CN208899840U - For volumed space building inner top constructing device - Google Patents
For volumed space building inner top constructing device Download PDFInfo
- Publication number
- CN208899840U CN208899840U CN201821559928.3U CN201821559928U CN208899840U CN 208899840 U CN208899840 U CN 208899840U CN 201821559928 U CN201821559928 U CN 201821559928U CN 208899840 U CN208899840 U CN 208899840U
- Authority
- CN
- China
- Prior art keywords
- inner top
- constructing device
- building inner
- space building
- volumed space
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses one kind to be used for volumed space building inner top constructing device, including bottom support platform, two cross bars and two groups of hanging pieces, the bottom end of two groups of hanging pieces is separately positioned on the rear and front end of bottom support platform, two groups of hanging pieces are symmetrical set, two cross bars are fixed at building inner top, and the top of two groups of hanging pieces is articulated in respectively on two cross bars.This, which is used for volumed space building inner top constructing device, has many advantages, such as that of simple structure and low cost, suspension is convenient and security performance is high.
Description
Technical field
The utility model relates to a kind of construction platform equipment technical fields, more particularly to one kind to be used for volumed space building
Inner top constructing device.
Background technique
In architectural engineering, such as warehouse, cinema, Dali hall volumed space building inner top carry out in work progress, because
Operation side height is higher, and volumed space building is in its inner top operation, and cannot influence lower section Ground Operation, that is, needs
Guarantee ground and high-altitude operation simultaneously, traditional full paving scaffold scheme and existing operation platform, which are all unable to satisfy scene, to be needed
It wants, the bottom of scaffold needs to support and influence Ground Operation, and structure is complicated for existing high-altitude operation platform, expensive, outstanding
It hangs inconvenient and lacks safety prevention measure.
Utility model content
The technical problems to be solved in the utility model is to overcome the deficiencies of the prior art and provide that a kind of structure is simple, cost
Cheap, suspension facilitates and what security performance was high is used for volumed space building inner top constructing device.
In order to solve the above technical problems, the utility model uses following technical scheme:
One kind being used for volumed space building inner top constructing device, including bottom support platform, two cross bars and two groups of hanging pieces,
The bottom end of two groups of hanging pieces is separately positioned on the rear and front end of the bottom support platform, and two groups of hanging pieces are symmetrical set, two cross
Bar is fixed at building inner top, and the top of two groups of hanging pieces is articulated in respectively on two cross bars.
As a further improvement of the above technical scheme:
Every group of hanging piece includes at least two pairs of vertical bars, the corresponding side of each pair of vertical bar of every group of hanging piece along the bottom support platform
Edge is evenly spaced on, and each pair of vertical bar interval is simultaneously symmetrical arranged, and the top of each pair of vertical bar is inserted with bolt, and each pair of vertical bar passes through
Bolt thereon is articulated on corresponding cross bar, and the cross bar is located between each pair of vertical bar of respective end.
The cross bar and hanging piece, which are all provided with, is set to steel construction.
The bottom support platform includes rectangular steel structure frame and plank, and the bottom end of two groups of hanging pieces is separately fixed at described
On the frame body of rectangular steel structure frame rear and front end, the plank is laid on the top of the rectangular steel structure frame.
The plank upper surface is equipped with flameproof fabric.
A circle protective fence is surrounded by it on the rectangular steel structure frame.
Dodge gate is equipped at left and right sides of the protective fence.
The top of the rectangular steel structure frame is equipped with the lateral flitch of more be evenly spaced on, and the plank is laid with
On each lateral flitch.
Between the side frame of the rectangular steel structure frame in the bottom end of each lateral flitch be connected with it is intersecting in length and breadth plus
Strengthening tendons.
The front and rear sides of the rectangular steel structure frame are equipped with suspension hook.
Compared with the prior art, the advantages of the utility model are:
1, the volumed space building inner top constructing device that is used for of the utility model mainly by bottom support platform, cross bar and is hung
Part composition, it is of simple structure and low cost;
2, the utility model for volumed space building inner top constructing device by the way that cross bar is fixed on building inner top,
Bottom support platform is articulated on cross bar by hanging piece again, suspension is convenient and suspension is stablized;
3, the utility model for being equipped with lateral flitch and plank, Neng Gou in volumed space building inner top constructing device
Blocking plays the role of vibration damping and de-noising while falling object, and further reduces the cost;Flitch is stretched out to two sides simultaneously, is had
Conducive to multiple docking for volumed space building inner top constructing device, its mutual seam is reduced, guarantees construction personnel's peace
All-pass row;
4, the utility model for being equipped with protective fence in volumed space building inner top constructing device, improve the peace of construction
Quan Xing;What the protective fence left and right sides was symmetrical simultaneously is equipped with two dodge gates, and multiple volumed space building inner tops that are used for is made to construct
It can be interconnected by dodge gate after device docking, convenient for construction.
Detailed description of the invention
Fig. 1 is the schematic perspective view that the utility model is used for volumed space building inner top constructing device.
Fig. 2 is the schematic view of the front view that the utility model is used for volumed space building inner top constructing device.
Fig. 3 is the overlooking structure diagram of Fig. 2.
Fig. 4 is the left view structural representation of Fig. 2.
Each label indicates in figure:
1, bottom support platform;11, rectangular steel structure frame;111, lateral flitch;112, reinforcing rib;113, suspension hook;12,
Plank;13, flameproof fabric;14, protective fence;15, dodge gate;2, cross bar;3, hanging piece;31, vertical bar;32, bolt.
Specific embodiment
The utility model is described in further details below with reference to Figure of description and specific embodiment.
Shown in Fig. 1 to Fig. 4, a kind of embodiment for volumed space building inner top constructing device of the present embodiment, including
1, two cross bar 2 of bottom support platform and two groups of hanging pieces 3, before the bottom end of two groups of hanging pieces 3 is separately positioned on bottom support platform 1
Both ends afterwards, two groups of hanging pieces 3 are symmetrical set, and two cross bars 2 are fixed at building inner top, the top difference of two groups of hanging pieces 3
It is articulated on two cross bars 2.In the structure, what it is for volumed space building inner top constructing device includes bottom support platform 1, two
A 2 both ends of cross bar are separately fixed at the inner top of volumed space building, and (such as 2 both ends of cross bar pass through steel pole and are hanging connected in volumed space building
Inner top), two cross bars 2 are arranged in parallel, and two cross bars 2 are i-beam structure, and the bottom end of two groups of hanging pieces 3 is separately fixed at
The rear and front end of bottom support platform 1, two groups of hanging pieces 3 are vertically arranged, and the longitudinal pitch of two groups of hanging pieces 3 corresponds to two cross bars 2
Spacing, so that the top of two groups of hanging pieces 3 is respectively aligned to the cross bar 2 of respective end and be articulated on corresponding cross bar 2.Using for big empty
Between building inner top constructing device when constructing to volumed space building inner top, due to not needing to prop up below the constructing device
It holds, has left the space of bottom operation operation for, allow the bottom and top operation simultaneously in volumed space building, while at the scene
Full paving support (such as scaffold) is not needed, quick and easy, save the cost is played, it is ensured that the effect of construction speed and safety;And
And the constructing device structure is simple, manufacture low processing cost;There are also constructing device suspensions conveniently, first in implementation process
Cross bar 2 is first mounted on volumed space building inner top to need to set up at platform, and four groups of hoist engines are installed on large space top, it will
The constructing device sets up marshalling immediately below platform needed for being hoisted to using truck crane, four groups of hoist engines are fallen simultaneously, rolls up
The machine wirerope of raising is hung on the constructing device, is then started four groups of hoist engines simultaneously, is at the uniform velocity risen, until two groups of hanging pieces 3 are distinguished
It is aligned and is articulated on corresponding cross bar 2, in such a way that hanging piece 3 is articulated in cross bar 2, it is firm to mount easy to operate and mounting.
In the present embodiment, every group of hanging piece 3 includes at least two pairs of vertical bars 31, preferably two pairs of vertical bars 31, every group of hanging piece 3 it is each right
Vertical bar 31 is evenly spaced on along the respective side edge edge of bottom support platform 1, and each pair of vertical bar 31, which is spaced, to be simultaneously symmetrical arranged, each pair of perpendicular
The top of bar 31 is inserted with bolt 32, and each pair of vertical bar 31 is articulated on corresponding cross bar 2 by bolt 32 thereon, and cross bar 2
Between each pair of vertical bar 31 of respective end.In the structure, every group of hanging piece 3 is preferably made of two pairs of vertical bars 31, according to load-bearing conditions,
It can increase more to vertical bar 31, symmetrical spaced each pair of vertical bar 31 is used as a mounting point, each pair of 31 top phase of vertical bar
To offering the through-hole passed through for bolt 32 on position, after each pair of vertical bar 31 is placed on corresponding cross bar 2 in its top, then will be every
A bolt 32 is inserted in the through-hole mutually coped on vertical bar 31 respectively is articulated in each pair of vertical bar 31 on corresponding cross bar 2, such as every
It is set with a scroll wheel on a bolt 32, the constructing device can be made to move along cross bar 2 and change construction location.
In the present embodiment, cross bar 2 and hanging piece 3 are all provided with and are set to steel construction.In the structure, hanging piece 3 is steel construction, and cross bar 2 is
I-steel, the vertical bar 31 of hanging piece 3 are channel steel.
In the present embodiment, bottom support platform 1 includes rectangular steel structure frame 11 and plank 12, the bottom end of two groups of hanging pieces 3
It is separately fixed on the frame body of rectangular 11 rear and front end of steel structure frame, plank 12 is laid on the top of rectangular steel structure frame 11
End.In the structure, bottom support platform 1 includes rectangular steel structure frame 11 and plank 12, four pairs of vertical bars 31 of two groups of hanging pieces 3
Bottom is respectively welded on the lateral steelframe of rectangular 11 rear and front end of steel structure frame, and two pairs of vertical bars 31 of every group of hanging piece 3 divide
Not Wei Yu respective transversal steelframe left and right ends, plank 12 is laid on the top of rectangular steel structure frame 11 for preventing large space
Object is fallen when building inner top construction, and cost bottom is honest and clean and increases construction safety, while fall can on plank 12 for object
Reduce noise.
In the present embodiment, 12 upper surface of plank is equipped with flameproof fabric 13.In the structure, flameproof fabric 13 is such as worked as preventing fires
It stands when plank 12 carries out electric welding field, if the Mars that electric welding field generates is easily damaged plank 12 very without flameproof fabric 13
To causing fire, and 12 upper berth of plank sets flameproof fabric 13, can prevent Mars damage plank 12 and fire from occurring.
In the present embodiment, a circle protective fence 14 is surrounded by it on rectangular steel structure frame 11.In the structure, protective fence
14 are arranged around rectangular steel structure frame 11, and protective fence 14 is used for the safety of construction of prevention work operating personnel, prevent personnel in bottom
It is fallen down from bottom support platform 1 accidentally when operation in support platform 1, while being also prevented from other objects in bottom support platform 1
Body falls to 1 lower section of bottom support platform.
In the present embodiment, the left and right sides of protective fence 14 is equipped with dodge gate 15.In the structure, in the left and right of protective fence 14
A dodge gate 15 is respectively set in two sides, and dodge gate 15 is irony structure, is used for volumed space building inner top constructing device when multiple
When docking, make wherein each dodge gate 15 guarantee respectively to be interconnected for volumed space building inner top constructing device in conllinear arrangement.
In the present embodiment, the top of rectangular steel structure frame 11 is equipped with the lateral flitch 111 of more be evenly spaced on,
Plank 12 is laid on each lateral flitch 111.In the structure, each transverse direction flitch 111 is according to the constructing device size according to interval
350mm arrangement, lateral flitch 111 play vibration damping to plank 12 thereon and reinforce supporting role, while lateral flitch 111 is in side
(extension elongation is designed according to operation side situation and arrangement situation) is stretched out in the left and right sides of shape steel structure frame 11, makes
Connection respectively is being combined in use, reducing its mutual seam for volumed space building inner top constructing device, guarantees constructor
Member's safe passing.
In the present embodiment, it is connected in length and breadth between the side frame of rectangular steel structure frame 11 in the bottom end of each lateral flitch 111
The reinforcing rib 112 of intersection.In the structure, the steel reinforcing rib 112 is welded by six roots of sensation square steel, horizontal direction and vertical direction
It is upper each using three, it is in " latticed arrangement;It, will be above vertical direction in vertical direction square steel and horizontal direction square steel infall
Steel is split Cheng Sigen, is fully welded overlap joint, and the bottom end and top for guaranteeing each square steel are in same level.
In the present embodiment, the front and rear sides of rectangular steel structure frame 11 are equipped with suspension hook 113.In the structure, suspension hook 113 by
Round steel simmering and bending are welded, the front and back of rectangular steel structure frame 11 at " hump suspension hook " shape and structure with rectangular steel structure frame 11
Two suspension hooks 113 are respectively set in two sides, and the suspension hook 113 of rectangular 11 front and rear sides of steel structure frame is oppositely arranged, that is, is arranged symmetrically.
The manufacturing process of the constructing device are as follows: applied first according to operation side size in volumed space building to rationally design
Tooling sets size dimension, carrys out square shaped steel construction further according to stacking material weight and construction worker's quantity needed for constructing device
Frame 11 carries out fashioned iron option, makes the constructing device of low processing cost.Production square bar knot is first carried out according to square steel type selecting
Structure frame 11;Hanging piece 3 and bolt 7 are made again;Suspension hook 113 is made further according to overall weight;Handrail column 14 and dodge gate are installed again
15;Lateral flitch 111, plank 12 and flameproof fabric 13 are finally laid on rectangular steel structure frame 11.
Work before constructing device production: carrying out fashioned iron type selecting, and frame structure needs to carry out mechanical analysis in advance, meet
Device force request, it is ensured that safety;The quantity for needing to arrange constructing device is determined according to Contraction in Site face size.
Preparation before construction: it carries out and confides a technological secret;Points for attention are hung on this constructing device, to avoid surpassing
Reconstructed image.
Although the utility model is disclosed as above with preferred embodiment, it is not intended to limit the utility model.It is any
Those skilled in the art, in the case where not departing from technical solutions of the utility model range, all using the disclosure above
Technology contents many possible changes and modifications are made to technical solutions of the utility model, or be revised as the equivalent of equivalent variations
Embodiment.Therefore, all contents without departing from technical solutions of the utility model, according to the utility model technical spirit to the above reality
Any simple modifications, equivalents, and modifications that example is done are applied, should all be fallen in the range of technical solutions of the utility model protection.
Claims (10)
1. one kind is used for volumed space building inner top constructing device, it is characterised in that: including bottom support platform (1), two cross
Bar (2) and two groups of hanging pieces (3), the bottom end of two groups of hanging pieces (3) are separately positioned on the rear and front end of the bottom support platform (1),
Two groups of hanging pieces (3) are symmetrical set, and two cross bars (2) are fixed at building inner top, and the top of two groups of hanging pieces (3) is hung respectively
It connects on two cross bars (2).
2. according to claim 1 be used for volumed space building inner top constructing device, it is characterised in that: every group of hanging piece (3)
Including at least two pairs of vertical bars (31), the respective side edge of each pair of vertical bar (31) of every group of hanging piece (3) along the bottom support platform (1)
Along being evenly spaced on, each pair of vertical bar (31) is spaced and is symmetrical arranged, and the top of each pair of vertical bar (31) is inserted with bolt (32), often
Vertical bar (31) are articulated on corresponding cross bar (2) by bolt (32) thereon, the cross bar (2) is located at each pair of of respective end
Between vertical bar (31).
3. being used for volumed space building inner top constructing device according to claim 1 or described in 2, it is characterised in that: the cross
Bar (2) and hanging piece (3) are all provided with and are set to steel construction.
4. according to claim 3 be used for volumed space building inner top constructing device, it is characterised in that: the bottom support
Platform (1) includes rectangular steel structure frame (11) and plank (12), and the bottom end of two groups of hanging pieces (3) is separately fixed at the square bar
On the frame body of structural framing (11) rear and front end, the plank (12) is laid on the top of the rectangular steel structure frame (11).
5. according to claim 4 be used for volumed space building inner top constructing device, it is characterised in that: the plank (12)
Upper surface is equipped with flameproof fabric (13).
6. according to claim 4 be used for volumed space building inner top constructing device, it is characterised in that: the square bar knot
A circle protective fence (14) is surrounded by it on structure frame (11).
7. according to claim 6 be used for volumed space building inner top constructing device, it is characterised in that: the protective fence
(14) dodge gate (15) are equipped at left and right sides of.
8. according to claim 4 be used for volumed space building inner top constructing device, it is characterised in that: the square bar knot
The top of structure frame (11) is equipped with the lateral flitch (111) of more be evenly spaced on, and the plank (12) is laid on each institute
It states on lateral flitch (111).
9. according to claim 8 be used for volumed space building inner top constructing device, it is characterised in that: the square bar knot
The reinforcing rib (112) intersected in length and breadth is connected in the bottom end of each lateral flitch (111) between the side frame of structure frame (11).
10. according to claim 4 be used for volumed space building inner top constructing device, it is characterised in that: the square bar
The front and rear sides of structural framing (11) are equipped with suspension hook (113).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821559928.3U CN208899840U (en) | 2018-09-25 | 2018-09-25 | For volumed space building inner top constructing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821559928.3U CN208899840U (en) | 2018-09-25 | 2018-09-25 | For volumed space building inner top constructing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208899840U true CN208899840U (en) | 2019-05-24 |
Family
ID=66573565
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821559928.3U Expired - Fee Related CN208899840U (en) | 2018-09-25 | 2018-09-25 | For volumed space building inner top constructing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208899840U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109098429A (en) * | 2018-09-25 | 2018-12-28 | 中信国安建工集团有限公司 | For volumed space building inner top constructing device |
-
2018
- 2018-09-25 CN CN201821559928.3U patent/CN208899840U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109098429A (en) * | 2018-09-25 | 2018-12-28 | 中信国安建工集团有限公司 | For volumed space building inner top constructing device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102383588B (en) | Lifting platform for protecting safety of high-level construction | |
CN109653484B (en) | Roofing superelevation faces external hanging flower basket mounting structure of empty curtain engineering | |
CN209011528U (en) | A kind of all steel attachment type raise scaffold | |
CN208899840U (en) | For volumed space building inner top constructing device | |
CN205892588U (en) | Hoisting equipment | |
CN101440660B (en) | Guiding-rail attached lifting scaffold | |
CN207267961U (en) | A kind of bridge pier shaft pours operating platform | |
CN203767837U (en) | Special hanging basket structure for hanging gas pipelines | |
CN205295965U (en) | Large -span continuous beam bridge strides existing station rotation construction and wraps protective structure entirely with hanging basket | |
CN208363666U (en) | It is a kind of for build face side construction safety protection frame | |
CN219280494U (en) | Tower beam temporary consolidation supporting structure for bridge tower stability control | |
CN109098429A (en) | For volumed space building inner top constructing device | |
CN201141203Y (en) | Guiding-rail attached lifting scaffold | |
CN2701971Y (en) | Dual-purpose tripod for building construction and decoration | |
CN109132791A (en) | A kind of mounting structure that people's goods elevator attached wall lengthening rods are fixed | |
CN205295966U (en) | Large -span continuous beam bridge strides existing station rotation construction with hanging basket bottom parcel platform | |
CN213572927U (en) | Movable steel platform with adjustable size and capable of being circulated | |
CN212271556U (en) | Remove construction platform convenient to cable testing bridge lays | |
CN210419022U (en) | Tower crane standard knot with safety performance | |
CN201065638Y (en) | Suspended steel structure lower hanging handling frame | |
CN206581578U (en) | Double-layer basket constructing device for overhanging scaffold | |
CN211338598U (en) | Ring rail hoisting device for installing high-rise curtain wall | |
CN220336411U (en) | Protection platform lifting point truss for building construction | |
CN207109614U (en) | A kind of Hanging Basket for building | |
CN215948984U (en) | Overhanging protection unit and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190524 Termination date: 20210925 |
|
CF01 | Termination of patent right due to non-payment of annual fee |