CN208883284U - A kind of multi-purpose suspender of assembled architecture - Google Patents

A kind of multi-purpose suspender of assembled architecture Download PDF

Info

Publication number
CN208883284U
CN208883284U CN201821641363.3U CN201821641363U CN208883284U CN 208883284 U CN208883284 U CN 208883284U CN 201821641363 U CN201821641363 U CN 201821641363U CN 208883284 U CN208883284 U CN 208883284U
Authority
CN
China
Prior art keywords
balance
hanging beam
lifting lug
assembled architecture
balance hanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821641363.3U
Other languages
Chinese (zh)
Inventor
张攀峰
陈华斌
刘洋
敖凌宇
施维
杨才鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Construction Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Original Assignee
Construction Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Construction Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd filed Critical Construction Engineering Co Ltd of China Railway No 5 Engineering Group Co Ltd
Priority to CN201821641363.3U priority Critical patent/CN208883284U/en
Application granted granted Critical
Publication of CN208883284U publication Critical patent/CN208883284U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型公开了一种装配式建筑多用吊具,属于装配式建筑施工技术领域,它包括平衡吊梁,平衡吊梁的个数为两个,且所述平衡吊梁的上顶部之间搭接有连接块;连接块的两端分别通高强螺栓与平衡吊梁紧固连接;平衡吊梁上顶部的端面上还设置有两个以上销轴吊环;销轴吊环通过吊杆与吊索相连接;平衡吊梁的下端面设置有一个以上吊耳;吊耳上可拆卸地安装有调节装置,本实用新型有效地降低了吊装难度,提高了吊装设备对于装配式预制构件、部件的适用性;且本实用新型的结构牢固可靠,优化了吊装过程中吊索的受力情况,稳定性也大大提高,同时还能防止吊耳在吊装过程中与平衡吊梁所产生的相对运动,还能有效控制调整吊装时构件的重心位置。

The utility model discloses a prefabricated building multi-purpose hanger, belonging to the technical field of prefabricated building construction. A connecting block is connected; the two ends of the connecting block are respectively connected with the balance suspension beam by high-strength bolts; more than two pin shaft suspension rings are also arranged on the end face of the top of the balance suspension beam; the pin shaft suspension rings are connected with the suspension rope through the suspension rod The lower end face of the balance suspending beam is provided with more than one lifting lug; the lifting lug is detachably installed with an adjusting device, the utility model effectively reduces the difficulty of hoisting and improves the applicability of the hoisting equipment to prefabricated components and parts And the structure of the utility model is firm and reliable, the stress of the sling during the hoisting process is optimized, the stability is also greatly improved, and at the same time, the relative movement of the lifting lug and the balance suspending beam can be prevented during the hoisting process, and the Effectively control and adjust the center of gravity of components during hoisting.

Description

A kind of multi-purpose suspender of assembled architecture
Technical field
The utility model relates to assembled architecture technical field of construction, and in particular to a kind of multi-purpose suspender of assembled architecture.
Background technique
With the rapid development of our country's economy, it in order to promote building construction technology to modernize, improves efficiency, shortens the construction period, Environment, energy-saving and emission-reduction are protected, and ensure the quality and performance of building, the industrialization of architectural engineering has been becoming for industry development Gesture.Industrialization engineering outstanding feature is exactly fabricated construction, promotes prefabricated assembled concrete, the steel knot for being suitble to industrialized production The building systems such as structure accelerate development the prefabricated and mounting technology of construction project, and it is close for improving building industrialization Integration ofTechnology level Several years Major Strategics.
With the development of architectural industrialization, the standards systems such as industrialized design, construction, component production are gradually built up, While assembled arthitecutral structure component, component, part standard, the type of standard component is also more and more abundant, and lifts and apply Work is the important component of assembled arthitecutral structure system, for the construction efficiency for improving assembled architecture, reduces lifting and applies The difficulty of work shortens the lifting set-up time, needs a kind of adaptation different shape different types of prefabricated component, component Lifting device.
Utility model content
The technical problem to be solved by the utility model is to provide a kind of assembled architectures to be mostly used suspender, current to solve Hanging device can not provide efficient lifting construction mode according to the shape and classification of different prefabricated components and component; Lifting construction difficulty is excessive, and then the problem of lifting time is long, and the duration also lengthens therewith occurs.
To solve the above problems, the utility model provides following technical solution:
A kind of multi-purpose suspender of assembled architecture, it includes balance hanging beam, is additionally provided on the end face of balance hanging beam upper top More than two pin shaft hanging rings;Pin shaft hanging ring is connected by sunpender with hoist cable;The lower end surface of balance hanging beam is provided with more than one Lifting lug;Regulating device has been removably installed on lifting lug;The upper top of balance hanging beam has been removably installed connection by bolt Block.
Preferably, the number of balance hanging beam is two, and is connected between described two balance hanging beams by link block.
Further, the number of link block is three, and link block is separately positioned on described two balance hanging beam upper tops Two sides and balance hanging beam length direction midpoint.
Preferably, regulating device is ring-chain hoist, and the hook portion that suspension hook is fixed on ring-chain hoist is hung on lifting lug.
Preferably, reinforcing rib is provided on the vertical direction of balance hanging beam.
Preferably, pin shaft hanging ring is symmetrically mounted on balance hanging beam as symmetry axis using the center line between two balance hanging beams In top end surface.
Preferably, lifting lug and balance hanging beam are integrally formed design.
The utility model the utility model has the advantages that
The utility model keeps it pre- for different shape, the assembled of different process by carrying out composite joint to hanging beam Component and component processed can be lifted efficiently, and hoisting difficulty is significantly reduced, and improve hanging device for assembly The applicability of formula prefabricated components, component;In addition, the sound construction of the utility model is reliable, hoist cable in hoisting process is optimized Stress condition, stability also greatly improve, at the same can also prevent lifting lug in hoisting process with it is opposite caused by balance hanging beam Movement, moreover it is possible to the position of centre of gravity of component when effectively control adjustment lifts.
Detailed description of the invention
Fig. 1 is the main view of the utility model;
Fig. 2 is top view when two balance hanging beams are connected by link block;
Fig. 3 is three-dimensional simplified schematic diagram when lifting PC beam using the utility model;
Fig. 4 is three-dimensional simplified schematic diagram when lifting PC floor using the utility model;
Fig. 5 is plane simplified schematic diagram when lifting PC stair using the utility model;
Description of symbols: 1 hoist cable, 2 sunpenders, 3 pin shaft hanging rings, 4 link blocks, 5 balance hanging beams, 6 lifting lugs, 7 regulating devices, 701 fixed suspension hooks, 8 reinforcing ribs, 9 PC beams, 10 PC floors, 11 PC stair.
Specific embodiment
With reference to the accompanying drawing and the utility model is described further in specific embodiment:
Embodiment 1:
Referring to Fig.1, the present embodiment provides a kind of assembled architectures to be mostly used suspender, it includes balance hanging beam 5, balance hanging beam 5 Pin shaft hanging ring 3 there are two being also set up on the end face of upper top;Pin shaft hanging ring 3 is connected by sunpender 2 with hoist cable 1;Balance hanging beam 5 Lower end surface setting there are five lifting lug 6;Regulating device 7 has been removably installed on lifting lug 6;The upper top of balance hanging beam 5 passes through Bolt has been removably installed link block 4.
Regulating device 7 is ring-chain hoist, and the hook portion that suspension hook 701 is fixed on ring-chain hoist is hung on lifting lug 6.It uses Ring-chain hoist as regulating device 7 be in order to guarantee it is non-uniform for both ends height provide controllable hoist length to hanging piece, make It can be in ideal lifting state, so that the gravity center instability solved in assembling process to hanging piece is difficult to control after different component lifting The problem of processed.
Two reinforcing ribs 8 are provided on the vertical direction of balance hanging beam 5.The setting of reinforcing rib 8 can reinforce balance crane The intensity of beam 5, to improve the reliability of device.
Pin shaft hanging ring 3 is symmetrically mounted on the top of balance hanging beam 5 using the center line between two balance hanging beams 5 as symmetry axis On end face.The pin shaft hanging ring 3 being symmetrically installed can be with pulling force suffered by Optimal Hoisting process middle hanger and hoist cable.
Lifting lug 6 and balance hanging beam 5 are integrally formed design.Lifting lug 6 is integrally formed to design to reduce with balance hanging beam 5 and hang The displacement or rotation generated when ear 6 is commonly assembled relative to balance hanging beam 5.
Referring to Fig. 3, PC beam 9 can be lifted using multi-purpose suspender shown in FIG. 1, it can be directly by the way that two be adjusted The suspension hook of device 7 hangs over 9 upper end of PC beam along the length direction of PC beam 9, and the level of PC beam can be guaranteed by adjusting regulating device, realizes Lifting to beam type material.Similarly, the lifting of PC vertical member in more can be realized using multi-purpose suspender shown in FIG. 1.
Embodiment 2:
Referring to Fig. 2, on the basis of the present embodiment structure shown in embodiment 1, increase the number of balance hanging beam 5 to two, And be attached described two balance hanging beams 5 by link block 4, become a new hoisting appliance.
The number of link block 4 is three, and link block 4 is separately positioned on two of described two 5 upper tops of balance hanging beam The midpoint of 5 length direction of side and balance hanging beam.
Referring to Fig. 4 and Fig. 5, since PC floor 10 and 11 structure size of PC stair are different from the PC beam lifted in embodiment 1 9, so lifted respectively to PC floor 10 and PC stair 11 using device shown in Fig. 2, by two balance hanging beams 5 not Regulating device 7 with position catches on the top planes of PC floor 10 or that catches on PC stair 11 marks time top surface to complete to lift.
And it is further, it is a solid simple in rule compared to PC floor 10, the structure of PC stair 11 is increasingly complex, therefore And it selects the lifting lug 6 of different location or changes the chain length of 6 lower section ring-chain hoist of lifting lug to guarantee that assembly parts were lifting Stability in journey, it is ensured that assembly efficiency is improved in the position of assembly parts center of gravity, keeps lifting operation more easy, time saving.And this reality It is connected with the novel combination by being mostly used suspender, improves the applicability of suspender, effectively reduce hoisting difficulty.

Claims (7)

1. a kind of assembled architecture is mostly used suspender, it includes balance hanging beam (5), it is characterised in that: balance hanging beam (5) upper top More than two pin shaft hanging rings (3) are additionally provided on end face;Pin shaft hanging ring (3) is connected by sunpender (2) with hoist cable (1);Balance The lower end surface of hanging beam (5) is provided with more than one lifting lug (6);Regulating device (7) have been removably installed on lifting lug (6);Balance The upper top of hanging beam (5) has been removably installed link block (4) by bolt.
2. a kind of assembled architecture according to claim 1 is mostly used suspender, it is characterised in that: the number of balance hanging beam (5) It is two, and is connected between described two balance hanging beams (5) by link block (4).
3. a kind of assembled architecture according to claim 2 is mostly used suspender, it is characterised in that: the number of link block (4) is Three, and link block (4) is separately positioned on two sides and balance hanging beam (5) length of described two balance hanging beams (5) upper top Spend the midpoint in direction.
4. a kind of assembled architecture according to claim 1 is mostly used suspender, it is characterised in that: regulating device (7) is loop chain Cucurbit, and the hook portion that suspension hook (701) is fixed on ring-chain hoist is hung on lifting lug (6).
5. a kind of assembled architecture according to claim 1 is mostly used suspender, it is characterised in that: in the perpendicular of balance hanging beam (5) Histogram has set up reinforcing rib (8).
6. a kind of assembled architecture according to claim 1 is mostly used suspender, it is characterised in that: pin shaft hanging ring (3) is with two Center line between balance hanging beam (5) is that symmetry axis is symmetrically mounted in the top end surface of balance hanging beam (5).
7. a kind of assembled architecture according to claim 1 is mostly used suspender, it is characterised in that: lifting lug (6) and balance hanging beam (5) be integrally formed design.
CN201821641363.3U 2018-10-10 2018-10-10 A kind of multi-purpose suspender of assembled architecture Expired - Fee Related CN208883284U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821641363.3U CN208883284U (en) 2018-10-10 2018-10-10 A kind of multi-purpose suspender of assembled architecture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821641363.3U CN208883284U (en) 2018-10-10 2018-10-10 A kind of multi-purpose suspender of assembled architecture

Publications (1)

Publication Number Publication Date
CN208883284U true CN208883284U (en) 2019-05-21

Family

ID=66515594

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821641363.3U Expired - Fee Related CN208883284U (en) 2018-10-10 2018-10-10 A kind of multi-purpose suspender of assembled architecture

Country Status (1)

Country Link
CN (1) CN208883284U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110422753A (en) * 2019-08-21 2019-11-08 中联精工(天津)有限公司 A kind of hoisting mechanism for gear box casing
CN111689367A (en) * 2020-07-16 2020-09-22 中国工程物理研究院机械制造工艺研究所 Balance lifting appliance device
CN119018751A (en) * 2024-07-16 2024-11-26 北京科技大学 Lifting point, grabbing and releasing mechanism and method, and lifting and transporting device and method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110422753A (en) * 2019-08-21 2019-11-08 中联精工(天津)有限公司 A kind of hoisting mechanism for gear box casing
CN111689367A (en) * 2020-07-16 2020-09-22 中国工程物理研究院机械制造工艺研究所 Balance lifting appliance device
CN119018751A (en) * 2024-07-16 2024-11-26 北京科技大学 Lifting point, grabbing and releasing mechanism and method, and lifting and transporting device and method

Similar Documents

Publication Publication Date Title
CN207244465U (en) A kind of hanging apparatus for adjusting and positioning for steel box arch rib aerial statue
CN208883284U (en) A kind of multi-purpose suspender of assembled architecture
CN101649682A (en) Method for assembling tower by post-assembly rocker arm holding pole technology
CN207551713U (en) For the suspender of container sledge
CN203173684U (en) Component for hoisting reinforcement cage
CN202030434U (en) Large-span whole-section hoisting sling for steel box girder
CN202214131U (en) Three-point lifting beam
CN109653513A (en) A kind of large-scale 7 font truss structure turn-over hanging method
CN103395689A (en) Horizontal hoisting clamp for wallboard
CN213894875U (en) Arborescent cast steel node hoist and mount auxiliary device
CN208293566U (en) A kind of steel reinforcement cage positioning hangar system
CN205772956U (en) Novel tower crane counterweight is from dismantling device
CN203159036U (en) Line-shaped lifting appliance
CN217376980U (en) double-T-beam self-balancing hoisting sling
CN217732417U (en) A hanging device for a wheel well of a monorail vehicle
CN219009694U (en) Hoisting device for box culvert
CN110589676A (en) A new type of balancing sling for lifting and using method thereof
CN205838328U (en) A kind of reel lifting tool
CN220845070U (en) Prefabricated assembled concrete member hoist device and crane
CN212712464U (en) Lifting boom
CN204297984U (en) Syllogic arm crane
CN210313126U (en) Large-scale steel box girder suspends auxiliary device in midair
CN208932803U (en) A jib tower crane combined spreader with quick switching of lifting magnification
CN207404687U (en) A kind of heavy truck rivet line vehicle frame suspender
CN209038856U (en) A kind of overhead traveling crane steel plate special suspender

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190521