CN204082167U - The auxiliary locator of super-front large pipe shed in a kind of Tunnel - Google Patents
The auxiliary locator of super-front large pipe shed in a kind of Tunnel Download PDFInfo
- Publication number
- CN204082167U CN204082167U CN201420545153.XU CN201420545153U CN204082167U CN 204082167 U CN204082167 U CN 204082167U CN 201420545153 U CN201420545153 U CN 201420545153U CN 204082167 U CN204082167 U CN 204082167U
- Authority
- CN
- China
- Prior art keywords
- iron
- arch
- bracket
- seamless steel
- tunnel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
- Lining And Supports For Tunnels (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
The utility model embodiment provides the auxiliary locator of super-front large pipe shed in a kind of Tunnel, relates to the realm of building construction, can save a large amount of human and material resources, financial resources and duration, and guarantees the safety of personnel and equipment in work progress.Described device comprises: bracket, and described bracket comprises builder's staging; In the front-end and back-end of described bracket, reinforcement of weld has an arch i iron separately; Wherein, the arch i iron of rear end is higher than the arch i iron of front end; The arch i iron held in the rear with on the arch i iron of described front end according to certain pitch of holes corresponding offer some to emptying aperture, be welded with the seamless steel pipe that a diameter is greater than emptying aperture between often pair of emptying aperture, the angle of described seamless steel pipe and horizontal plane is 1 ° ~ 5 °; Reinforcing bar is welded with between adjacent two seamless steel pipes; The bottom of described bracket is provided with anchor structure, and described anchor structure is used for described auxiliary locator and ground are connected firmly.
Description
Technical field
The utility model relates to the realm of building construction, particularly relates to the auxiliary locator of super-front large pipe shed in a kind of Tunnel.
Background technology
At present, (as: the fault zone when Tunnel Passing bad geological section, weak surrounding rock location etc.) steel tube shed need be performed, first is to ensure that in-cavity construction pipe canopy has enough working spaces and construction plant, second is also to ensure that steel tube shed inserts country rock according to the insertion angle of designing requirement, therefore conventional method is first form a working space expanded, namely tunnel excavation section is expanded, this expands section will outwards be amplified to 1-2 rice than former design section excavation contour line, 4-7 rice is extended along line direction, such guarantee steel tube shed squeezes into rock mass according to the angle of designing requirement.At bad geological section due to country rock self developmental joint fissure, self-stable ability is poor, when carrying out expanding section construction, not only the self-stability of country rock and the safety of construction make people worried, and perform expand section consume human and material resources, financial resources also often in invisible increase, schedule delays.
Utility model content
Embodiment of the present utility model provides the auxiliary locator of super-front large pipe shed in a kind of Tunnel, saves a large amount of human and material resources, financial resources and duration, and guarantees the safety of personnel and equipment in work progress.
For achieving the above object, embodiment of the present utility model adopts following technical scheme:
An auxiliary locator for super-front large pipe shed in Tunnel, comprising:
Bracket, described bracket comprises builder's staging, described builder's staging comprises 3 layers of operation platform with i iron processing; Wherein the height of every layer of platform and the width of whole bracket are determined by the design size that each tunnel is concrete;
In the front-end and back-end of described bracket, reinforcement of weld has an arch i iron separately; Wherein, the arch i iron of rear end is higher than the arch i iron of front end;
The arch i iron held in the rear with on the arch i iron of described front end according to certain pitch of holes corresponding offer some to emptying aperture, insert the seamless steel pipe being welded with a diameter and being greater than emptying aperture between often pair of emptying aperture, the angle of described seamless steel pipe and horizontal plane is 1 ° ~ 5 °; Wherein, described certain pitch of holes is 30cm-50cm;
Reinforcing bar is welded with between adjacent two seamless steel pipes; Described reinforcing bar is for guaranteeing the firm of each seamless steel pipe;
The bottom of described bracket is provided with anchor structure, and described anchor structure is used for described auxiliary locator and ground are connected firmly.
Optionally, supporting reinforcing structure is provided with between the second layer operation platform of described front end arch i iron and described bracket and third layer operation platform;
Supporting reinforcing structure is provided with between the second layer operation platform of described rear end arch i iron and described bracket and third layer operation platform.
The auxiliary locator of super-front large pipe shed in the Tunnel that technique scheme provides, not only need not perform daguanpeng construction chamber, and this positioner can be selected to be in due course to process, so, not only save a large amount of human and material resources, financial resources and duration, and also ensure that the safety of personnel and equipment in work progress.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
The Facad structure schematic diagram of the auxiliary locator of super-front large pipe shed in a kind of Tunnel that Fig. 1 provides for the utility model embodiment;
The side structure schematic diagram of the auxiliary locator of super-front large pipe shed in a kind of Tunnel that Fig. 2 provides for the utility model embodiment.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the utility model embodiment, be clearly and completely described the technical scheme in the utility model embodiment, obviously, described embodiment is only the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all belong to the scope of the utility model protection.
The utility model embodiment provides the auxiliary locator of super-front large pipe shed in a kind of Tunnel, and as shown in Figure 1, described auxiliary locator comprises:
Bracket 1, described bracket comprises builder's staging, described builder's staging comprise with i iron processing, 3 layers of operation platform (the first operation platform 11, second operation platform the 12, three operation platform 13 as shown in Figure 1); Wherein the height of every layer of platform and the width of whole bracket are determined by the design size that each tunnel is concrete.In the front-end and back-end of described bracket 1, reinforcement of weld has an arch i iron separately; Wherein, the arch i iron 3 of rear end is higher than the arch i iron 2 of front end.As shown in Figure 2, the arch i iron 3 held in the rear with on the arch i iron 2 of described front end according to certain pitch of holes corresponding offer some to emptying aperture, insert the seamless steel pipe being welded with a diameter and being greater than emptying aperture between often pair of emptying aperture, the angle of described seamless steel pipe and horizontal plane is 1 ° ~ 5 °; Wherein, described certain pitch of holes is 30cm-50cm; Reinforcing bar 6 is welded with between adjacent two seamless steel pipes 5; Described reinforcing bar is for guaranteeing the firm of each seamless steel pipe; The bottom of described bracket 1 is provided with anchor structure 7, and described anchor structure 7 is connected firmly for making described auxiliary locator and ground.
Here it should be noted that, the builder's staging used in the utility model embodiment can be the builder's staging that tunnel construction site processes.
In addition, the height H that the arch i iron 3 of rear end is higher than the arch i iron 2 of front end, the angle [alpha] that can ensure to be inserted in seamless steel pipe 5 on often pair of emptying aperture 4 of offering and level ground is 1 ° ~ 5 °.
Optionally, as shown in Figure 1, supporting reinforcing structure 6 is provided with between the second layer operation platform 12 of described front end arch i iron 2 and described bracket and third layer operation platform 13; Supporting reinforcing structure (not shown) is provided with between the second layer operation platform of described rear end arch i iron and described bracket and third layer operation platform.
When using said apparatus, whole device is needed to be placed in front, tunnel front, ensure that the crag of work plane is close to by rear end i iron 3, and by itself and ground stable connection, recycle between two i iron, diameter larger than emptying aperture, have the seamless steel pipe of certain angle (α) as guide duct, the drilling rod of pipe canopy rig is inserted from the emptying aperture i iron 2, bored to tunnel surrounding by seamless steel pipe, final formation can insert the duct of steel tube shed, need not perform the object in daguanpeng construction chamber during to reach and to construct steel tube shed in tunnel.So, not only save a large amount of human and material resources, financial resources and duration, and also ensure that the safety of personnel and equipment in work progress.
The above; be only detailed description of the invention of the present utility model; but protection domain of the present utility model is not limited thereto; anyly be familiar with those skilled in the art in the technical scope that the utility model discloses; the change that can expect easily or replacement, all should be encompassed within protection domain of the present utility model.Therefore, protection domain of the present utility model should be as the criterion with the protection domain of described claim.
Claims (2)
1. the auxiliary locator of super-front large pipe shed in Tunnel, is characterized in that, comprising:
Bracket, described bracket comprises builder's staging, described builder's staging comprise with i iron processing, 3 layers of operation platform; Wherein the height of every layer of platform and the width of whole bracket are determined by the design size that each tunnel is concrete;
In the front-end and back-end of described bracket, reinforcement of weld has an arch i iron separately; Wherein, the arch i iron of rear end is higher than the arch i iron of front end;
The arch i iron held in the rear with on the arch i iron of described front end according to certain pitch of holes corresponding offer some to emptying aperture, insert the seamless steel pipe being welded with a diameter and being greater than emptying aperture between often pair of emptying aperture, the angle of described seamless steel pipe and horizontal plane is 1 ° ~ 5 °; Wherein, described certain pitch of holes is 30cm-50cm; Reinforcing bar is welded with between adjacent two seamless steel pipes; Described reinforcing bar is for guaranteeing the firm of each seamless steel pipe;
The bottom of described bracket is provided with anchor structure, and described anchor structure is used for described auxiliary locator and ground are connected firmly.
2. auxiliary locator according to claim 1, is characterized in that, is provided with supporting reinforcing structure between the second layer operation platform of described front end arch i iron and described bracket and third layer operation platform;
Supporting reinforcing structure is provided with between the second layer operation platform of described rear end arch i iron and described bracket and third layer operation platform.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420545153.XU CN204082167U (en) | 2014-09-12 | 2014-09-12 | The auxiliary locator of super-front large pipe shed in a kind of Tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420545153.XU CN204082167U (en) | 2014-09-12 | 2014-09-12 | The auxiliary locator of super-front large pipe shed in a kind of Tunnel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204082167U true CN204082167U (en) | 2015-01-07 |
Family
ID=52174898
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420545153.XU Expired - Fee Related CN204082167U (en) | 2014-09-12 | 2014-09-12 | The auxiliary locator of super-front large pipe shed in a kind of Tunnel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204082167U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109281688A (en) * | 2018-11-07 | 2019-01-29 | 中国建筑土木建设有限公司 | Tunnel advanced pipe shed accurate positioning system and construction method |
-
2014
- 2014-09-12 CN CN201420545153.XU patent/CN204082167U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109281688A (en) * | 2018-11-07 | 2019-01-29 | 中国建筑土木建设有限公司 | Tunnel advanced pipe shed accurate positioning system and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203756182U (en) | Support structure applied to shallow road tunnel in weak rock area | |
CN109209392B (en) | Full-ring excavation method suitable for IV-V-grade surrounding rock of large-section tunnel | |
CN104863597B (en) | A kind of construction method transverse direction hole lid method in shallow buried covered excavation Large Underground space | |
CN109404005B (en) | Pre-reinforcing system for small hole and large hole of underground tunnel and construction method | |
CN101775988A (en) | Construction method for inclined shaft to main tunnel of weak surrounding rock | |
WO2016206617A1 (en) | Anti-collapse structure beside roadway based on 110 construction method for breaking roof | |
CN104947681A (en) | Super large super deep basement ground pit construction method | |
CN104533428A (en) | Steep cliff tunnel hole excavation construction method | |
CN203614107U (en) | Composite retaining structure for horsehead | |
CN205400757U (en) | High ground stress district TBM construction tunnel initial stage supporting construction | |
CN109372521A (en) | New pipe-roof method construction technology and construction pipe suspension device | |
CN112267899A (en) | Tunnel exit construction method | |
CN206346737U (en) | A kind of supporting major diameter curve pipe curtain | |
CN204002832U (en) | A kind of shield tunnel portal structure | |
CN103556820A (en) | Suspension mold for enlarging and reinforcing concrete beam and construction method of suspension mold | |
CN204082167U (en) | The auxiliary locator of super-front large pipe shed in a kind of Tunnel | |
CN106759365B (en) | A kind of counterfort wing wall waterproof curtain construction method of foundation pit enclosure wall | |
CN103410529B (en) | A kind of support of tunnel arch springing ruggedized construction for weak surrounding rock and construction method | |
CN105782576B (en) | Fluted tube line guard method is excavated below interim pipeline | |
CN205444232U (en) | Stock - gravity type infiltration retaining wall | |
CN204754945U (en) | Mine method tunnel preliminary bracing lining cutting grid steel support make | |
CN112031831A (en) | Tunnel steel pipe arch primary support structure and support method thereof | |
CN102733395A (en) | Connecting method of supporting beam at second path or under second path and vertical column pile in deep foundation pit of basement of building engineering | |
CN210396738U (en) | Air-leg rock drill bit | |
CN204023579U (en) | Reverse construction method post dowel bar tool holder |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150107 Termination date: 20180912 |
|
CF01 | Termination of patent right due to non-payment of annual fee |