CN208830713U - A kind of novel structure column bar prefabricated components - Google Patents

A kind of novel structure column bar prefabricated components Download PDF

Info

Publication number
CN208830713U
CN208830713U CN201820204009.8U CN201820204009U CN208830713U CN 208830713 U CN208830713 U CN 208830713U CN 201820204009 U CN201820204009 U CN 201820204009U CN 208830713 U CN208830713 U CN 208830713U
Authority
CN
China
Prior art keywords
prefabricated components
nut
back cord
screw arbor
novel structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820204009.8U
Other languages
Chinese (zh)
Inventor
黄金桥
项钰
薛建华
赵鑫群
陶日进
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CN201820204009.8U priority Critical patent/CN208830713U/en
Application granted granted Critical
Publication of CN208830713U publication Critical patent/CN208830713U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of novel structure column bar prefabricated components, prefabricated components ontology, Screw arbor with nut at both-ends and flitch back cord comprising being equipped with perforation casing.Prefabricated components ontology is produced using factory's concentrated processing, with perforation casing one-pass molding;Prefabricated components arrange according to constructional column reinforcement criteria and build that Screw arbor with nut at both-ends is fastenedly connected by perforation casing and lateral flitch back cord;Vertical back cord is vertically arranged two along construction column template, and is fastened by lateral back cord and Screw arbor with nut at both-ends drawknot, and construction column template is reinforced by Screw arbor with nut at both-ends and the fastening of flitch back cord, is connect with prefabricated components ontology integral.The utility model is by carrying out prefabricated processing, reserved perforation casing to masonry, it do not need to dig punching on masonry or mortar joint, wear Screw arbor with nut at both-ends, realize industrial industrialization, it avoids the loosening of wall caused by wall damage and causes hidden danger of quality, it ensure that constructional column formwork erection is secured, it ensure that constructional column pouring construction quality, save the operating time, reduce environmental pollution.

Description

A kind of novel structure column bar prefabricated components
Technical field
The utility model relates to building structure construction technical fields, and in particular to a kind of prefabricated structure of novel structure column bar Part.
Background technique
For the globality and stability for enhancing building, reinforced concrete construction is added in multilayer structure wall Column carries out constructional column formwork erection, concreting that is, after secondary structure masonry construction.Currently, widespread practice is Punching is dug on the masonry structure (or along mortar joint) on constructional column periphery, wears Screw arbor with nut at both-ends, carries out formwork erection, it is serious to destroy The globality and stability of masonry structure.Meanwhile artificial aperture is time-consuming, laborious, causes a large amount of fugitive dusts, pollutes environment.
Summary of the invention
The utility model mainly solves technical problem present in the prior art, to provide a kind of guarantee structure peace Entirely, a kind of time saving and energy saving and low in the pollution of the environment novel structure column bar prefabricated components.
In order to solve the above technical problems, the utility model adopts the following technical solution: a kind of novel structure column bar is prefabricated Component, prefabricated components ontology, Screw arbor with nut at both-ends and flitch back cord comprising being equipped with perforation casing;The prefabricated components are according to construction Column reinforcement criteria is arranged masonry, and the Screw arbor with nut at both-ends is fastenedly connected by perforation casing with the flitch back cord, with Fixture construction column template.
Preferably, the prefabricated components ontology can be produced using factory's concentrated processing, be realized according to field demand size Industrial industrialization, it is economic and environment-friendly.
Preferably, perforation casing positioning when prefabricated components ontology enters mould processing, it is primary with prefabricated components ontology Property molding, and compare draw screw diameter it is bigger, it is ensured that Screw arbor with nut at both-ends site of perforation is accurate.
Preferably, it after the completion of the constructional column formwork erection, is reinforced by Screw arbor with nut at both-ends and the fastening of flitch back cord, and it is pre- Member bodies connection processed is integral, guarantees that template is secured, and then guarantee constructional column pouring construction quality.
Preferably, the flitch back cord is vertically arranged two along construction column template, and vertical back cord passes through lateral back cord It is fastened with Screw arbor with nut at both-ends drawknot.
The utility model is a kind of novel structure column bar prefabricated components, by carrying out prefabricated processing to masonry, reserving and wear Hole sleeve does not need to dig punching on masonry or mortar joint, wears Screw arbor with nut at both-ends, avoids the loosening of wall caused by wall damage and makes It at hidden danger of quality, and can guarantee that constructional column formwork erection is secured, and then save the operating time, ensure that constructional column pouring construction Quality.Meanwhile prefabricated components concentrated processing produces, and realizes industrial industrialization, reduces environmental pollution.
The utility model is further described with reference to the accompanying drawings and detailed description.
Detailed description of the invention
Fig. 1 is the utility model constructional column formwork erection schematic diagram.
Fig. 2 is a kind of novel structure column bar prefabricated components arrangement schematic diagram of the utility model.
Fig. 3 is a kind of novel structure column bar prefabricated components schematic diagram of the utility model.
Detailed description of the invention: 1 --- prefabricated components ontology;2 --- perforation casing;3 --- Screw arbor with nut at both-ends;4 --- template; 5 --- flitch back cord, 51 --- vertical back cord, 52 --- lateral back cord;6 --- constructional column.
Specific embodiment
As shown in Fig. 1 ~ 3, the utility model is a kind of novel structure column bar prefabricated components, comprising being equipped with perforation casing Prefabricated components ontology, Screw arbor with nut at both-ends and flitch back cord.Firstly, prefabricated components ontology can be deepened according to row's brick determines size sum number Amount is produced using factory's concentrated processing;Perforation casing positioning when prefabricated components ontology enters mould processing, with prefabricated components ontology one Secondary property molding, it is ensured that the Screw arbor with nut at both-ends site of perforation is accurate.Secondly, prefabricated components carry out cloth according to constructional column reinforcement criteria Masonry is set, Screw arbor with nut at both-ends is fastenedly connected by perforation casing with flitch back cord.Finally, constructional column formwork erection, flitch back cord edge Construction column template be vertically arranged two, vertical back cord passes through lateral back cord and Screw arbor with nut at both-ends drawknot fastens, and construction column template is logical Cross Screw arbor with nut at both-ends and flitch back cord fastening reinforce, connect with prefabricated components ontology it is integral, guarantee template it is secured.
The utility model is a kind of novel structure column bar prefabricated components, by carrying out prefabricated processing to masonry, reserving and wear Hole sleeve avoids and digs punching on masonry or mortar joint, wears Screw arbor with nut at both-ends, and can guarantee that constructional column formwork erection is secured, into And it saves the operating time, ensure that constructional column pouring construction quality.Meanwhile prefabricated components concentrated processing produces, and realizes work Industry industrialization, reduces environmental pollution.
The foregoing is merely specific embodiment of the utility model, but the technical characteristics of the utility model is not limited to This, in the field of the utility model, made changes or modifications all cover practical new at this any those skilled in the art Among the scope of the patents of type.

Claims (5)

1. a kind of novel structure column bar prefabricated components, it is characterised in that: the prefabricated components ontology comprising being equipped with perforation casing (2) (1), Screw arbor with nut at both-ends (3), template (4) and flitch back cord (5);The prefabricated components ontology (1) is reinforced according to constructional column (6) and is wanted It asks and is arranged masonry, the Screw arbor with nut at both-ends (3) is fastened by perforation casing (2) and flitch back cord (5), with fixture construction column Template (4).
2. a kind of novel structure column bar prefabricated components according to claim 1, it is characterised in that: the prefabricated components Ontology (1) can be produced using factory's concentrated processing according to field demand size, realize industrial industrialization.
3. a kind of novel structure column bar prefabricated components according to claim 1 or 2, it is characterised in that: the perforation Casing (2) positioning when prefabricated components ontology (1) enters mould processing, and prefabricated components ontology disposal molding, and compare Screw arbor with nut at both-ends (3) diameter is bigger, it is ensured that Screw arbor with nut at both-ends (3) site of perforation is accurate.
4. a kind of novel structure column bar prefabricated components according to claim 1, it is characterised in that: the constructional column mould After the completion of plate (4) installs, is reinforced by Screw arbor with nut at both-ends (3) and flitch back cord (5) fastening, connected into prefabricated components ontology (1) It is whole, guarantee that template is secured, and then guarantee constructional column pouring construction quality.
5. a kind of novel structure column bar prefabricated components according to claim 1, it is characterised in that: the flitch back cord (5) two are vertically arranged along construction column template (4), vertical back cord (51) passes through lateral back cord (52) and Screw arbor with nut at both-ends (3) are drawn It is bolted solid.
CN201820204009.8U 2018-02-06 2018-02-06 A kind of novel structure column bar prefabricated components Expired - Fee Related CN208830713U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820204009.8U CN208830713U (en) 2018-02-06 2018-02-06 A kind of novel structure column bar prefabricated components

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820204009.8U CN208830713U (en) 2018-02-06 2018-02-06 A kind of novel structure column bar prefabricated components

Publications (1)

Publication Number Publication Date
CN208830713U true CN208830713U (en) 2019-05-07

Family

ID=66303522

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820204009.8U Expired - Fee Related CN208830713U (en) 2018-02-06 2018-02-06 A kind of novel structure column bar prefabricated components

Country Status (1)

Country Link
CN (1) CN208830713U (en)

Similar Documents

Publication Publication Date Title
CN203452378U (en) Post-cast strip locating structure
CN206157913U (en) Assembled square steel tube concrete post and girder steel connected node
CN106639042A (en) Dry type connected concrete shear wall and dry type wall connecting method
CN204492328U (en) A kind of assembling baffle wall
CN208830713U (en) A kind of novel structure column bar prefabricated components
CN204552104U (en) A kind of flooring aluminum alloy building template form removal instrument
CN213330018U (en) L type constructional column template reinforcing apparatus
CN107386457A (en) A kind of built-in fitting in cast-in-situ concrete member
CN207892243U (en) A kind of template assembly system
CN211572085U (en) A wallboard connection major structure for assembly type structure
CN204456090U (en) A kind of static pressure pipe pile
CN204899034U (en) Prefabricated wall post
CN203284801U (en) Assembled inspection well
CN204456187U (en) A kind of underground pipe gallery construction inner formword support member
CN206487141U (en) A kind of assembled architecture beam and post and beam and girder connection template assembly
CN204282819U (en) A kind of through-flooring pipeline preformed hole casing bit
CN208858140U (en) A kind of precast concrete baffle
CN216787649U (en) Assembled concrete filled steel tube column splicing structure
CN210151949U (en) Can have enough to meet need and consolidate packing built-in fitting tool to lock
CN204626973U (en) A kind of sealing up screw for building
CN214834695U (en) Anti-deformation aluminum template
CN204781462U (en) Anti wall fixing sub -assembly that splits
CN203334666U (en) Expansion joint shear wall shaping formwork
CN211258644U (en) Preliminary bracing structure of underground works
CN216810932U (en) Many broken lines concrete continuous wall corner template reinforcing apparatus

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190507

Termination date: 20200206

CF01 Termination of patent right due to non-payment of annual fee