CN204754164U - Elevartor shaft construction derrick - Google Patents

Elevartor shaft construction derrick Download PDF

Info

Publication number
CN204754164U
CN204754164U CN201520422016.1U CN201520422016U CN204754164U CN 204754164 U CN204754164 U CN 204754164U CN 201520422016 U CN201520422016 U CN 201520422016U CN 204754164 U CN204754164 U CN 204754164U
Authority
CN
China
Prior art keywords
platform
knighthead
construction
vertical
lower floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520422016.1U
Other languages
Chinese (zh)
Inventor
卓碧洪
李朝康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mcc 19 Chengdu Construction Co Ltd
Original Assignee
Mcc 19 Chengdu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mcc 19 Chengdu Construction Co Ltd filed Critical Mcc 19 Chengdu Construction Co Ltd
Priority to CN201520422016.1U priority Critical patent/CN204754164U/en
Application granted granted Critical
Publication of CN204754164U publication Critical patent/CN204754164U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to an elevartor shaft construction field discloses an elevartor shaft construction derrick. It includes supporting slanting pole, supports montant and construction operation platform, peg graft in the lift -cabin door entrance to a cave or wall of a well reservation spliced eye in supporting slanting pole's bottom, supporting slanting pole's top leans on on the wall of a well of elevartor shaft opposite one side in the entrance to a cave, supporting the lower extreme of montant and being connected with supporting slanting pole, the upper portion of supporting the montant is provided with construction operation platform. This elevartor shaft construction derrick effectively avoided the material of traditional full hall scaffold extravagant with the safe risk scheduling problem of construction, can extensively be applicable to various elevator wells, its simple structure, security be high, it is convenient to shift, can practice thrift construction cost when improving work efficiency.

Description

Construction of lift well derrick
Technical field
The utility model relates to construction of lift well field, especially a kind of construction of lift well derrick.
Background technology
In the construction of elevator shaft, conventional is set up full hall scaffold in elevator shaft at present, formwork, assembling reinforcement on scaffold.
There is the following defect in above-mentioned form of construction work:
One, must from setting up full hall scaffold bottom elevator shaft to elevator shaft top, materials'use is more, and the duration is longer, costly.
Two, when elevator shaft reach a certain height, need with shaped steel or steel pipe unloading, complex operation, and when carrying out unloading construction, there is larger potential safety hazard.
Three, as elevator shaft adopts full hall scaffold construction, must soft, hard protection be set on support body, must arranges around elevator shaft and face limit maintenance.
Four, the taking of full hall scaffold, tear workload open greatly, costly, taking, to tear workman's operational danger on support body in process open very large.
Utility model content
Technical problem to be solved in the utility model is to provide the construction of lift well derrick that a kind of structure is simple, save material.
Construction of lift well derrick disclosed in the utility model, comprise knighthead, vertical supporting rod and construction operation platform, the bottom of described knighthead is plugged in elevator door hole or spliced eye reserved by the borehole wall, the top of knighthead rests against on the borehole wall of side, opposite, the lower end of described vertical supporting rod is connected with knighthead, and the top of vertical supporting rod is provided with described construction operation platform.
Preferably, both sides are respectively furnished with two described knightheads, described vertical supporting rod comprises two long support montants and two short vertical supporting rods, described two long support montants are connected to the bottom of the knighthead of both sides, described two short vertical supporting rods are connected to the top of the knighthead of both sides, and described each long support montant and each short vertical supporting rod are arranged between two knightheads of homonymy respectively.
Preferably, described long support montant and knighthead connection and short vertical supporting rod and knighthead junction are provided with transverse horizontal bar, described short vertical supporting rod and knighthead connection are also provided with vertical equity bar, described vertical equity bar extends and is connected with long support montant, described vertical equity bar and long support montant connection are also provided with transverse horizontal bar, described each transverse horizontal bar and knighthead perpendicular, described vertical equity bar and transverse horizontal bar perpendicular.
Preferably, the bottom of described each knighthead is connected with fixed transverse rod, and described fixed transverse rod is connected with each knighthead is vertical.
Preferably, described construction operation platform comprises upper platform and lower floor's platform, and described upper platform area is less than lower floor's platform.
Preferably, described lower floor platform comprises at least two lower floor's platform cross bars arranged in parallel and at least two lower floor's platform vertical poles arranged in parallel, described lower floor platform cross bar and knighthead perpendicular, described lower floor platform vertical pole and lower floor's platform cross bar perpendicular, described lower floor platform cross bar and lower floor's platform vertical pole are equipped with lower floor's landing slab; Described upper platform comprises at least two upper platform cross bars arranged in parallel and at least two upper platform vertical poles arranged in parallel, described upper platform cross bar and knighthead perpendicular, described upper platform vertical pole and upper platform cross bar perpendicular, described upper platform cross bar and upper platform vertical pole are equipped with upper platform plate.
Preferably, described lower floor platform is installed with hole for hoist, during lifting, hole for hoist is connected with lifting steel cable, the suspension centre of lifting steel cable is positioned on longitudinal bisector of hoistway cross section, and being positioned at hoistway vertical central point deflection side, knighthead bottom, the distance d between suspension centre and hoistway longitudinal center's point is 30cm-50cm.
The beneficial effects of the utility model are:
One, this construction of lift well derrick solves in traditional construction technique and needs to set up full hall scaffold, and work progress is loaded down with trivial details, the problem of the comparatively large and waste of material of security risk;
Two, this construction operation platform can for the hoistway of different size, different floor height, from main regulation knighthead inclination angle and supported rod erecting height, and construction operation platform area, applied widely;
Three, this operating desk can utilize tower crane to be lifted into next construction layer, avoids the situation that traditional construction needs to unload with shaped steel or frame pipe;
Four, use construction of lift well operating desk all to cover hoistway plane, safety increases greatly, and does not need to set up hole again and face limit and safeguard;
Five, use construction of lift well derrick to increase work efficiency, save construction cost.
Accompanying drawing explanation
Fig. 1 is plan view of the present utility model;
Fig. 2 is I-I sectional view in Fig. 1.
Reference numeral: 1-knighthead, 2-fixed transverse rod, 3-long support montant, the short vertical supporting rod of 4-, 5-transverse horizontal bar, 6-vertical equity bar, 7-lower floor platform cross bar, 8-lower floor platform vertical pole, 9-lower floor landing slab, 10-upper platform cross bar, 11-upper platform vertical pole, 12-upper platform plate, 13-reinforces transverse bar, and 14-lifts steel cable, 15-suspension centre, the vertical central point of 16-hoistway, the longitudinal bisector of 17-, 18-elevator shaft hole.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is further illustrated.
As shown in Figure 1 and Figure 2, construction of lift well derrick of the present utility model, comprise knighthead 1, vertical supporting rod and construction operation platform, the bottom of described knighthead 1 is plugged in elevator door hole 18 or spliced eye reserved by the borehole wall, the top of knighthead 1 rests against on the borehole wall of side, opposite, the lower end of described vertical supporting rod is connected with knighthead 1, and the top of vertical supporting rod is provided with described construction operation platform.
This construction of lift well derrick is basic as load by the knighthead 1 that elevator door hole 18 is inserted in bottom, top leans on opposite sidewall, connect vertical supporting rod thereon, vertical supporting rod arranges construction operation platform and just can complete setting up whole derrick, according to actual conditions, also spliced eye can be reserved at the elevator shaft borehole wall, for the grafting of knighthead 1, and the size of the concrete each component of derrick can be determined according to the real size of elevator shaft.When building construction operation platform, platform can be made substantially to cover hoistway, thus improve the safety of construction.Because whole derrick leans on knighthead 1 as brace foundation, after elevator shaft one deck construction casting concrete completes, next construction layer will be hung by tower crane and install and use, and without the need to again setting up in addition.
Concrete quantity and the arrangement of knighthead 1 and vertical supporting rod can be determined according to actual conditions, and as a kind of preferred embodiment, both sides are respectively furnished with two described knightheads 1, described vertical supporting rod comprises two long support montants 3 and two short vertical supporting rods 4, described two long support montants 3 are connected to the bottom of the knighthead 1 of both sides, described two short vertical supporting rods 4 are connected to the top of the knighthead 1 of both sides, and described each long support montant 3 and each short vertical supporting rod 4 are arranged between two knightheads 1 of homonymy respectively.
Wherein both sides are respectively furnished with the stability that two knightheads 1 can ensure load, and two long two short totally four vertical supporting rods can be convenient to setting up of top construction operation platform.As shown in Figure 1, between two knightheads 1 vertical supporting rod being arranged at respectively homonymy, the stability connected can be ensured.
For ensureing stablizing of vertical supporting rod lower end and stablizing of being connected with knighthead 1 thereof, as preferred embodiment, described long support montant 3 is provided with transverse horizontal bar 5 with knighthead 1 connection and short vertical supporting rod 4 with knighthead 1 junction, described short vertical supporting rod 4 is also provided with vertical equity bar 6 with knighthead 1 connection, described vertical equity bar 6 extends and is connected with long support montant 3, described vertical equity bar 6 is also provided with transverse horizontal bar 5 with long support montant 3 connection, described each transverse horizontal bar 5 is perpendicular with knighthead 1, described vertical equity bar 6 is perpendicular with transverse horizontal bar 5.
By the reinforcement by connection of vertical equity bar 6 and transverse horizontal bar 5, thus improve the stability of support bottom.Can find out, longitudinal direction is here actual be consistent with the horizontal-extending direction of knighthead 1, horizontal then be direction perpendicular with knighthead 1 in the horizontal plane.
Equally, for ensureing that knighthead 1 bottom is stablized, not easily because of stressed occurred level Slip Deformation, as preferred embodiment, the bottom of described each knighthead 1 is connected with fixed transverse rod 2, and described fixed transverse rod 2 is connected with each knighthead 1 is vertical.
As mentioned before, the derrick provided in view of the utility model adopts the mode of lifting to shift construction, for ease of the carrying out of lifting, preferred elevator shaft adopts form of construction work from top to bottom, after transfer construction, when lower floor carries out pouring construction, attended operation is carried out, for convenience of this operation, as preferred embodiment bottom the collar tie beam need built last layer, described construction operation platform comprises upper platform and lower floor's platform, and described upper platform area is less than lower floor's platform.
Wherein, the collar tie beam that upper platform is mainly used in last layer has been built carries out construction maintenance, and lower floor's platform is mainly used in building this layer of collar tie beam.Constructor needs to shift up and down between two-layer platform, and therefore, while lower floor's platform substantially covers hoistway thus ensures safety, upper platform is smaller, so that the lifting of redundant labor transfer and derrick.
Upper and lower two-layer platform concrete structure can refer to general putting up platform, and providing a kind of preferred embodiment set up at this: described lower floor platform comprises at least two lower floor's platform cross bars 7 arranged in parallel and at least two lower floor's platform vertical poles 8 arranged in parallel, described lower floor platform cross bar 7 is perpendicular with knighthead 1, described lower floor platform vertical pole 8 is perpendicular with lower floor's platform cross bar 7, and described lower floor platform cross bar 7 and lower floor's platform vertical pole 8 are equipped with lower floor's landing slab 9; Described upper platform comprises at least two upper platform cross bars 10 arranged in parallel and at least two upper platform vertical poles 11 arranged in parallel, described upper platform cross bar 10 is perpendicular with knighthead 1, described upper platform vertical pole 11 is perpendicular with upper platform cross bar 10, and described upper platform cross bar 10 and upper platform vertical pole 11 are equipped with upper platform plate 12.That is, adopt platform bar composition platform skeleton in length and breadth, then lay landing slab thereon and can complete setting up of platform.As shown in Figure 2, wherein lower floor's platform have employed four platform vertical poles and four platform cross bars, wherein two platform vertical poles are connected with four vertical supporting rods respectively with two platform cross bars, with stabilized platform basis, and upper platform is primarily of three platform cross bars and two platform vertical pole compositions, two platform vertical poles are connected with vertical supporting rod, and three platform cross bar uniform spreadings are located on platform vertical pole, because these three platform cross bars are not directly connected with vertical supporting rod, in order to ensure stablizing in integral frame upper lateral, the reinforcing transverse bar 13 that two connect vertical supporting rods is being added especially in the bottom of upper platform.
Because derrick preferably adopts lifting form to shift, for convenience of lifting, as preferred embodiment, described lower floor platform is installed with hole for hoist, during lifting, hole for hoist is connected with lifting steel cable 14, and the suspension centre 15 of lifting steel cable is positioned on longitudinal bisector 17 of hoistway cross section, and be positioned at the vertical central point 16 of hoistway and be partial to side, knighthead 1 bottom, the distance d between suspension centre 15 and hoistway longitudinal center's point 16 is 30cm-50cm.
Reserve hole for hoist at lower floor's platform to lift to facilitate connection lifting steel cable 14, and when lifting, the selection of the suspension centre 15 of steel cable is comparatively exquisite, as depicted in figs. 1 and 2, suspension centre 15 is selected on longitudinal bisector 17, during to ensure lifting, the balance of derrick transverse direction, require that suspension centre 15 is partial to 30cm-50cm place, side, knighthead 1 bottom at the vertical central point 16 of hoistway simultaneously, so, when lifting by crane, constructor stands on derrick and the lower end of knighthead 1 can be extracted once pushing away gently, and when behind arrival precalculated position, slowly let go and knighthead 1 just can be made to insert predetermined position, so make whole lifting transfer process very convenient.

Claims (7)

1. construction of lift well derrick, it is characterized in that: comprise knighthead (1), vertical supporting rod and construction operation platform, the bottom of described knighthead (1) is plugged in elevator door hole (18) or spliced eye reserved by the borehole wall, the top of knighthead (1) rests against on the borehole wall of side, opposite, the lower end of described vertical supporting rod is connected with knighthead (1), and the top of vertical supporting rod is provided with described construction operation platform.
2. construction of lift well derrick as claimed in claim 1, it is characterized in that: both sides are respectively furnished with two described knightheads (1), described vertical supporting rod comprises two long support montants (3) and two short vertical supporting rods (4), described two long support montants (3) are connected to the bottom of the knighthead (1) of both sides, described two short vertical supporting rods (4) are connected to the top of the knighthead (1) of both sides, described each long support montant (3) and each short vertical supporting rod (4) are arranged between two knightheads (1) of homonymy respectively.
3. construction of lift well derrick as claimed in claim 2, it is characterized in that: described long support montant (3) is provided with transverse horizontal bar (5) with knighthead (1) connection and short vertical supporting rod (4) with knighthead (1) junction, described short vertical supporting rod (4) and knighthead (1) connection are also provided with vertical equity bar (6), described vertical equity bar (6) extends and is connected with long support montant (3), described vertical equity bar (6) and long support montant (3) connection are also provided with transverse horizontal bar (5), described each transverse horizontal bar (5) is perpendicular with knighthead (1), described vertical equity bar (6) is perpendicular with transverse horizontal bar (5).
4. construction of lift well derrick as claimed in claim 2 or claim 3, it is characterized in that: the bottom of described each knighthead (1) is connected with fixed transverse rod (2), described fixed transverse rod (2) is connected with each knighthead (1) is vertical.
5. construction of lift well derrick as claimed in claim 1, it is characterized in that: described construction operation platform comprises upper platform and lower floor's platform, described upper platform area is less than lower floor's platform.
6. construction of lift well derrick as claimed in claim 5, it is characterized in that: described lower floor platform comprises at least two lower floors's platform cross bar (7) arranged in parallel and at least two lower floors's platform vertical pole (8) arranged in parallel, described lower floor's platform cross bar (7) is perpendicular with knighthead (1), described lower floor's platform vertical pole (8) is perpendicular with lower floor's platform cross bar (7), and described lower floor's platform cross bar (7) and lower floor's platform vertical pole (8) are equipped with lower floor's landing slab (9);
Described upper platform comprises at least two upper platform cross bars (10) arranged in parallel and at least two upper platform vertical poles (11) arranged in parallel, described upper platform cross bar (10) is perpendicular with knighthead (1), described upper platform vertical pole (11) is perpendicular with upper platform cross bar (10), and described upper platform cross bar (10) and upper platform vertical pole (11) are equipped with upper platform plate (12).
7. construction of lift well derrick as claimed in claim 6, it is characterized in that: described lower floor platform is installed with hole for hoist, during lifting, hole for hoist is connected with lifting steel cable (14), the suspension centre (15) of lifting steel cable is positioned on longitudinal bisector (17) of hoistway cross section, and being positioned at the vertical central point of hoistway (16) deflection knighthead (1) side, bottom, the distance d between suspension centre (15) and hoistway longitudinal center point (16) is 30cm-50cm.
CN201520422016.1U 2015-06-17 2015-06-17 Elevartor shaft construction derrick Active CN204754164U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520422016.1U CN204754164U (en) 2015-06-17 2015-06-17 Elevartor shaft construction derrick

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520422016.1U CN204754164U (en) 2015-06-17 2015-06-17 Elevartor shaft construction derrick

Publications (1)

Publication Number Publication Date
CN204754164U true CN204754164U (en) 2015-11-11

Family

ID=54468887

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520422016.1U Active CN204754164U (en) 2015-06-17 2015-06-17 Elevartor shaft construction derrick

Country Status (1)

Country Link
CN (1) CN204754164U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106703388A (en) * 2017-01-13 2017-05-24 中国五冶集团有限公司 Construction scaffold platform erected in super-high-layer building elevator shaft

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106703388A (en) * 2017-01-13 2017-05-24 中国五冶集团有限公司 Construction scaffold platform erected in super-high-layer building elevator shaft

Similar Documents

Publication Publication Date Title
CN104695337B (en) Self-lifting sliding and turnover construction system and construction method
CN203188121U (en) Cast-in-place bridge floor suspending mold of half-through or through arch bridge
CN106088493A (en) A kind of pin key connects mounting structure and the construction thereof of prefabricated bench
CN102704676A (en) Jacking formwork mechanism
CN204781927U (en) Elevartor shaft formwork and elevartor shaft concrete placement operation platform
CN102913248B (en) The overall upset hanging template of wholecircle and formwork erection, release method
CN102966240B (en) Construction method for high-altitude reinforced concrete outer cantilevered structure
CN202483154U (en) High bearing capacity suspending scaffold
CN105484503A (en) Method for hoisting inclining shuttle-shaped space truss
CN204754164U (en) Elevartor shaft construction derrick
CN103061508A (en) Triangular slip form device and construction method for the same triangular slip form
CN204475841U (en) Self lift type shaft template device
CN204435820U (en) From steady buckle type elevator shaft Mobile operating platform
CN202220435U (en) Formwork decreasing device of top-down underground concrete structure
CN108222006B (en) Construction method of square underground continuous wall
CN108019040B (en) A kind of high-rise building transfer floor Bailey bracket platform construction method
CN205840190U (en) A kind of pin key connects the mounting structure of prefabricated bench
CN105370027B (en) The construction method of steel supporting platform structure is integrally lifted in high-rise hanging structure
CN203654754U (en) Double-layered overhanging type discharging platform
CN203320922U (en) Supporting device for forming of elevator shaft template
CN208039864U (en) The attached lift-type discharging platform of Guiding Support Elevating Scaffold
CN206570700U (en) The continuous lowering system of steel jacket box
CN204059906U (en) Elevator hoistways Integral lifting type steel scaffold
CN203782863U (en) Frame type draining well
CN111196566A (en) Construction structure and construction method of super high-rise inner climbing tower crane