- CN208870250U CN208870250U CN201821462385.3U CN201821462385U CN208870250U CN 208870250 U CN208870250 U CN 208870250U CN 201821462385 U CN201821462385 U CN 201821462385U CN 208870250 U CN208870250 U CN 208870250U
- Authority
- CN
- China
- Prior art keywords
- steel
- angle
- steel column
- curtain wall
- wallboard
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
The utility model discloses a kind of large area installation stone curtain walls, including steel column, angle iron connecting piece, wallboard and aluminium alloy pendant, the steel column is vertically arranged, the angle iron connecting piece is provided with multipair, each pair of angle iron connecting piece is respectively and fixedly connected in the two sides of the steel column, angle iron connecting piece is welded with embedded board close to the side of concrete structure, and the embedded board is fixedly connected with concrete structure;The wallboard is connected with muti-piece floor close to the side of concrete walls, the aluminium alloy pendant is provided with multiple, it is respectively and fixedly connected on the floor, the inside of each aluminium alloy pendant is connected with steel angle hitch, the angle steel perpendicular with the steel column is equipped with below each steel angle hitch side wall, the one side of angle steel is welded to connect with steel column, and another side is fixedly connected with steel angle hitch.The utility model has the advantages that improving the bonding strength after curtain wall installation, reduces the quantity of plate stitch between adjacent wall board, reduce installation difficulty.
Description
Technical field
The utility model relates to building curtain wall technical field, in particular to stone curtain wall is used in a kind of large area installation.
Background technique
Currently, building curtain wall is as more popular alien invasion trailing a kind of in industry, mainly using glass curtain wall,
The single way of several forms such as stone curtain wall, metal curtain wall, novel hanging board curtain wall (ceramic plate, concrete slab etc.) or mixing are done
Method, wherein stone curtain wall due to panel type it is more, the features such as decorative pattern is beautiful, various colors, and perception is steady, is on utilities building
Application it is more universal.
The building structure of existing stone curtain wall is usual are as follows: steel construction is cooperated as keel, masonry slab by connector
Bolt is fixed on keel, and finally decorative thread is mounted on masonry slab, since the quality of stone material is more crisp, is actually answered
Masonry slab in is fritter plate, and the disadvantages of this solution is: steel structure keel precision is poor, after stone material plate is fixed not
It is smooth, appearance is influenced, in processing stone material plate, for the installation for considering the later period, needs masonry slab doing thickness, thus anti-
Only masonry slab is when throwing bolt into, since impact force is excessive and fragmentation, causes to waste;Large area region is installed simultaneously
When, several pieces of masonry slabs need to be used, more plate stitch is will form during installation, between adjacent sheet metal, influences curtain wall
Heat preservation, waterproof performance after installation.
Utility model content
The purpose of the utility model is to provide a kind of large area installation stone curtain walls, its advantage is that improving curtain wall installation
Bonding strength afterwards reduces the quantity of plate stitch between adjacent wall board, reduces installation difficulty.
The above-mentioned technical purpose of the utility model has the technical scheme that a kind of large area installation is used
Stone curtain wall, including steel column, angle iron connecting piece, wallboard and aluminium alloy pendant, the steel column are vertically arranged, the angle steel
Connector is provided with multipair along the length direction of the steel column, and each pair of angle iron connecting piece is respectively and fixedly connected in the steel column
The two sides at place are abutted with concrete structure, the angle iron connecting piece is welded with embedded board close to the side of concrete structure, described
It is fixedly connected between embedded board and concrete structure by stainless steel bolt;
The wallboard is connected with muti-piece floor close to the side of concrete walls, and the aluminium alloy pendant is provided with more
It is a, it is respectively and fixedly connected on the floor by stainless steel bolt, the inside of each aluminium alloy pendant is connected with steel angle
Code, towards the direction horizontal extension of concrete structure, the lower section of each steel angle hitch side wall is equal for the one side wall of the steel angle hitch
Equipped with the angle steel perpendicular with the steel column, the one side of the angle steel is welded to connect with the steel column, another side with it is described
It is fixedly connected between steel angle hitch by stainless steel bolt.
Through the above technical solutions, the application mainly passes through the steel construction that angle iron connecting piece, steel column, angle steel form stress
Skeleton, and be fixed on reinforced concrete structure by embedded board, the wallboard of special large area utilizes on the floor of the back side not
Rust steel bolt connect to form whole curtain wall with steel structure framework as fixed point, and by aluminium alloy pendant and corner brace, makes to pacify
Curtain wall surfacing after dress, beauty.
The setting of floor, for reinforcing the intensity of plate face, to make wallboard itself that can process thinner, dimensioned
It is larger, and then realize and rationalize materials, due to the increase of wallboard size, when installing the curtain wall of certain area, subtract
Lack wallboard usage quantity, and then reduced the plate stitch between adjacent wall board, improves curtain wall heat preservation, waterproof and the work gone along with sb. to guard him
With being allowed to clean and tidy generous, be convenient to clean;The partial region on wallboard can be made to be thickeied simultaneously, in order to which staff will
Stainless steel bolt is thrown into wallboard, is effectively connect to be formed between aluminium alloy pendant, is reduced the difficulty of installation.
The utility model is further arranged to: vertical and horizontal arranged in a crossed manner between the floor.
Through the above technical solutions, further increasing the use intensity of wallboard, it can bear higher impact force, mention
The high service life of wallboard.
The utility model is further arranged to: cross one another position is respectively equipped with for stainless steel bolt between the floor
The screw shell of threaded connection.
Through the above technical solutions, the setting of screw shell, mounts and dismounts wallboard convenient for staff, prevent
Wallboard deforms after being hit, and then stainless steel bolt is caused to be stuck in or be compressed in wallboard and inconvenient taking-up.
The utility model is further arranged to: the angle steel passes perpendicularly through the steel column and welds with the steel column.
Through the above technical solutions, angle steel initially passes through steel column, then it is connected by welding with steel column again,
The stability connected between steel column and angle steel is increased, simultaneously because steel column diagonal steel is formed after angle steel passes through steel column
First support, therefore be also convenient for staff's diagonal steel and carry out weld job.
The utility model is further arranged to: being respectively arranged with reinforcing bar on the floor on the inside of the wallboard and is hung
Ring, the reinforcing bar hanging ring are affixed close to the side of concrete structure with the floor.
Through the above technical solutions, the setting of hanging ring, lifts wallboard convenient for staff.
The utility model is further arranged to: the steel column, angle iron connecting piece, angle steel, aluminium alloy pendant and steel angle
The outer surface of code is coated with zinc layers.
Through the above technical solutions, the setting of zinc layers improves it and uses the longevity for increasing the anticorrosive property of above-mentioned connector
Life.
In conclusion the utility model has the following beneficial effects:
1, the application mainly passes through the steel structure framework that angle iron connecting piece, steel column, angle steel form stress, and by pre-buried
Plate is fixed on reinforced concrete structure, and the wallboard of special large area is using the stainless steel bolt on the floor of the back side as fixation
Point, and connect to form whole curtain wall with steel structure framework by aluminium alloy pendant and corner brace;The setting of floor is used for stiffening plate
The intensity in face, so that it is thinner to process wallboard itself can, dimensioned it is larger, and then realize and rationalize materials,
Since the increase of wallboard size reduces wallboard usage quantity, and then reduce phase when installing the curtain wall of certain area
Plate stitch between adjacent wallboard improves curtain wall heat preservation, waterproof and the effect gone along with sb. to guard him, and is allowed to clean and tidy generous, is convenient to clean, while can
So that the partial region on wallboard is thickeied, in order to which staff throws stainless steel bolt in wallboard into, to close with aluminium
Effectively connection is formed between golden pendant, is not needed to throw stainless steel bolt into prefabricated panel for convenience of the later period and is done wallboard
Thickness reduces cost of material;
2, the setting of screw shell, mounts and dismounts wallboard convenient for staff, prevents wallboard from being hit
After deform, and then lead to that stainless steel bolt is stuck in or is compressed in wallboard and inconvenient take out;
3, the setting of zinc layers improves its service life for increasing the anticorrosive property of above-mentioned connector.
Detailed description of the invention
Fig. 1 is the overall structure diagram of curtain wall in the present embodiment;
Fig. 2 is the schematic diagram for embodying each member connection structure;
Fig. 3 is the cross-sectional view for embodying screw shell;
In figure, 1, steel column;2, angle iron connecting piece;3, wallboard;31, floor;32, reinforcing bar hanging ring;4, aluminium alloy pendant;5,
Steel angle hitch;6, concrete structure;7, embedded board;8, screw shell;9, angle steel.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.The wherein identical attached drawing of identical components
Label indicates.It should be noted that word "front", "rear" used in the following description, "left", "right", "upper", "lower", " bottom
Face " and " top surface " refer to that the direction in attached drawing, word "inner" and "outside" are referred respectively to towards or away from particular elements geometry
The direction at center.
Embodiment: a kind of large area installation stone curtain wall, as depicted in figs. 1 and 2, including steel column 1, angle iron connecting piece
2, wallboard 3, aluminium alloy pendant 4, steel angle hitch 5, as shown in Figure 1, steel column 1 is vertically arranged and one side and concrete structure 6 are tight
Patch is used for support wallboard 3, and 7 connector 2 of angle steel is provided with multipair along the length direction of steel column 1, and each pair of angle iron connecting piece 2 divides
The two sides that steel column 1 abuts place with concrete structure 6 are not set, and are connected by stainless steel bolt, every diagonal steel connects
Fitting 2 is equipped with embedded board 7 close to the side of concrete structure 6, is welded to connect between angle iron connecting piece 2 and embedded board 7, pre-buried
Plate 7 is fixedly connected by stainless steel bolt with concrete structure 6, the setting of multiple groups connection structure, keeps steel column 1 fixed more
Securely, while bearing capacity to wallboard 3 is improved.
As shown in Fig. 2, wallboard 3 can be made of the material of inorganic quartz, compared to lithotome, artificial stone material is not only
It can achieve decorative pattern identical with lithotome, color and appearance, while can be with the biggish plate face of processing dimension, wallboard
3 are connected with muti-piece staggered floor 31 anyhow close to the side of concrete walls, for reinforcing the intensity of plate face, to make wall
Plate 3 itself can process it is thinner, dimensioned it is larger, and then realize rationalize materials, due to the increasing of 3 size of wallboard
Greatly, therefore when installing the curtain wall of certain area, reduce the plate stitch between adjacent wall board 3, improve curtain wall heat preservation, waterproof and
The effect gone along with sb. to guard him is allowed to clean and tidy generous, is convenient to clean.
It is respectively arranged with reinforcing bar hanging ring 32 on the floor 31 of 3 inside of wallboard, with floor 31 close to concrete structure 6
Side it is affixed, in order to which staff lifts wallboard 3.
As shown in Figures 2 and 3, cross one another position is equipped with screw shell 8 between floor 31, is embedded in floor 31
Inside, aluminium alloy pendant 4 is provided with multiple, is threadedly coupled with screw shell 8 by stainless steel bolt, to be fixed on wall
On plate 3, the setting of screw shell 8 mounts and dismounts wallboard 3 convenient for staff, prevents wallboard 3 after being hit
Deformation, and then stainless steel bolt is caused to be stuck in or be compressed in wallboard 3 and inconvenient taking-up;The setting of floor 31 simultaneously, also
The partial region on wallboard 3 can be made to be thickeied, in order to which staff throws stainless steel bolt in wallboard 3 into, thus with
Effectively connection is formed between aluminium alloy pendant 4, reduces installation difficulty.
As shown in Figures 2 and 3, steel angle hitch 5 is provided with multiple, is corresponded with aluminium alloy pendant 4, and pass through adjusting
Bolt is fixed on the inside of aluminium alloy pendant 4, the wherein one side wall on steel angle hitch 5 towards concrete structure 6 direction horizontal extension,
The lower section of each steel angle hitch 5 is equipped with angle steel 9, the position welding for passing perpendicularly through steel column 1 and intersecting with steel column 1, angle
It is fixedly connected between steel 9 and steel angle hitch 5 by stainless steel bolt, angle steel 9 initially passes through steel column 1, then passes through again with steel column 1
The mode of welding is connected, and increases the stability connected between steel column 1 and angle steel 9, simultaneously because angle steel 9 passes through steel column
After 1,1 diagonal steel 9 of steel column forms first support, therefore is also convenient for staff's diagonal steel 9 and carries out weld job.
Further, steel column 1, angle iron connecting piece 2, embedded board 7, angle steel 9, aluminium alloy pendant 4 and steel angle hitch 5 is outer
Surface is coated with zinc layers, for increasing the anticorrosive property of above-mentioned connector, improves its service life.
The application mainly passes through the steel structure framework that angle iron connecting piece 2, steel column 1, angle steel 9 form stress, and by pre-
Buried plate 7 is fixed on reinforced concrete structure 6, and the wallboard 3 of special large area utilizes the stainless steel bolt on back side floor 31
It connect to form whole curtain wall with steel structure framework as fixed point, and by aluminium alloy pendant 4 and corner brace.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability
Field technique personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but
As long as all by the protection of Patent Law in the scope of the claims of the utility model.
Claims (6)
1. a kind of large area installation stone curtain wall, it is characterized in that: include steel column (1), angle iron connecting piece (2), wallboard (3) with
And aluminium alloy pendant (4), the steel column (1) are vertically arranged, length of the angle iron connecting piece (2) along the steel column (1)
Direction is provided with multipair, and each pair of angle iron connecting piece (2) is respectively and fixedly connected with supports in the steel column (1) and concrete structure (6)
The two sides at place are connect, the angle iron connecting piece (2) is welded with embedded board (7), the embedded board close to the side of concrete structure (6)
(7) it is fixedly connected between concrete structure (6) by stainless steel bolt;
The wallboard (3) is connected with muti-piece floor (31) close to the side of concrete walls, aluminium alloy pendant (4) setting
Have multiple, is respectively and fixedly connected on the floor (31) by stainless steel bolt, the inside of each aluminium alloy pendant (4) is equal
It is connected with steel angle hitch (5), direction horizontal extension of the one side wall of the steel angle hitch (5) towards concrete structure (6), each steel
The angle steel (9) perpendicular with the steel column (1), the one side of the angle steel (9) and institute are equipped with below corner brace (5) side wall
Steel column (1) welded connecting is stated, is fixedly connected between another side and the steel angle hitch (5) by stainless steel bolt.
2. a kind of large area installation stone curtain wall according to claim 1, it is characterized in that: horizontal between the floor (31)
It erects arranged in a crossed manner.
3. a kind of large area installation stone curtain wall according to claim 2, it is characterized in that: phase between the floor (31)
The position mutually intersected is respectively equipped with the screw shell (8) being threadedly coupled for stainless steel bolt.
4. a kind of large area installation stone curtain wall according to claim 1, it is characterized in that: the angle steel (9) is vertically worn
It crosses the steel column (1) and is welded with the steel column (1).
5. a kind of large area installation stone curtain wall according to claim 1, it is characterized in that: in the wallboard (3)
It is respectively arranged with reinforcing bar hanging ring (32) on the floor (31) of side, the reinforcing bar hanging ring (32) and the floor (31) are close to mixed
The side of Xtah Crude Clay structure (6) is affixed.
6. a kind of large area installation stone curtain wall according to claim 1, it is characterized in that: the steel column (1), described
Angle iron connecting piece (2), the angle steel (9), the aluminium alloy pendant (4) and the steel angle hitch (5) outer surface be coated with zinc
Layer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821462385.3U CN208870250U (en) | 2018-09-06 | 2018-09-06 | Stone curtain wall is used in a kind of installation of large area |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821462385.3U CN208870250U (en) | 2018-09-06 | 2018-09-06 | Stone curtain wall is used in a kind of installation of large area |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208870250U true CN208870250U (en) | 2019-05-17 |
Family
ID=66467016
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821462385.3U Expired - Fee Related CN208870250U (en) | 2018-09-06 | 2018-09-06 | Stone curtain wall is used in a kind of installation of large area |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208870250U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110805185A (en) * | 2019-11-20 | 2020-02-18 | 大同煤矿集团有限责任公司 | Installation method of large-span curved surface special-shaped stone curtain wall |
CN112621963A (en) * | 2020-09-11 | 2021-04-09 | 北京市第五建筑工程集团有限公司 | Method for making national emblem |
CN112695973A (en) * | 2020-12-29 | 2021-04-23 | 苏州邦得新材料科技有限公司 | Hanging type wallboard mounting structure and mounting method |
-
2018
- 2018-09-06 CN CN201821462385.3U patent/CN208870250U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110805185A (en) * | 2019-11-20 | 2020-02-18 | 大同煤矿集团有限责任公司 | Installation method of large-span curved surface special-shaped stone curtain wall |
CN112621963A (en) * | 2020-09-11 | 2021-04-09 | 北京市第五建筑工程集团有限公司 | Method for making national emblem |
CN112621963B (en) * | 2020-09-11 | 2022-10-21 | 北京市第五建筑工程集团有限公司 | Method for making national emblem |
CN112695973A (en) * | 2020-12-29 | 2021-04-23 | 苏州邦得新材料科技有限公司 | Hanging type wallboard mounting structure and mounting method |
CN112695973B (en) * | 2020-12-29 | 2023-08-22 | 苏州邦得新材料科技有限公司 | Hanging wallboard mounting structure and mounting method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208870250U (en) | Stone curtain wall is used in a kind of installation of large area | |
CN104652668B (en) | Armored integrated wall and construction method thereof | |
CN105507539A (en) | Light external wall point-hang heat-insulation and decorative plate combined anchoring system and method for constructing same | |
CN211396208U (en) | Green type coincide floor's mosaic structure | |
CN105544858B (en) | The telescopic frame mould integration partition plate of plate stitch | |
CN108204058A (en) | Compound retaining wall of sandwich and preparation method thereof | |
CN202595962U (en) | Curtain stone pendant system | |
CN202000692U (en) | Light toilet unit | |
CN204919881U (en) | Whole wall of assembly spouting lightweight concrete | |
CN207794401U (en) | A kind of composite floor | |
CN107178153B (en) | A kind of compound big plate connector of steel building assembling type outer wall and installation method | |
CN202595965U (en) | Curtain wall stone corner system | |
CN206408807U (en) | A kind of connecting bracket | |
CN205954970U (en) | Removable thickness adjustable assembled steel bar truss building carrier plate of die block board | |
CN213204597U (en) | Stone curtain wall at cornice closing-in opening of inclined roof | |
CN210482645U (en) | Assembled building external thermal insulation wall | |
CN209114681U (en) | A kind of outdoor dry-hang stone and ground intersection node structure | |
CN208430719U (en) | A kind of steel skeleton dry-hang stone railing | |
CN207998951U (en) | Skeleton partition wall | |
CN207363071U (en) | A kind of novel metal plate curtain wall system | |
CN207516311U (en) | A kind of construction engineering quality safety risk management system | |
CN206408888U (en) | The cladding system of super large plate width stone wall surface | |
CN216810606U (en) | Pretensioning prestress assembly type bare concrete external hanging wallboard with ribs | |
CN218814388U (en) | High-precision metal galvanizing embedded part | |
CN214498015U (en) | Open stone curtain wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190517 Termination date: 20210906 |
|
CF01 | Termination of patent right due to non-payment of annual fee |