CN208898943U - A kind of cooling and heating circulation system of annealing furnace - Google Patents

A kind of cooling and heating circulation system of annealing furnace Download PDF

Info

Publication number
CN208898943U
CN208898943U CN201821643199.XU CN201821643199U CN208898943U CN 208898943 U CN208898943 U CN 208898943U CN 201821643199 U CN201821643199 U CN 201821643199U CN 208898943 U CN208898943 U CN 208898943U
Authority
CN
China
Prior art keywords
centrifugal blower
preheating chamber
pipe
slow cooling
room
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821643199.XU
Other languages
Chinese (zh)
Inventor
骆陈四郎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Chee Industrial Furnace Technology Co Ltd
Original Assignee
Hangzhou Chee Industrial Furnace Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Chee Industrial Furnace Technology Co Ltd filed Critical Hangzhou Chee Industrial Furnace Technology Co Ltd
Priority to CN201821643199.XU priority Critical patent/CN208898943U/en
Application granted granted Critical
Publication of CN208898943U publication Critical patent/CN208898943U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Heat Treatments In General, Especially Conveying And Cooling (AREA)

Abstract

The utility model discloses a kind of cooling and heating circulation systems of annealing furnace, including centrifugal blower, preheating chamber, heat room, isothermal chamber is eased up cold house, centrifugal blower includes the first centrifugal blower and the second centrifugal blower, first centrifugal blower is mounted on the bottom of slow cooling room, second centrifugal blower is mounted on the bottom of preheating chamber, centrifugal blower is equipped with air inlet shield and wind scooper, the slow cooling room and the bottom of preheating chamber are designed with an assembling seat, first centrifugal blower and the second centrifugal blower are separately fixed at the bottom of slow cooling room and preheating chamber by motor mount, the bottom of the slow cooling room is equipped with first pipe, one end of first pipe is connect with the first centrifugal blower, the bottom of the preheating chamber is equipped with second pipe, one end of second pipe is connect with the second centrifugal blower, pass through the effect of centrifugal blower, the cold house so that preheating chamber eases up Gas can circulation, be conducive to energy saving, reduce the loss of energy, reduce production cost.

Description

A kind of cooling and heating circulation system of annealing furnace
Technical field
The utility model relates to a kind of annealing furnace cooling and heating circulation system.
Background technique
Annealing furnace is primarily adapted for use in the wire rods such as mild steel, low-alloy steel, bearing steel, disk member, bar, steel pipe, forging and casting The heat treatment process such as spheroidizing, soft annealing, full annealing, destressing, normalization, carbon restoration.Workpiece needs between heat treatment Preheating dehumidification treatments carried out to workpiece, while need to carry out retarded cooling process processing to workpiece after heat treatment, when preheating needs Workpiece is heated, workpiece needs to absorb heat when heating, this, which just needs to provide sufficient heat, makes workpiece heat up;Work simultaneously Part is during cooling, and since the temperature of slow cooling room is higher, workpiece cooling is slower, this just needs to cool down to slow cooling room, Make workpiece Slow cooling by cooling;Existing annealing furnace when workpiece preheats is carried out by way of gas heating, It when workpiece cools down, is carried out by way of natural cooling, since the temperature of furnace interior is high, causes cooling velocity more slow Slowly, the production efficiency of workpiece, while gas heating are affected, a large amount of consumption of the energy is will lead to, increases production cost.
Utility model content
The hot and cold gas inside annealing furnace can be made to realize the technical problem to be solved by the present invention is to provide one kind to follow Circulation is dynamic, so that hot and cold gas be made to reach maximized utilization, realizes energy-saving and environment-friendly purpose, reduces production cost, mention High production efficiency, the cooling and heating circulation system of the annealing furnace with practicability and using popularity.
To solve the above problems, the utility model adopts the following technical solution:
A kind of cooling and heating circulation system of annealing furnace, including centrifugal blower, preheating chamber, heating room, the gentle cold house of isothermal chamber, institute Stating centrifugal blower includes the first centrifugal blower and the second centrifugal blower, and the first centrifugal blower is mounted on the bottom of slow cooling room, and second Centrifugal blower is mounted on the bottom of preheating chamber, and centrifugal blower is equipped with air inlet shield and wind scooper, the slow cooling room and pre- It is solid respectively by motor mount that the bottom in hot cell is designed with an assembling seat, the first centrifugal blower and the second centrifugal blower Be scheduled on the bottom of slow cooling room and preheating chamber, the bottom of the slow cooling room is equipped with first pipe, one end of first pipe with first from The connection of heart blower, first pipe passes through isothermal chamber by the bottom of slow cooling room, the bottom of heating room extends to the bottom of preheating chamber, institute The bottom for stating preheating chamber is equipped with second nozzle, and the other end of first pipe is connect with second nozzle, and the bottom of the preheating chamber is set Have second pipe, one end of second pipe is connect with the second centrifugal blower, second pipe by preheating chamber bottom pass through heating room, The bottom of isothermal chamber extends to the bottom of slow cooling room, and the bottom of the slow cooling room is equipped with first jet, the other end of second pipe Connect with first jet, first pipe is installed side by side with second pipe, above-mentioned preheating chamber, heating room, isothermal chamber ease up cold house it Between be designed with hermatic door.
The utility model installs the first centrifugal blower and the second centrifugal blower by the bottom in slow cooling room and preheating chamber, leads to The hot-air of slow cooling chamber interior is transmitted in preheating chamber by the effect for crossing blower, and the cold air in preheating chamber is delivered to slow cooling room In, reach the exchange of hot and cold air, realize the reasonable utilization of hot and cold air, reduce the consumption of the energy, reduce production cost, Production efficiency is improved, energy-saving and environment-friendly purpose is reached.
Multiple ventholes, first jet are designed on the first jet and second nozzle as a preferred technical solution, The bottom of slow cooling room and preheating chamber is longitudinally mounted to second nozzle.
So that the hot and cold gas sprayed are uniform, range is wide for the setting, accelerates the circulation speed of hot and cold gas inside annealing furnace Degree.
First centrifugal blower and first jet are separately positioned on the both ends of slow cooling room as a preferred technical solution, Second centrifugal blower and second nozzle are separately positioned on the both ends of preheating chamber.
The setting is convenient for the hot and cold gas replacement inside the gentle cold house of preheating chamber, so that cold heat exchange effect is more preferable.
First centrifugal blower and the second centrifugal blower are using variable-frequency motor as a preferred technical solution,.
The setting is convenient for the first centrifugal blower and the second centrifugal blower according to the temperature regime inside slow cooling room and preheating chamber The revolving speed for adjusting motor, opens or closes motor.
It is circulated the beneficial effects of the utility model are: the hot and cold gas inside annealing furnace can be made to realize, to make Hot and cold gas reach maximized utilization, realize energy-saving and environment-friendly purpose, reduce production cost, improve production efficiency, With practicability and use popularity.
Detailed description of the invention
Illustrate the utility model embodiment or technical solution in the prior art for more Chu, below will to embodiment or Attached drawing needed to be used in the description of the prior art is briefly described, but is not the limit to scope of protection of the utility model System.
Fig. 1 is the scheme of installation of the utility model;
Fig. 2 is the centrifugal blower scheme of installation of the utility model;
Fig. 3 is the nozzle arrangements schematic diagram of the utility model;
Wherein, 1. first centrifugal blower, 2. second centrifugal blowers, 3. first pipes, 4. second pipes, 5. first jets, 6. second nozzle, 7. preheating chambers, 8. heating rooms, 9. isothermal chambers, 10. slow cooling rooms, 11. hermatic doors, 12. ventholes, 13. air inlets Shield, 14. wind scoopers, 15. motor mounts.
Specific embodiment
A kind of cooling and heating circulation system of annealing furnace referring to FIG. 1 to 3, including centrifugal blower, preheating chamber 7, heating Ease up cold house 10 for room 8, isothermal chamber 9, and the centrifugal blower includes the first centrifugal blower 1 and the second centrifugal blower 2, the first centrifugation wind Machine 1 is mounted on the bottom of slow cooling room 10, and the second centrifugal blower 2 is mounted on the bottom of preheating chamber 7, and centrifugal blower is equipped with air inlet The bottom of shield 13 and wind scooper 14, the slow cooling room 10 and preheating chamber 7 is designed with an assembling seat 15, the first centrifugation Blower 1 and the second centrifugal blower 2 are separately fixed at the bottom of slow cooling room 10 and preheating chamber 7 by motor mount 15, described slow The bottom of cold house 10 is equipped with first pipe 3, and one end of first pipe 3 is connect with the first centrifugal blower 1, and first pipe 3 is by slow cooling The bottom of room 10 passes through isothermal chamber 9, the bottom of heating room 8 extends to the bottom of preheating chamber 7, and the bottom of the preheating chamber 7 is equipped with The other end of second nozzle 6, first pipe 3 is connect with second nozzle 6, and the bottom of the preheating chamber 7 is equipped with second pipe 4, the One end of two pipelines 4 is connect with the second centrifugal blower 2, and second pipe 4 passes through heating room 8, isothermal chamber 9 by the bottom of preheating chamber 7 Bottom extend to the bottom of slow cooling room 10, the bottom of the slow cooling room 10 is equipped with first jet 5, the other end of second pipe 4 It is connect with first jet 5, first pipe 3 and second pipe 4 are installed side by side, are designed on the first jet 5 and second nozzle 6 Multiple ventholes 12, first jet 5 and second nozzle 6 are longitudinally mounted to the bottom of slow cooling room 10 and preheating chamber 7;Described first from Heart blower 1 and first jet 5 are separately positioned on the both ends of slow cooling room 10, and the second centrifugal blower 2 and second nozzle 6 are separately positioned on The both ends of preheating chamber 7;First centrifugal blower 1 and the second centrifugal blower 2 are using variable-frequency motor;The preheating chamber 7 adds Hot cell 8, isothermal chamber 9, which are eased up, is designed with hermatic door 11 between cold house 10.
When the utility model is used, the first centrifugal blower and the second centrifugal blower are mounted on slow cooling room and preheating chamber first Bottom and pass through pipeline be connected with each other;When work, the hot-air of slow cooling chamber interior is passed by the effect of the first centrifugal blower It is delivered in preheating chamber, so that the temperature in preheating chamber rises;The cold air in preheating chamber is delivered to by the second centrifugal blower In slow cooling room, so that the temperature in slow cooling room reduces, to achieve the purpose that hot and cold air exchanges, the reasonable of hot and cold air is realized It utilizes, reaches energy-saving and environment-friendly purpose.It can be such that the realization of the hot and cold gas inside annealing furnace circulates, to make cold and hot gas Body reaches maximized utilization, realizes energy-saving and environment-friendly purpose, reduces production cost, improves production efficiency, has real With property and use popularity.
More than, only specific embodiment of the present utility model, but protection scope of the utility model is not limited thereto, Any change or replacement expected without creative work, should be covered within the scope of the utility model.Therefore, The protection scope of the utility model should be determined by the scope of protection defined in the claims.

Claims (4)

1. a kind of cooling and heating circulation system of annealing furnace, it is characterised in that: including centrifugal blower, preheating chamber, heating room, isothermal chamber and Slow cooling room, the centrifugal blower include the first centrifugal blower and the second centrifugal blower, and the first centrifugal blower is mounted on slow cooling room Bottom, the second centrifugal blower are mounted on the bottom of preheating chamber, and centrifugal blower is equipped with air inlet shield and wind scooper, described slow Cold house and the bottom of preheating chamber are designed with an assembling seat, the first centrifugal blower and the second centrifugal blower and are installed by motor Seat is separately fixed at the bottom of slow cooling room and preheating chamber, and the bottom of the slow cooling room is equipped with first pipe, one end of first pipe It is connect with the first centrifugal blower, first pipe passes through isothermal chamber by the bottom of slow cooling room, the bottom of heating room extends to preheating chamber Bottom, the bottom of the preheating chamber is equipped with second nozzle, and the other end of first pipe is connect with second nozzle, the preheating chamber Bottom be equipped with second pipe, one end of second pipe connect with the second centrifugal blower, and second pipe is worn by the bottom of preheating chamber Cross heating room, the bottom of isothermal chamber extends to the bottom of slow cooling room, the bottom of the slow cooling room is equipped with first jet, second pipe The other end connect with first jet, first pipe is installed side by side with second pipe, the preheating chamber, heating room, isothermal chamber and Slow cooling is designed with hermatic door between room.
2. a kind of cooling and heating circulation system of annealing furnace according to claim 1, it is characterised in that: the first jet and Multiple ventholes are designed on two nozzles, first jet and second nozzle are longitudinally mounted to the bottom of slow cooling room and preheating chamber.
3. a kind of cooling and heating circulation system of annealing furnace according to claim 1, it is characterised in that: first centrifugal blower The both ends of slow cooling room are separately positioned on first jet, the second centrifugal blower and second nozzle are separately positioned on the two of preheating chamber End.
4. a kind of cooling and heating circulation system of annealing furnace according to claim 1, it is characterised in that: first centrifugal blower With the second centrifugal blower using variable-frequency motor.
CN201821643199.XU 2018-10-11 2018-10-11 A kind of cooling and heating circulation system of annealing furnace Expired - Fee Related CN208898943U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821643199.XU CN208898943U (en) 2018-10-11 2018-10-11 A kind of cooling and heating circulation system of annealing furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821643199.XU CN208898943U (en) 2018-10-11 2018-10-11 A kind of cooling and heating circulation system of annealing furnace

Publications (1)

Publication Number Publication Date
CN208898943U true CN208898943U (en) 2019-05-24

Family

ID=66575204

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821643199.XU Expired - Fee Related CN208898943U (en) 2018-10-11 2018-10-11 A kind of cooling and heating circulation system of annealing furnace

Country Status (1)

Country Link
CN (1) CN208898943U (en)

Similar Documents

Publication Publication Date Title
CN204325430U (en) The low pressure air cooling vacuum annealing oven that a kind of speed of cooling is controlled
CN201495170U (en) High-pressure air convection circulating heating device
CN102020416B (en) Homogeneous furnace for toughened glass
CN208898943U (en) A kind of cooling and heating circulation system of annealing furnace
CN210740551U (en) Fresh air processing and energy recovery system of air conditioner
CN208308910U (en) A kind of vacuum drying oven air cooling system suitable for 20bar high pressure gas quenching
CN106435144B (en) A kind of modifier treatment production line of probing geology steel tube
CN216550134U (en) Energy-saving utilization system of toughened glass heating furnace
CN205808107U (en) There is the environment-friendly type aluminum profile extrusion heat-insulation system of hot circulation function
CN201818389U (en) Non-conjugated zero-distance high-low temperature heat source thermomotor
CN204369926U (en) A kind of annealing furnace
CN203999686U (en) A kind of isothermal normalizing furnace of energy optimization
CN1807661A (en) Heat treatment furnace employing heat pipe to quickly lower temperature
CN203048981U (en) Vertical tempering furnace
CN100999777A (en) Pushing type heating furnace with cooling apparatus
CN216472867U (en) Small-size horizontal roller formula glass tempering furnace
CN207180252U (en) A kind of SCR denitration cellular catalyst drying device
CN205522186U (en) Three -dimensional gas rotational moulding stove
CN205152068U (en) Infrared heating device
CN206477011U (en) A kind of tempering furnace hot air circulating system
CN201473446U (en) Toughened glass homogenizing furnace
CN110057094A (en) A kind of pre-heated heat exchange device for air and heat change method
CN108580144A (en) Full-automatic integral formula fuel gas energy-saving high temperature furnace
CN209322948U (en) A kind of energy-saving Equipment for Heating Processing
CN209854211U (en) Uniform heating tempering furnace

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190524