CN208830230U - A kind of interim crash bearer - Google Patents

A kind of interim crash bearer Download PDF

Info

Publication number
CN208830230U
CN208830230U CN201821399135.XU CN201821399135U CN208830230U CN 208830230 U CN208830230 U CN 208830230U CN 201821399135 U CN201821399135 U CN 201821399135U CN 208830230 U CN208830230 U CN 208830230U
Authority
CN
China
Prior art keywords
steel wire
steel
interim
steel pipe
braided geotextile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821399135.XU
Other languages
Chinese (zh)
Inventor
宾红军
李骥
鲍剑锋
黄人峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 14 Co Ltd
Original Assignee
Sinohydro Bureau 14 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 14 Co Ltd filed Critical Sinohydro Bureau 14 Co Ltd
Priority to CN201821399135.XU priority Critical patent/CN208830230U/en
Application granted granted Critical
Publication of CN208830230U publication Critical patent/CN208830230U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The utility model discloses a kind of interim crash bearers, it is desirable to provide a kind of low interim crash bearer of use cost.It includes the steel wire of besieged city rectangle, the steel pipe being set at four angles of steel wire, it is set to the drill rod of steel pipe lower end, it is set to the braided geotextile of four facade two sides of steel wire, for connecting the steel strand wires of steel wire and braided geotextile upper and lower ends, the longitudinal steel wire rope for connecting steel wire and braided geotextile is arranged in longitudinal steel wire rope and several intervals of several interval settings for connecting steel wire and braided geotextile;Several connection rings for passing through for longitudinal steel wire rope are set on the steel pipe.The utility model using flexible, is influenced smaller by geographical location etc., its size can be increasedd or decreased according to service condition, can also be arranged according to topographical position.

Description

A kind of interim crash bearer
Technical field
The utility model relates to highway civil engineering technical field of engineering equipment, more particularly, to a kind of interim crash bearer.
Background technique
Interim crash bearer is extremely common in construction of the highway, mostly uses concreting.Although this method is in certain condition It is lower to play the role of protection, but be no different in practice of construction with the production of permanent crash bearer, therefore deposit in actual use In the inconvenient problem that wastes and construct.Nowadays, with the development of Geosynthetics technology, braided geotextile is in construction of the highway Become extremely common, and there can be certain waste in practice.The utility model uses braided geotextile more particularly to a kind of With a kind of anticollision device, collision-prevention device of steel wire steel frame composition, different from the scheme that Other Engineering uses, same type is temporarily prevented at home It hits in pier document and also has no relevant report.
Utility model content
The purpose of this utility model is intended to overcome the shortcomings of the prior art, provides a kind of interim crash bearer.This is anti- Pier energy save the cost is hit, shortens the completion time of project, generates preferable social and economic benefit.
In order to solve the above-mentioned technical problem, the utility model is achieved through the following technical solutions:
A kind of interim crash bearer, the steel wire including rectangle of encircling a city, the steel pipe being set at four angles of steel wire are set to The drill rod of steel pipe lower end is set to the braided geotextile of four facade two sides of steel wire, for connecting steel wire and braiding geotechnique The longitudinal steel wire rope for connecting steel wire and braided geotextile, Yi Jiruo is arranged in the steel strand wires of cloth upper and lower ends, several intervals The longitudinal steel wire rope for connecting steel wire and braided geotextile is arranged in dry interval;It is arranged on the steel pipe several for for longitudinal direction The connection ring of steel wire penetrating.
Preferably, the connection ring and steel pipe pass through welded connecting.
Preferably, the drill rod grafting and steel pipe lower end.
Compared with prior art, the utility model has the advantages that
1, the utility model uses braided geotextile, using part obsolete material in construction, with save the cost.
2, the utility model uses geotextiles, wirerope and steel wire, and the folded characteristic of soft pliable makes the device quality Gently, portable.
3, the utility model is placed in the device using stone or the soil body, can save a large amount of production concrete crash bearers The resources such as the punching block and concrete that use, and the discarded soil body and rubble can be made full use of.
4, the interim crash bearer dress efficiently solves the defect that interim crash bearer once utilizes, and can take after construction It is reused after the device out.
5, this interim crash bearer using flexible, is influenced smaller by geographical location etc., can be increased according to service condition and be added deduct Its small size, can also arrange according to topographical position.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor Under, it can also be obtained according to these attached drawings other attached drawings.
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the left view of Fig. 1.
Fig. 3 is the top view of Fig. 1.
Fig. 4 is the structural schematic diagram that braided geotextile is connect with steel wire end with steel strand wires.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are under that premise of not paying creative labor Every other embodiment obtained, fall within the protection scope of the utility model.In the following description, in order to clearly demonstrate originally The structure and working method of utility model will be described on the basis of attached drawing by many Directional words, but should be incited somebody to action The Word Understandings such as "front", "rear", "left", "right", "upper", "lower" are not construed as word of limitation for convenience of term.
Interim crash bearer shown in Fig. 1-4 comprising the steel wire 2 for rectangle of encircling a city, the steel being set at 2 four angles of steel wire Pipe 6 is set to the drill rod 8 of 6 lower end of steel pipe, the braided geotextile 1 of 2 four facade two sides of steel wire is set to, for connecting steel The steel strand wires 3 of 1 upper and lower ends of silk screen 2 and braided geotextile, several intervals are arranged for connecting steel wire 2 and braided geotextile 1 Longitudinal steel wire rope 4 and several intervals longitudinal steel wire rope 4 for connecting steel wire 2 and braided geotextile 1 is set;It is described Several connection rings 7 for passing through for longitudinal steel wire rope 4 are set on steel pipe 6.
Particularly, the connection ring 7 passes through welded connecting with steel pipe 6, it is clear that threaded connection etc. can also be used.
8 grafting of drill rod and 6 lower end of steel pipe, can also be by welding or being clamped.
The construction method of interim crash bearer is as follows:
1) braided geotextile consolidation process: the effect of braided geotextile is the package soil body and stone and decomposes foreign impacts Power is the important component of the crash bearer.To ensure that crash bearer can resist the active force of foreign impacts and the soil body, stone, compile Geotextiles are knitted by the way of the rebuilding of two sides, one of 1mm × 50 × 50mm steel wire is added among the braided geotextile of two sides Net, and respectively sew up braided geotextile and steel wire in laterally and longitudinally setting wirerope;Laterally use 5mm × 6 × 7 steel wires Rope, every 10cm setting is together;Longitudinal to use 3 × 6 × 7 wirerope, every 15cm setting is together.Wherein longitudinal steel wire rope both ends use U-shaped button is fixed on steel strand wires, and transverse steel wire rope is fixed on the outside of four steel pipes and after passing through preformed hole.
2) processing for the braced frame that four steel pipes are constituted: the effect of braced frame is to ensure that native stone inserts braided geotextile Not slump after bag.Support construction uses four 48 × 3.6mm of φ steel pipes for strut angle, and longitudinal every 15cm weldering in outer wall of steel pipe Connect preformed hole at one.It is inserted into 45 drill rod of φ in steel pipe lower part, is not less than 0.5m in insertion steel pipe, it is not small that drill rod reserves length of steel pipe In 0.5m.
3) connection is handled: using 1mm × 7 × 9.5mm steel strand wires connection, braiding soil between braced frame and braided geotextile Work cloth upper and lower side is fixed on steel strand wires, and steel strand wires pass through preformed hole on the outside of steel pipe, and using U-shaped after four steel pipe supports Button is fixed.The transverse steel wire rope being pierced by from geotextiles passes through preformed hole, and is fixed after four steel pipe supports using U-shaped button.
The material requested table of the present embodiment is as shown in table 1:
Drill rod is inserted into the soil body when this interim crash bearer installation, and inserts in the region that braided geotextile and steel wire are encircled a city Rubble or the soil body take out reusable after the device after construction.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on should be included in the utility model Protection scope within.

Claims (3)

1. a kind of interim crash bearer, it is characterised in that: the steel wire (2) including rectangle of encircling a city is set to (2) four angles of steel wire The steel pipe (6) at place is set to the drill rod (8) of steel pipe (6) lower end, is set to the braiding geotechnique of (2) four facade two sides of steel wire Cloth (1), for connecting the steel strand wires (3) of steel wire (2) and braided geotextile (1) upper and lower ends, several intervals are arranged for connecting Connect steel wire (2) and braided geotextile (1) longitudinal steel wire rope (4) and several intervals setting for connect steel wire (2) and The longitudinal steel wire rope (4) of braided geotextile (1);Several companies for passing through for longitudinal steel wire rope (4) are set on the steel pipe (6) Connect ring (7).
2. interim crash bearer according to claim 1, it is characterised in that: the connection ring (7) and steel pipe (6) are connected by welding It connects.
3. interim crash bearer according to claim 1 or claim 2, it is characterised in that: drill rod (8) grafting and steel pipe (6) lower end.
CN201821399135.XU 2018-08-29 2018-08-29 A kind of interim crash bearer Active CN208830230U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821399135.XU CN208830230U (en) 2018-08-29 2018-08-29 A kind of interim crash bearer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821399135.XU CN208830230U (en) 2018-08-29 2018-08-29 A kind of interim crash bearer

Publications (1)

Publication Number Publication Date
CN208830230U true CN208830230U (en) 2019-05-07

Family

ID=66311046

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821399135.XU Active CN208830230U (en) 2018-08-29 2018-08-29 A kind of interim crash bearer

Country Status (1)

Country Link
CN (1) CN208830230U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112695618A (en) * 2020-12-21 2021-04-23 四川省交通勘察设计研究院有限公司 Pier protector

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112695618A (en) * 2020-12-21 2021-04-23 四川省交通勘察设计研究院有限公司 Pier protector

Similar Documents

Publication Publication Date Title
CN104358356B (en) Inside set high strengthening regenerative mixed steel pipe concrete anti-earthquake and the construction technology of local restriction
CN208830230U (en) A kind of interim crash bearer
CN203448270U (en) Device for screening rockfill materials
CN107387135A (en) A kind of tunnel longitudinal direction waterstop holding clamp and application method
CN206439060U (en) A kind of steel pipe concrete bracket contractibility attachment means
CN203846512U (en) Supporting device for long edges of strip-shaped and rectangular foundation pit
CN206223577U (en) A kind of closely-knitted safety net impact property testing machine
CN205333379U (en) Artifical preparation designability soil curing means
CN211735556U (en) Multifunctional stirring model test box
CN211922593U (en) Gravel pile for soft soil foundation
CN206378340U (en) Pre-manufactured model stake for electric osmose joint stake reinforcing soft ground model test
CN209619840U (en) A kind of concrete support rod structure
CN207974033U (en) A kind of falling rocks interception structure for the scenic spot security protection of lofty mountains type
CN208150777U (en) A kind of multi-use architecture material lifting cage
CN111894669A (en) Novel purification barrier structure and rapid construction method
CN107268571A (en) The constructing structure that outstanding bag sand-protecting barrier, segmentation sand-protecting barrier are combined with plantation
CN202788878U (en) Can pier column for coal mine tunnel support
CN206667467U (en) A kind of frame structure system joint strengthening structure
CN206205446U (en) A kind of steel assembles passage
CN205839990U (en) Staircase built-in fitting
CN206554110U (en) A kind of prefabricated isolated footing frame
CN207739263U (en) The auxiliary pouring device of concrete tubular pile stake core
CN212452604U (en) Cast-in-place pile concrete pouring isolation device
CN204082167U (en) The auxiliary locator of super-front large pipe shed in a kind of Tunnel
CN218493639U (en) Recyclable detachable filling retaining wall for upward horizontal access