CN106435144B - A kind of modifier treatment production line of probing geology steel tube - Google Patents

A kind of modifier treatment production line of probing geology steel tube Download PDF

Info

Publication number
CN106435144B
CN106435144B CN201610775803.3A CN201610775803A CN106435144B CN 106435144 B CN106435144 B CN 106435144B CN 201610775803 A CN201610775803 A CN 201610775803A CN 106435144 B CN106435144 B CN 106435144B
Authority
CN
China
Prior art keywords
cooling
quenching
conveying device
group
tempering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610775803.3A
Other languages
Chinese (zh)
Other versions
CN106435144A (en
Inventor
彭敦林
林虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANJI PENGDA STEEL PIPE Co Ltd
Original Assignee
ANJI PENGDA STEEL PIPE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANJI PENGDA STEEL PIPE Co Ltd filed Critical ANJI PENGDA STEEL PIPE Co Ltd
Priority to CN201610775803.3A priority Critical patent/CN106435144B/en
Publication of CN106435144A publication Critical patent/CN106435144A/en
Application granted granted Critical
Publication of CN106435144B publication Critical patent/CN106435144B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/08Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for tubular bodies or pipes
    • C21D9/085Cooling or quenching
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/34Methods of heating
    • C21D1/42Induction heating
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/62Quenching devices
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D11/00Process control or regulation for heat treatments
    • C21D11/005Process control or regulation for heat treatments for cooling
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/25Process efficiency

Abstract

The invention discloses a kind of modifier treatment production line of probing geology steel tube, including the frame with top mounting layer Yu bottom mounting layer, the first conveying device group, quenching unit group, the second conveying device group, back-fire arrangement group and the 3rd conveying device group being sequentially arranged in the frame;Also include the feeding device located at the first conveying device group side, the chilled(cooling) water supply (CWS) below the quenching unit group and back-fire arrangement group and recovery channel system, integrated console, electrical control cubicles group.The present invention provides a kind of modifier treatment production line of probing geology steel tube, rational deployment is carried out to the equipment on production line, while stable mechanical property after ensureing the overall temperature homogeneity of steel pipe, keep quenched, increase heater and conveying device heat-sinking capability in itself and solar heat protection lesion capability, improve the ability using durability degree and production line long-play of device.

Description

A kind of modifier treatment production line of probing geology steel tube
Technical field
The present invention relates to steel pipe Field of Heat-treatment, more particularly to a kind of modifier treatment streamline of probing geology steel tube.
Background technology
Probing is a kind of to require that steel pipe has the steel pipe kind of good comprehensive mechanical performance, it is necessary to protect with geology steel tube There is good plasticity and toughness while holding higher-strength, often reach this purpose using modifier treatment in production. Traditional steel pipe modifier treatment is the progress for the heating furnace for steel pipe cutting being loaded into based on gas heating and resistance heating The off-line type operating type of heating, heating process programming rate is slow, and efficiency is low, and needs to expend mass energy and hardening media.
Chinese invention patent Authorization Notice No. is that the B of CN 104032112 patent of invention discloses a kind of more work(of steel pipe Can heat treatment system, including six groups of roller-ways, Medium frequency induction furnace apparatus, high temperature resistance furnace apparatus, ultra-fast cooling device, dress is sprayed in outer leaching Put with low-temperature resistance furnace apparatus, carried out in a manner of the heating and cooling device between roller-way group adds roller-way at the online heat of steel pipe Reason, the continuous pipelining of steel pipe heat treatment is realized, processing line is compact to design, easy to operate, meets a variety of heat treatment works Skill requirement.The invention has used induction heating mode to heat steel pipe, and sensing heating has that energy-flux density is big, firing rate Hurry up, heating process it is easy to control, the series of advantages such as the thermal efficiency is high, save the energy, free from environmental pollution, manufacturing cost is low, beneficial to reality Serialization, the automation of existing modifier treatment process.
But the invention does not consider how to ensure that steel pipe does not produce excessive deformation in itself, and device or roller-way are in itself Safeguard measure, because the steel pipe after heating can be deformed bending, easy damaging device in itself or heater therein or Roller-way, also it is unfavorable for the alignment process of steel pipe after heat treatment.
The content of the invention
It is an object of the invention to provide a kind of modifier treatment production line of probing geology steel tube, set on rational deployment line It is standby, while stable mechanical property after ensureing the overall temperature homogeneity of steel pipe, keep quenched, increase heater and conveying Device heat-sinking capability in itself and solar heat protection lesion capability, improve device using durability degree and the energy of production line long-play Power.
The present invention above-mentioned technical purpose technical scheme is that:
A kind of modifier treatment production line of probing geology steel tube, including the machine with top mounting layer Yu bottom mounting layer Frame, be sequentially arranged in the first conveying device group in the frame, quenching unit group, the second conveying device group, back-fire arrangement group with And the 3rd conveying device group;
Also include the feeding device located at the first conveying device group side, filled located at the quenching unit group and tempering Put group chilled(cooling) water supply (CWS) of lower section and recovery channel system, integrated console, electrical control cubicles group;
The first conveying device group, the second conveying device group, the 3rd conveying device group are by multiple in one line defeated Device is sent to form;The quenching unit group includes the quenching preheating cabinet that order is set, and Quench heating case, quenches cooler bin, is located at The band cooling conveying device and quenching thermo detector in gap between the quenching preheating cabinet, Quench heating case, quenching cooler bin; The back-fire arrangement group includes the tempering preheating cabinet that order is set, the first tempering heater box, the second tempering heater box, the 3rd tempering Heater box, tempering cooler bin, add located at the tempering preheating cabinet, the first tempering heater box, the second tempering heater box, the 3rd tempering The band cooling conveying device and tempering thermo detector in gap between hot tank, tempering cooler bin.
Preferably, the conveying device includes the bottom on the top mounting layer with cooling conveying device with described Plate, a pair of delivery wheels, the affixed delivery wheel located at the delivery wheel both sides and the bottom plate delivery wheel mounting bracket, be located at The driving motor on the mounting layer of bottom below the delivery wheel.
Preferably, the bottom plate is provided with the open slot for being used for adjusting the delivery wheel spacing, the delivery wheel installation Frame is coaxially connected with delivery wheel by bearing;The output shaft of the driving motor is provided with a pair of output drive wheels, described in two Output drive wheel is connected with the drive on two delivery wheels respectively each via driving member.
Preferably, the angle of the line of centres of the axis of the delivery wheel and steel pipe direct of travel into 76 °~85 °.
Preferably, it is described also include with cooling conveying device it is on the bottom plate and by the lower end of the delivery wheel The cooling water storage tank of inside is contained in, the cooling water storage tank is connected with the chilled(cooling) water supply (CWS) with recovery channel system by pipeline Connect.
Preferably, the electrical control cubicles group preheats with the quenching preheating cabinet, Quench heating case, quenching cooler bin, tempering Case, the first tempering heater box, the second tempering heater box, the 3rd tempering heater box, tempering cooler bin, driving motor electrical connection;Institute State integrated console and the electrical control cubicles group, feeding device, chilled(cooling) water supply (CWS) and recovery channel system, quenching thermo detector, tempering Thermo detector is electrically connected.
Preferably, the quenching preheating cabinet includes the quenching casing of upper end open, the front-rear side walls of the quenching casing Through hole is provided with, a pair of small through hole are provided with above the through hole;The quenching preheating cabinet is also included located at the quenching casing The heating plate, affixed through the through hole and the heating plate with the centre bore being adapted with the through hole on front-rear side walls Hollow heat conducting pipe, multigroup hollow induction coil being set around on the hollow heat conducting pipe, the end being fixedly arranged in the heating plate The hollow induction coil in portion;Resistance to hometown is equipped between the hollow induction coil and the hollow heat conducting pipe;The hollow sensing Coil on the hollow induction coil in the end with being equipped with water inlet and delivery port, the water inlet of the hollow induction coil in end Stretch to the quenching box house through the small through hole with delivery port, be provided with above the quenching casing respectively with the sky The inlet channel and return pipe that the water inlet of the hollow induction coil of heart induction coil and the end is connected with delivery port pipeline Road,;The inlet channel and water return pipeline are connected with the chilled(cooling) water supply (CWS) with recovery channel system pipeline.
Preferably, the quenching cooler bin includes the cooling box of upper and lower opening, is suspended in the cooling box Cooling tube, the cooling box and the casing perforate passed through for steel pipe and pipe perforate on the cooling tube are opened in, it is described cold But pipe is fixedly connected with the side wall of the cooling box by linking arm;The cooling tube includes and affixed outer of the linking arm Pipe, with the outer coaxial tube setting inner tube, the affixed outer tube and said inner tube end plate, be opened in the outer tube with it is described The lower aquaporin of inner tube bottom, equidistant multiple quenching water holes on said inner tube tube wall.
Preferably, the outer tube upper end is provided with cooling water inlet, the under shed of the cooling box and the cooling water Import is independently connected with the chilled(cooling) water supply (CWS) with recovery channel system pipeline.
Preferably, being connected with horizontal mobile mechanism under the quenching preheating cabinet, the horizontal mobile mechanism is located at described It is the pinion and rack by motor control on the mounting layer of bottom.
In summary, the invention has the advantages that:
A kind of modifier treatment production line of probing geology steel tube, steel pipe spinning all the time in the presence of conveying device Advance, advanced by integrated console control and rotary speed, make each position of steel pipe in quenching preheating, Quench heating, quenching cool down, Keep heated in each phase process such as tempering preheating, tempering heating, tempering cooling or cooling is uniform, conveying device is with suitable Spacing is continuously arranged, prevents steel pipe from producing excessive deformation between adjacent conveyor device, ensures that the overall deformation of steel pipe is controlled;Add The interval mode of heating of more heater boxes of thermal recovery sensing heating, firing rate is fast, the thermal efficiency is high, and the setting of more heater boxes is reduced The volume of single heater box and equipment complexity and single heating duration, reduce power consumption, and make the heating-up temperature of steel pipe It is more controllable;Integrated console collects each heater box and the temperature signal after cooler bin, with reference to real-time transporting velocity, adjusts at any time Whole heating-up temperature, heat time, cooling water washing flow and washing time, the mechanical property after every steel pipe of guarantee is quenched are steady It is fixed;Each heater box opened upper end, cooling water is connected with induction coil, the heating plate of rear and front end is provided with the hollow line of induction in end Circle, obtains cooling water and air-cooled dual-cooled effect, avoids heater box both ends heater thermally damaged;Between heater box The band cooling conveying device of setting while ensureing that pipe deformation is controllable, bearing in main protection band cooling conveying device by Fire damage and premature breakdown, improve the ability using durability degree and production line long-play of device.
Brief description of the drawings
Fig. 1 is the structural representation of one embodiment of the invention;
Fig. 2 is the structural representation of the first conveying device group and feeding device;
Fig. 3 is the structural representation of quenching unit group;
Fig. 4 is the structural representation of conveying device;
Fig. 5 is the top view of conveying device
Fig. 6 is the top view with cooling conveying device;
Fig. 7 is the structural representation of back-fire arrangement group;
Fig. 8 is the structural representation of quenching preheating cabinet;
Fig. 9 is the structural representation of quenching cooler bin.
Embodiment
The present invention will be further described in detail for scheme below in conjunction with the accompanying drawings and preferably.
This specific embodiment is only explanation of the invention, and it is not limitation of the present invention, people in the art Member can make the modification of no creative contribution to the present embodiment as needed after this specification is read, but as long as at this All protected in the right of invention by Patent Law.
Embodiment:As shown in figures 1-8, a kind of modifier treatment production line of probing geology steel tube, including pacify with top Fill the frame 10 of layer 11 and bottom mounting layer 12, the first conveying device group being sequentially arranged in one linely in the frame 10 20th, quenching unit group 30, the second conveying device group 40, the conveying device group 60 of back-fire arrangement group 50 and the 3rd;
Also include located at the side of the first conveying device group 20 feeding device 70, located at the quenching unit group 30 with The chilled(cooling) water supply (CWS) of the lower section of back-fire arrangement group 50 and recovery channel system 80, integrated console 90, electrical control cubicles group 91;
The first conveying device group 20, the second conveying device group 40, the 3rd conveying device group 60 are arranged by multiple words The conveying device 2A compositions opened;The quenching unit group 30 includes the quenching preheating cabinet 31 that order is set, and Quench heating case 32, quenches Fiery cooler bin 33, the band cooling in the gap between the quenching preheating cabinet 31, Quench heating case 32, quenching cooler bin 33 are defeated Send device 2B and quenching thermo detector 1A;The back-fire arrangement group 50 includes the tempering preheating cabinet 51 that order is set, and the first tempering adds Hot tank 52, the second tempering heater box 53, the 3rd tempering heater box 54, cooler bin 55 is tempered, located at the tempering preheating cabinet 51, the The band that one tempering heater box 52, second is tempered the gap that heater box the 53, the 3rd is tempered between heater box 54, tempering cooler bin 55 is cold But conveying device 2B and tempering thermo detector 1B.
The electrical control cubicles group 91 and the quenching preheating cabinet 31, Quench heating case 32, quenching cooler bin 33, tempering preheating cabinet 51st, the first tempering heater box 52, second is tempered heater box the 53, the 3rd and is tempered heater box 54, tempering cooler bin 55, driving motor 24 Electrical connection;The integrated console 90 and the electrical control cubicles group 91, feeding device 70, chilled(cooling) water supply (CWS) and recovery channel system 80th, thermo detector 1A, tempering thermo detector 1B electric signal connections are quenched.
The whole production process of the integrated centralized Control of console 90, is collected between each heater box and cooler bin by each thermo detector The temperature signal of steel pipe, the heating-up temperature of each heater box is controlled by electrical control cubicles, with reference to the association of the transporting velocity of each conveying device Adjust, ensure heating and the stabilization of cooling parameter, keep the stabilization of the quenched quality of steel pipe.
The conveying device 2A includes the bottom plate on the top mounting layer 11 with cooling conveying device 2B with described 21st, the level of a pair of parallel setting divides the delivery wheel 22 of row steel pipe direct of travel both sides, divides consolidating for the row both sides of delivery wheel 22 Connect the delivery wheel mounting bracket 23 of the delivery wheel 22 and the bottom plate 21, the bottom mounting layer 12 located at the lower section of delivery wheel 22 On driving motor 24.
The bottom plate 21 is provided with the open slot 211 for being used for adjusting the spacing of delivery wheel 22, passes through bearing and delivery wheel 22 coaxial roll connect;The output shaft 241 of the driving motor 24 is provided with a pair of output drive wheels 242, the output transmission Wheel 242 is each connected by driving member 25 with the drive 221 on the delivery wheel 22.
The line of centres of the axis of the delivery wheel 22 and steel pipe direct of travel are into 75 °~85 ° of angle.
Power and and steel are axially pushed caused by the rotating Vortex of delivery wheel 22 that conveying device 2A is set using a pair of angled The spinning while stiction of pipe makes the steel pipe advance, make each position of steel pipe in quenching preheating, Quench heating, quenching cool down, Keep heated in each phase process such as tempering preheating, tempering heating, tempering cooling or cooling is uniform, and be easy to steel pipe quenching The self-correction in cooling is realized in the second conveying device group 40 afterwards, the 3rd conveying device group 60 after tempering, it is defeated Send device continuously to be arranged with suitable spacing, prevent steel pipe from producing excessive deformation between adjacent conveyor device, make pipe deformation All the time it is controlled.
Open slot 211 makes delivery wheel mounting bracket 23 can be along the slide in opposition of open slot 211, between change delivery wheel 22 Spacing, the steel pipe that thus adjustment is erected between delivery wheel 22 are highly allowed to same with the front and rear perforation of each heater box and cooler bin all the time The heart.
It is described also to include with cooling conveying device 2B on the bottom plate 21 and hold the lower end of the delivery wheel 22 The cooling water storage tank 27 of inside is contained in, the cooling water storage tank 27 connects with the chilled(cooling) water supply (CWS) and the pipeline of recovery channel system 80 Connect.Band cooling conveying device 2B is located between each heater box, and steel pipe has higher temperature, is cooled down in water storage tank 27 and is connected with flowing Recirculated cooling water, provide cooling to the delivery wheel 22 of rotation, avoid band cooling conveying device 2B, bearing especially therein It is thermally damaged.
The quenching preheating cabinet 31 includes the quenching casing 310 of upper end open, on the front-rear side walls for quenching casing 310 Provided with through hole 311, the top of through hole 311 is provided with a pair of small through hole 312;The quenching preheating cabinet 31 also includes quenching located at described There is the heating plate 313 for the centre bore being adapted with the through hole 311, lead to through described on the front-rear side walls of fire-box body 310 Hole 311 is set around the hollow sense on the hollow heat conducting pipe 314 with the affixed hollow heat conducting pipe 314 of the heating plate 313, multi beam Coil 315 is answered, the hollow induction coil 316 in the end being fixedly arranged in the heating plate 313;The hollow induction coil 315 and institute State and be equipped with resistance to hometown 317 between hollow heat conducting pipe 314;The hollow induction coil 315 and the hollow induction coil in the end 316 are equipped with water inlet and delivery port, and water inlet and the delivery port of the hollow induction coil 316 in end pass through the small through hole 312 stretch to inside the quenching casing 310, and the top of quenching casing 310 is provided with inlet channel 318 and water return pipeline 319, The water inlet with the hollow induction coil 316 of the hollow induction coil 315 and the end is connected with delivery port pipeline respectively;Institute Inlet channel 318 and water return pipeline 319 is stated to be connected with the chilled(cooling) water supply (CWS) with the pipeline of recovery channel system 80.
Quench heating case 32, tempering preheating cabinet 51, first are tempered heater box 52, second and are tempered the tempering of heater box the 53, the 3rd Heater box 54 uses similar structure Frequency Induction Heating structure, quenching preheating cabinet 31 and Quench heating case with quenching preheating cabinet 31 32 are arranged in series, while the steel pipe is heated to critical-temperature Ac3 or Ac1 temperatures above in the short period, avoid it is single plus Hot tank produces higher power utilization load peak, reduces the risk of electricity system collapse and heater box overheating itself;Preheated using tempering Case 51, the first tempering heater box 52, second are tempered three tempering heater boxes that heater box the 53, the 3rd is tempered heater box 54, make steel Temperature when pipe is tempered divides the multistage to grow steadily, the speed conveyed with reference to conveying device, makes steel pipe tempering uniform, thoroughly, together When reduce power load peak value.
Each heater box opened upper end, hollow induction coil 315 are preceding with being connected with cooling water in the hollow induction coil 316 in end The heating plate at both ends is provided with the hollow induction coil 316 in end afterwards, makes end while increase heater box effective heated length Hollow induction coil 316 itself obtains cooling water and air-cooled dual-cooled effect, make heater box both ends heater avoid by Fire damage.
The cooling box 331 of the quenching cooler bin 33 including upper and lower opening, be suspended at it is cold in the cooling box 331 But pipe 332, be opened in the cooling box 331 and opened with the casing perforate 335 passed through for steel pipe on the cooling tube 332 and pipe Hole 336, the cooling tube 332 are fixedly connected with the side wall of the cooling box 331 by linking arm 333;The cooling tube 332 It is the inner tube 3322 that is coaxially disposed including the outer tube 3321 affixed with the linking arm 333, with the outer tube 3321, affixed described outer Pipe 3321 and the end plate 3323 of said inner tube 3322, it is opened in the outer tube 3321 and the lower aquaporin of the bottom of said inner tube 3322 3324th, equidistant multiple quenching water holes 3325 on the tube wall of said inner tube 3322;The upper end of outer tube 3321 is provided with cold But water inlet 3326, the under shed 3311 and the cooling water inlet 3326 of the cooling box 331 independently with the cooling Water supply is connected with the pipeline of recovery channel system 80.So that cooling water is uniformly sprayed on the steel pipe of spinning in large quantities, lead to Cross integrated console 90 and control the flow of cooling water and the pace and rotating speed of steel pipe, ensure steel pipe by quenching cooler bin 33 Normal temperature is quickly cooled to afterwards.Cooler bin 55 is tempered to use with the cooler bin 33 that quenches to similar structure.
Horizontal mobile mechanism is connected with the quenching preheating cabinet 31, the horizontal mobile mechanism is installed located at the bottom It is the pinion and rack by motor control on layer 12.The horizontal mobile mechanism is equally controlled by integrated console 90, when the life When producing line handles special steel, quenching preheating cabinet 31 can move forward and backward with horizontal mobile mechanism, coordinate the pace of special steel, right Thicker region progress trailing type heats repeatedly on special steel, the steel pipe thickness in the region is down to other positions always, so as to Follow-up actual modifier treatment can be carried out.

Claims (8)

  1. A kind of 1. modifier treatment production line of probing geology steel tube, it is characterised in that:Including with top mounting layer(11)With Bottom mounting layer(12)Frame(10), it is sequentially arranged in the frame(10)On the first conveying device group(20), quenching unit Group(30), the second conveying device group(40), back-fire arrangement group(50)And the 3rd conveying device group(60);Also include located at described First conveying device group(20)The feeding device of side(70), located at the quenching unit group(30)With back-fire arrangement group(50)Under The chilled(cooling) water supply (CWS) of side and recovery channel system(80), integrated console(90), electrical control cubicles group(91);First conveying device Group(20), the second conveying device group(40), the 3rd conveying device group(60)By multiple conveying devices in one line(2A)Group Into;The quenching unit group(30)The quenching preheating cabinet set including order(31), Quench heating case(32), quench cooler bin (33), located at the quenching preheating cabinet(31), Quench heating case(32), quenching cooler bin(33)Between gap in band cooling Conveying device(2B)With quenching thermo detector(1A);The back-fire arrangement group(50)The tempering preheating cabinet set including order(51), First tempering heater box(52), the second tempering heater box(53), the 3rd tempering heater box(54), it is tempered cooler bin(55), it is located at The tempering preheating cabinet(51), first tempering heater box(52), second tempering heater box(53), the 3rd tempering heater box(54)、 It is tempered cooler bin(55)Between gap in band cooling conveying device(2B)With tempering thermo detector(1B);
    The conveying device(2A)With the band cooling conveying device(2B)Including located at the top mounting layer(11)On bottom Plate(21), a pair of delivery wheels(22), located at the delivery wheel(22)The affixed delivery wheel of both sides(22)With the bottom plate (21)Delivery wheel mounting bracket(23), located at the delivery wheel(22)The bottom mounting layer of lower section(12)On driving motor (24);
    The quenching preheating cabinet(31)Under be connected with horizontal mobile mechanism, the horizontal mobile mechanism is located at the bottom mounting layer (12)On, it is the pinion and rack by motor control.
  2. A kind of 2. modifier treatment production line of probing geology steel tube according to claim 1, it is characterised in that:The bottom Plate(21)It is provided with and is used to adjust the delivery wheel(22)The open slot of spacing(211), the delivery wheel mounting bracket(23)Pass through Bearing and delivery wheel(22)It is coaxially connected;The driving motor(24)Output shaft(241)It is provided with a pair of output drive wheels (242), two output drive wheels(242)Each via driving member(25)Respectively with two delivery wheels(22)On biography Driving wheel(221)Connection.
  3. A kind of 3. modifier treatment production line of probing geology steel tube according to claim 2, it is characterised in that:It is described defeated Send wheel(22)Axis the line of centres and steel pipe direct of travel into 75 °~85 ° of angle.
  4. A kind of 4. modifier treatment production line of probing geology steel tube according to claim 1, it is characterised in that:The band Cooling conveying device(2B)Also include being located at the bottom plate(21)On and by the delivery wheel(22)Lower end be contained in inside Cooling water storage tank(27), the cooling water storage tank(27)With the chilled(cooling) water supply (CWS) and recovery channel system(80)Pass through pipeline Connection.
  5. A kind of 5. modifier treatment production line of probing geology steel tube according to claim 1, it is characterised in that:The electricity Control cabinet group(91)With the quenching preheating cabinet(31), Quench heating case(32), quenching cooler bin(33), tempering preheating cabinet(51)、 First tempering heater box(52), second tempering heater box(53), the 3rd tempering heater box(54), tempering cooler bin(55), transmission Motor(24)Electrical connection;The integrated console(90)With the electrical control cubicles group(91), feeding device(70), chilled(cooling) water supply (CWS) with Recovery channel system(80), quenching thermo detector(1A), tempering thermo detector(1B)It is electrically connected.
  6. A kind of 6. modifier treatment production line of probing geology steel tube according to claim 1, it is characterised in that:It is described to quench Fiery preheating cabinet(31)Quenching casing including upper end open(310), the quenching casing(310)Front-rear side walls be provided with through hole (311), the through hole(311)Top is provided with a pair of small through hole(312);The quenching preheating cabinet(31)Also include quenching located at described Fire-box body(310)Front-rear side walls on have and the through hole(311)The heating plate of adaptable centre bore(313), pass through The through hole(311)With the heating plate(313)Affixed hollow heat conducting pipe(314), multigroup be set around the hollow heat conducting pipe (314)On hollow induction coil(315), it is fixedly arranged on the heating plate(313)On the hollow induction coil in end(316);Institute State hollow induction coil(315)With the hollow heat conducting pipe(314)Between be equipped with resistance to hometown(317);The hollow line of induction Circle(315)With the hollow induction coil in the end(316)On be equipped with water inlet and delivery port, the hollow induction coil in end (316)Water inlet and delivery port pass through the small through hole(312)Stretch to the quenching casing(310)Inside, the quenching Casing(310)Top be provided with respectively with the hollow induction coil(315)With the hollow induction coil in the end(316)Water inlet The inlet channel that mouth is connected with delivery port pipeline(318)And water return pipeline(319);The inlet channel(318)And water return pipeline (319)With the chilled(cooling) water supply (CWS) and recovery channel system(80)Pipeline connects.
  7. A kind of 7. modifier treatment production line of probing geology steel tube according to claim 1, it is characterised in that:It is described to quench Fiery cooler bin(33)Cooling box including upper and lower opening(331), be suspended at the cooling box(331)Interior cooling tube (332), be opened in the cooling box(331)With the cooling tube(332)On the casing perforate passed through for steel pipe(335)With Pipe perforate(336), the cooling tube(332)With the cooling box(331)Side wall pass through linking arm(333)It is fixedly connected; The cooling tube(332)Including with the linking arm(333)Affixed outer tube(3321)And the outer tube(3321)It is coaxially disposed Inner tube(3322), the affixed outer tube(3321)With said inner tube(3322)End plate(3323), be opened in the outer tube (3321)With said inner tube(3322)The lower aquaporin of bottom(3324), located at said inner tube(3322)It is equidistant on tube wall Multiple quenching water holes(3325).
  8. A kind of 8. modifier treatment production line of probing geology steel tube according to claim 7, it is characterised in that:It is described outer Pipe(3321)Upper end is provided with cooling water inlet(3326), the cooling box(331)Under shed(3311)With the cooling water Import(3326)Independently with the chilled(cooling) water supply (CWS) and recovery channel system(80)Pipeline connects.
CN201610775803.3A 2016-08-31 2016-08-31 A kind of modifier treatment production line of probing geology steel tube Active CN106435144B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610775803.3A CN106435144B (en) 2016-08-31 2016-08-31 A kind of modifier treatment production line of probing geology steel tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610775803.3A CN106435144B (en) 2016-08-31 2016-08-31 A kind of modifier treatment production line of probing geology steel tube

Publications (2)

Publication Number Publication Date
CN106435144A CN106435144A (en) 2017-02-22
CN106435144B true CN106435144B (en) 2018-01-12

Family

ID=58091009

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610775803.3A Active CN106435144B (en) 2016-08-31 2016-08-31 A kind of modifier treatment production line of probing geology steel tube

Country Status (1)

Country Link
CN (1) CN106435144B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110408746A (en) * 2019-04-29 2019-11-05 南京南化建设有限公司 Anti-H 2 S annealing device
CN114517248A (en) * 2019-12-31 2022-05-20 上海大学 Rapid quenching and tempering heat treatment method for gun steel bar with 10-time speed level

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09143567A (en) * 1995-11-15 1997-06-03 Nittetsu Kokan Kk Production of high strength steel tube
CN100500884C (en) * 2007-06-28 2009-06-17 朱兴发 Medium frequency induction heating treatment system for steel pipe, petroleum well pipe and drill pipe
CN101220408A (en) * 2008-01-23 2008-07-16 江苏凡力钢管有限公司 Oil tube electrical heat quenching and tempering thermal treatment method and apparatus
CN202415643U (en) * 2011-12-31 2012-09-05 湖北新冶钢有限公司 Heat treatment apparatus for steel pipe
CN103898279A (en) * 2012-12-28 2014-07-02 赫菲斯热处理系统江苏有限公司 Pretreatment production line
CN105385828A (en) * 2015-12-25 2016-03-09 攀钢集团成都钢钒有限公司 Quenching-tempering heat treatment method for seamless steel tubes
CN105886733A (en) * 2016-06-21 2016-08-24 洛阳市钢峰工程机械制造有限公司 Roller bottom type heat treatment production line
CN206052094U (en) * 2016-08-31 2017-03-29 安吉县鹏大钢管有限公司 A kind of modifier treatment production line of probing geology steel tube

Also Published As

Publication number Publication date
CN106435144A (en) 2017-02-22

Similar Documents

Publication Publication Date Title
CN101250678B (en) Low stove pressure convection continuous roller bottom type annealing furnace and annealing technique
CN207498416U (en) A kind of aluminium profile quenching device
CN206736310U (en) A kind of energy-efficient tempering furnace of roller shaft type
CN103074471B (en) Roller-type spheroidizing annealing production line and isothermal spheroidizing annealing method
CN201306928Y (en) Air circulation structure of large straight-flow furnace
CN104313295B (en) Roller-bottom type sheet material continuous tempering furnace and tempering method thereof
CN106435144B (en) A kind of modifier treatment production line of probing geology steel tube
CN201495170U (en) High-pressure air convection circulating heating device
CN206052094U (en) A kind of modifier treatment production line of probing geology steel tube
CN202099324U (en) Three-section continuous vacuum annealing furnace
CN209541407U (en) A kind of cooling continuous rotary kiln of multitube
CN101979190A (en) Multifunctional furnace for continuously degreasing, sintering, quenching and tempering powder metallurgical products
CN103878275B (en) A kind of non-hardened and tempered steel cooling after forged production line
CN205024288U (en) Horizontal annealing stove heating section structure
CN207738837U (en) A kind of low temperature salt-bath carbo-nitriding processing unit of restricting orifice
CN104388662A (en) Roller-hearth type plate continuous tempering furnace and tempering method thereof
CN205138203U (en) Spiral conveying type heating furnace and horizontal cooling arrangement
CN202054868U (en) Bearing steel isothermal spheroidizing furnace
CN104178604A (en) Energy-consumption-optimized isothermal normalizing furnace
CN204385238U (en) A kind of medium and small bar of quenched and tempered steel or tubing continuous refining heat treatment production line device
CN208308910U (en) A kind of vacuum drying oven air cooling system suitable for 20bar high pressure gas quenching
CN203999686U (en) A kind of isothermal normalizing furnace of energy optimization
CN106222374A (en) Variable section workpiece heat treatment system
CN201903268U (en) Continuous degreasing, sintering, quenching and tempering multifunction furnace of powder metallurgy products
CN202447778U (en) Liquid nitrogen-cooled reflow soldering system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant