CN207794401U - A kind of composite floor - Google Patents
A kind of composite floor Download PDFInfo
- Publication number
- CN207794401U CN207794401U CN201820004258.2U CN201820004258U CN207794401U CN 207794401 U CN207794401 U CN 207794401U CN 201820004258 U CN201820004258 U CN 201820004258U CN 207794401 U CN207794401 U CN 207794401U
- Authority
- CN
- China
- Prior art keywords
- composite floor
- floor slab
- truss
- steel plate
- profiled steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本实用新型公开了一种组合楼板,所述组合楼板包括桁架梁(1)、固定在所述桁架梁(1)上的压型钢板(2)、固定在所述压型钢板(2)上的上层板(3),在所述桁架梁(1)上安装有至少两根吊装杆(4),所述吊装杆(4)位于所述压型钢板(2)的下方,在所述上层板(3)上开设有至少三个吊装孔(5),所述吊装孔(5)穿过所述上层板(3)和所述压型钢板(2),所述吊装孔(5)位于所述吊装杆(4)的正上方,每根吊装杆(4)的正上方设置有至少一个吊装孔(5)。本实用新型提供的组合楼板可以方便地实现楼板的吊装,并且基本不会对桁架梁的结构强度产生影响。
The utility model discloses a composite floor, which comprises a truss beam (1), a profiled steel plate (2) fixed on the truss beam (1), a profiled steel plate (2) fixed on the profiled steel plate (2). The upper plate (3), at least two lifting rods (4) are installed on the truss beam (1), the lifting rods (4) are located below the profiled steel plate (2), and on the upper There are at least three hoisting holes (5) on the plate (3), the hoisting holes (5) pass through the upper layer (3) and the profiled steel plate (2), and the hoisting holes (5) are located Directly above the lifting rods (4), at least one lifting hole (5) is arranged directly above each lifting rod (4). The combined floor slab provided by the utility model can realize the hoisting of the floor slab conveniently, and basically does not affect the structural strength of the truss beam.
Description
技术领域technical field
本实用新型涉及装配式建筑技术领域,尤其涉及一种用于装配式建筑的组合楼板。The utility model relates to the technical field of prefabricated buildings, in particular to a composite floor for prefabricated buildings.
背景技术Background technique
装配式建筑是在工厂预制部分或全部构件运输至施工现场,将构件通过可靠的连接方式组装而成的建筑物,与传统的房屋结构相比,装配式建筑具有如下优点:1)空间布置灵活、集成化程度高;2)自重轻、承载力高、抗震性能优越;3)绿色、环保、节能,在建造过程中不会产生大量废料污染环境;4)建造周期短、产品质量高;5)可实现房屋建设的工业化和产业化,实现技术集成化,提高房屋的科技含量和使用功能;6)综合经济效益高;7)受气候条件制约小。The prefabricated building is a building that is prefabricated in the factory and transported to the construction site, and the components are assembled through reliable connections. Compared with the traditional house structure, the prefabricated building has the following advantages: 1) Flexible space layout , high degree of integration; 2) light weight, high bearing capacity, superior seismic performance; 3) green, environmental protection, energy saving, will not produce a lot of waste to pollute the environment during the construction process; 4) short construction period, high product quality; 5 ) can realize the industrialization and industrialization of housing construction, realize technology integration, and improve the scientific and technological content and use functions of housing; 6) high comprehensive economic benefits; 7) less restricted by climatic conditions.
现有的装配式建筑的楼板通常由桁架梁、压型钢板、钢筋网和面层构成。这种楼板具有抗振性能好、受力合理、自重轻且强度高、成本低等优点。当装配该楼板时,需要将吊带绑在桁架梁上,然后使用起重机将楼板吊起,与位于下方的独立基础对准并固定。The floor slabs of existing prefabricated buildings are usually composed of truss beams, profiled steel plates, steel mesh and surface layers. This floor slab has the advantages of good anti-vibration performance, reasonable stress, light weight, high strength, and low cost. When the slab was assembled, straps were tied to the truss beams, and a crane was used to lift the slab into alignment with the freestanding foundations below and secure it.
虽然上述楼板在起吊时采用吊带固定楼板,但是由于吊带直接作用在桁架的杆件上,可能会对桁架梁的结构强度产生影响,而且在将多块楼板拼合成一块较大的楼板时,楼板悬挂吊带的位置受到很大的限制,不便于楼板的吊装。Although the above-mentioned floors are fixed with slings when hoisting, since the slings directly act on the rods of the trusses, it may affect the structural strength of the truss girders. The position of the suspension sling is greatly restricted, which is not convenient for the hoisting of the floor.
实用新型内容Utility model content
本实用新型的目的是提供一种组合楼板,可以方便地实现楼板的吊装,并且基本不会对桁架梁的结构强度产生影响。The purpose of the utility model is to provide a combined floor slab, which can realize the hoisting of the floor slab conveniently, and basically does not affect the structural strength of the truss beam.
为了实现上述目的,本实用新型提供了一种组合楼板,所述组合楼板包括桁架梁、固定在所述桁架梁上的压型钢板、固定在所述压型钢板上的上层板,在所述桁架梁上安装有至少两根吊装杆,所述吊装杆位于所述压型钢板的下方,在所述上层板上开设有至少三个吊装孔,所述吊装孔穿过所述上层板和所述压型钢板,所述吊装孔位于所述吊装杆的正上方,每根吊装杆的正上方设置有至少一个吊装孔。In order to achieve the above object, the utility model provides a composite floor, which includes a truss beam, a profiled steel plate fixed on the truss beam, an upper plate fixed on the profiled steel plate, and the At least two hoisting rods are installed on the truss girder, the hoisting rods are located below the profiled steel plate, and at least three hoisting holes are opened on the upper deck, and the hoisting holes pass through the upper deck and the As for the profiled steel plate, the hoisting hole is located directly above the hoisting rod, and at least one hoisting hole is provided directly above each hoisting rod.
优选地,所述吊装杆可拆卸地安装在所述桁架梁上。Preferably, the lifting rod is detachably mounted on the truss beam.
优选地,所述桁架梁的前横梁和后横梁的底杆上均固定有两个安装板,所述安装板上开设有用于穿过所述吊装杆的通孔,所述吊装杆的前后两端分别插入所述前横梁和后横梁上的安装板的通孔中。Preferably, two mounting plates are fixed on the bottom bars of the front beam and the rear beam of the truss girder, and a through hole for passing through the lifting rod is opened on the mounting plate. The ends are respectively inserted into the through holes of the mounting plates on the front beam and the rear beam.
优选地,所述前横梁上的两个安装板的通孔的轴线相互平行,并且位于所述前横梁左侧的安装板距离所述前横梁左端的距离等于位于所述前横梁右侧的安装板距离所述前横梁右端的距离。Preferably, the axes of the through holes of the two mounting plates on the front beam are parallel to each other, and the distance between the mounting plate on the left side of the front beam and the left end of the front beam is equal to that of the mounting plate on the right side of the front beam. The distance between the plate and the right end of the front cross member.
优选地,所述上层板包括面层和固定在所述面层上的装饰层。Preferably, the upper layer board includes a surface layer and a decorative layer fixed on the surface layer.
优选地,所述上层板的上表面从一端向另一端倾斜,所上层板的上表面的倾斜角为0.1-5度。Preferably, the upper surface of the upper layer is inclined from one end to the other, and the inclination angle of the upper surface of the upper layer is 0.1-5 degrees.
优选地,所述上层板的上表面为一端高、一端低的台阶面。Preferably, the upper surface of the upper layer plate is a stepped surface with one end high and one end low.
优选地,所述上层板设置有插座安装孔,所述插座安装孔穿过所述上层板和压型钢板,所述插座安装孔上固定安装有插座。Preferably, the upper board is provided with a socket installation hole, the socket installation hole passes through the upper board and the profiled steel plate, and the socket is fixedly installed on the socket installation hole.
优选地,所述组合楼板还包括独立基础,在所述桁架梁的每个拐角处均安装有一个所述独立基础,所述独立基础位于所述桁架梁的下方。Preferably, the composite floor slab further includes an independent foundation, one independent foundation is installed at each corner of the truss beam, and the independent foundation is located below the truss beam.
优选地,所述桁架梁的每个拐角处均固定有固定板,所述独立基础通过地脚螺栓与固定板连接。Preferably, a fixed plate is fixed at each corner of the truss beam, and the independent foundation is connected to the fixed plate through anchor bolts.
本实用新型与现有技术的不同之处在于,本实用新型提供的组合楼板通过在上层板上开设吊装孔,并且在桁架梁上安装吊装杆,在吊装组合楼板时,吊带穿过吊装孔后与位于下方的吊装杆连接,由于吊带通过吊装杆将作用力施加到桁架梁上,对桁架梁产生向上的作用力,不会像将吊带直接连接在桁架梁上一样产生侧向力,因此基本不会影响桁架梁的结构强度。同时由于吊带是通过开设在上层板上的吊装孔与吊装杆连接的,在将多块楼板组合在一起时,不会因为组装多块楼板而对楼板的吊装产生影响。因此,本实用新型提供的组合楼板可以方便地实现楼板的吊装,并且基本不会对桁架梁的结构强度产生影响。The utility model differs from the prior art in that the composite floor provided by the utility model is provided with hoisting holes on the upper floor, and a hoisting rod is installed on the truss beam. When the composite floor is hoisted, the sling passes through the hoisting hole It is connected with the lifting rod located below, because the lifting strap exerts force on the truss beam through the lifting rod, and generates an upward force on the truss beam, which will not generate lateral force like connecting the lifting strap directly to the truss beam, so basically Does not affect the structural strength of the truss beam. Simultaneously, because the sling is connected with the hoisting rod through the hoisting hole provided on the upper deck, when a plurality of floor slabs are combined together, the hoisting of the floor slabs will not be affected due to the assembly of the plurality of floor slabs. Therefore, the combined floor slab provided by the utility model can realize the hoisting of the floor slab conveniently, and basically does not affect the structural strength of the truss beam.
附图说明Description of drawings
图1是本实用新型提供的一种实施方式的组合楼板的结构示意图;Fig. 1 is a structural schematic diagram of a composite floor slab of an embodiment provided by the utility model;
图2是本实用新型提供的另一种实施方式的组合楼板的结构示意图;Fig. 2 is a structural schematic diagram of another embodiment of the composite floor provided by the utility model;
图3是图2所示的组合楼板的主视图;Fig. 3 is the front view of the composite floor shown in Fig. 2;
图4是本实用新型提供的组合楼板的结构示意图,其中上层板和部分压型钢板未示出;Fig. 4 is a structural schematic diagram of the composite floor provided by the utility model, wherein the upper deck and part of the profiled steel plate are not shown;
附图标记说明:Explanation of reference signs:
1-桁架梁;11-前横梁;12-后横梁;2-压型钢板;3-上层板;4-吊装杆;5-吊装孔;6-安装板;7-插座;8-独立基础。1-truss beam; 11-front beam; 12-rear beam; 2-profiled steel plate; 3-upper plate; 4-hoisting rod; 5-hoisting hole; 6-installation plate;
具体实施方式Detailed ways
下面结合附图和实施方式对本实用新型进一步说明。但这些例举性实施方式的用途和目的仅用来例举本实用新型,并非对本实用新型的实际保护范围构成任何形式的任何限定,更非将本实用新型的保护范围局限于此。Below in conjunction with accompanying drawing and embodiment the utility model is further described. However, the use and purpose of these exemplary embodiments are only used to illustrate the utility model, and do not constitute any form of any limitation on the actual protection scope of the utility model, let alone limit the protection scope of the utility model thereto.
在本实用新型中限定了一些方位词,在未作出相反说明的情况下,所使用的方位词如“上、下、左、右、前、后”是指本实用新型提供的组合楼板在正常使用情况下定义的,并与附图3中所示的上下左右前后方向一致。“内、外”是指相对于各零部件本身轮廓的内外。这些方位词是为了便于理解而采用的,因而不构成对本实用新型保护范围的限制。Some orientation words are defined in the utility model. In the case of no contrary description, the orientation words used such as "up, down, left, right, front, and back" refer to the composite floor provided by the utility model in normal It is defined in the use case and is consistent with the up, down, left, right, front, back directions shown in Figure 3. "Inside and outside" refer to inside and outside relative to the outline of each part itself. These orientation words are adopted for ease of understanding, and thus do not constitute a limitation to the protection scope of the present utility model.
在本实用新型中,当零部件被称为“固定”在另一个零部件上,它可以直接固定在另一个零部件上,或者也可以存在居中的零部件。当一个零部件被认为是“连接”另一个零部件,它可以是直接连接到另一个零部件或者可能同时存在居中零部件。In the present invention, when a component is said to be "fixed" to another component, it may be directly fixed to the other component, or there may be an intervening component. When a component is said to be "connected" to another component, it can be directly connected to the other component or there may be a centered component at the same time.
适当参考图1所示,本实用新型提供的基本实施方式的组合楼板包括桁架梁1、固定在所述桁架梁1上的压型钢板2、固定在所述压型钢板2上的上层板3。所述桁架梁1的形状一般为矩形,结合图4所示,包括依次首尾固定连接的前横梁11、左纵梁、后横梁12和右纵梁,前横梁11、左纵梁、后横梁12和右纵梁均由桁架构件组成,具体地,如图4所述,均包括由上杆、与上杆平行的下杆、上下两端焊接在上杆和下杆的斜支撑杆和竖直支撑杆,所述上杆、下杆、斜支撑杆和竖直支撑杆均由角铁制作。所述压型钢板2优选采用闭口压型钢板。通过将前横梁11、左纵梁、后横梁12和右纵梁的上杆采用角铁制成,也可以方便压型钢板2的固定。所述上层板3为在工厂浇筑的楼板,其材料可以为改性水泥砂浆、轻集料混凝土、发泡混凝土或者轻质煤矸石混凝土等。Appropriately referring to Figure 1, the composite floor slab of the basic embodiment provided by the utility model includes a truss beam 1, a profiled steel plate 2 fixed on the truss beam 1, and an upper plate 3 fixed on the profiled steel plate 2 . The shape of the truss girder 1 is generally rectangular, as shown in FIG. and the right longitudinal beam are both composed of truss members, specifically, as shown in Figure 4, both include an upper rod, a lower rod parallel to the upper rod, an oblique support rod and a vertical The support rods, the upper rods, the lower rods, the oblique support rods and the vertical support rods are all made of angle iron. The profiled steel plate 2 is preferably a closed profiled steel plate. The fixing of the profiled steel plate 2 can also be facilitated by making the upper bars of the front cross beam 11, the left longitudinal beam, the rear cross beam 12 and the right longitudinal beam an angle iron. The upper slab 3 is a floor slab poured in a factory, and its material can be modified cement mortar, light aggregate concrete, foamed concrete or light gangue concrete.
其中所述组合楼板还可以包括设置在压型钢板上的钢筋网,该钢筋网可以在浇筑上层板3时固定在上层板3内,从而提高上层板3的结构强度。Wherein the composite floor slab may also include a reinforcement mesh arranged on a profiled steel plate, and the reinforcement mesh may be fixed in the upper slab 3 when the upper slab 3 is poured, thereby improving the structural strength of the upper slab 3 .
参考图1、图3、图4所示,在本实施方式中,在所述桁架梁1上安装有至少两根吊装杆4,所述吊装杆4位于所述压型钢板2的下方,在所述上层板3上开设有至少三个吊装孔5,所述吊装孔5穿过所述上层板3和所述压型钢板2,所述吊装孔5位于所述吊装杆4的正上方,每根吊装杆4的正上方设置有至少一个吊装孔5。Referring to Fig. 1, Fig. 3 and Fig. 4, in this embodiment, at least two lifting rods 4 are installed on the truss girder 1, and the lifting rods 4 are located below the profiled steel plate 2. The upper plate 3 is provided with at least three hoisting holes 5, the hoisting holes 5 pass through the upper plate 3 and the profiled steel plate 2, the hoisting holes 5 are located directly above the hoisting rod 4, At least one hoisting hole 5 is arranged directly above each hoisting rod 4 .
当上述基本实施方式提供的组合楼板在组装时,可以将吊带穿过开设在上层板3上的吊装孔5,然后捆绑在吊装杆4上,然后将吊带的上端与起重机械的吊钩连接,由于设置有两根吊装杆和至少三个吊装孔5,因此可以保证吊起的组合楼板的平衡。由于吊带通过吊装杆4将作用力施加到桁架梁1上,对桁架梁1产生向上的作用力,因此基本不会影响桁架梁1的结构强度。同时由于吊带是通过开设在上层板3上的吊装孔5与吊装杆4连接的,在将多块楼板组合在一起时,可以方便地将多块楼板拼合在一起。When the combined floor slab provided by the above-mentioned basic embodiment is assembled, the sling can be passed through the hoisting hole 5 provided on the upper floor 3, then bound on the hoisting rod 4, and then the upper end of the sling is connected to the hook of the hoisting machine , since two hoisting rods and at least three hoisting holes 5 are provided, the balance of the hoisted combined floor slab can be ensured. Because the sling exerts force on the truss girder 1 through the lifting rod 4 , and generates an upward force on the truss girder 1 , it basically does not affect the structural strength of the truss girder 1 . Simultaneously because suspender is to be connected with hoisting bar 4 by offering hoisting hole 5 on the upper deck 3, when a plurality of floor slabs are combined together, a plurality of floor slabs can be pieced together easily.
在上述实施方式的基础上,优选地,所述上层板3可以包括面层和固定在所述面层上的装饰层,所述面层可以采用发泡混凝土等材料浇筑而成,装饰层可以为在工厂流水线上施工附上的室内地板砖,室内地板砖可以为玻化砖、抛光砖、釉面砖、防滑砖等。此时所开设的吊装孔5穿过装饰层和面层。根据需要,也可以现场组成完成后再铺设装饰层,此时装饰层可以封闭吊装孔5。On the basis of the above embodiments, preferably, the upper layer 3 may include a surface layer and a decorative layer fixed on the surface layer, the surface layer may be poured from materials such as foamed concrete, and the decorative layer may be For the indoor floor tiles attached to the construction on the factory assembly line, the indoor floor tiles can be vitrified tiles, polished tiles, glazed tiles, anti-skid tiles, etc. The hoisting hole 5 that opened now passes through the decoration layer and the surface layer. According to needs, the decorative layer can also be laid after the on-site composition is completed. At this time, the decorative layer can close the hoisting hole 5 .
在本实用新型的一个优选实施方式中,所述吊装杆4可拆卸地安装在所述桁架梁1上。即当组合楼板安装完成后,可以将吊装杆4拆下,并用于其它组合楼板的吊装,从而可以使得多块组合楼板共用一个吊装杆4,以降低组合楼板的生产成本。In a preferred embodiment of the present invention, the lifting rod 4 is detachably installed on the truss beam 1 . That is, after the composite floor is installed, the lifting rod 4 can be removed and used for hoisting of other composite floors, so that multiple composite floors can share one lifting rod 4 to reduce the production cost of the composite floor.
所述吊装杆4可以为空心杆或者实心杆,其材料可以使用模具钢等材料制作。The lifting rod 4 can be a hollow rod or a solid rod, and its material can be made of mold steel and other materials.
在本实用新型中,所述吊装杆4可以采用各种方式可拆卸地安装在桁架梁1上。优选地,如图1、图2所示,在一个优选的实施方式中,所述桁架梁1的前横梁11和后横梁12的底杆上均固定有两个安装板6,所述安装板6上开设有用于穿过所述吊装杆4的通孔,所述吊装杆4的前后两端分别插入所述前横梁11和后横梁12上的安装板6的通孔中。所述安装板6的形状可以为矩形,在其中部开设通孔,所述通孔的形状根据吊装杆4的形状确定,当吊装杆4为圆杆时,所述通孔为圆形孔,当吊装杆4为矩形杆时,所述通孔为矩形。所述安装板6可以通过焊接、螺栓连接等方式固定在前横梁11或后横梁12的底杆上。In the present invention, the lifting rod 4 can be detachably installed on the truss girder 1 in various ways. Preferably, as shown in Fig. 1 and Fig. 2, in a preferred embodiment, two mounting plates 6 are fixed on the bottom bars of the front beam 11 and the rear beam 12 of the truss girder 1, and the mounting plates 6 is provided with a through hole for passing through the lifting rod 4, and the front and rear ends of the lifting rod 4 are respectively inserted into the through holes of the mounting plate 6 on the front beam 11 and the rear beam 12. The shape of the mounting plate 6 can be rectangular, and a through hole is opened in the middle thereof. The shape of the through hole is determined according to the shape of the lifting rod 4. When the lifting rod 4 is a round rod, the through hole is a circular hole. When the lifting rod 4 is a rectangular rod, the through hole is rectangular. The mounting plate 6 can be fixed on the bottom bar of the front cross beam 11 or the rear cross beam 12 by means of welding, bolt connection and the like.
采用上述的安装板6来固定吊装杆4,当组合楼板吊装完毕后,可以将吊装杆4从安装板6的通孔中方便地抽出,用于其他组合楼板的吊装。The above-mentioned mounting plate 6 is used to fix the lifting rod 4. After the composite floor is hoisted, the lifting rod 4 can be easily extracted from the through hole of the mounting plate 6 for hoisting of other composite floors.
优选地,固定在所述前横梁11上的两个安装板6的通孔的轴线相互平行,并且位于所述前横梁11左侧的安装板6距离所述前横梁11左端的距离等于位于所述前横梁11右侧的安装板6距离所述前横梁11右端的距离。即安装在前横梁11上的两个安装板6的通孔的轴线关于前横梁11的中心左右对称设置,安装在后横梁12上的两个安装板6的通孔的轴线也关于前横梁11的中心左右对称设置。从而可以使得安装的两根吊装杆4相互平行。Preferably, the axes of the through holes of the two mounting plates 6 fixed on the front beam 11 are parallel to each other, and the distance between the mounting plate 6 on the left side of the front beam 11 and the left end of the front beam 11 is equal to that on the left side of the front beam 11. The distance between the mounting plate 6 on the right side of the front beam 11 and the right end of the front beam 11 . That is, the axes of the through holes of the two mounting plates 6 installed on the front beam 11 are symmetrically arranged about the center of the front beam 11, and the axes of the through holes of the two mounting plates 6 installed on the rear beam 12 are also about the front beam 11. The left-right symmetrical setting of the center. Thereby, the two lifting rods 4 installed can be made to be parallel to each other.
根据需要,所述桁架梁1上也可以安装三根或更多根的吊装杆,以方便组合楼板的吊装。According to needs, three or more hoisting rods can also be installed on the truss girder 1 to facilitate the hoisting of the composite floor.
在本实用新型的一个实施方式中,所述上层板3的上表面从一端向另一端倾斜,所上层板3的上表面的倾斜角为0.1-5度。该组合楼板可以适用于厨房使用,通过将上层板3的上表面设置为略微倾斜的表面,可以使得洒落在上层板3上的水汇聚到组合楼板的一端而被设置的地漏排出,保证不会出现由于忘记关水龙头而浸渍放置在楼板上的家具电器。In one embodiment of the present utility model, the upper surface of the upper layer plate 3 is inclined from one end to the other end, and the inclination angle of the upper surface of the upper layer plate 3 is 0.1-5 degrees. The composite floor can be used in the kitchen, by setting the upper surface of the upper floor 3 as a slightly inclined surface, the water spilled on the upper floor 3 can be gathered to one end of the composite floor to be discharged by the floor drain, so that it will not Occurrence of impregnation of furniture appliances placed on the floor due to forgetting to turn off the tap.
在本实用新型的另一个实施方式中,如图2、图3所示,所述上层板3的上表面为一端高、一端低的台阶面。将上层板3的上表面设置为台阶面,可以方便该楼板用于卫生间,即将较低的一端设置为洗浴使用,不会使得洗浴用水流到卫生间地板各处,有助于保持卫生间的整体清洁。In another embodiment of the present utility model, as shown in FIG. 2 and FIG. 3 , the upper surface of the upper plate 3 is a stepped surface with one end high and the other end low. Setting the upper surface of the upper board 3 as a step surface can facilitate the use of the floor in the bathroom, that is, the lower end is set for bathing, so that the bathing water will not flow to the bathroom floor, which helps to keep the bathroom clean as a whole .
在本实用新型中,为了便于室内电器的安装,如图1所示,优选地,在所述上层板3设置有插座安装孔,所述插座安装孔穿过所述上层板3和压型钢板2,所述插座安装孔上固定安装有插座7。连接插座7的电线可以设置在位于压型钢板2下的桁架梁1之间。In the utility model, in order to facilitate the installation of indoor electrical appliances, as shown in Figure 1, preferably, a socket mounting hole is provided on the upper layer 3, and the socket mounting hole passes through the upper layer 3 and the profiled steel plate 2. A socket 7 is fixedly installed on the socket mounting hole. Wires connecting the sockets 7 can be arranged between the truss girders 1 located under the profiled steel plates 2 .
在本实用新型中,所述组合楼板还可以包括独立基础8,在所述桁架梁1的每个拐角处均安装有一个所述独立基础8,所述独立基础8位于所述桁架梁1的下方。例如,如图1所示,当桁架梁1为矩形时,在桁架梁1的四个拐角处均固定有一个独立基础8,从而可以稳定地支撑桁架梁1。In the present utility model, the composite floor slab may also include an independent foundation 8, one independent foundation 8 is installed at each corner of the truss beam 1, and the independent foundation 8 is located at the corner of the truss beam 1 below. For example, as shown in FIG. 1 , when the truss girder 1 is rectangular, an independent foundation 8 is fixed at four corners of the truss girder 1 , so that the truss girder 1 can be stably supported.
所述独立基础8为工厂预制的带有预埋地脚螺栓的钢筋混凝土基础,独立基础8一般包括混凝土墩和位于混凝土墩上的基础短柱,混凝土墩为在模具中浇筑而成,基础短柱预埋在混凝土墩内,其中设置有地脚螺栓。The independent foundation 8 is a reinforced concrete foundation with pre-embedded anchor bolts prefabricated in the factory. The independent foundation 8 generally includes a concrete pier and a short foundation column located on the concrete pier. The concrete pier is cast in a mold, and the short foundation The column is pre-buried in the concrete pier, in which anchor bolts are set.
所述桁架梁1可以通过各种适当方式与独立基础8固定连接。在一个优选的实施方式中,在所述桁架梁1的每个拐角处均固定有固定板,所述独立基础8通过地脚螺栓与固定板连接。具体地,在桁架梁1的底杆形成的拐角处焊接连接有矩形的固定板,并在固定板上开设有长条形的安装孔,地脚螺栓穿过固定板上的安装孔后通过螺母锁紧。其中桁架梁1的下端压在独立基础8上,从而使得固定板只承受横向的作用力,因此可以提高组合楼板的整体结构强度。The truss girder 1 can be fixedly connected to the independent foundation 8 in various appropriate ways. In a preferred embodiment, a fixed plate is fixed at each corner of the truss beam 1 , and the independent foundation 8 is connected to the fixed plate through anchor bolts. Specifically, at the corner formed by the bottom bar of the truss girder 1, a rectangular fixing plate is welded and connected, and a long strip-shaped mounting hole is opened on the fixing plate, and the anchor bolt passes through the mounting hole on the fixing plate and passes through the nut lock tight. Wherein the lower end of the truss beam 1 is pressed on the independent foundation 8, so that the fixed plate only bears the lateral force, so the overall structural strength of the composite floor can be improved.
由上述可知,本实用新型提供的组合楼板相对于现有的楼板具有以下技术优势:1、吊装方便,适合多块组合楼板的安装;2、吊装组合楼板时基本不会影响组合楼板的结构强度;3、组合楼板的整体结构强度高、制造成本低。It can be seen from the above that the composite floor provided by the utility model has the following technical advantages compared with the existing floor: 1. It is convenient for hoisting and is suitable for the installation of multiple composite floors; 2. The structural strength of the composite floor will not be affected basically when the composite floor is hoisted ; 3. The overall structural strength of the combined floor slab is high and the manufacturing cost is low.
以上实施方式的先后顺序仅为便于描述,不代表实施方式的优劣。The order of the above implementations is for convenience of description only, and does not represent the advantages or disadvantages of the implementations.
最后应说明的是:以上实施方式仅用以说明本实用新型的技术方案,而非对其限制;尽管参照前述实施方式对本实用新型进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施方式所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本实用新型各实施方式技术方案的精神和范围。Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present utility model, rather than to limit them; although the utility model has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art should understand that: It is still possible to modify the technical solutions recorded in the foregoing embodiments, or to perform equivalent replacements for some of the technical features; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the spirit of the technical solutions of the various embodiments of the present invention. and range.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201820004258.2U CN207794401U (en) | 2018-01-02 | 2018-01-02 | A kind of composite floor |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201820004258.2U CN207794401U (en) | 2018-01-02 | 2018-01-02 | A kind of composite floor |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207794401U true CN207794401U (en) | 2018-08-31 |
Family
ID=63278280
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201820004258.2U Expired - Fee Related CN207794401U (en) | 2018-01-02 | 2018-01-02 | A kind of composite floor |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207794401U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110005105A (en) * | 2019-04-28 | 2019-07-12 | 安徽军瑶新型材料有限公司 | A kind of monoblock type assembly building prefabrication Roofing slab |
| CN113550476A (en) * | 2021-07-17 | 2021-10-26 | 南京明辉建设有限公司 | Combined floor structure |
-
2018
- 2018-01-02 CN CN201820004258.2U patent/CN207794401U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110005105A (en) * | 2019-04-28 | 2019-07-12 | 安徽军瑶新型材料有限公司 | A kind of monoblock type assembly building prefabrication Roofing slab |
| CN113550476A (en) * | 2021-07-17 | 2021-10-26 | 南京明辉建设有限公司 | Combined floor structure |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104563384B (en) | Structural heat-insulation and decoration integrated large prefabricated external wall panel and manufacturing method thereof | |
| CN101845852B (en) | Light steel and light concrete structural system and construction method thereof | |
| JP2015519491A (en) | How to assemble a truss, suspend a formwork, and manufacture a ferrocement slab on site | |
| CN101967851A (en) | Board-mixing structure assembly type house and building method thereof | |
| CN103924710B (en) | Low layer assembled combined wall house Plate Welding node structure | |
| CN108589986A (en) | One kind being based on bolted assembled composite wall structure and its construction method | |
| CN206859479U (en) | A kind of steel bar girder laminated floor slab | |
| CN108005387A (en) | A kind of assembled wallboard and the cast-in-place main body method for synchronously constructing of shear wall with short piers | |
| CN111411724A (en) | Steel beam-concrete composite floor slab combined assembly system | |
| CN108104284B (en) | Wall panel connection structure and assembly method with steel arm of shear wall embedded in floor slab | |
| CN204781575U (en) | A large-scale prefabricated external wall panel integrated with structural insulation and decoration | |
| CN107989238A (en) | A kind of cast-in-place sandwiched heat-preservation shear wall structure, assembled architecture and engineering method | |
| CN103628683A (en) | Construction method of cast-in-place hollow girderless floor | |
| CN212534738U (en) | Truss Floor Slab | |
| CN105672664A (en) | Integral heat insulation wallboard building system | |
| CN110644663B (en) | Assembled coincide floor | |
| CN110499858A (en) | Non-demolition-free non-metallic base plate fixed-form laminated plate, corresponding floor structure and floor construction method | |
| CN111411693A (en) | Assembly and pouring integrated shear wall structure building system | |
| CN215106121U (en) | One-way superimposed sheet piece department joint construction | |
| CN207794401U (en) | A kind of composite floor | |
| CN112982692A (en) | One-way superimposed sheet joint connecting structure and construction method | |
| CN109895239B (en) | A kind of prefabricated concrete stair ramp slab and its construction method | |
| CN101487309A (en) | Precast slab for cast-in-situ floor and its construction method | |
| CN205444514U (en) | Bearing light insulation intergral template | |
| CN218176242U (en) | Assembled high performance concrete restraint shear force wall |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180831 |