CN208816844U - A kind of underground water seal cave depot Shaft bank pipe-supporting device - Google Patents

A kind of underground water seal cave depot Shaft bank pipe-supporting device Download PDF

Info

Publication number
CN208816844U
CN208816844U CN201821516952.9U CN201821516952U CN208816844U CN 208816844 U CN208816844 U CN 208816844U CN 201821516952 U CN201821516952 U CN 201821516952U CN 208816844 U CN208816844 U CN 208816844U
Authority
CN
China
Prior art keywords
shaft
pipeline
water seal
underground water
bracing members
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821516952.9U
Other languages
Chinese (zh)
Inventor
任文明
梁久正
陈雪见
许杰
马晓成
詹胜文
李印
杨征
徐大宝
胡谋鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Design Branch Of China Petroleum Pipeline Engineering Corp
China National Petroleum Corp
China Petroleum Pipeline Engineering Corp
Original Assignee
China National Petroleum Corp
China Petroleum Pipeline Engineering Corp
China Petroleum Pipeline Engineering Corp Design Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Petroleum Corp, China Petroleum Pipeline Engineering Corp, China Petroleum Pipeline Engineering Corp Design Branch filed Critical China National Petroleum Corp
Priority to CN201821516952.9U priority Critical patent/CN208816844U/en
Application granted granted Critical
Publication of CN208816844U publication Critical patent/CN208816844U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model relates to a kind of underground water seal cave depot Shaft bank pipe-supporting devices, it include: girder steel support frame, its two supports is on shaft wall, bracing members circle, it is wrapped in tube circumference, and is placed on the girder steel support frame, bracing members block, it is located on the pipeline outer wall, and muti-piece bracing members block is welded in the pipe circumference direction.It is stuck on bracing members circle using the supporting block on pipeline, pipe load is passed to the girder steel support frame of lower section by bracing members circle, load is transmitted to shaft wall by girder steel support frame, pipeline is temporarily fixed on well head girder steel support frame to realize, the Pipe installing in realization small space, ultra-deep shaft, pipeline is welded on Shaft bank progress, it avoids and carries out weld job in vertical shaft, has good construction exploitativeness, construction cost is low, ensure that pipeline welding quality.

Description

A kind of underground water seal cave depot Shaft bank pipe-supporting device
Technical field
The utility model relates to a kind of underground water seal cave depot Shaft bank pipe-supporting devices.
Background technique
Underground water seal cave depot is buried in underground, is connection underground oil storage cavern and ground storage and transportation pipe network into and out of oily vertical shaft Uniquely coupled channel, pipeline need small space (3~6m of diameter), ultra-deep (about 100m deep) into and out of carrying out in oily vertical shaft Installation.Pipe installing needs to undergo the multiple working procedures such as pipeline welding, non-destructive testing, corrosion-resistanting interpolating port, if using traditional vertical shaft Pipe installing mode, pipeline will be into and out of welding in oily vertical shaft, and section needed for vertical shaft is larger, and construction belongs to and has in vertical shaft Job space is limited, construction environment is poor, and security risk is big, long construction period, and welding quality is not easy to control.Therefore, in vertical shaft It carries out pipeline welding and belongs to confined space operation, security risk is larger.Comparing reasonable scheme is that pipeline is incited somebody to action in ground group postwelding Lifting pipeline enters well.How pipeline is temporarily fixed on well head, subsequent pipeline further hangs pipeline after the completion of well head welds It is packed into well, becomes the technical problem of urgent need to resolve.
Utility model content
Aiming at the shortcomings existing in the above problems, the utility model provides a kind of underground water seal cave depot Shaft bank pipe Pipeline is temporarily fixed on Shaft bank by road supporting arrangement, is realized and is carried out pipeline welding, repaired mouth in well head, is avoided perpendicular Pipeline welding is carried out in well, lifting is convenient, detachably, ensure that the smooth implementation of small space, ultra-deep shaft Pipe installing.
To achieve the above object, the utility model provides a kind of underground water seal cave depot Shaft bank pipe-supporting device, packet It includes:
Girder steel support frame, two supports are on shaft wall;
Bracing members circle is wrapped in tube circumference, and is placed on the girder steel support frame;
Bracing members block is located on the pipeline outer wall, and muti-piece bracing members block is welded in the pipe circumference direction.
It is further improved as the utility model, girder steel support frame is by H profile steel welding group at the H profile steel two supports On the shaft wall.
It is further improved as the utility model, offers the branch being coupled with the H profile steel on the shaft wall Support slot.
It is further improved as the utility model, steel plate is set between the H profile steel bottom and the support slot.
It is further improved as the utility model, the bracing members circle is made of two symmetrical semi arches, the semicircle The end of arc offers hole for hoist, and two semi arches are bolted by connection.
It is further improved as the utility model, the connection bolt is M42 bolt.
It is further improved as the utility model, polyfluortetraethylene plate is arranged in the bracing members circle inner wall.
It is further improved as the utility model, the bracing members circle processes composition using the steel plate of 50mm thickness.
It is further improved as the utility model, one block of steel is respectively welded at perimeter quartile on the pipe circumference direction Supporting block.
It is further improved as the utility model, the size of the bracing members block is 100mm × 150mm × 50mm.
The utility model has the following beneficial effects:
It is stuck on bracing members circle using the supporting block on pipeline, pipe load is passed to the girder steel branch of lower section by bracing members circle Load is transmitted to shaft wall by support, girder steel support frame, and pipeline is temporarily fixed on well head girder steel support frame to realize, Pipe installing in realization small space, ultra-deep shaft, pipeline are welded on Shaft bank progress, avoid and welded in vertical shaft Operation is connect, has good construction exploitativeness, construction cost is low, ensure that pipeline welding quality.
Detailed description of the invention
Fig. 1 is a kind of schematic diagram of underground water seal cave depot Shaft bank pipe-supporting device of the utility model;
Fig. 2 is the top view of the multiple well head pipe-supporting devices of arrangement in underground water seal cave depot vertical shaft;
Fig. 3 is the schematic diagram of girder steel support frame;
Fig. 4 is the main view of bracing members block;
Fig. 5 is the top view of bracing members block;
Fig. 6 is the top view of bracing members circle;
Fig. 7 is the main view of bracing members circle.
In figure:
1, pipeline;2, bracing members block;3, bracing members circle;4, hole for hoist;5, bolt is connected;6, girder steel support frame;7, vertical shaft The borehole wall;8, steel plate;9, polyfluortetraethylene plate;.
Specific embodiment
As shown in Figure 1, a kind of underground water seal cave depot Shaft bank pipe-supporting device of the utility model embodiment, packet It includes: girder steel support frame 6, bracing members circle 3 and bracing members block 2.Since vertical shaft is equipped with more root canal roads, the utility model well head pipeline Supporting arrangement is suitable for more root canal roads in vertical shaft, after installation as shown in Figure 2.
As shown in figure 3, girder steel support frame 6 is arranged in well head first, 6 two supports of girder steel support frame are on shaft wall 7. Preferably, girder steel support frame 6 is by H profile steel welding group at H profile steel two supports are on shaft wall 7.H profile steel type selecting according to across Degree, pipe load, which calculate, to be determined.For the fixation for realizing H profile steel, 7 corresponding position of shaft wall, which offers to cooperate with H profile steel, pacifies The support slot of dress after the completion of girder steel support frame 6 is constructed, will support groove location to tamp using concrete.For the benefit of load is spread, and is increased Add support performance, steel plate 8 is set between H profile steel bottom and support slot.
As shown in fig. 6-7, bracing members circle 3 is wrapped in 1 periphery of pipeline, and is placed on girder steel support frame 6.According to quasi- bearing 1 outer diameter of pipeline, determine 3 internal diameter of bracing members circle.Preferably, bracing members circle processes composition using the steel plate of 50mm thickness.Bracing members Circle 3 is made of two symmetrical semi arches, and two semi arches are connected by connection bolt 5, it is preferred to use M42 is bolted.Often The end of a semi arch offers the hole for hoist 4 of a diameter 78mm, convenient for the lifting of bracing members circle 3.Outside for protective conduit 1 Erosion resistant coating is not damaged, and pastes the polyfluortetraethylene plate 9 of 10mm thickness in 3 inner surface of bracing members circle, while can also play steel construction Being electrically insulated between component and pipeline.
As illustrated in figures 4-5, bracing members block 2 is located on 1 outer wall of pipeline, and 1 circumferencial direction of pipeline welds muti-piece bracing members block 2, Preferably, one piece of bracing members block 2 is respectively welded at perimeter quartile.The size of bracing members block 2 is 100mm × 150mm × 50mm, It meets power transmission requirement with a thickness of 50mm, fusion length and thickness.Distance of the bracing members block 2 apart from 1 butt weld of pipeline be not small In 500mm.
In practical applications, according to the outer diameter tube and length of quasi- support, the size for determining bracing members block, bracing members are calculated The specification of circle, it is ensured that the pipe load (including self weight of pipeline, pressure testing water) for needing to support in work progress can be undertaken.
When specifically used, according to the pipe arrangement in vertical shaft, girder steel support frame is set in Shaft bank, according to outside pipeline Diameter wraps up a bracing members circle in tube circumference, and bracing members circle is placed on well head girder steel support frame.In pipeline perimeter quartile One piece of bracing members block is respectively welded in place, and the lifting pipeline of group postwelding is entered well using crane after the completion of ground group is welded by pipeline, benefit It is stuck on bracing members circle with the bracing members block on pipeline, pipe load is passed to the girder steel support frame of lower section, steel by bracing members circle Load is transmitted to shaft wall by beam support frame, and pipeline is temporarily fixed on well head girder steel support frame to realize.
The above descriptions are merely preferred embodiments of the present invention, is not intended to limit the utility model, for this For the technical staff in field, various modifications and changes may be made to the present invention.It is all in the spirit and principles of the utility model Within, any modification, equivalent replacement, improvement and so on should be included within the scope of protection of this utility model.

Claims (10)

1. a kind of underground water seal cave depot Shaft bank pipe-supporting device characterized by comprising
Girder steel support frame (6), two supports are on shaft wall (7);
Bracing members circle (3) is wrapped in pipeline (1) periphery, and is placed on the girder steel support frame (6);
Bracing members block (2) is located on the pipeline (1) outer wall, and pipeline (1) circumferencial direction welds muti-piece bracing members block (2)。
2. underground water seal cave depot Shaft bank pipe-supporting device according to claim 1, which is characterized in that girder steel support Frame (6) is by H profile steel welding group at the H profile steel two supports are on the shaft wall (7).
3. underground water seal cave depot Shaft bank pipe-supporting device according to claim 2, which is characterized in that the vertical shaft The borehole wall offers the support slot being coupled with the H profile steel on (7).
4. underground water seal cave depot Shaft bank pipe-supporting device according to claim 3, which is characterized in that the H-type Steel plate (8) are set between steel bottom and the support slot.
5. underground water seal cave depot Shaft bank pipe-supporting device according to claim 1, which is characterized in that the steel branch Support ring (3) is made of two symmetrical semi arches, and the end of the semi arch offers hole for hoist (4), two semicircles Arc passes through connection bolt (5) connection.
6. underground water seal cave depot Shaft bank pipe-supporting device according to claim 5, which is characterized in that the connection Bolt (5) is M42 bolt.
7. underground water seal cave depot Shaft bank pipe-supporting device according to claim 1, which is characterized in that the steel branch Polyfluortetraethylene plate (9) are arranged in support ring (3) inner wall.
8. underground water seal cave depot Shaft bank pipe-supporting device according to claim 1, which is characterized in that the steel branch Support ring processes composition using the steel plate of 50mm thickness.
9. underground water seal cave depot Shaft bank pipe-supporting device according to claim 1, which is characterized in that the pipeline (1) one piece of bracing members block (2) is respectively welded on circumferencial direction at perimeter quartile.
10. underground water seal cave depot Shaft bank pipe-supporting device according to claim 1, which is characterized in that the steel The size of supporting block (2) is 100mm × 150mm × 50mm.
CN201821516952.9U 2018-09-17 2018-09-17 A kind of underground water seal cave depot Shaft bank pipe-supporting device Active CN208816844U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821516952.9U CN208816844U (en) 2018-09-17 2018-09-17 A kind of underground water seal cave depot Shaft bank pipe-supporting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821516952.9U CN208816844U (en) 2018-09-17 2018-09-17 A kind of underground water seal cave depot Shaft bank pipe-supporting device

Publications (1)

Publication Number Publication Date
CN208816844U true CN208816844U (en) 2019-05-03

Family

ID=66277318

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821516952.9U Active CN208816844U (en) 2018-09-17 2018-09-17 A kind of underground water seal cave depot Shaft bank pipe-supporting device

Country Status (1)

Country Link
CN (1) CN208816844U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110952985A (en) * 2019-11-28 2020-04-03 苏州中车建设工程有限公司 Sliding type vertical shaft annular steel support assembly and construction method
CN111360461A (en) * 2019-09-16 2020-07-03 中国铁建重工集团股份有限公司 Shaft duct piece hoisting equipment and control method thereof
CN114955858A (en) * 2022-04-06 2022-08-30 中国原子能科学研究院 Method and apparatus for downhole installation of tubing

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111360461A (en) * 2019-09-16 2020-07-03 中国铁建重工集团股份有限公司 Shaft duct piece hoisting equipment and control method thereof
CN110952985A (en) * 2019-11-28 2020-04-03 苏州中车建设工程有限公司 Sliding type vertical shaft annular steel support assembly and construction method
CN110952985B (en) * 2019-11-28 2021-10-26 苏州中车建设工程有限公司 Sliding type vertical shaft annular steel support assembly and construction method
CN114955858A (en) * 2022-04-06 2022-08-30 中国原子能科学研究院 Method and apparatus for downhole installation of tubing

Similar Documents

Publication Publication Date Title
CN208816844U (en) A kind of underground water seal cave depot Shaft bank pipe-supporting device
CN103362119B (en) Large-size rebar cage exempt from the method that is welded to connect and syndeton
CN103243961B (en) Titanium plate steel inner tank reversed construction device for chimney of thermal power station
CN103123016B (en) Construction method for laying gas pipelines along bridge
CN114165099A (en) Modular construction method of large tower
CN206036390U (en) Pipeline rising -falling tone is put by paper -back edition
CN104308449A (en) Technology for repairing big-caliber concrete pipeline lining by utilizing thin wall stainless steel
CN103558090B (en) The single seam crossing water test unit of major diameter bearing pipe and hydraulic test method
CN202213886U (en) A large metal container
CN209705486U (en) A kind of anti-corrosion gas pipeline of high-weatherability
CN107725966A (en) A kind of liner RPC thin-walled reparation pipes and its restorative procedure for broken pipe reparation
CN208034022U (en) A kind of nozzle for Large Diameter Pipeline steel pipe and nozzle docking facilities
CN203363529U (en) Concrete pipe repairing device of water supply prestress steel cylinder
WO2015158074A1 (en) Construction method for connection and replacement of underground water-supply fiber-reinforced plastic mortar pipe and steel pipe
CN201554027U (en) Splicing pipe structure of steel bracing strut
CN204401628U (en) Large-span steel supports multidirectional connector
CN107152026B (en) A kind of the mud jacking pipe support and its distribution method of steel-pipe pile
CN212455972U (en) Urban gas buried pipeline protection device
CN207227959U (en) Overall peace is torn open connects high construction platform built in formula radial pattern colyliform steel pile casting
CN103692195A (en) Pipe installation method
CN204098024U (en) A kind of secondary grouting concrete pipe pile construction device
CN207176693U (en) A kind of plug for pressure steel pipe of hydropower station grouting construction
CN202509774U (en) External joint grouting device for socket of prestressed concrete cylinder pipe (PCCP)
CN212027878U (en) Shield constructs quick-witted components of a whole that can function independently and originally adds long pipeline hanging flower basket
CN105628005A (en) Auxiliary bar for measuring in working well

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 100120 Xicheng District six paw Kang in Beijing City

Co-patentee after: China Petroleum Pipeline Engineering Co.,Ltd.

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Co-patentee after: DESIGN BRANCH OF CHINA PETROLEUM PIPELINE ENGINEERING Corp.

Address before: 100120 Xicheng District six paw Kang in Beijing City

Co-patentee before: China Petroleum Pipeline Engineering Co.,Ltd.

Patentee before: China National Petroleum Corp.

Co-patentee before: DESIGN BRANCH OF CHINA PETROLEUM PIPELINE ENGINEERING Corp.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190430

Address after: 100120 Xicheng District six paw Kang in Beijing City

Co-patentee after: China Petroleum Pipeline Engineering Co.,Ltd.

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Co-patentee after: CHINA PETROLEUM PIPELINE ENGINEERING Corp.

Address before: 100120 Xicheng District six paw Kang in Beijing City

Co-patentee before: China Petroleum Pipeline Engineering Co.,Ltd.

Patentee before: CHINA NATIONAL PETROLEUM Corp.

Co-patentee before: DESIGN BRANCH OF CHINA PETROLEUM PIPELINE ENGINEERING Corp.