CN208867149U - A kind of wallboard heap frame - Google Patents

A kind of wallboard heap frame Download PDF

Info

Publication number
CN208867149U
CN208867149U CN201821244309.5U CN201821244309U CN208867149U CN 208867149 U CN208867149 U CN 208867149U CN 201821244309 U CN201821244309 U CN 201821244309U CN 208867149 U CN208867149 U CN 208867149U
Authority
CN
China
Prior art keywords
wallboard
girder
stand
gag lever
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821244309.5U
Other languages
Chinese (zh)
Inventor
时晗
陈键
王振
李修昌
刘发杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Hanshi Yunsheng Residential Industrial Development Co Ltd
Original Assignee
Shanghai Hanshi Yunsheng Residential Industrial Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Hanshi Yunsheng Residential Industrial Development Co Ltd filed Critical Shanghai Hanshi Yunsheng Residential Industrial Development Co Ltd
Priority to CN201821244309.5U priority Critical patent/CN208867149U/en
Application granted granted Critical
Publication of CN208867149U publication Critical patent/CN208867149U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to prefabricated panel fields, a kind of wallboard heap frame is disclosed, including support frame and the girder being plugged on support frame, is uniformly provided with multiple intercommunicating pores on girder, intercommunicating pore is axial parallel with width of main beam direction, and the separating tube for partition wallboard is equipped in intercommunicating pore.Wallboard is stacked in practice, wallboard accumulation confusion is unfavorable for the problem of checking management, the utility model passes through setting separating tube, wallboard is vertically placed between two pieces of separating tubes, operator is facilitated to check wallboard quantity, keep wallboard accumulation more neat, while wallboard is placed vertically, the suspension hook on wallboard is placed upward and lifts by crane wallboard convenient for loop wheel machine.

Description

A kind of wallboard heap frame
Technical field
The utility model relates to prefabricated panel fields, more specifically, it relates to a kind of wallboard heap frame.
Background technique
Precast concrete refers in the factory through the concrete product of standardization, mechanized manner processing, phase Faster for conventional preform mould speed, cost is lower.
When prefabricated panel in the factory is transported to construction site, it is lifted in building after needing to be arranged, it is existing Have in technology, wallboard usually optionally stacks on the ground, then lifts by crane wallboard one by one by loop wheel machine and is conveyed, due to wallboard heap Product confusion is inconvenient to check quantity, easily causes wallboard conveying quantity incorrect.
Utility model content
For the problem that practice deadlight accumulates confusion, it is not easy to check quantity, the utility model aim is to mention A kind of wallboard heap frame, concrete scheme are as follows out:
A kind of wallboard heap frame uniformly opens up on the girder including support frame and the girder being plugged on support frame as described above There are multiple intercommunicating pores, the intercommunicating pore is axial parallel with width of main beam direction, is equipped in the intercommunicating pore for partition wallboard Separating tube.
By above-mentioned setting, is stored in use, wallboard is vertically placed between two adjacent separating tubes, facilitate behaviour Wallboard quantity is checked as personnel, and wallboard accumulation is more neat, while wallboard is placed vertically, and the suspension hook on wallboard is put upward It sets, loop wheel machine is facilitated to lift by crane wallboard.
Further, the positioning plate for fixing separating tube position, the separating tube are fixedly connected on the separating tube On be additionally provided with limit hole, be provided with gag lever post in the limit hole, the limit pole length is greater than the limit hole length, institute It states gag lever post and positioning plate is respectively arranged at girder two sides.
By above-mentioned setting, positioning plate and gag lever post are connected to girder two sides respectively, prevent separating tube from sending out in its axial direction The problem that raw sliding causes wallboard accumulation unstable.
Further, the gag lever post grafting is set to positioning hole, and the gag lever post upper end, which is provided with, prevents gag lever post The limited block fallen from limit hole.
By above-mentioned setting, gag lever post is detachable setting, and operator is facilitated to dismount separating tube.
Further, support frame as described above bottom is provided with pedestal, and the pedestal is set as a metal base plate.
By above-mentioned setting, increase contact area of the support frame between ground, prevents support frame lower section ground because of pressure It is excessive and collapse, at the same guarantee support frame can be horizontally arranged avoid tilting because of support frame caused by wallboard tilt and collapse.
Further, support frame as described above includes the stand being vertically arranged and the batter post being obliquely installed, and described bottom plate one end is put Be placed on bottom plate, inserting groove be provided on the other end, the girder is plugged in the inserting groove, described batter post one end with it is described Stand is fixedly connected, and the batter post is set on the pedestal far from stand one end.
By above-mentioned setting, stable triangular structure is constituted between stand, batter post and bottom plate, so that wallboard heap frame is whole more It is firm.
Further, the girder includes inserting section and linkage section, and the inserting section is set to linkage section both ends, described to insert Section is connect to be plugged in inserting groove, the section of the inserting section in the width direction be the linkage section in the width direction Section Scaling.
By above-mentioned setting, girder grafting is entered in inserting groove, and will not occur axially to shift along girder.
Further, diagonal brace is set between the girder and stand, and described diagonal brace one end is fixedly connected with the stand, institute It states diagonal brace and is fixedly connected far from stand one end with the girder.
By above-mentioned setting, stable triangular structure is constituted between girder, stand and diagonal brace, so that wallboard heap frame is whole more It is firm.
Further, being horizontally disposed in the stand has more stepped stems.
By above-mentioned setting, height is higher when being placed vertically due to wallboard, and operator can climb up wall by stepped stem Above sheetpile frame, convenient for the suspension hook of hoisting machine is docked with wallboard top hanging ring.
Compared with prior art, the beneficial effects of the utility model are as follows:
(1) by setting separating tube, enable wallboard vertically and prevent to facilitate operation in the compartment between two separating tubes Personnel check wallboard quantity, keep wallboard accumulation more neat, while wallboard is placed lift by crane wallboard convenient for loop wheel machine vertically;
(2) position of separating tube will be secured by the way that positioning plate and gag lever post, positioning plate and gag lever post are arranged on separating tube It sets, prevents separating tube generation is mobile when stacking wallboard from wallboard being caused to shake easy initiation safety accident therewith;
(3) by the way that dismountable girder, separating tube is arranged, wallboard heap frame can be dismantled when not in use, facilitate storage and Transport.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the utility model;
Fig. 2 is the partial enlargement diagram in the portion A in Fig. 1;
Fig. 3 is the attachment structure schematic diagram of girder and separating tube;
Fig. 4 is the diagrammatic cross-section of girder and separating tube.
Appended drawing reference: 1, support frame;2, girder;21, inserting section;22, linkage section;3, intercommunicating pore;4, separating tube;5, it positions Plate;6, limit hole;7, gag lever post;8, limited block;9, bottom plate;10, diagonal brace;11, stand;12, batter post;13, inserting groove;14, rank Ladder bars.
Specific embodiment
Below with reference to examples and drawings, the utility model is described in further detail, but the implementation of the utility model Mode is not limited only to this.
As depicted in figs. 1 and 2, a kind of wallboard heap frame, including support frame 1, girder 2 and separating tube 4, girder 2 are plugged in On support frame 1, multiple intercommunicating pores 3 are uniformly provided on girder 2, intercommunicating pore 3 is axial parallel with 2 width direction of girder.Separating tube 4 It is plugged in intercommunicating pore 3,3 quantity of intercommunicating pore being spaced between adjacent separating tube 4 can be selected according to wallboard thickness, wallboard is placed in Between separating tube 4.
Specifically, as shown in figures 1 and 3, being welded on the outside tube wall of separating tube 4 for fixing 4 position of separating tube Circular orientation plate 5 is abutted when separating tube 4 is inserted into rear position plate 5 with girder 2.In the side of the remotely located plate 5 of girder 2, separating tube Limit hole 6 is offered on 4, gag lever post 7 is plugged in limit hole 6, and 7 length of gag lever post is greater than the length of limit hole 6.Gag lever post 7 Upper end is wholely set the limited block 8 for preventing gag lever post 7 from falling from limit hole 6.Girder 2 is clipped in by gag lever post 7 and positioning plate 5 Fixed separating tube 4 is played the role of in centre, while operator can extract gag lever post 7 out, and separating tube 4 is disassembled.
Since wallboard is overweight, if support frame 1 is placed directly on ground and may result in support frame 1 and ground abuts against place Sedimentation, which occurs, for ground keeps support frame 1 unstable.So being placed with pedestal in 1 bottom of support frame, pedestal is a steel bottom plate 9, bottom plate 9 Area is adapted to specific wallboard size.Support frame 1 includes the stand 11 being vertically arranged and the batter post 12 being obliquely installed.Stand 11 1 End is placed on bottom plate 9, and inserting groove 13 is offered on the other end.Girder 2 is plugged in inserting groove 13,12 one end of batter post and vertical Frame 11 is welded and fixed, and batter post 12 is far from 11 one end of stand and is placed on pedestal.Structure between stand 11, batter post 12 and bottom plate 9 At stable triangular structure, so that wallboard heap frame is whole more firm.Girder 2 includes inserting section 21 and connection.It is horizontal in stand 11 It is provided with the more stepped stems 14 convenient for staff's climbing.
In conjunction with Fig. 1 and Fig. 4, inserting section 21 is integrally formed at 22 both ends of linkage section, and inserting section 21 is plugged in inserting groove 13, The section of inserting section 21 in the width direction is the section Scaling of linkage section 22 in the width direction, and is in rectangle. Diagonal brace 10 is set between girder 2 and stand 11,10 one end of diagonal brace is fixedly connected with stand 11, diagonal brace 10 far from 11 one end of stand and Girder 2 is fixedly connected.Stable triangular structure is constituted between girder 2, stand 11 and diagonal brace 10.
It the implementation principle of the utility model and has the beneficial effect that:
Girder 2 is first plugged into the stand 11 of support frame 1 by operator by inserting section 21, then inserts separating tube 4 Enter the intercommunicating pore 3 on girder 2, finally gag lever post 7 is inserted into limit hole 6 and plays the role of fixed separating tube 4.In lifting wallboard When, operator climbs up support frame 1 by stepped stem 14, and loop wheel machine is linked up with and is connect with wallboard top hanging ring.The utility model tool The characteristics of being easily installed disassembly, while wallboard can be stacked vertically, wallboard is lifted by crane with crane convenient for checking.
The above is only the preferred embodiment of the utility model, and the protection scope of the utility model is not limited merely to Above-described embodiment, technical solution belonging to the idea of the present invention belong to the protection scope of the utility model.It should refer to Out, for those skilled in the art, it is without departing from the principle of the utility model it is several improvement and Retouching, these improvements and modifications also should be regarded as the protection scope of the utility model.

Claims (8)

1. a kind of wallboard heap frame, which is characterized in that including support frame (1) and the girder (2) being plugged on support frame as described above (1), It being uniformly provided with multiple intercommunicating pores (3) on the girder (2), the intercommunicating pore (3) is axial parallel with girder (2) width direction, The separating tube (4) for partition wallboard is equipped in the intercommunicating pore (3).
2. wallboard heap frame according to claim 1, which is characterized in that be fixedly connected on the separating tube (4) for solid Determine the positioning plate (5) of separating tube (4) position, be additionally provided with limit hole (6) on the separating tube (4), is set in the limit hole (6) It is equipped with gag lever post (7), gag lever post (7) length is greater than the limit hole (6) length, the gag lever post (7) and positioning plate (5) It is respectively arranged at girder (2) two sides.
3. wallboard heap frame according to claim 2, which is characterized in that gag lever post (7) grafting is set to positioning hole, Gag lever post (7) upper end is provided with the limited block (8) for preventing gag lever post (7) from falling from limit hole (6).
4. wallboard heap frame according to claim 1, which is characterized in that support frame as described above (1) bottom is provided with pedestal, described Pedestal is set as a metal base plate (9).
5. wallboard heap frame according to claim 4, which is characterized in that support frame as described above (1) includes the stand being vertically arranged (11) with the batter post (12) that is obliquely installed, described stand (11) one end is placed on bottom plate (9), and inserting groove is provided on the other end (13), the girder (2) is plugged in the inserting groove (13), described batter post (12) one end and the stand (11) fixed company It connects, the batter post (12) is set on the pedestal far from stand (11) one end.
6. wallboard heap frame according to claim 5, which is characterized in that the girder (2) includes inserting section (21) and connection Section (22), the inserting section (21) are set to linkage section (22) both ends, and the inserting section (21) is plugged in inserting groove (13), institute The section of inserting section (21) in the width direction and the section of the linkage section (22) in the width direction is stated to contract in grade ratio It is small.
7. wallboard heap frame according to claim 6, which is characterized in that be arranged between the girder (2) and stand (11) oblique Support (10), described diagonal brace (10) one end is fixedly connected with the stand (11), the diagonal brace (10) far from stand (11) one end and The girder (2) is fixedly connected.
8. wallboard heap frame according to claim 7, which is characterized in that being horizontally disposed on the stand (11) has more ladders Bar (14).
CN201821244309.5U 2018-08-03 2018-08-03 A kind of wallboard heap frame Expired - Fee Related CN208867149U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821244309.5U CN208867149U (en) 2018-08-03 2018-08-03 A kind of wallboard heap frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821244309.5U CN208867149U (en) 2018-08-03 2018-08-03 A kind of wallboard heap frame

Publications (1)

Publication Number Publication Date
CN208867149U true CN208867149U (en) 2019-05-17

Family

ID=66464028

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821244309.5U Expired - Fee Related CN208867149U (en) 2018-08-03 2018-08-03 A kind of wallboard heap frame

Country Status (1)

Country Link
CN (1) CN208867149U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110497368A (en) * 2019-09-16 2019-11-26 安徽省高迪环保股份有限公司 A kind of prefabricated panel piling bin
CN111003038A (en) * 2019-12-26 2020-04-14 绩溪县徽洋车桥有限责任公司 Special conveyer of car axle
CN113716171A (en) * 2021-09-03 2021-11-30 四川华构建筑工程有限公司 Pre-assembled roof truss stacking frame

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110497368A (en) * 2019-09-16 2019-11-26 安徽省高迪环保股份有限公司 A kind of prefabricated panel piling bin
CN111003038A (en) * 2019-12-26 2020-04-14 绩溪县徽洋车桥有限责任公司 Special conveyer of car axle
CN113716171A (en) * 2021-09-03 2021-11-30 四川华构建筑工程有限公司 Pre-assembled roof truss stacking frame

Similar Documents

Publication Publication Date Title
CN208867149U (en) A kind of wallboard heap frame
CN207048306U (en) Sliding formwork flexibility platform
AU2010346421B2 (en) Scaffold and methods for installing or removing such a scaffold
CN105971271B (en) Unilateral cantilever form and its construction method of climbing certainly
CN201714050U (en) Integral triangular support operating platform for elevator shaft
US7735606B1 (en) Scaffold support platform
US3672115A (en) Method of erecting super-high-rised tower structure
AU2015226825A1 (en) A container for framework elements
CN215441501U (en) Cantilever steel structure combined construction hanging basket
CN209011528U (en) A kind of all steel attachment type raise scaffold
CN117302746A (en) Bearing frame for stacking reinforcing steel bars convenient to assemble
CN217128907U (en) Scaffold frame for building engineering construction convenient to material loading
CN208650506U (en) A kind of slip-framed reverse mould constructing device
US20060102712A1 (en) Chute transition frame and chute system incorporating the same
CN214424055U (en) Attached lifting scaffold platform of unloading
CN210885075U (en) Equipment secondary transportation and hoist and mount frame of taking one's place
CN209855192U (en) Automatic lifting frame for shaped elevator shaft way
CN219327290U (en) Face limit operation platform
CN210597039U (en) Cast-in-place box girder wet joint concrete placement system
CN217500855U (en) Externally hung stair case
CN211523220U (en) Underground continuous wall construction device
CN204754164U (en) Elevartor shaft construction derrick
CN221342045U (en) Assembled stair stacking rack
CN219100689U (en) Attachment structure suitable for super high floor attached lifting scaffold
CN218090875U (en) Deepwater pile foundation reinforcement cage installation device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190517