CN208884537U - A kind of New-type mould bag soil nailing pile composite supporting structure - Google Patents

A kind of New-type mould bag soil nailing pile composite supporting structure Download PDF

Info

Publication number
CN208884537U
CN208884537U CN201821452711.2U CN201821452711U CN208884537U CN 208884537 U CN208884537 U CN 208884537U CN 201821452711 U CN201821452711 U CN 201821452711U CN 208884537 U CN208884537 U CN 208884537U
Authority
CN
China
Prior art keywords
mould bag
soil nailing
stake
slope
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821452711.2U
Other languages
Chinese (zh)
Inventor
蔡进强
蔡荪萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201821452711.2U priority Critical patent/CN208884537U/en
Application granted granted Critical
Publication of CN208884537U publication Critical patent/CN208884537U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The utility model discloses a kind of New-type mould bag soil nailing pile composite supporting structures; it includes: mould bag soil nailing body stake consolidated structures body, slope protection protective, slope foot reinforcing mould bag pile body that it, which is formed; mould bag soil nailing body stake consolidated structures body is uniformly arranged in the slope protection protective bottom; the mould bag soil nailing body stake consolidated structures body angle with horizontal plane is arranged at 5o~20o; the outer drainage system of mould bag soil nailing pile body is provided on the slope protection protective, the slope protection protective bottom is provided with slope foot and reinforces mould bag pile body.Not only intensity is high for the New-type mould bag soil nailing pile composite supporting structure, and preferably solves to pour into type Anticorrosion, and the soft layers such as mud, muck soil particularly suitable for pore-forming difficulty various banket and sand.

Description

A kind of New-type mould bag soil nailing pile composite supporting structure
Technical field
The utility model relates to engineering construction technology field, specially a kind of New-type mould bag soil nailing pile composite supporting knot Structure.
Background technique
Existing soil-nailed structure body reinforces excavation slope the soil nailing made of reinforcing bar, and side slope surface is laid with one The slope reinforcement type construction method for supporting that one layer of concrete surface layer of road steel mesh fill-before-fire and earthwork side slope combine.It is configured to be arranged The complex and surface layer institute structure that reinforcement rod piece (i.e. soil nailing or anchor pole) and its surrounding soil secure bond in slopes are formed At similar Form Gravity Breast Wall supporting construction, the length of soil nailing is about 0.5 ~ 1.2 times of cutting depth, be spaced about 1 ~ 2m, Angle with horizontal plane is preferably 5 degree ~ 20 degree;Soil nailing reinforcing bar preferably uses HRB335, HRB400 grades of reinforcing bars, and bar diameter is preferably 16 ~ 32mm, bore diameter are 70 ~ 120mm;Soil nail wall injecting paste material preferably uses cement slurry or cement mortar, and strength grade is unsuitable low In M20.
Utility model content
The purpose of this utility model is to provide a kind of New-type mould bag soil nailing pile composite supporting structures, to solve above-mentioned background The problem of being proposed in technology.
To achieve the above object, the utility model provides the following technical solutions: a kind of New-type mould bag soil nailing pile composite supporting Structure, composition include: mould bag soil nailing body stake consolidated structures body, slope protection protective, slope foot reinforce mould bag pile body, it is described Mould bag soil nailing body stake consolidated structures body, the mould bag soil nailing body stake consolidated structures are uniformly arranged in slope protection protective bottom Body angle with horizontal plane is arranged at 5o~20o, is provided with mould bag soil nailing pile body outlet water system on the slope protection protective System, the slope protection protective bottom are provided with slope foot and reinforce mould bag pile body.
Preferably, the New-type mould bag soil nailing pile composite supporting structure, the mould bag soil nailing body stake consolidated structures body It is made of the soil nailing body stake of mould bag and stake end chemical grouting solidified body, the mould bag soil nailing body stake includes form sack grouting body by being in the milk The woven mould bag of steel pipe, high-strength polypropylene filament yarn, packer grouting isolator, PVC drain pipe composition.
Preferably, the New-type mould bag soil nailing pile composite supporting structure, the slope table of the slope protection protective Face is laid with one of steel mesh, sprays one layer of concrete surface layer on the steel mesh.
Preferably, the New-type mould bag soil nailing pile composite supporting structure, the slope foot reinforce mould bag pile body by crown beam It is formed with mould bag stake, elongated connection in the crown beam and the stake of mould bag.
Preferably, the New-type mould bag soil nailing pile composite supporting structure, the outer drainage system of the mould bag soil nailing pile body Including drilling, the drilling is arranged on the non-mould bag soil nailing pile body of slope surface, and drainpipe, the row are inserted in the drilling Water pipe tube wall is drilled with the PVC drain pipe of the draining eye of spacing 100mm aperture 12mm, covers water strainer and film on the drainpipe Cloth.
Compared with prior art, the utility model has the beneficial effects that the New-type mould bag soil nailing pile composite supporting structure It proposes, replaces reinforcing bar to be used as grout pipe simultaneously by embedded steel pipe, combined with separator with film bag, using high-pressure grouting side Formula forms the mould bag soil nailing pile composite supporting structural body of a kind of novel pile body reaming extrusion soil and stake end consolidation.New-type mould bag Soil nailing stake complex structure body intensity is high, effectively squeezes reaming and special discharge structure, the more effective inside for strengthening the insertion soil body Structure improves soil body compactness, increases substantially soil nailing and soil body contact surface viscous force and frictional force, especially stake end and consolidates, The breakout capacity of soil nailing stake is greatly improved, the more preferable support action for playing soil-nailed structure body.New-type mould bag soil nailing composite pile supporting Not only intensity is high for structure, and preferably solves to pour into type Anticorrosion, and mud, muck soil particularly suitable for pore-forming difficulty etc. is soft Weak soil layer various bankets and sand.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model.
Fig. 2 is the utility model floor map.
Fig. 3 is the utility model mould bag soil nailing body stake consolidated structures body schematic diagram.
In figure: 1, slope protection protective, 2, the outer drainage system of mould bag soil nailing pile body, 3, mould bag soil nailing body stake consolidated structures Body, 4, crown beam, 5, slope foot reinforcing mould bag pile body, 6, packer grouting isolator, 7, the woven mould bag of high-strength polypropylene filament yarn, 8, PVC row Water pipe, 10, mould bag stake.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Referring to Fig. 1, the utility model provides a kind of technical solution: a kind of New-type mould bag soil nailing pile composite supporting structure, It includes: mould bag soil nailing body stake consolidated structures body 3, slope protection protective 1, slope foot reinforcing mould bag pile body 5, feature that it, which is formed, Be: mould bag soil nailing body stake consolidated structures body 3, the mould bag soil nailing are uniformly arranged in 1 bottom of slope protection protective 3 angle with horizontal plane of body stake consolidated structures body is arranged at 5o~20o, and mould bag soil is provided on the slope protection protective 1 The outer drainage system 2 of pile body is followed closely, 1 bottom of slope protection protective is provided with slope foot and reinforces mould bag pile body 5, the mould bag Soil nailing body stake consolidated structures body 3 is made of the soil nailing body stake of mould bag and stake end chemical grouting solidified body, the mould bag soil nailing body stake Including form sack grouting body by grouting steel pipe 8, the woven mould bag 7 of high-strength polypropylene filament yarn, packer grouting isolator 6,9 groups of PVC drain pipe At the side slope surface of the slope protection protective 1 is laid with one of steel mesh, sprays one layer of concrete face on the steel mesh Layer, the slope foot are reinforced mould bag pile body 5 and are made of crown beam 4 and mould bag stake 10, elongated company in the crown beam 4 and mould bag stake 10 It connects, the outer drainage system 2 of the mould bag soil nailing pile body includes drilling, and the drilling is arranged in the non-mould bag soil nailing pile body of slope surface On, drainpipe is inserted in the drilling, the draining tube wall is drilled with the PVC of the draining eye of spacing 100mm aperture 12mm Drainpipe covers water strainer and film cloth on the drainpipe.
Working principle: New-type mould bag soil nailing stake braced wall by mould bag soil nailing body stake consolidated structures body, slope protection protective, Slope foot reinforces the outer drainage system of mould bag pile body composition, mould bag soil nailing pile body.
1, mould bag soil nailing body stake solidified body: length is 0.5~1.2 times of cutting depth, angle with horizontal plane be preferably 5o~ 20o, the spacing of mould bag soil nailing body stake solidified body arranged: laterally (vertical with excavation, supporting direction) 0~2m;It is longitudinal (with open Digging, supporting direction are parallel) 0~2m.Mould bag soil nailing body stake solidified body is by the soil nailing body stake of mould bag and stake end chemical grouting solidified body group At.
(1) mould bag soil nailing body stake pile body diameter is generally 0.20~0.35cm, and pile body drilling diameter is 0.10~0.15cm Design is reached using high-pressure grouting extrusion soil afterwards and needs pile body diameter, it is expanding than (high-pressure grouting of mould bag soil nailing pile body forms Pile body diameter and pile body drilling diameter ratio) it is 1~4;
(2) stake end chemical consolidation is in the milk: mixing and stirring for waterglass and cement, grouting volume diameter is generally mould bag soil nailing 1~3 times of body stake.
2, slope protection protective: the slope surface gunite concrete of excavation.Side slope surface be laid with one steel mesh (HBR335 or HBR400 reinforcing bar) one layer of concrete surface layer of fill-before-fire, thickness is greater than 10cm;
3, slope foot reinforces mould bag pile body: being made of crown beam and mould bag stake (mini pile)
(1) mould bag stake (mini pile): mini pile diameter is 100~350mm, and building-in depth is greater than 2m~6m, between mould bag stake Away from for 0.3~2.0m;Concrete strength is not less than 30.0MPa.
(2) crown beam: elongated connection in mould bag stake.Crown beam width should be greater than mould bag stake diameter and not less than 250mm, and crown beam is high (150~250mm) is bound using HBR335 or HBR400 reinforcing bar, and concrete strength is not less than 20.0MPa.
4, it the outer drainage system of mould bag soil nailing pile body: drills at the non-mould bag soil nailing pile body setting of slope surface, boring aperture is greater than The PVC draining that DN25~DN50 tube wall is drilled with the draining eye of spacing 100mm aperture 12mm is set as needed in drain pipe diameter Pipe, then water strainer and film cloth are put on, length is greater than mould bag soil nailing pile body and stake root chemosetting body length summation.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of New-type mould bag soil nailing pile composite supporting structure, composition includes: mould bag soil nailing body stake consolidated structures body (3), slope Face protection body (1), slope foot reinforce mould bag pile body (5), it is characterized in that: described slope protection protective (1) bottom is uniform Arrangement mould bag soil nailing body stake consolidated structures body (3), mould bag soil nailing body stake consolidated structures body (3) angle with horizontal plane at 5o~20o is arranged, and the outer drainage system (2) of mould bag soil nailing pile body, the slope are provided on the slope protection protective (1) Face protection body (1) bottom is provided with slope foot and reinforces mould bag pile body (5).
2. New-type mould bag soil nailing pile composite supporting structure according to claim 1, it is characterized in that: the mould bag soil nailing body Stake consolidated structures body (3) is made of the soil nailing body stake of mould bag and stake end chemical grouting solidified body, and the mould bag soil nailing body stake includes Form sack grouting body is by grouting steel pipe (8), the woven mould bag (7) of high-strength polypropylene filament yarn, packer grouting isolator (6), PVC drain pipe (9) it forms.
3. New-type mould bag soil nailing pile composite supporting structure according to claim 1, it is characterized in that: the slope protection is protected The side slope surface of watch box (1) is laid with one of steel mesh, sprays one layer of concrete surface layer on the steel mesh.
4. New-type mould bag soil nailing pile composite supporting structure according to claim 1, it is characterized in that: the slope foot reinforces mould Bag pile body (5) is made of crown beam (4) and mould bag stake (10), elongated connection in the crown beam (4) and mould bag stake (10).
5. New-type mould bag soil nailing pile composite supporting structure according to claim 1, it is characterized in that: the mould bag soil nailing stake External drainage system (2) includes drilling, and the drilling is arranged on the non-mould bag soil nailing pile body of slope surface, is inserted in the drilling Drainpipe, the draining tube wall are drilled with the PVC drain pipe of the draining eye of spacing 100mm aperture 12mm, the drainpipe Above cover water strainer and film cloth.
CN201821452711.2U 2018-09-06 2018-09-06 A kind of New-type mould bag soil nailing pile composite supporting structure Expired - Fee Related CN208884537U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821452711.2U CN208884537U (en) 2018-09-06 2018-09-06 A kind of New-type mould bag soil nailing pile composite supporting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821452711.2U CN208884537U (en) 2018-09-06 2018-09-06 A kind of New-type mould bag soil nailing pile composite supporting structure

Publications (1)

Publication Number Publication Date
CN208884537U true CN208884537U (en) 2019-05-21

Family

ID=66511238

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821452711.2U Expired - Fee Related CN208884537U (en) 2018-09-06 2018-09-06 A kind of New-type mould bag soil nailing pile composite supporting structure

Country Status (1)

Country Link
CN (1) CN208884537U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108797610A (en) * 2018-09-06 2018-11-13 蔡荪萍 A kind of New-type mould bag soil nailing pile composite supporting structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108797610A (en) * 2018-09-06 2018-11-13 蔡荪萍 A kind of New-type mould bag soil nailing pile composite supporting structure

Similar Documents

Publication Publication Date Title
CN101532290B (en) Granule grouting pile of ripple plastic sleeve with hole for strengthening soft soil foundation and strengthening method
CN107165652B (en) A kind of tunnel monoblock type collapse after construction method
CN103590425B (en) A kind of Peaty soft soil stratum subway station construction technology
CN107503257B (en) One kind being close to mountain high-filled subgrade stabilization and Deformation control structure and construction method
CN104131575B (en) A kind of karst height grows the leak stopping water discharge method of the stratum dam foundation
CN206722878U (en) A kind of mining light-duty filling counterfort
CN109736346B (en) Steel anchor pipe reinforced weathered rock stratum reinforced weighing type retaining wall structure and construction method
CN105862887A (en) Ecological slope protection structure for ion rare earth mine
CN102296630A (en) Construction method of long-screw high-pressure mix jetting cement diaphragm wall
CN106948340B (en) A kind of construction method of the Manual excavated pile structure of high polymer grouting protection
CN110528533A (en) A kind of microorganism solidification impacting steel tube for soil-nail and its construction method
CN107299650B (en) A kind of remote open caisson casting method for correcting error
CN111549799A (en) Comprehensive control system applied to gravel soil slope
CN103993598A (en) Crashed stone grouting pile with lead holes implanted in cloth bag and construction method
CN201395794Y (en) Foundation ditch with concealed columns and soil-nailing support
CN104480956B (en) A kind of minor diameter mold-bagged concrete pile composite foundation
CN208884537U (en) A kind of New-type mould bag soil nailing pile composite supporting structure
CN207032212U (en) A kind of stabilization by drainage structure of new and old roadbed in the firm splicing of watersplash
CN110805049B (en) Construction method of mountain slope ultra-thickness spray anchor permanent supporting structure
CN107605494A (en) A kind of crushed zone soft-rock tunnel advance support technology
CN114059566B (en) Soft rock slope semi-rigid supporting and retaining structure and construction method thereof
CN206873466U (en) One kind is used for footrill flume section safeguard structure
CN114164846B (en) Permanent slope waterproof reinforcing construction method
CN202787275U (en) Tubular soil nailing wall of novel pneumatic impact anchor
CN215165710U (en) Tunnel side slope structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190521

Termination date: 20190906