CN208844593U CN201821290940.9U CN201821290940U CN208844593U CN 208844593 U CN208844593 U CN 208844593U CN 201821290940 U CN201821290940 U CN 201821290940U CN 208844593 U CN208844593 U CN 208844593U
Authority
CN
China
Prior art keywords
steel
pipe pile
steel pipe
cofferdam
fore shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821290940.9U
Other languages
Chinese (zh)
Inventor
王志远
徐欢乐
李忠伟
李茜
檀兴华
赵国栋
黄志强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
China Communication North Road and Bridge Co Ltd
Original Assignee
Road and Bridge International Co Ltd
China Communication North Road and Bridge Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd, China Communication North Road and Bridge Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN201821290940.9U priority Critical patent/CN208844593U/en
Application granted granted Critical
Publication of CN208844593U publication Critical patent/CN208844593U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Revetment (AREA)

Abstract

Latch type steel pipe pile cofferdam construction device, the device is the cofferdam being made of the linking in parallel of more fore shaft steel-pipe piles (1), " C " type yin fore shaft (2) and T-shape steel (3) is respectively welded along steel-pipe pile axis direction on the lateral wall of the two sides of steel-pipe pile, the utility model structure construction speed is fast, fabrication and installation simple process, without heavy mechanical equipment, without transportation by driving facility.Steel pipe pile joint uses male and female connector, reduces lock quantity, reduces cofferdam percolating water probability.The simple process such as bentonite are used in lock can reach water plugging effect, ensure that the recycling and reusing of steel-pipe pile, saving steel is economic and practical.

Description

Latch type steel pipe pile cofferdam construction device
Technical field
The utility model relates to the steel pipe pile cofferdam used in deep foundation pit construction, in particular to a kind of deep water flows layer of sand Upper steel pipe pile cofferdam locker.
Background technique
In recent years, with the development of national economy, the continuous quickening of Provincial Communications Fundamental Construction paces is built on great rivers Extra-large bridge engineering and build that bridge spanning the sea engineering is more and more in coastal area, the bridge quantity in Highway Project Also it is continuously increased.
Deepwater foundation construction is the key that wide span bridge building, and construction skill is complicated, and investment construction equipment is more, Shared economic specific gravity is huge in entire bridge construction engineering.Cofferdam is specially designed interim anti-for bridge bearing platform construction Water-bound, effect are to be obstructed water flow except the body of weir by cofferdam outer wall and concrete sealing bottom.Opening locked steel tube pilecofferdam with Its good economic benefit and stress performance are widely used.Lock catch device is added in steel pipe two sides in fore shaft steel-pipe pile, can make two Adjacent steel-pipe pile, which links closely, to be connected together, and has the characteristics that overall stiffness is big, bending resistance is strong, whole structural stability is good.
There is operation of sand dredger on river throughout the year, water velocity is excessive in addition, and layer of sand mobility is very big, the flowing of profundal zone The influence of layer of sand brings difficulty of construction to the stability of opening locked steel tube pilecofferdam, and construction safety and structural stability are waited for supervise Survey research.
Utility model content
Purpose of utility model:
The utility model provides a kind of latch type steel pipe pile cofferdam construction device and construction method, previous the purpose is to solve The problems of.
Technical solution:
The device is to be connected the cofferdam constituted (axially in parallel by more fore shaft steel-pipe piles (1) are in parallel!), the two sides of steel-pipe pile Lateral wall on along steel-pipe pile axis direction be respectively welded " C " type yin fore shaft (2) and T-shape steel (3), T-shape steel (3) is by even The " T " shape structure that piece (4) and the edge of a wing (5) are constituted, (4) connect the side wall of fore shaft steel-pipe pile (1) in flakes, and (4) are perpendicular to lock in flakes The tangent line of the side wall of mouthful steel-pipe pile (1), the edge of a wing (5) are arranged perpendicular to (4) in flakes, when connection, the opening of " C " type yin fore shaft (2) (6) are stitched towards T-shape steel (3), and (side is exactly such as the side perpendicular to drawing in Fig. 3 from side on the edge of a wing (5) of T-shape steel (3) To, or upper and lower ends can also be described as!) protrude into " C " type yin fore shaft (2), (4) pass through open seam (6) in flakes, form lock Button connection.
Setting side reinforcing bar (7) between the lateral wall of fore shaft steel-pipe pile (1) and the lateral surface of " C " type yin fore shaft (2).
It fills in the fore shaft cavity (8) surrounded by " C " type yin fore shaft and T-shape sun fore shaft mixed with big cotton-wool and swelling Earth mixtures.
It crowds around in the outside surrounding for enclosing stupefied (9) in more fore shaft steel-pipe piles (1) cofferdam in parallel constituted.(as shown in Figure 1!)
Thick steel plate (10) to enclose it is stupefied reinforce, thick steel plate (10) setting is enclosing inside and outside stupefied (9).
It encloses stupefied (9) and entirety is welded by I-steel, and connected in the side by inner support with thick steel plate.
Latch type steel pipe pile cofferdam construction method as described above, it is characterised in that: steps are as follows:
Using trestle steel pipe pile foundation (11), on it with I25a work steel welding joist (12), and the is placed on joist It encloses together stupefied, is enclosed using first layer stupefied for frame, along stupefied outside inserting piling fore shaft steel-pipe pile (1) is enclosed, answer strict control to lock in the process Mouthful steel-pipe pile installation error, strives the inclination of high-precision control stake, and in order to injection in the process and cofferdam is last closes up;
When assigning steel-pipe pile, from downstream side (downstream side of water flow, the left side of example as shown in figure 1) apart from corner pile (1-1) (such as The steel-pipe pile that corner location is in shown in Fig. 1 is exactly corner pile) 6~7 piles initially as first stake, then successively inserting piling arrives Position, until the fore shaft steel-pipe pile inserting piling in downstream side (left side of example as shown in figure 1) in place and continues to complete closing up for entire cofferdam.
The step of inserting piling of first pile is beginning and the most critical of cofferdam construction, the verticality of first stake influences entirely The verticality of the other steel-pipe piles in cofferdam more slowly should will suspend pile sinking when being driven into projected depth half when squeezing into, and check Whether pile body verticality meets the requirements (within 0.5% and ≯ 10cm), continues out hammer if meeting and is sink to designed elevation, otherwise answers It is beaten again after extraction;
Cofferdam steel pipe height of pile top be cofferdam designed elevation, upstream side consider water wave effect, steel pipe stake top can relatively under Swim the slightly higher 10cm~20cm in side.
When encountering piling difficulty, the method auxiliary sinking that jetting in stake inhales mud (general pile jetting) can be used; Forbid to hammer it is too quickly, cause steel-pipe pile fore shaft destroy and influence water-stagnating effect.
This method detailed step is as follows:
(1), " C " type yin fore shaft is welded along steel-pipe pile centerline direction on the lateral wall of the first steel-pipe pile, in the second steel Along steel-pipe pile centerline direction there are cracking on the lateral wall of tubular pole, and by the insertion of T-shape steel web crack among and weld, shape At T-shape sun fore shaft.
(2), the edge of a wing of T-shape steel is plugged in " C " type yin fore shaft.
(3), the setting side reinforcing bar between the lateral wall of the first steel-pipe pile and the lateral surface of " C " type yin fore shaft.
(4), it fills in the fore shaft cavity surrounded by " C " type yin fore shaft and T-shape sun fore shaft mixed with the rope made of hemp and swelling Earth mixtures.
(5), I25a steel is used to weld joist on it using trestle steel pipe pile foundation;
(6), it is placed on joist and encloses stupefied, and fixation in first layer;
(7), enclosed using first layer it is stupefied as frame, along stupefied outside inserting piling fore shaft steel-pipe pile is enclosed, until cofferdam fold;
(8), the supporting steel pipe (13) and diagonal brace (14) of first layer inner support system are installed;
(9), it is closely knit that the stupefied gap C20 concrete pad between locking notch pile will be enclosed;
(10), excavation pit or backfill fine sand, diver flatten riverbed;
(11), back cover concrete operation platform is set up, C20 back cover concrete is poured and is waited by force, draw water 4~5m, installs and encloses in second Stupefied and inner support is closely knit by gap pad between second inner support and fore shaft steel-pipe pile with C20 concrete;
(12), draw water 3~4m, installs in third road and encloses stupefied and inner support, by third road inner support and is locked with C20 concrete Gap pad is closely knit between mouth steel-pipe pile.
Advantageous effect:
The purpose of this utility model, which is that, overcomes above-mentioned the deficiencies in the prior art, and provides a kind of be suitable for deeply Construction method of opening locked steel tube pilecofferdam on water flowing layer of sand, the stability in this method cofferdam is high, rigidity is big, and barrier performance is strong, applies Work speed is fast, constructs, repairs, removing conveniently, and without using large-scale lifting equipment waterborne and great deal of steel.
The cofferdam constituted is connected in series by more fore shaft steel-pipe piles in it from beginning to end, and with thick strength plate to enclose at stupefied fulcrum web into Row is reinforced, and the novel lock button steel-pipe pile includes the first steel-pipe pile and the second steel-pipe pile, on the lateral wall of the first steel-pipe pile " C " type yin fore shaft is welded along steel-pipe pile centerline direction, is stayed on the lateral wall of the second steel-pipe pile along steel-pipe pile centerline direction Have and crack, and by T-shape steel web insertion crack among and weld, formed T-shape sun fore shaft.The edge of a wing of T-shape steel is plugged on In " C " type yin fore shaft, lock is formed.
The setting side reinforcing bar between the lateral wall of the first steel-pipe pile and the lateral surface of " C " type yin fore shaft.By " C " type yin It fills in the fore shaft cavity that fore shaft and T-shape sun fore shaft are surrounded mixed with big cotton-wool and bentonite mixtures.It encloses stupefied by I-shaped Steel is welded into entirety, and is connected in the side by inner support with thick steel plate.It encloses and stupefied puts forth one's strength plate in the corresponding position of the fulcrum of inner support Reinforced.
The utility model structure construction speed is fast, and fabrication and installation simple process is set without heavy mechanical equipment without transportation by driving It applies.Steel pipe pile joint uses male and female connector, reduces lock quantity, reduces cofferdam percolating water probability.Swelling is used in lock The simple process such as soil can reach water plugging effect, ensure that the recycling and reusing of steel-pipe pile, saving steel is economic and practical.
Detailed description of the invention
Fig. 1 is steel pipe pile cofferdam plan view.
Fig. 2 is fore shaft steel-pipe pile parallel connection linking schematic diagram;
Fig. 3 is the buckle structure schematic diagram that T-shape steel and " C " type yin fore shaft are formed, i.e. the enlarged drawing at the position A in Fig. 1.
Specific embodiment
A kind of latch type steel pipe pile cofferdam construction device, the device are to be made of the linking in parallel of more fore shaft steel-pipe piles (1) Cofferdam it is (axial parallel!), " C " type yin fore shaft is respectively welded along steel-pipe pile axis direction on the lateral wall of the two sides of steel-pipe pile (2) and T-shape steel (3), T-shape steel (3) are the " T " shape structure being made of (4) in flakes and the edge of a wing (5), and (4) connect fore shaft in flakes The side wall of steel-pipe pile (1), (4) perpendicular to the tangent line of the side wall of fore shaft steel-pipe pile (1), the edge of a wing (5) are set perpendicular to (4) in flakes in flakes It sets, when connection, the open seam (6) of " C " type yin fore shaft (2) is towards T-shape steel (3), and the edge of a wing (5) of T-shape steel (3) is from side (side is exactly that or can also be described as upper and lower ends such as the direction perpendicular to drawing in Fig. 3!) protrude into " C " type yin fore shaft (2) Interior, (4) pass through open seam (6) in flakes, form lock connection.
Setting side reinforcing bar (7) between the lateral wall of fore shaft steel-pipe pile (1) and the lateral surface of " C " type yin fore shaft (2).
It fills in the fore shaft cavity (8) surrounded by " C " type yin fore shaft and T-shape sun fore shaft mixed with big cotton-wool and swelling Earth mixtures.
It crowds around in the outside surrounding for enclosing stupefied (9) in more fore shaft steel-pipe piles (1) cofferdam in parallel constituted.(as shown in Figure 1!)
Thick steel plate (10) to enclose it is stupefied reinforce, thick steel plate (10) setting is enclosing inside and outside stupefied (9).
It encloses stupefied (9) and entirety is welded by I-steel, and connected in the side by inner support with thick steel plate.
Latch type steel pipe pile cofferdam construction method as described above, it is characterised in that: steps are as follows:
Using trestle steel pipe pile foundation (11), on it with I25a work steel welding joist (12), and the is placed on joist It encloses together stupefied, is enclosed using first layer stupefied for frame, along stupefied outside inserting piling fore shaft steel-pipe pile (1) is enclosed, answer strict control to lock in the process Mouthful steel-pipe pile installation error, strives the inclination of high-precision control stake, and in order to injection in the process and cofferdam is last closes up;
When assigning steel-pipe pile, from downstream side (downstream side of water flow, the left side of example as shown in figure 1) apart from corner pile (1-1) (such as The steel-pipe pile that corner location is in shown in Fig. 1 is exactly corner pile) 6~7 piles initially as first stake, then successively inserting piling arrives Position, until the fore shaft steel-pipe pile inserting piling in downstream side (left side of example as shown in figure 1) in place and continues to complete closing up for entire cofferdam.
The step of inserting piling of first pile is beginning and the most critical of cofferdam construction, the verticality of first stake influences entirely The verticality of the other steel-pipe piles in cofferdam more slowly should will suspend pile sinking when being driven into projected depth half when squeezing into, and check Whether pile body verticality meets the requirements (within 0.5% and ≯ 10cm), continues out hammer if meeting and is sink to designed elevation, otherwise answers It is beaten again after extraction;
Cofferdam steel pipe height of pile top be cofferdam designed elevation, upstream side consider water wave effect, steel pipe stake top can relatively under Swim the slightly higher 10cm~20cm in side.
When encountering piling difficulty, the method auxiliary sinking that jetting in stake inhales mud (general pile jetting) can be used; Forbid to hammer it is too quickly, cause steel-pipe pile fore shaft destroy and influence water-stagnating effect.
This method detailed step is as follows:
(1), " C " type yin fore shaft is welded along steel-pipe pile centerline direction on the lateral wall of the first steel-pipe pile, in the second steel Along steel-pipe pile centerline direction there are cracking on the lateral wall of tubular pole, and by the insertion of T-shape steel web crack among and weld, shape At T-shape sun fore shaft.
(2), the edge of a wing of T-shape steel is plugged in " C " type yin fore shaft.
(3), the setting side reinforcing bar between the lateral wall of the first steel-pipe pile and the lateral surface of " C " type yin fore shaft.
(4), it fills in the fore shaft cavity surrounded by " C " type yin fore shaft and T-shape sun fore shaft mixed with the rope made of hemp and swelling Earth mixtures.
(5), I25a steel is used to weld joist on it using trestle steel pipe pile foundation;
(6), it is placed on joist and encloses stupefied, and fixation in first layer;
(7), enclosed using first layer it is stupefied as frame, along stupefied outside inserting piling fore shaft steel-pipe pile is enclosed, until cofferdam fold;
(8), the supporting steel pipe (13) and diagonal brace (14) of first layer inner support system are installed;
(9), it is closely knit that the stupefied gap C20 concrete pad between locking notch pile will be enclosed;
(10), excavation pit or backfill fine sand, diver flatten riverbed;
(11), back cover concrete operation platform is set up, C20 back cover concrete is poured and is waited by force, draw water 4~5m, installs and encloses in second Stupefied and inner support is closely knit by gap pad between second inner support and fore shaft steel-pipe pile with C20 concrete;
(12), draw water 3~4m, installs in third road and encloses stupefied and inner support, by third road inner support and is locked with C20 concrete Gap pad is closely knit between mouth steel-pipe pile.

Claims (6)

1.一种锁扣式钢管桩围堰施工装置,其特征在于:该装置为由多根锁口钢管桩(1)并联衔接构成的围堰,钢管桩的两侧的外侧壁上沿钢管桩轴线方向分别焊接“C”型阴锁口(2)和“T”型钢(3),“T”型钢(3)为由连片(4)和翼缘(5)构成的“T”形结构,连片(4)连接锁口钢管桩(1)的侧壁,连片(4)垂直于锁口钢管桩(1)的侧壁的切线,翼缘(5)垂直于连片(4)设置,连接时,“C”型阴锁口(2)的开口缝(6)朝向“T”型钢(3),且“T”型钢(3)的翼缘(5)从侧面伸入“C”型阴锁口(2)内,连片(4)穿过开口缝(6),形成锁扣连接。1. a locking type steel pipe pile cofferdam construction device, is characterized in that: this device is the cofferdam that is formed by the parallel connection of a plurality of locking steel pipe piles (1), on the outer side walls of both sides of the steel pipe pile Weld the "C"-shaped female lock (2) and the "T"-shaped steel (3) respectively along the axis of the steel pipe pile. T"-shaped structure, the connecting piece (4) is connected to the side wall of the locking steel pipe pile (1), the connecting piece (4) is perpendicular to the tangent of the side wall of the locking steel pipe pile (1), and the flange (5) is vertical Set on the connecting piece (4), when connecting, the opening seam (6) of the "C"-shaped female lock (2) faces the "T"-shaped steel (3), and the flange (5) of the "T"-shaped steel (3) It extends into the "C"-shaped female lock opening (2) from the side, and the connecting piece (4) passes through the opening slit (6) to form a lock connection. 2.根据权利要求1所述的锁扣式钢管桩围堰施工装置,其特征在于:在锁口钢管桩(1)的外侧壁与“C”型阴锁口(2)的外侧面之间设置帮条钢筋(7)。2. The locking type steel pipe pile cofferdam construction device according to claim 1, characterized in that: on the outer side wall of the locking steel pipe pile (1) and the outer side of the "C" type female lock (2) The help bars (7) are arranged between them. 3.根据权利要求1所述的锁扣式钢管桩围堰施工装置,其特征在于:在由“C”型阴锁口和“T”型阳锁口所围成的锁口空腔(8)中填筑掺有大棉絮与膨润土混合物。3. The locking type steel pipe pile cofferdam construction device according to claim 1 is characterized in that: in the lock cavity ( 8) The filling is mixed with a mixture of large cotton wool and bentonite. 4.根据权利要求1所述的锁扣式钢管桩围堰施工装置,其特征在于:多根锁口钢管桩(1)并联构成的围堰围拢在围楞(9)的外侧四周。4 . The locking type steel pipe pile cofferdam construction device according to claim 1 , wherein the cofferdam formed by a plurality of locking steel pipe piles ( 1 ) in parallel surrounds the outer periphery of the wall ( 9 ). 5 . 5.根据权利要求4所述的锁扣式钢管桩围堰施工装置,其特征在于:厚钢板(10)对围楞进行加强,厚钢板(10)设置在围楞(9)的内外两侧。5. The locking type steel pipe pile cofferdam construction device according to claim 4, characterized in that: the thick steel plate (10) strengthens the surrounding corrugation, and the thick steel plate (10) is arranged on the inner and outer sides of the surrounding corrugation (9). side. 6.根据权利要求4所述的锁扣式钢管桩围堰施工装置,其特征在于:围楞(9)由工字钢焊成整体,且在靠内撑的一侧用厚钢板将其连接。6. The locking type steel pipe pile cofferdam construction device according to claim 4, characterized in that: the enclosing corrugation (9) is welded into a whole by I-beam, and the side close to the inner support is made of thick steel plate. connect.
CN201821290940.9U 2018-08-10 2018-08-10 Locking type steel pipe pile cofferdam construction device Expired - Fee Related CN208844593U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821290940.9U CN208844593U (en) 2018-08-10 2018-08-10 Locking type steel pipe pile cofferdam construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821290940.9U CN208844593U (en) 2018-08-10 2018-08-10 Locking type steel pipe pile cofferdam construction device

Publications (1)

Publication Number Publication Date
CN208844593U true CN208844593U (en) 2019-05-10

Family

ID=66355555

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821290940.9U Expired - Fee Related CN208844593U (en) 2018-08-10 2018-08-10 Locking type steel pipe pile cofferdam construction device

Country Status (1)

Country Link
CN (1) CN208844593U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109162288A (en) * 2018-08-10 2019-01-08 中交路桥北方工程有限公司 Latch type steel pipe pile cofferdam construction device and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109162288A (en) * 2018-08-10 2019-01-08 中交路桥北方工程有限公司 Latch type steel pipe pile cofferdam construction device and construction method
CN109162288B (en) * 2018-08-10 2024-05-24 中交路桥北方工程有限公司 Lock catch type steel pipe pile cofferdam construction device and construction method

Similar Documents

Publication Publication Date Title
CN105133627B (en) Construction under single wall steel sheet-pile cofferdam flowing water state
CN102434717B (en) Construction method of joist steel pipe-jacking work pit
CN204491626U (en) The foundation pit enclosure structure that Larsen steel sheet pile and prestressed anchor combine
CN101215834A (en) Construction Method of Outrigger Type Diaphragm Wall
CN101538833B (en) Vertical subsection double-wall steel cofferdam water stopping construction method
CN106638640A (en) Modular coffer construction method for concrete without subsealing in the geologic condition of stratum
CN109162288A (en) Latch type steel pipe pile cofferdam construction device and construction method
CN103321246A (en) Construction Method of Foundation Pit Using Underground Diaphragm Wall
CN111851588A (en) A pipe jacking well structure and its construction method
CN110777809A (en) A kind of deep foundation pit combined support adjacent to existing buildings and construction method thereof
CN205975646U (en) Shallow water territory steel pipe pile holder fortifield village weir structure
CN211816279U (en) New and old ground is wall interface processing structure even
CN106088120A (en) Construction method is transferred in a kind of cofferdam
CN208844593U (en) Locking type steel pipe pile cofferdam construction device
CN111042161A (en) Slope collapse high slope flexible processing structure and construction method thereof
CN216407913U (en) A water intake pipe jacking structure crossing the Linjiang Railway
CN207159990U (en) One kind combination steel construction support pile
CN215888299U (en) Combined temporary cofferdam for crossing river channel
CN211285658U (en) Structure capable of carrying out deep water area hollowing repair in rapid stream state
CN108729457A (en) A kind of steel pipe pile cofferdam and its construction method for bridge deepwater foundation
CN211228523U (en) A kind of deep foundation pit combined support adjacent to existing buildings
CN213329051U (en) A flexible treatment structure for high slopes
CN212506339U (en) Long double larsen steel sheet pile stone-filling slag cofferdam
CN104499489A (en) Foundation pit construction method
CN110565666A (en) Construction method of flat combined sheet pile ground connecting wall type water retaining cofferdam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190510