CN218814388U - High-precision metal galvanizing embedded part - Google Patents

High-precision metal galvanizing embedded part Download PDF

Info

Publication number
CN218814388U
CN218814388U CN202223485616.1U CN202223485616U CN218814388U CN 218814388 U CN218814388 U CN 218814388U CN 202223485616 U CN202223485616 U CN 202223485616U CN 218814388 U CN218814388 U CN 218814388U
Authority
CN
China
Prior art keywords
plate
galvanized
connecting plate
fixing
embedded part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223485616.1U
Other languages
Chinese (zh)
Inventor
谢国伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Hancheng Hardware Co ltd
Original Assignee
Hangzhou Xiangwei Chemical Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Xiangwei Chemical Equipment Co ltd filed Critical Hangzhou Xiangwei Chemical Equipment Co ltd
Priority to CN202223485616.1U priority Critical patent/CN218814388U/en
Application granted granted Critical
Publication of CN218814388U publication Critical patent/CN218814388U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/24Structural elements or technologies for improving thermal insulation
    • Y02A30/244Structural elements or technologies for improving thermal insulation using natural or recycled building materials, e.g. straw, wool, clay or used tires

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model provides a high accuracy metal-plating zinc built-in fitting includes the wall body, the right side of wall body is provided with the fixing base, two fixed plates of right side fixedly connected with of fixing base, two one side that the fixed plate is relative is provided with the steel sheet, the positive fixedly connected with connecting plate of steel sheet, the connecting hole has been seted up to the inboard of connecting plate. The utility model provides a high accuracy metal plating built-in fitting fixes the zinc-plated link plate through setting up of steel sheet and connecting plate, has cancelled the connected mode of traditional side's pipe and angle steel, need not weldment work during the construction, has improved the efficiency of work, and has saved the expenditure cost of angle steel, and the interval between the connecting plate is the same, and the gap size between the dry-hanging back stone material is also the same, more pleasing to the eye after the construction.

Description

High-precision metal galvanizing embedded part
Technical Field
The utility model relates to an embedded part field especially relates to a high accuracy metal galvanization embedded part.
Background
The embedded part is a member which is pre-installed in hidden engineering, is a structural part arranged during structural pouring and is used for overlapping when an upper structure is built. In order to be favorable to the installation of external engineering equipment basis fixed, the built-in fitting is mostly made by metal, for example: the steel bar or cast iron, also can be made of non-metal rigid material such as wood, plastics, etc.
The embedded part is a member which is reserved in a structure and consists of a steel plate and an anchoring rib and is used for connecting a structural member or a non-structural member for fixing. For example, the fixing of the post-process, such as the connecting pieces used for doors, windows, curtain walls, water pipes, gas pipes and the like. There are many points where the concrete structure is connected to the steel structure.
In the related technology, stone dry hanging is a novel construction process in wall decoration, and the method uses metal embedded parts to directly hang facing stones on a wall or hang the facing stones on a steel frame without grouting and bonding. However, when the existing stone dry-hanging embedded part is used, angle steel is mostly welded on the surface of a square pipe, then the stone is hung in a dry mode through a metal hanging part, angle deviation of the angle steel is easy to occur in the welding process, welding accuracy is not convenient to control, and therefore gaps between the stone dry-hanging embedded part and the stone dry-hanging embedded part are different, and attractiveness of the outer vertical face of a building is affected.
Therefore, it is necessary to provide a high-precision metal-galvanized embedded part to solve the above technical problems.
SUMMERY OF THE UTILITY MODEL
The utility model provides a high accuracy metal galvanization built-in fitting has solved in the correlation technique, and current partial stone material hangs the built-in fitting futilely when using, and angle steel appears angular deviation easily at the welded in-process, causes the problem of gap variation in size between the stone material easily.
In order to solve the technical problem, the utility model provides a pair of high accuracy metal-plating built-in fitting, the light-weight pipe comprises a wall body, the right side of wall body is provided with the fixing base, two fixed plates of the right side fixedly connected with of fixing base, two one side that the fixed plate is relative is provided with the steel sheet, the positive fixedly connected with connecting plate of steel sheet, the connecting hole has been seted up to the inboard of connecting plate.
Preferably, the top of connecting plate is provided with the galvanized hanging plate, the bottom of connecting plate is provided with the galvanized bolt, the bottom that the bottom of connecting plate and galvanized hanging plate drive bottom and extend to the top of galvanized hanging plate are run through in proper order in the top of galvanized bolt, the side just is located the top threaded connection of galvanized hanging plate in the week of galvanized bolt has fixed spiral shell piece.
Preferably, the periphery side on galvanized hanging plate right side is provided with two stone material boards, two the relative one side of stone material board has all been seted up and has been hung the groove.
Preferably, the right side of fixing base is provided with four expansion bolts, four expansion bolt's left side runs through the right side of fixing base and the right side of wall body in proper order and extends to the inside of wall body.
Preferably, the front surface of the front fixing plate is provided with two fixing bolts, and the back surfaces of the two fixing bolts sequentially penetrate through the front surface of the front fixing plate, the front surface of the steel plate and the front surface of the rear fixing plate and extend to the back surface of the rear fixing plate.
Preferably, four mounting holes are formed in the inner side of the fixing seat.
Compared with the prior art, the utility model provides a pair of high accuracy metal galvanization built-in fitting has following beneficial effect:
the utility model provides a high accuracy metal plating built-in fitting fixes the zinc-plated link plate through setting up of steel sheet and connecting plate, has cancelled the connected mode of traditional side's pipe and angle steel, need not weldment work during the construction, has improved the efficiency of work, and has saved the expenditure cost of angle steel, and the interval between the connecting plate is the same, and the gap size between the dry-hanging back stone material is also the same, more pleasing to the eye after the construction.
Drawings
Fig. 1 is a schematic structural diagram of a preferred embodiment of a high-precision galvanized embedded part provided by the present invention;
FIG. 2 is an enlarged view of the structure of the region A shown in FIG. 1;
FIG. 3 is a schematic structural view of the fixing base shown in FIG. 2;
FIG. 4 is a schematic structural view of the steel plate shown in FIG. 1;
fig. 5 is an enlarged view of the structure of the region B shown in fig. 1.
Reference numbers in the figures: 1. a wall body; 2. a fixed seat; 3. a fixing plate; 4. a steel plate; 5. a connecting plate; 6. connecting holes; 7. a galvanized hanging plate; 8. a galvanized bolt; 9. fixing the screw block; 10. a stone plate; 11. hanging a groove; 12. an expansion bolt; 13. fixing the bolt; 14. and (7) installing holes.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and embodiments.
Please refer to fig. 1, fig. 2, fig. 3, fig. 4 and fig. 5 in combination, in which fig. 1 is a schematic structural diagram of a preferred embodiment of a high-precision galvanized embedded part according to the present invention; FIG. 2 is an enlarged view of the structure of the region A shown in FIG. 1; FIG. 3 is a schematic structural view of the fixing base shown in FIG. 2; FIG. 4 is a schematic structural view of the steel plate shown in FIG. 1; fig. 5 is the enlarged schematic diagram of the structure in the B district that fig. 1 shows, a high accuracy metal galvanization built-in fitting, including wall body 1, the right side of wall body 1 is provided with fixing base 2, two fixed plates 3 of the right side fixedly connected with of fixing base 2, one side that two fixed plates 3 are relative is provided with steel sheet 4, the positive fixedly connected with connecting plate 5 of steel sheet 4, connecting hole 6 has been seted up to the inboard of connecting plate 5, connecting hole 6 uses with the cooperation of galvanized bolt 8 for fixed galvanization link plate 7.
The top of connecting plate 5 is provided with galvanized link plate 7, the bottom of connecting plate 5 is provided with galvanized bolt 8, galvanized bolt 8's top runs through the bottom of connecting plate 5 and the top that galvanized link plate 7 drove the bottom and extended to galvanized link plate 7 in proper order, galvanized bolt 8's week side and the top threaded connection who is located galvanized link plate 7 have fixed spiral shell piece 9, galvanized link plate 7 is common structure on the existing market, interval between the connecting plate 5 is decided according to the size of hanging the stone material futilely, and 5 intervals of connecting plate on the same batch of steel sheet 4 are the same.
The week side on 7 right sides of galvanized hanging plate is provided with two stone material boards 10, and hanging groove 11 has all been seted up to one side that two stone material boards 10 are relative, hangs groove 11 and the cooperation of galvanized hanging plate 7 and uses for install stone material board 10, need paint the marble glue when hanging construction in the groove 11, improve the joint strength of galvanized hanging plate 7 and stone material board 10.
The right side of fixing base 2 is provided with four expansion bolts 12, and the left side of four expansion bolts 12 runs through the right side of fixing base 2 and the right side of wall body 1 in proper order and extends to the inside of wall body 1, need paint building structure glue in the week side of expansion bolts 12 and the inboard that is located wall body 1 during the installation to improve the intensity of connecting.
The front surface of the front fixing plate 3 is provided with two fixing bolts 13, and the back surfaces of the two fixing bolts 13 sequentially penetrate through the front surface of the front fixing plate 3, the front surface of the steel plate 4 and the front surface of the rear fixing plate 3 and extend to the back surface of the rear fixing plate 3.
Four mounting holes 14 have been seted up to the inboard of fixing base 2, and mounting hole 14 uses with expansion bolts 12 cooperation for be connected fixing base 2 and wall body 1 through expansion bolts 12.
The utility model provides a pair of high accuracy metal galvanization built-in fitting's theory of operation as follows:
when using, connect fixing base 2 and wall body 1 through expansion bolts 12, then place steel sheet 4 in the relative one side of two fixed plates 3, connect fixed plate 3 and steel sheet 4 through fixing bolts 13, utilize galvanized bolt 8 to connect connecting plate 5 and galvanized link plate 7, and then can hang stone material board 10 on galvanized link plate 7 through hanging groove 11, accomplish the dry-hanging to stone material board 10.
Compared with the prior art, the utility model provides a pair of high accuracy metal-plating zinc built-in fitting has following beneficial effect:
the galvanized hanging plate 7 is fixed through the arrangement of the steel plate 4 and the connecting plate 5, the traditional connection mode of the square pipe and the angle steel is omitted, welding work is not needed during construction, the work efficiency is improved, the expenditure cost of the angle steel is saved, the distance between the connecting plates 5 is the same, the size of a gap between dry-hanging back stones is the same, and the appearance is more attractive after construction.
The above only is the embodiment of the present invention, not limiting the scope of the present invention, all the equivalent structures or equivalent processes of the present invention are used in the specification and the attached drawings, or directly or indirectly applied to other related technical fields, and the same principle is included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a high accuracy metal galvanization built-in fitting, includes wall body (1), its characterized in that: the right side of wall body (1) is provided with fixing base (2), two fixed plate (3) of right side fixedly connected with of fixing base (2), two one side that fixed plate (3) are relative is provided with steel sheet (4), positive fixedly connected with connecting plate (5) of steel sheet (4), connecting hole (6) have been seted up to the inboard of connecting plate (5).
2. The high-precision metal-plated embedded part according to claim 1, wherein a galvanized hanging plate (7) is arranged at the top of the connecting plate (5), a galvanized bolt (8) is arranged at the bottom of the connecting plate (5), the top of the galvanized bolt (8) sequentially penetrates through the bottom of the connecting plate (5) and the top of the galvanized hanging plate (7) to drive the bottom and extend to the top of the galvanized hanging plate (7), and a fixing screw block (9) is connected to the peripheral side of the galvanized bolt (8) and the top of the galvanized hanging plate (7) in a threaded manner.
3. The high-precision metal-plated embedded part according to claim 2, wherein two stone plates (10) are arranged on the peripheral side surface on the right side of the galvanized hanging plate (7), and hanging grooves (11) are formed in the opposite sides of the two stone plates (10).
4. The high-precision metal-galvanized embedded part according to claim 1, characterized in that four expansion bolts (12) are arranged on the right side of the fixed seat (2), and the left sides of the four expansion bolts (12) sequentially penetrate through the right side of the fixed seat (2) and the right side of the wall body (1) and extend into the wall body (1).
5. The high-precision metal-galvanized embedded part according to claim 1, characterized in that the front surface of the front fixing plate (3) is provided with two fixing bolts (13), and the back surfaces of the two fixing bolts (13) sequentially penetrate through the front surface of the front fixing plate (3), the front surface of the steel plate (4) and the front surface of the rear fixing plate (3) and extend to the back surface of the rear fixing plate (3).
6. The high-precision metal-galvanized embedded part according to claim 5, characterized in that four mounting holes (14) are formed on the inner side of the fixed seat (2).
CN202223485616.1U 2022-12-27 2022-12-27 High-precision metal galvanizing embedded part Active CN218814388U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223485616.1U CN218814388U (en) 2022-12-27 2022-12-27 High-precision metal galvanizing embedded part

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223485616.1U CN218814388U (en) 2022-12-27 2022-12-27 High-precision metal galvanizing embedded part

Publications (1)

Publication Number Publication Date
CN218814388U true CN218814388U (en) 2023-04-07

Family

ID=87275579

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223485616.1U Active CN218814388U (en) 2022-12-27 2022-12-27 High-precision metal galvanizing embedded part

Country Status (1)

Country Link
CN (1) CN218814388U (en)

Similar Documents

Publication Publication Date Title
CN103726597A (en) Frame type unit curtain wall adopting auxiliary installing rack, tooth profile angle and tooth profile support
CN205314423U (en) Back rib hangs decorative board futilely
CN218814388U (en) High-precision metal galvanizing embedded part
CN208870250U (en) Stone curtain wall is used in a kind of installation of large area
CN102493620B (en) Through long folded fastener type wall body connecting piece of heat insulation integrated plate and mounting method thereof
CN208379857U (en) A kind of disjunctor stone curtain wall
CN215484336U (en) Outer facade transformation assembled stone material mounting structure
WO2013040884A1 (en) Split-body clamp-fixed-type ceramic tile curtain wall
CN101984199A (en) Anti-corrosion wood decoration system of outer wall and construction method thereof
CN213897927U (en) Bearing device for arranging heat-insulation and decoration integrated plate on outer wall of building
JPH10131366A (en) Mounting structure of alc panel
CN111877772B (en) Installation method of unit type building exterior decoration ceiling system
CN211833860U (en) Curtain box node structure for indoor suspended ceiling
CN212866706U (en) Assembled aluminum plate dry hanging structure
CN210293982U (en) Water absorption detection device for building material design
CN202899532U (en) Connecting component for low carbon plate adhesive clamping combination
CN110374227B (en) External net sheet type wall heat preservation and decoration system and construction method thereof
CN207892179U (en) A kind of cladding steel construction of stull no-welding
CN205875482U (en) Installation connection structure at complicated position of GRC side fascia
CN221276934U (en) Steel structure wall
CN211899142U (en) Slotting stone water leakage-proof aluminum veneer back plate mounting structure
CN217734685U (en) Dry-hanging stone connecting piece fixing device
CN204940776U (en) Finished product wood veneer board keel blade inserting hanging structure
CN216713451U (en) Steel construction is preassembleing formula outer wall for building
CN215166802U (en) Assembled window frame wall body

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240620

Address after: 311118 Room 101, 1st Floor, Building 1, Baizhang Village, Baizhang Town, Yuhang District, Hangzhou City, Zhejiang Province

Patentee after: Hangzhou Hancheng Hardware Co.,Ltd.

Country or region after: China

Address before: 311200 Zhedong Village, Nanyang Street, Xiaoshan District, Hangzhou City, Zhejiang Province

Patentee before: Hangzhou Xiangwei Chemical Equipment Co.,Ltd.

Country or region before: China