CN205637617U - Hoist and mount of many roof beams of girder steel construction cluster are put - Google Patents

Hoist and mount of many roof beams of girder steel construction cluster are put Download PDF

Info

Publication number
CN205637617U
CN205637617U CN201620247363.XU CN201620247363U CN205637617U CN 205637617 U CN205637617 U CN 205637617U CN 201620247363 U CN201620247363 U CN 201620247363U CN 205637617 U CN205637617 U CN 205637617U
Authority
CN
China
Prior art keywords
hoist
mount
mainboard
girder steel
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620247363.XU
Other languages
Chinese (zh)
Inventor
常永强
王丰哲
孙良科
张子煜
李伟杰
林泽阳
陈兆永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Science and Industry Corp Ltd
China Construction Steel Structure Engineering Co Ltd
Original Assignee
China Construction Steel Structure Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Steel Structure Corp Ltd filed Critical China Construction Steel Structure Corp Ltd
Priority to CN201620247363.XU priority Critical patent/CN205637617U/en
Application granted granted Critical
Publication of CN205637617U publication Critical patent/CN205637617U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a hoist and mount of many roof beams of girder steel construction cluster are put, it includes mainboard (1) its characterized in that, is provided with horizontal stiffener (4) and vertical stiffener (5) on mainboard (1) mainboard (1) top symmetry of vertical stiffener (5) both sides is provided with main atress snap ring (2) that are connected with hoisting equipment's couple mainboard (1) below is central symmetry with vertical stiffener (5) and is provided with a plurality of hoist and mount snap ring (3) that are used for hoisting the girder steel. The utility model discloses can realize once carrying on the hoist and mount of many steel members, improve hoist and mount efficiency, guarantee the security of many component hoist and mount processes simultaneously, save wire rope's quantity, the simple operation is reliable.

Description

Girder steel construction many beams string device for hoisting
Technical field
This utility model relates to Installation Technology of Steel Structure field, is specifically related to steel girder erection and a kind of device that can simultaneously carry out many lifting components when constructing of unloading.Belong to construction steel structure technical field.
Background technology
Along with the development of building trade, steel construction also gets more and more in the application of building trade.The steel beam column major part of construction steel structure is steel column, girder steel, and wherein the quantity of girder steel is many and construction weight is the lightest.During steel construction site operation, Main Hoisting Machinery is tower crane, truck crane and crawler crane, and the proportion that crane gear cost accounts for engineering cost is the biggest;Meanwhile, the construction period of construction steel structure is urgent, and the lifting efficiency improving steel beam column is particularly important.
In current Construction of Steel Structure, steel beam lifting mainly uses the lifting mode of " beam one hangs ".In the case of girder steel less in cross section, lighter in weight is a fairly large number of, this kind of mode lifts inefficiency, and construction cost is too high, both cannot meet construction period, also cannot ensure the control of engineering cost.Additionally, engineering construction is on-the-spot steel beam lifting be there is also to the mode that the mode directly hung carries out lifting with steel wire rope string, every girder steel uniform two pass steel wire rope is directly hung on suspension hook, and girder steel misplaces up and down and hangs successively.This kind of lifting mode, steel wire rope consumption is big, and in hoisting process, steel wire rope easily distorts knotting, there is serious construction risk.
This engineering steel construction scale of construction is big, and steel beam column is large number of, and the duration is urgent, how ensure that site operation safety, improves the difficult problem that on-the-spot efficiency of construction is this engineering.
Summary of the invention
The purpose of this utility model is to overcome above-mentioned deficiency, it is provided that a kind of safe and reliable while can carry out the device of many steel beam column lifting, safe ready, be greatly improved efficiency of construction.
The purpose of this utility model is achieved in that a kind of girder steel construction many beams string device for hoisting, it includes mainboard, mainboard is provided with lateral stiffening plate and longitudinal stiffener, it is symmetrically arranged with, above the mainboard of described longitudinal stiffener both sides, the main stress snap ring that the hook with crane gear is connected, below described mainboard, centered by longitudinal stiffener, is symmetrically arranged with multiple lifting snap ring for hoisting steel beam.
Compared with prior art, the beneficial effects of the utility model are:
This utility model can realize once carrying out the lifting of many steel beam column, improves lifting efficiency, ensure that the safety of many lifting component processes simultaneously, saves the consumption of steel wire rope, and simple operation is reliable.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the side view of Fig. 1.
Fig. 3 is use state diagram of the present utility model.
Wherein:
Mainboard 1
Main stress snap ring 2
Lifting snap ring 3
Lateral stiffening plate 4
Longitudinal stiffener 5.
Detailed description of the invention
Seeing Fig. 1 Fig. 3, this utility model relates to a kind of girder steel construction many beams string device for hoisting, including mainboard 1,10t main stress snap ring 2,5t lifting snap ring 3, lateral stiffening plate 4 and longitudinal stiffener 5.The scope of application of girder steel construction hoisting device is mainly used for the lifting of the girder steel less than or equal to 2t.Unloading or in installation process at girder steel, construction mainboard upper end uses the main stress snap ring 2 of 2 10t, it is connected with the hook of crane gear by steel wire rope, the lower end lifting snap ring 3 by 5t, draw from Inside To Outside symmetry centered by longitudinal stiffener 5 and set steel wire rope, spacing between each lifting snap ring 3 is 150cm, and misplace hoisting steel beam up and down.A piece girder steel is lifted by two symmetrical steel wire ropes.Simultaneously according to crane gear and construction floor clear height, carry out construct " shoulder pole " adjustment of upper and lower side rope capacity, the consumption of minimizing construction steel wire rope.

Claims (1)

1. girder steel construction many beams string device for hoisting, it is characterized in that it includes mainboard (1), mainboard (1) is provided with lateral stiffening plate (4) and longitudinal stiffener (5), mainboard (1) top in described longitudinal stiffener (5) both sides is symmetrically arranged with the main stress snap ring (2) that the hook with crane gear is connected, and is symmetrically arranged with multiple lifting snap ring (3) for hoisting steel beam in described mainboard (1) lower section centered by longitudinal stiffener (5).
CN201620247363.XU 2016-03-29 2016-03-29 Hoist and mount of many roof beams of girder steel construction cluster are put Active CN205637617U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620247363.XU CN205637617U (en) 2016-03-29 2016-03-29 Hoist and mount of many roof beams of girder steel construction cluster are put

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620247363.XU CN205637617U (en) 2016-03-29 2016-03-29 Hoist and mount of many roof beams of girder steel construction cluster are put

Publications (1)

Publication Number Publication Date
CN205637617U true CN205637617U (en) 2016-10-12

Family

ID=57074761

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620247363.XU Active CN205637617U (en) 2016-03-29 2016-03-29 Hoist and mount of many roof beams of girder steel construction cluster are put

Country Status (1)

Country Link
CN (1) CN205637617U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112010156A (en) * 2020-09-16 2020-12-01 中国五冶集团有限公司 Super high-rise high-efficiency steel beam lifting appliance and lifting method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112010156A (en) * 2020-09-16 2020-12-01 中国五冶集团有限公司 Super high-rise high-efficiency steel beam lifting appliance and lifting method thereof

Similar Documents

Publication Publication Date Title
CN205045698U (en) Reinforcement cage hoisting utensil
CN202785258U (en) Hoisting device for air overturn of large-sized steel column
CN204342250U (en) A kind of multi-state hoisting balance beam
CN205932941U (en) A device for handling of precast box girder template
CN202465025U (en) Sling special for prefabricated panel
CN102774743A (en) Box-type member turn-over lifting appliance with oversized cross section and application method thereof
CN101994318A (en) Lifting frame, hoisting system and hoisting method for vertically and rotatably hoisting steel reinforcement cage
CN205397854U (en) Gasifier hoist and mount hoisting device
CN202848940U (en) Chamber roof truss overall declining removal device of large gas chamber
CN204342257U (en) A kind of large-scale component turning device
CN206665952U (en) A kind of novel hanging tool
CN205637617U (en) Hoist and mount of many roof beams of girder steel construction cluster are put
CN206693061U (en) A kind of hoisting device for main cable saddle of suspension bridge lifting
CN202390116U (en) High-intensity small-tonnage hoist
CN207047703U (en) A kind of beam piece prestressed stretch-draw jack easy device in place
CN205011219U (en) Assembly type structure precast shear wall's multi -purpose hoist and mount balance beam
CN201962679U (en) Lifting bracket used for vertically and aswirl lifting steel reinforcement cage and lifting system
CN202164028U (en) Snap rope hanger capable of hanging components by one hook
CN201762053U (en) Simple automatic derrick
CN204689351U (en) A kind of H profile steel structural elements suspender
CN203998745U (en) The tower machine suspension hook disconnected rope anti-drop device of rushing to summit
CN103058083B (en) Bolt sphere truss gig
CN203545427U (en) Special hoisting tool for car body of C80-type open wagon
CN203159036U (en) Line-shaped lifting appliance
CN201914830U (en) Rope separator of tower hoist

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 3801, 38 / F, China Construction Science and engineering building, No. 3331, Weilan Coast Community Central Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province

Patentee after: China Construction Engineering Group Co.,Ltd.

Address before: 518000 Guangdong Shenzhen Futian District Che Kung Temple Riverfront Avenue deep industry Tien pine building 17 floor 17A

Patentee before: China Construction Steel Structure Corp.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221116

Address after: Room 1908, Chengtou Xin Times Building, No. 2009, Pingshan Avenue, Liulian Community, Pingshan Street, Pingshan District, Shenzhen 518000

Patentee after: China Construction Steel Engineering Co.,Ltd.

Address before: 3801, 38 / F, China Construction Science and engineering building, No. 3331, Weilan Coast Community Central Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province

Patentee before: China Construction Engineering Group Co.,Ltd.