodiment, above-mentioned aerator 25 is perforated pipe.
In the present embodiment, it is mounted in above-mentioned first demulsification area 15, the area PAC 4 and the area PAM 5 with stirring blade 34 Blender 35.
In the present embodiment, demulsification area 16, above-mentioned first demulsification area 15, second, the area PAC 4, the area PAM 5, release area 6 and row The bottom for putting recovery area 12 is equipped with drain 36.
In the present embodiment, above-mentioned oil removal settling zone 3, floating oil collecting area 13, precipitation-air-flotation area 7, intermediate pool 8 and sludge are heavy The bottom in shallow lake area 11 is equipped with mud discharging mouth 37.
The processing method of the raw integrated treating device 100 of sewage treatment materialization is as follows in this example, including the following steps:
A, the sewage come out from dissolving 1 is added after demulsifier wherein and flows into the first demulsification area 15, warp by water inlet 17 Agitating device separates the grease in sewage after being sufficiently stirred in first demulsification area 15, is then flowed by the first overflow port 14 Enter progress residue precipitating in the second demulsification area 16, the sewage after slagging-off mainly includes grease two parts, then by the second overflow port 18 Oil removal settling zone 3 is flowed into, sewage upper layer oil slick in oil removal settling zone 3 is scraped to floating oil collecting area 13, completed to dirt by mud-scraping apparatus Water deoils for the first time;
B, the less sewage of 3 middle part oil-containing of oil removal settling zone flows into the area PAC 4 along the first outlet pipe 19, stirs and fills in the area Under the action of setting, sewage and flocculant PAC sufficiently react, and the sludge in sewage starts to flocculate for the first time, and caseous sludge of wadding a quilt with cotton is heavy 4 bottom of the area Dian Zhi PAC;
C, the sewage after mud is gone then to flow into the area PAM 5 by third overflow port 20 for the first time, in the effect of area's agitating device Under, sewage and flocculant PAM sufficiently react, and the sludge in sewage starts secondary flocculation, and caseous sludge settling of wadding a quilt with cotton is to the area PAM 5 bottoms;
D, secondary to go the sewage after mud to be flowed into release area 6 by the 4th overflow port 21 to carry out first natural sedimentation, go The sludge removed is precipitated to release 6 bottom of area again, and the sewage on release 6 top of area then passes through the 5th overflow port 22 and flows into precipitating gas Floating region 7, mud-scraping apparatus scrape sewage upper layer oil slick in precipitation-air-flotation area 7 to floating oil collecting area 13,7 middle part oil-containing of precipitation-air-flotation area Less sewage, which then passes through the second outlet pipe 23 and flows into middle area 8, carries out secondary natural sedimentation, by sludge settling to centre 8 bottom of area;
E, the sewage in middle area 8 flows into 9 bottom of hydrolysis acidification area by the first overflow pipe 24, and the area Xian Jinggai perforated pipe exposes Then gas covers the hydrolysis filling 26 in the middle part of the area again and flows into 10 bottom of catalytic oxidation area from the second overflow pipe 38;
F, it after flowing into the same area the Xian Jinggai perforated pipe aerating regulation of sewage in catalytic oxidation area 10, then covers again in the middle part of the area Catalytic oxidation filler 27, then successively above the area after the overflow weir 28 of side-walls and the central draft tube 29 of area's centre 11 bottom of sludge settling area is flowed into, under the buffering of the lower cone 30 of 29 bottom of central draft tube, so that the sludge in sewage is again It is secondary to be deposited in the area bottom;
G, the overflow weir 28 that the sewage in sludge settling area 11 is discharged 12 top side-walls of recovery area flows into discharge recycling The sewage in the area is detected in area 12, and the drain 36 for passing through the area bottom if it meets discharge standard arranges sewage Fall, is connected to, repeats with the water inlet 17 in the first demulsification area 15 if it does not meet the refluxing opening 31 in the area discharge standard Ze Jianggai Above-mentioned steps A to F, until sewage reaches discharge standard;
H, after the useless discharge of food and drink, through the first demulsification area 16, demulsification area 15, second, the area PAC 4, the area PAM 5, release area 6 With the drain 36 of discharge 12 bottom of recovery area, oil removal settling zone 3, floating oil collecting area 13, precipitation-air-flotation area 7, intermediate pool 8 and dirt The mud discharging mouth 37 of 11 bottom of mud settling zone respectively cleans each area.
In the present embodiment, above-mentioned mud-scraping apparatus includes that mud scraper 32 and interval are mounted on mud scraper 32 in above-mentioned steps A Two scraper plates 33 on crawler belt, two scraper plates 33 are respectively used to will be in oil removal settling zone 3 and precipitation-air-flotation area 7 in sewage level Oil slick is scraped into floating oil collecting area 13.
Having the beneficial effect that for the raw integrated treating device of sewage treatment materialization provided in this embodiment is provided by the utility model The integrated height of integrated treating device is given birth in sewage treatment materialization, ingenious in design, and oil removal settling zone and precipitation-air-flotation area share one and float Oil collection area and a mud-scraping apparatus, by installing two scraper plates on mud-scraping apparatus to reach to oil removal settling zone and precipitating gas The advantages of floating region synchronizes the purpose deoiled, and has and saves energy consumption, reduces cost;Furthermore the treatment process of the equipment is comprehensive, collection It has closed mechanical, chemistry and micro-organism treatment process, treatment effect is splendid.
The above does not impose any limitation on the present invention, although the utility model is with preferably real It is disclosed above to apply example, however is not intended to limit the utility model, any person skilled in the art is not departing from this reality With in new technique aspects, when the technology contents using the disclosure above make a little change or are modified to equivalent variations Equivalent embodiment, but all contents without departing from technical solutions of the utility model, according to the technical essence of the utility model to Any simple modification, equivalent change and modification made by upper embodiment, are still within the scope of the technical solutions of the present invention.

Claims (6)

1. a kind of raw integrated treating device of sewage treatment materialization, including dissolving, which is characterized in that the sewage treatment materialization is raw Inside integrated treating device by partition along drainage flow direction be in turn divided into demulsification area, oil removal settling zone, the area PAC, the area PAM, Discharge area, precipitation-air-flotation area, middle area, hydrolysis acidification area, catalytic oxidation area, sludge settling area and discharge recovery area, interval Oily settling zone and precipitation-air-flotation area share a floating oil collecting area;
The first demulsification area and the second demulsification area through the connection of the first overflow port are divided into demulsification, and the first demulsification area is equipped with water inlet Mouthful, the second demulsification area is connected to the second overflow port of oil removal settling zone;
The first outlet pipe is equipped in the middle part of oil removal settling zone, the oil removal settling zone inner wall positioned at the first outlet pipe top is equipped with described Floating oil collecting area;
The area PAC is connected to by the first outlet pipe with oil removal settling zone;
The area PAM is connected to by third overflow port with the area PAC;
Release area is connected to by the 4th overflow port with the area PAM;
Precipitation-air-flotation area is connected to by the 5th overflow port with release area, and the second outlet pipe is equipped in the middle part of precipitation-air-flotation area, is located at The precipitation-air-flotation area inner wall on the second outlet pipe top is equipped with the floating oil collecting area;
Middle area is connected to by the second outlet pipe with precipitation-air-flotation area;
Hydrolysis acidification area is connected to by the first overflow pipe with middle area, and is successively arranged aeration dress in hydrolysis acidification area from the bottom to top It sets and hydrolysis filling;
Catalytic oxidation area is connected to by the second overflow pipe with hydrolysis acidification area, and is successively arranged exposure in catalytic oxidation area from the bottom to top Device of air and catalytic oxidation filler;
Sludge settling area is connected to by central draft tube with catalytic oxidation area, and central draft tube lower end is equipped with lower cone;
Discharge recovery area is connected to by overflow weir with sludge settling area, and is discharged and be additionally provided with refluxing opening on recovery area;
Mud-scraping apparatus is additionally provided on partition between oil removal settling zone and precipitation-air-flotation area.
2. the raw integrated treating device of sewage treatment materialization according to claim 1, which is characterized in that the mud-scraping apparatus packet It includes mud scraper and is spaced two scraper plates being mounted on mud scraper crawler belt, two scraper plates are respectively used to oil removal settling zone and precipitating Oil slick in air flotation zone in sewage level is scraped into floating oil collecting area.
3. the raw integrated treating device of sewage treatment materialization according to claim 1, which is characterized in that the aerator is Perforated pipe.
4. the raw integrated treating device of sewage treatment materialization according to claim 1, which is characterized in that first demulsification The blender with stirring blade is mounted in area, the area PAC and the area PAM.
5. the raw integrated treating device of sewage treatment materialization according to claim 1, which is characterized in that first demulsification Area, the second bottom for being demulsified area, the area PAC, the area PAM, release area and discharge recovery area are equipped with drain.
6. the raw integrated treating device of sewage treatment materialization according to claim 1, which is characterized in that the oil removal precipitating Area, floating oil collecting area, precipitation-air-flotation area, intermediate pool and sludge settling area bottom be equipped with mud discharging mouth.
CN201821399681.3U 2018-08-28 2018-08-28 Integrated treating device is given birth in sewage treatment materialization Active CN208917017U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821399681.3U CN208917017U (en) 2018-08-28 2018-08-28 Integrated treating device is given birth in sewage treatment materialization

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821399681.3U CN208917017U (en) 2018-08-28 2018-08-28 Integrated treating device is given birth in sewage treatment materialization

Publications (1)

Publication Number Publication Date
CN208917017U true CN208917017U (en) 2019-05-31

Family

ID=66704399

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821399681.3U Active CN208917017U (en) 2018-08-28 2018-08-28 Integrated treating device is given birth in sewage treatment materialization

Country Status (1)

Country Link
CN (1) CN208917017U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108793643A (en) * 2018-08-28 2018-11-13 江苏国松环境科技开发有限公司 Integrated treating device and processing method are given birth in sewage disposal materialization

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108793643A (en) * 2018-08-28 2018-11-13 江苏国松环境科技开发有限公司 Integrated treating device and processing method are given birth in sewage disposal materialization

Similar Documents

Publication Publication Date Title
CN106007209B (en) A kind of oil refinery's sewage oil removing pretreating process
CN205774033U (en) A kind of compound efficient depositing reservoir
CN205527844U (en) Sewage coagulation air floats purification tank
CN106902549A (en) A kind of automatic oily water separating equipment of combined type
CN106927588A (en) A kind of automatic oily water separating equipment of modularization
CN107619122B (en) Restaurant sewage treatment equipment with oil collecting and backflow device and working method thereof
CN208917017U (en) Integrated treating device is given birth in sewage treatment materialization
CN106731200A (en) Full-automatic food garbage separation equipment
CN212655634U (en) Rotary oil scraping device and oil discharge structure of oil separation lifting equipment thereof
CN203568912U (en) Automatic restaurant wastewater treatment equipment
CN107721016A (en) A kind of oil-polluted water grease removal treatment device and processing method
CN107473429A (en) A kind of belt waste cooking oil extraction equipment
CN112138434A (en) A sediment device for oiliness mud
CN106946370A (en) A kind of sewage from catering business oil-water residue separating one-piece
CN108793643A (en) Integrated treating device and processing method are given birth in sewage disposal materialization
CN207468366U (en) A kind of oily wastewater grease removal treatment device
CN208265916U (en) A kind of high efficiency composition EPS reactor
CN205258184U (en) Oily wastewater treating device
CN209367983U (en) A kind of oil separator
CN205258190U (en) Oily sewage biochemical treatment system
CN209721757U (en) A kind of pretreatment system for sewage
CN113880296A (en) Sewage treatment device for cigarette factory
CN113461187A (en) Automatic oil removal lifting device
CN208829325U (en) A kind of oil-containing water treatment facilities
CN206289089U (en) A kind of skewed culvert filter residue air floatation machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant