CN208885437U - A kind of three runner preheating devices for diesel engine cold start-up - Google Patents

A kind of three runner preheating devices for diesel engine cold start-up Download PDF

Info

Publication number
CN208885437U
CN208885437U CN201821363464.9U CN201821363464U CN208885437U CN 208885437 U CN208885437 U CN 208885437U CN 201821363464 U CN201821363464 U CN 201821363464U CN 208885437 U CN208885437 U CN 208885437U
Authority
CN
China
Prior art keywords
runner
heating chamber
diesel engine
diesel
cold start
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821363464.9U
Other languages
Chinese (zh)
Inventor
彭涛
王钊钊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUBEI YINGPAI POWER TECHNOLOGY Co Ltd
Original Assignee
HUBEI YINGPAI POWER TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUBEI YINGPAI POWER TECHNOLOGY Co Ltd filed Critical HUBEI YINGPAI POWER TECHNOLOGY Co Ltd
Priority to CN201821363464.9U priority Critical patent/CN208885437U/en
Application granted granted Critical
Publication of CN208885437U publication Critical patent/CN208885437U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/10Internal combustion engine [ICE] based vehicles
    • Y02T10/12Improving ICE efficiencies

Abstract

The utility model discloses a kind of three runner preheating devices for diesel engine cold start-up, including smoke evacuation runner, heating chamber, cooling liquid flowing channel, diesel oil runner and air flow channel, heating chamber and smoke evacuation runner contact indirect heat exchange, cooling liquid flowing channel, diesel oil runner and air flow channel and heating chamber contact indirect heat exchange, the top of heating chamber is equipped with water filling port and exhaust outlet, and lower part is equipped with the heating agent portion for filling lime powder in heating chamber.Using lime powder and water heat caused by chemical reaction generation calcium hydroxide heated engine coolant liquid, diesel oil and air simultaneously occur for the utility model, to reach the quick start of diesel engine at low ambient temperatures;And calcium hydroxide is generated calcium oxide by the solution that dries out under the continuous high temperature effect of engine high-temperature flue gas again, without additionally consuming electric energy or fuel oil, without configuration power circuit, control circuit and program, structure is simple, easy to maintain, at low cost and energy conservation and environmental protection.

Description

A kind of three runner preheating devices for diesel engine cold start-up
Technical field
The utility model belongs to diesel engine technologies field, in particular to a kind of three for diesel engine cold start-up Runner preheating device.
Background technique
Although diesel engine has many advantages, such as the thermal efficiency and better economy, since its fuel is bavin Oil, diesel oil are big compared with gasoline viscosity, so, under the low temperature environments such as plateau band, diesel oil can be made thick solidifying, wax deposition, obstruction oil occur The problems such as pipe, prevent diesel engine is from starting.
In the prior art, following two preheating method is mainly used in cold start-up in diesel-driven generator: (1) using electricity The pre- liquid cooled heat of the mode of heating, but the energy consumption of this heating method is big, easily makes storage battery power shortage, it is cold to also result in diesel engine Difficulty in starting;(2) be separately configured fuel oil jacket heater (such as liquid oil heater) burning diesel oil come it is cold in heating water jacket But liquid preheats diesel engine, the structure of liquid oil heater by coolant liquid circulating in diesel engine It is divided into combustion head, combustion chamber, water sleeve water pump, further needs exist for configuring the control circuits such as corresponding fuel feeding and igniting and program, Structure and control are complicated, at high cost, equally exist the big disadvantage at high cost of preheating energy consumption;(3) heated cooling fluid when preheating Equally exist the risk that diesel engine can not start under the conditions of ultra low temperature.
Utility model content
The utility model is to overcome problems of the prior art, provides a kind of three for diesel engine cold start-up Runner preheating device occurs heat caused by chemical reaction generation calcium hydroxide using lime powder and water and heats hair simultaneously Motivation coolant liquid, diesel oil and air, to reach the quick start of diesel engine at low ambient temperatures;And calcium hydroxide is sent out The solution that dries out under the continuous high temperature effect of motivation high-temperature flue gas generates calcium oxide again, consumes electric energy or fuel oil without additional, Without configuration power circuit, control circuit and program, structure is simple, easy to maintain, at low cost and energy conservation and environmental protection.
The utility model is to solve above-mentioned problems of the prior art, is adopted the following technical scheme that.
A kind of three runner preheating devices for diesel engine cold start-up, which is characterized in that including smoke evacuation runner, heating Chamber, cooling liquid flowing channel, diesel oil runner and air flow channel, the heating chamber and smoke evacuation runner contact indirect heat exchange, the coolant liquid Runner, diesel oil runner and air flow channel and the heating chamber contact indirect heat exchange, the top of the heating chamber be equipped with water filling port and Exhaust outlet, lower part is equipped with the heating agent portion for filling lime powder in the heating chamber.
Further, the heating chamber and air flow channel are cannula structure, and the cooling liquid flowing channel and diesel oil runner are equal For serpentine coil structure, the heating chamber is sheathed on the periphery of the smoke evacuation runner, and the air flow channel is sheathed on the heating The periphery of chamber, the cooling liquid flowing channel and diesel oil runner are fixedly arranged in the heating agent portion of heating chamber, the cooling liquid flowing channel, diesel stream The interval setting each other of the inner wall in road, the outer wall for runner of discharging fume and heating chamber.
Further, the ratio between the radical length in the heating agent portion and height are 1.2~2:1.
It further, further include tubulose liquid distributor, the tubulose liquid distributor is fixedly arranged on inside heating chamber and around heating chamber Axis is circumferentially arranged, and the tubulose liquid distributor is connect with water filling port, the circumferentially uniformly distributed multiple apopores of the tubulose liquid distributor.
Further, the quantity of the tubulose liquid distributor is multiple, radial direction of multiple tubulose liquid distributors along the heating chamber It is distributed and communicates with each other.
Further, the apopore is opened in the upper half backwards to heating agent portion of tubulose liquid distributor.
Further, switch valve and high temperature automatic exhaust steam valve are successively arranged on the exhaust outlet.
Further, the Heating medium for adding lime powder is additionally provided at the top of the heating chamber.
Further, the smoke discharging pipe of the smoke evacuation runner and diesel engine connects, the import of the cooling liquid flowing channel Connect with the outlet of the coolant pump of diesel engine by pipeline, the outlet of the cooling liquid flowing channel and diesel engine it is cold But liquid import is connected by pipeline, and the import of the diesel oil runner and the outlet of engine oil tank are connected by pipeline, the bavin The outlet in oil stream road and the import of oil pump for engine are connected by pipeline, and the import of the air flow channel is communicated with atmosphere, described The outlet of air flow channel and the air intlet of diesel engine are connected by pipeline.
Further, the import of the air flow channel is additionally provided with air filter.
Compared with the existing technology, the utility model achieve it is following the utility model has the advantages that
1, the three runner preheating devices of the utility model, by the water filling port of heating chamber to the calcium oxide powder filled inside it End plus water, calcium oxide and water occur chemical reaction and generate calcium hydroxide, quickly and consistently release amount of heat, and by heat transfer It is sent out to the diesel oil that enters in the engine coolant recycled in cooling liquid flowing channel, the diesel oil and air flow channel that recycle in diesel oil runner The air of motivation carries out diesel engine by continuous circulation in diesel engine of coolant liquid and diesel oil and hot-air pre- Heat reaches the quick start of diesel engine at low ambient temperatures;After diesel engine starts and works normally a period of time, Exhaust gas temperature is often as high as 600 DEG C, and when high-temperature flue gas flows through the smoke evacuation runner of preheating device, lasting high temperature makes in heating chamber The calcium hydroxide solution that dries out generate calcium oxide again, and steam is then discharged by the exhaust outlet of heating chamber.In diesel engine When cold start-up next time, only need to add water i.e. to the water filling port of heating chamber again can reach the purpose of rapidly pre-warming diesel engine.
2, the three runner preheating devices of the utility model to engine coolant, diesel oil and can enter diesel engine simultaneously The air of machine is preheated, and preheating time needed for diesel engine cold start-up is effectively reduced, improves the preheating of diesel engine Efficiency.
3, the three runner preheating devices of the utility model, without additional consumption electric energy or fuel oil, without configuration power line Road, control circuit and program, structure is simple, easy to maintain, at low cost and energy conservation and environmental protection.
4, the three runner preheating devices of the utility model when design, are taken to shorten diesel engine preheating as far as possible Between, the contact area of lime powder and water need to be increased as far as possible to improve exothermic heat of reaction rate, it is necessary to increase heating agent portion Cross-sectional area (i.e. the diameter in heating agent portion increases), in heating agent portion in the case where constant volume, the height in heating agent portion then needs accordingly to subtract It is small, and the diameter in heating agent portion gets over that big height is smaller, then it is smaller with the contact heat-exchanging area of smoke evacuation runner, opens in diesel engine After dynamic, the heat that the calcium hydroxide for being unfavorable for the generation of heating agent portion absorbs high-temperature flue gas in runner of discharging fume is decomposed into calcium oxide again. The ratio between the radical length in the heating agent portion of the application and height are 1.2~2:1, can the contradiction of active balance between the two, reach contracting While the time required to short diesel engine preheating, calcium hydroxide is heated and can decompose completely again after guaranteeing diesel engine starting For calcium oxide.
5, the three runner preheating devices of the utility model, tubulose liquid distributor make the water being added by water filling port along heating chamber week To uniform water outlet, and apopore is opened in the upper half of tubulose liquid distributor, it is ensured that the water yield of each apopore balances, and improves The uniformity that calcium oxide is reacted with water, so that the preheating rate of diesel engine is faster.
Detailed description of the invention
It, below will be to required in embodiment description in order to illustrate more clearly of the technical scheme in the embodiment of the utility model Attached drawing to be used is briefly described, it should be apparent that, the accompanying drawings in the following description is only some realities of the utility model Example is applied, it for those of ordinary skill in the art, without creative efforts, can also be according to these attached drawings Obtain other attached drawings.
Fig. 1 is the structural schematic diagram of the three runner preheating devices for diesel engine cold start-up of the utility model.
Fig. 2 is the mounting structure signal of the three runner preheating devices for diesel engine cold start-up of the utility model Figure.
In figure: 1, runner of discharging fume;2, heating chamber;21, water filling port;22, exhaust outlet;23, heating agent portion;24, tubulose liquid distributor; 25, apopore;26, switch valve;27, high temperature automatic exhaust steam valve;28, Heating medium;3, cooling liquid flowing channel;4, diesel oil runner;5, Air flow channel;6, diesel engine;61, coolant pump;62, engine oil tank;63, oil pump for engine;7, air filter.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, the technical solution in embodiment is carried out it is clear, complete Ground description.Obviously, described embodiment is only a part of the embodiment of the utility model, instead of all the embodiments. Based on the embodiments of the present invention, institute obtained by those of ordinary skill in the art without making creative efforts There are other embodiments, fall within the protection scope of the utility model.
As shown in Figure 1, a kind of three runner preheating devices for diesel engine cold start-up, including smoke evacuation runner 1, heating Chamber 2, cooling liquid flowing channel 3, diesel oil runner 4 and air flow channel 5, heating chamber 2 and smoke evacuation runner 1 contact indirect heat exchange, cooling liquid stream Road 3, diesel oil runner 4 and air flow channel 5 and heating chamber 2 contact indirect heat exchange, and the top of heating chamber 2 is equipped with water filling port 21 and exhaust Mouthfuls 22, lower part is equipped with the heating agent portion 23 for filling lime powder in heating chamber 2.
Water filling port 21 and exhaust outlet 22 are connected to inside heating chamber 2, and water filling port 21 is used to add reaction into heating chamber 2 Required water can also add warm water or hot water for the initial reaction speed for improving calcium oxide directly into water filling port 21;Exhaust outlet 22 water vapour for being generated calcium hydroxide by thermal decomposition is discharged inside heating chamber 2.
When carrying out cold start-up preheating to engine, by the water filling port of heating chamber 2 21 to its inside the calcium oxide filled Powder adds water, and calcium oxide and water occur chemical reaction and generates calcium hydroxide, quickly and consistently releases amount of heat, and heat is passed Pass the entrance in the interior diesel oil and air flow channel 5 recycled of the engine coolant recycled in cooling liquid flowing channel 3, diesel oil runner 4 The air of diesel engine, by coolant liquid and diesel oil in diesel engine 6 it is continuous circulation and hot-air to diesel engine Machine 6 is preheated, and the quick start of diesel engine 6 at low ambient temperatures is reached;
And after diesel engine 6 starts and works normally a period of time, exhaust gas temperature is often as high as 600 DEG C, high temperature When flue gas flows through the smoke evacuation runner 1 of preheating device, lasting high temperature makes the calcium hydroxide in heating chamber 2 dry out solution again Calcium oxide is generated, and steam is then discharged by the exhaust outlet 22 of heating chamber 2.In diesel engine 6 next time of cold start-up, only need again It is the purpose that can reach rapidly pre-warming diesel engine 6 to the water filling port 21 of heating chamber 2 plus water.
The three runner preheating devices of the utility model can simultaneously preheat engine coolant, diesel oil and air, have Effect reduces diesel engine 6 and is cold-started required preheating time, improves the pre- thermal efficiency of diesel engine 6.
Preferred scheme, heating chamber 2 and air flow channel 5 are cannula structure, and cooling liquid flowing channel 3 and diesel oil runner 4 are Serpentine coil structure, heating chamber 2 weld the periphery for being sheathed on smoke evacuation runner 1, and air flow channel 5, which welds, is sheathed on the outer of heating chamber 2 Week.
Cooling liquid flowing channel 3 is fixedly arranged in the heating agent portion 23 of heating chamber 2 by the inlet and outlet nozzle of cooling liquid flowing channel 3, can also be with It is fixedly arranged on the inner wall in heating agent portion 23 of heating chamber 2 by more supporting ribs being set in heating chamber 2.
Bavin liquid flow channel for oil 4 is fixedly arranged in the heating agent portion 23 of heating chamber 2 by the inlet and outlet nozzle of diesel oil runner 4, can also be led to More supporting ribs being set in heating chamber 2 are crossed to be fixedly arranged on the inner wall in heating agent portion 23 of heating chamber 2.
Cooling liquid flowing channel 3, diesel oil runner 4, discharging fume to be spaced between the outer wall of runner 1 and the inner wall of heating chamber 2 sets It sets.
Preferred scheme, the ratio between the radical length in heating agent portion 23 and height are 1.2~2:1, i.e., D:H is 1.2~2 in figure: 1。
When design, the time required to shortening the preheating of diesel engine 6 as far as possible, lime powder and water need to be increased as far as possible Contact area to improve exothermic heat of reaction rate, it is necessary to increase heating agent portion 23 cross-sectional area (i.e. heating agent portion 23 diameter increase Add), in heating agent portion in the case where 23 constant volume, the height in heating agent portion 23 then needs accordingly to reduce, and the diameter in heating agent portion 23 is got over Big height is smaller, then it is smaller with the contact heat-exchanging area of smoke evacuation runner 1, after the starting of diesel engine 6, is unfavorable for heating agent portion The heat that 23 calcium hydroxides generated absorb high-temperature flue gas in smoke evacuation runner 1 is decomposed into calcium oxide again.The heating agent portion of the application The ratio between 23 radical length and height are 1.2~2:1, can the contradiction of active balance between the two, reach and shorten diesel engine 6 Calcium hydroxide is heated while the time required to preheating, after guarantee diesel engine 6 starts can be completely decomposed into calcium oxide again.
Preferred scheme, further includes tubulose liquid distributor 24, and tubulose liquid distributor 24 is fixedly arranged on 2 inside of heating chamber and around heating chamber 2 axis is circumferentially arranged, i.e. tubulose liquid distributor 24 is self-enclosed cyclic structure, tubulose liquid distributor 24 can both have been processed by round tube and At can also be process by square tube;Tubulose liquid distributor 24 can be hung at the roof of heating chamber 2, can also pass through the components branch such as gusset Support is fixed on the side wall of heating chamber 2.
Tubulose liquid distributor 24 is connect with water filling port 21, the circumferential uniformly distributed multiple apopores 25 of tubulose liquid distributor 24.Pass through water filling The water that mouth 21 is added can be sprayed more uniformly after the cloth liquid of tubulose liquid distributor 24 in the lime powder in heating agent portion 23 On cross section, be conducive to improve the uniformity that calcium oxide is reacted with water, so that the preheating rate of diesel engine 6 is faster.
Preferred scheme, the quantity of tubulose liquid distributor 24 are multiple, radial direction point of multiple tubulose liquid distributors 24 along heating chamber 2 It cloth and communicates with each other.
Preferred scheme, apopore 25 are opened in the upper half backwards to heating agent portion 23 of tubulose liquid distributor 24.Pass through water filling Mouthfuls 21 water being added enter tubulose liquid distributor 24, the bottom for the tubulose liquid distributor 24 that liquid level can be uniformly distributed in first, and only Have after liquid level gradually rises up to cover apopore 25, water can just be entered inside heating chamber 2 by apopore 25, avoided part and gone out The water yield in water hole 25 it is less than normal in addition it is anhydrous go out the problem of, it is ensured that the water yield of each apopore 25 balances, and improves oxidation The uniformity that calcium is reacted with water, so that the preheating rate of diesel engine 6 is faster.
Preferred scheme is successively arranged switch valve 26 and high temperature automatic exhaust steam valve 27 on exhaust outlet 22.Switch valve 26 is used for The on off operating mode for controlling exhaust outlet 22 is in normally opened state under normal condition, only when needing to high temperature automatic exhaust steam valve 27 are turned off when being safeguarded.For proposing air and steam in heating chamber 2 automatically, maintenance adds high temperature automatic exhaust steam valve 27 Pressure in hot chamber 2.
Preferred scheme, the top of heating chamber 2 are additionally provided with the Heating medium 28 for adding lime powder.
Preferred scheme, as shown in Fig. 2, smoke evacuation runner 1 is connect with the smoke discharging pipe of diesel engine 6, preheating device Smoke evacuation runner 1 can be directly welded on the smoke discharging pipe of diesel engine 6, can also be connect by flange with smoke discharging pipe.
The import of cooling liquid flowing channel 3 is connect with the outlet of the coolant pump 61 of diesel engine 6 by pipeline, cooling liquid stream The outlet in road 3 is connect with the cooling liquid inlet of diesel engine 6 by pipeline.
Coolant liquid in diesel engine 6 is extracted out by coolant pump 61, and the cooling liquid stream of preheating device is entered by pipeline In road 3, absorb the thermal temperature raising that 2 internal oxidition calcium of heating chamber react generation with water, it is heated after coolant liquid from coolant liquid The outlet of runner 3 is flowed out, and is back in engine by pipeline, realizes coolant liquid to the warm-up cycle of diesel engine 6.
The import of diesel oil runner 4 is connect with the outlet of engine oil tank 62 by pipeline, the outlet of diesel oil runner 4 with start The import of lubricating oil pump 63 is connected by pipeline.
Diesel oil storage is extracted out by pipeline and diesel oil runner 4 by oil pump for engine 53 in engine oil tank 52, passes through pipe Road enters in the diesel oil runner 4 of preheating device, absorbs 2 internal oxidition calcium of heating chamber and reacts the thermal temperature raising generated, warp with water Diesel oil after heating is flowed out from the outlet of diesel oil runner 4, enters oil pump for engine 53 by pipeline, and sent by oil pump for engine 53 Enter and flow through diesel engine 5, be finally back in engine oil tank 52, realizes diesel oil to the warm-up cycle of diesel engine 5.
The import of air flow channel 5 is communicated with atmosphere, and the outlet of air flow channel 5 and the air intlet of diesel engine 6 pass through Pipeline connection.
Air passes through air filter 7 and enters in the air flow channel 5 of preheating device under the action of diesel engine 6, Absorb the thermal temperature raising that 2 internal oxidition calcium of heating chamber react generation with water, it is heated after air from the outlet of air flow channel 5 Outflow enters in diesel engine 6.Air after heating not only can be improved the center housing temperature of diesel engine 6, and with combustion The mixed oil gas of oil is easier to be ignited, and can greatly improve the starting efficiency of diesel engine.
Further preferred scheme, the import of air flow channel 5 are additionally provided with air filter 7, and air filter 7 may filter that sky Dust in gas is to provide clean air for diesel engine 6.
Content described in this specification embodiment is only an enumeration of the implementation forms of the utility model concept, this is practical new The protection scope of type should not be construed as being limited to the specific forms stated in the embodiments, the protection scope of the utility model also and In those skilled in the art according to the utility model design it is conceivable that equivalent technologies mean.

Claims (10)

1. a kind of three runner preheating devices for diesel engine cold start-up, it is characterised in that: including smoke evacuation runner (1), add Hot chamber (2), cooling liquid flowing channel (3), diesel oil runner (4) and air flow channel (5), the heating chamber (2) contact with smoke evacuation runner (1) Indirect heat exchange, the cooling liquid flowing channel (3), diesel oil runner (4) and air flow channel (5) are contacted with the heating chamber (2) to be changed indirectly Heat, the top of the heating chamber (2) are equipped with water filling port (21) and exhaust outlet (22), and the interior lower part of the heating chamber (2) is equipped with and is used for Fill the heating agent portion (23) of lime powder.
2. a kind of three runner preheating devices for diesel engine cold start-up according to claim 1, it is characterised in that: The heating chamber (2) and air flow channel (5) are cannula structure, and the cooling liquid flowing channel (3) and diesel oil runner (4) are snakelike Coil arrangement, the heating chamber (2) are sheathed on the periphery of smoke evacuation runner (1), and the air flow channel (5) is sheathed on described add The periphery of hot chamber (2), the cooling liquid flowing channel (3) and diesel oil runner (4) are fixedly arranged in the heating agent portion (23) of heating chamber (2), institute The inner wall for stating cooling liquid flowing channel (3), diesel oil runner (4), the outer wall of smoke evacuation runner (1) and heating chamber (2) is spaced each other Setting.
3. described in any item a kind of three runner preheating devices for diesel engine cold start-up according to claim 1~2, Be characterized in that: the ratio between the radical length of the heating agent portion (23) and height are 1.2~2:1.
4. a kind of three runner preheating devices for diesel engine cold start-up according to claim 1, it is characterised in that: It further include tubulose liquid distributor (24), the tubulose liquid distributor (24) is fixedly arranged on heating chamber (2) inside and the axis around heating chamber (2) Circumferential setting, the tubulose liquid distributor (24) connects with water filling port (21), the tubulose liquid distributor (24) is circumferential be evenly distributed with it is multiple out Water hole (25).
5. a kind of three runner preheating devices for diesel engine cold start-up according to claim 4, it is characterised in that: The quantity of the tubulose liquid distributor (24) be it is multiple, multiple tubulose liquid distributors (24) along the heating chamber (2) radial distribution and It communicates with each other.
6. according to a kind of described in any item three runner preheating devices for diesel engine cold start-up of claim 4~5, Be characterized in that: the apopore (25) is opened in the upper half backwards to heating agent portion (23) of tubulose liquid distributor (24).
7. a kind of three runner preheating devices for diesel engine cold start-up according to claim 1, it is characterised in that: Switch valve (26) and high temperature automatic exhaust steam valve (27) are successively arranged on the exhaust outlet (22).
8. a kind of three runner preheating devices for diesel engine cold start-up according to claim 1, it is characterised in that: The Heating medium (28) for adding lime powder is additionally provided at the top of the heating chamber (2).
9. a kind of three runner preheating devices for diesel engine cold start-up according to claim 1, it is characterised in that: Smoke evacuation runner (1) connect with the smoke discharging pipe of diesel engine (6), and the import of the cooling liquid flowing channel (3) and diesel oil are sent out The outlet of the coolant pump (61) of motivation (6) is connected by pipeline, the outlet of the cooling liquid flowing channel (3) and diesel engine (6) cooling liquid inlet is connected by pipeline, and the import of the diesel oil runner (4) and the outlet of engine oil tank (62) pass through pipe Road connection, the outlet of the diesel oil runner (4) are connect with the import of oil pump for engine (63) by pipeline, the air flow channel (5) import is communicated with atmosphere, and the outlet of the air flow channel (5) and the air intlet of diesel engine (6) are connected by pipeline It connects.
10. a kind of three runner preheating devices for diesel engine cold start-up according to claim 9, feature exist In: the import of the air flow channel (5) is additionally provided with air filter (7).
CN201821363464.9U 2018-08-23 2018-08-23 A kind of three runner preheating devices for diesel engine cold start-up Active CN208885437U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821363464.9U CN208885437U (en) 2018-08-23 2018-08-23 A kind of three runner preheating devices for diesel engine cold start-up

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821363464.9U CN208885437U (en) 2018-08-23 2018-08-23 A kind of three runner preheating devices for diesel engine cold start-up

Publications (1)

Publication Number Publication Date
CN208885437U true CN208885437U (en) 2019-05-21

Family

ID=66509678

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821363464.9U Active CN208885437U (en) 2018-08-23 2018-08-23 A kind of three runner preheating devices for diesel engine cold start-up

Country Status (1)

Country Link
CN (1) CN208885437U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109026491A (en) * 2018-08-23 2018-12-18 湖北鹰牌动力科技有限公司 A kind of three runner preheating devices for diesel engine cold start-up

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109026491A (en) * 2018-08-23 2018-12-18 湖北鹰牌动力科技有限公司 A kind of three runner preheating devices for diesel engine cold start-up

Similar Documents

Publication Publication Date Title
CN105402071A (en) Engine preheating device based on phase change heat storage
CN109026491A (en) A kind of three runner preheating devices for diesel engine cold start-up
CN109256240B (en) Energy-concerving and environment-protective heated air circulation enamelling machine baker system
CN109026490A (en) A kind of dual channel preheating device for diesel engine cold start-up
CN208885437U (en) A kind of three runner preheating devices for diesel engine cold start-up
CN208885439U (en) A kind of dual channel preheating device for diesel engine cold start-up
CN208885436U (en) A kind of dual channel preheating device for diesel engine cold start-up
CN202024487U (en) Lower-exhaustion type multiple-inner container solar water heater
CN208885438U (en) A kind of diesel engine cold start preheating device
CN104826567A (en) Apparatus utilizing heat energy generated during platinum catalytic hydrogenation in cyclohexanone production for dehydrogenation technology
CN108825422A (en) A kind of dual channel preheating device for diesel engine cold start-up
CN205245139U (en) Highly -effective steam generator
CN204638179U (en) A kind of Cyclohexanone Production platinum catalysis hydrogenation heat energy is used for the device of dehydrogenating technology
CN108825421A (en) A kind of diesel engine cold start preheating device
CN108843429A (en) A kind of urea for vehicle tank
CN112628704A (en) Steam generator and hydrogen production method
CN105841177B (en) The desulphurization denitration clean exhaust system of low temperature waste gas
CN104895708B (en) The method and system of full combustion of fuel
CN207196906U (en) A kind of gas heater
CN108167095B (en) A kind of internal combustion engine cold start-up gas-circulating system and automobile
CN206360760U (en) A kind of high efficiency automobile tail gas utilizing device
CN214936047U (en) Hydrogen production device
CN2366777Y (en) High temp. steam boiler
CN210000201U (en) Mobile energy storage vehicle
CN206648469U (en) A kind of enamelling machine afterheat utilizing system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant