CN208813225U - High-speed magnetic floating operation control system - Google Patents
High-speed magnetic floating operation control system Download PDFInfo
- Publication number
- CN208813225U CN208813225U CN201821647148.4U CN201821647148U CN208813225U CN 208813225 U CN208813225 U CN 208813225U CN 201821647148 U CN201821647148 U CN 201821647148U CN 208813225 U CN208813225 U CN 208813225U
- Authority
- CN
- China
- Prior art keywords
- control system
- operation control
- speed magnetic
- magnetic floating
- communication
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Electric Propulsion And Braking For Vehicles (AREA)
- Train Traffic Observation, Control, And Security (AREA)
Abstract
The utility model embodiment provides a kind of high-speed magnetic floating operation control system, is related to high-speed magnetic levitation technical field, which includes: central control system, operation control system and multiple regions controller;Central control system and operation control system are all set in dispatching control center;Central control system and operation control system communication connection;Multiple regions controller is respectively arranged at corresponding traction subregion;Zone controller is connected with the trailer system of corresponding traction subregion or track switch conversion locking control system;Operation control system communicates to connect respectively with multiple regions controller.Operation control system is concentrated on Dispatch and Command Center by the utility model embodiment, is drawn subregion setting area controller, can utmostly be reduced the dispersed placement of equipment, conevying efficiency and economic benefit are higher in Life cycle;The quantity of equipment can also be reduced, to reduce the requirement to house, power supply, is relatively beneficial to energy-saving and environmental protection.
Description
Technical field
The utility model relates to high-speed magnetic levitation control technology fields, run control system more particularly, to a kind of high-speed magnetic floating
System.
Background technique
Existing high-speed maglev train, used operation control system are made of four sets of systems of three-decker.This three layers
Structure refers to that central control layer, zonal control layer and on-board running control layer structure, four sets of systems refer to center operation control system
System, partition running control system, on-board running control system and communication system.The basic function of operation control system includes operation
With display, automatic train operation, driving sequential control, train protection, Road defence, points protection, speed curve monitoring, safety
Positioning and traction cutting.
Wherein, central operation control system is mainly the function of completing dispatch control, really controls the core of magnetic transportation by driving row
It is to be correspondingly arranged decentralized layout with traction power transformation subregion in operation control partition.However above-mentioned layout type not only build by initial stage
If at high cost, later period field maintenance maintenance workload is also larger, and conevying efficiency and economic benefit are lower in Life cycle.
Utility model content
In view of this, reducing traction point the purpose of this utility model is to provide a kind of high-speed magnetic floating operation control system
Area's equipment not only reduces primary construction cost, and later period field maintenance maintenance workload also largely reduces, transport in Life cycle
Efficiency and economic benefit are higher, and are beneficial to energy-saving and environmental protection.
In a first aspect, the utility model embodiment provides a kind of high-speed magnetic floating operation control system, comprising: center control
System, operation control system and multiple regions controller;Central control system and operation control system are all set in scheduling controlling
Center;Central control system and operation control system communication connection;Multiple regions controller is respectively arranged at corresponding traction point
Area;Zone controller is connected with the trailer system of corresponding traction subregion and track switch conversion locking control system;Operation control system
System communicates to connect respectively with multiple regions controller;Operation control system and zone controller, central control system difference are wired
Connection.
With reference to first aspect, the utility model embodiment provides the first possible embodiment of first aspect,
In, operation control system includes at least one communication server, and the communication server and central control system communicate to connect.
With reference to first aspect, the utility model embodiment provides second of possible embodiment of first aspect,
In, operation control system includes at least one communication server, and the communication server and wireless communication networks core equipment communicate to connect,
The base station of wireless communication networks core equipment and high speed magnetically suspended train line controls transmission device communication connection.
The possible embodiment of first or second kind with reference to first aspect, the utility model embodiment provide first party
The third possible embodiment in face, wherein operation control system further includes Core server, interchanger, router and deposits
Storage media.
The possible embodiment of first or second kind with reference to first aspect, the utility model embodiment provide first party
The 4th kind of possible embodiment in face, wherein including two communication servers, be arranged in a manner of two-node cluster hot backup.
The third possible embodiment with reference to first aspect, the utility model embodiment provide the of first aspect
Five kinds of possible embodiments, wherein the router is communicated to connect by slack and the zone controller.
The possible embodiment of second with reference to first aspect, the utility model embodiment provide the of first aspect
Six kinds of possible embodiments, wherein wireless communication networks core equipment is communicated to connect by slack and the communication server, nothing
Line communication network core equipment is connect by optical fiber with base station transmission control equipment.
The first or second of possible embodiment, the utility model embodiment with reference to first aspect provides first
7th kind of possible embodiment of aspect, wherein the high-speed magnetic floating operation control system further includes on-board running control
System and communication system, operation control system communication system and on-board running control system communicate to connect.
The 7th kind of possible embodiment with reference to first aspect, the utility model embodiment provide the of first aspect
Eight kinds of possible embodiments, wherein on-board running control system is separately connected with onboard control device, vehicle positioning system.
The 8th kind of possible embodiment with reference to first aspect, the utility model embodiment provide the of first aspect
Nine kinds of possible embodiments, wherein the communication system is that 38GHz Millimeter-wave Wireless Communication System or 4G LTE are wirelessly communicated
System.
The utility model embodiment bring it is following the utility model has the advantages that
High-speed magnetic floating operation control system provided by the embodiment of the utility model and train control system, by operation control system
System concentrates on Dispatch and Command Center, draws subregion setting area controller, whole system is more succinct, can be maximum
Traction zone devices are reduced, primary construction cost is not only reduced, later period field maintenance maintenance workload also largely reduces, maximum journey
Degree reduces the dispersed placement of equipment, and conevying efficiency and economic benefit are higher in Life cycle;It can also reduce to greatest extent
The quantity of equipment is relatively beneficial to energy-saving and environmental protection to reduce the requirement to house, power supply.
Other feature and advantage of the disclosure will illustrate in the following description, alternatively, Partial Feature and advantage can be with
Deduce from specification or unambiguously determine, or by implement the disclosure above-mentioned technology it can be learnt that.
To enable the above objects, features, and advantages of the disclosure to be clearer and more comprehensible, preferred embodiment is cited below particularly, and cooperate
Appended attached drawing, is described in detail below.
Detailed description of the invention
It, below will be right in order to illustrate more clearly of specific embodiment of the present invention or technical solution in the prior art
Specific embodiment or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, it is described below
In attached drawing be that some embodiments of the utility model are not paying creativeness for those of ordinary skill in the art
Under the premise of labour, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the structural schematic diagram of train operation control system provided by the embodiment of the utility model;
Fig. 2 is the structural schematic diagram of traction partition running control system provided by the embodiment of the utility model;
Fig. 3 is a kind of structural schematic diagram of high-speed magnetic floating operation control system provided by the embodiment of the utility model;
Fig. 4 is a kind of system architecture diagram of high-speed magnetic floating operation control system provided by the embodiment of the utility model;
Fig. 5 is that a kind of operation control system provided by the embodiment of the utility model constitutes figure.
Specific embodiment
To keep the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, below in conjunction with attached drawing to this
The technical solution of utility model is described, it is clear that and the embodiments are a part of the embodiments of the present invention, rather than
Whole embodiments.
The structural schematic diagram of train operation control system shown in Figure 1 sequentially shows central control from top to bottom
Layer, zonal control layer and on-board running control layer.Central control layer is connect with zonal control layer by trackside optical network, subregion control
Preparative layer is connect by wireless radio transmission with on-board running control layer.Wherein, central control layer includes central operation control system, in
Entreating operation control system includes train automated driving system, operator terminal system and diagnosis terminal system;Zonal control layer packet
Include multiple partition running control systems corresponding with traction subregion.
Above system has the following problems:
(1) system composition is excessively dispersed
Central operation control system is mainly the function of completing dispatch control, and the core for really controlling magnetic transportation by driving row is to divide
Area's operation control system is correspondingly arranged decentralized layout with traction power transformation subregion, and partition running control system core equipment includes
Zonal control fail-safe computer, Regional Towing cutting computer, subregion track switch control module, subregion diagnosis computer, subregion without
The components such as line electric control unit and partition security protection communication network.The major function of completion includes checking and forwarding center operation control
System control command processed, control command decompose with execute, control track, control train, control trailer system, rail protective, column
The functions such as vehicle protection, traction cutting, speed curve monitoring, secure localization, diagnosis.As tightly coupled safety critical system, this
Kind system constitutes mode and is based on two aspect reasons, first is that needing closely to connect with traction power transformation subregion, is corresponding to it and configures equipment
Configuration is clear;Second is that the processing capacity of computer collocations is lower when based on system building.Traction as shown in Figure 2 point
Multiple zonal control subsystems, the zonal control subsystem in left side is shown in the structural schematic diagram of area's operation control system
Computer, sectored wireless electric control unit and subregion diagnosis computer are cut off including zonal control fail-safe computer, Regional Towing,
Intermediate zonal control subsystem further includes subregion track switch control module.It is protected between zonal control subsystem by partition security
Communication network connection, is connect by network node with trackside optical network.
(2) at high cost
Not only primary construction is at high cost, and later period field maintenance maintenance workload is also larger, conevying efficiency in Life cycle
It is lower with economic benefit.
(3) technical advance is poor
Above each system is all technology mature at the beginning of using 2000, and compared with the development of newest technology, gap is more next
It is bigger.Based on this, a kind of high-speed magnetic floating operation control system provided by the embodiment of the utility model, not only reduce primary construction at
This, later period field maintenance maintenance workload also largely reduces, and conevying efficiency and economic benefit are higher in Life cycle, and beneficial
In energy-saving and environmental protection.
For convenient for understanding the present embodiment, first to a kind of high speed magnetic transportation by driving disclosed in the utility model embodiment
Row control system describes in detail.
Embodiment 1
The utility model embodiment provides a kind of high-speed magnetic floating operation control system, high-speed magnetic floating shown in Figure 3
The structural schematic diagram of operation control system, the system include: central control system 31, operation control system 32 and multiple regions control
Device 33 processed.
Wherein, central control system and operation control system are all set in dispatching control center, central control system and fortune
The communication connection of row control system.The high-speed magnetic floating operation control system of the present embodiment is guaranteeing required by safety critical system
On the basis of equipment redundancy, it will be integrated into Central Control Center in the computer equipment of traction zonal control in the past, controlled with center
System is arranged together, establishes dispatching control center.
Multiple regions controller is respectively arranged at corresponding traction subregion, and zone controller is led with corresponding traction subregion
Draw system to connect with track switch conversion locking control system.Above-mentioned operation control system and multiple regions controller distinguish communication link
It connects.For example, operation control system can be wired with zone controller, central control system.Zone controller with it is corresponding
The trailer system of subregion is drawn using redundant channel connection, redundant channel can with but be not limited only to optical fiber, zone controller with it is right
Answer traction subregion track switch conversion locking control using redundant channel connect, redundant channel can with but be not limited only to optical fiber.
Above-mentioned operation control system includes at least one communication server, which communicates with central control system
Connection, the communication server are also communicated to connect with wireless communication networks core equipment, wireless communication networks core equipment and high-speed magnetic floating
The base station control transmission device communication connection of route.
The system architecture diagram of high-speed magnetic floating operation control system shown in Figure 4 shows dispatching control center, multiple
On-board running control system and wireless communication networks core equipment on subregion, train.
Under the system architecture, partitioned computer equipment is integrated into dispatching control center, sets up operation control system, it should
Control system is by Core server (multi -CPU redundant configuration), interchanger, router, storage medium, the communication server (dual-locomotive heat
It is standby) etc. composition, constitute a local area network.Each zone controller, the control of each base station are uniformly externally responsible for by router, fiber optic network
The control of transmission device processed.Operation control system realizes information exchange by the communication server with central control system;Operation control
System processed realizes information exchange by the communication server and wireless communication networks core equipment, all uses optical-fibre channel between equipment.
Traction subregion setting area controller, realize train operation traction cutting control and to track switch conversion,
The control of locking.It is realized and is connected by optical-fibre channel between operation control system and zone controller.
Operation control system shown in Figure 5 constitutes figure, and show: Core server is connect with storage medium, is used for
Read and write data;Core server is also connect with the communication server, then connects central control system by slack;Kernel service
Device also passes through interchanger and connect with router, and Core server passes through router and communication server join domain controller and nothing
Line communication network core equipment.
The control process of high-speed magnetic floating operation control system described below:
Central control system converts route plan for the train operation plan of formulation and operation figure, guarantees magnetic-levitation train
According to the operation of route plan tissue and scheduling train, and exercise supervision to the train operating conditions of whole system;And to operation
The data of process carry out record storage.
Operation control system is the core of system control vehicle, completes to check and forwards central control system control command, and is right
Control command is decomposed and is executed, control train, control trailer system, rail protective, train protection, traction cutting, rate curve
The functions such as monitoring, secure localization, diagnosis.
The instruction is sent to train after receiving the suspension order from zone controller by on-board running control system
On onboard control device (not illustrating in figure), realize the suspension of train;In magnetic-levitation train operational process, operation control system
It must be known by the current position of magnetic-levitation train, on-board running control system will manage and control vehicle positioning system and (not show in figure
Meaning) for information about;Before train operation, on-board running control system will check all possible letters for influencing safe train operation
Breath and state, only all safety requirements are all met, and on-board running control system could let pass train;In operational process
In, on-board running control system can calculate current train speed, vehicle by the location information of reception vehicle positioning system
This speed will constantly be monitored by carrying operation control system, it is ensured that the numerical value is in the range of safe operation.
Operation control system is concentrated on scheduling and referred to by high-speed magnetic floating operation control system provided by the embodiment of the utility model
Center is waved, subregion setting area controller is drawn, whole system is more succinct, can reduce traction subregion to the greatest extent and set
It is standby, primary construction cost is not only reduced, later period field maintenance maintenance workload also largely reduces, conevying efficiency in Life cycle
It is higher with economic benefit;The quantity of equipment can also be reduced to greatest extent, to reduce the requirement to house, power supply, more had
Beneficial to energy-saving and environmental protection.
Embodiment 2
The utility model embodiment provides a kind of high speed magnetic suspension train travel control system, further includes on-board running control
System and communication system.Wherein, operation control system is communicated to connect by communication system and on-board running control system.Vehicle-mounted running
Row control system is separately connected with onboard control device, vehicle positioning system.Above-mentioned communication system can be 38GHz millimeter wave without
Line communication system or 4G LTE wireless communication system.
Embodiment further provides a kind of machine readable storage medium, machine readable storage medium storages for the utility model
There is machine-executable instruction, when being called and being executed by processor, machine-executable instruction promotes to handle machine-executable instruction
The method of device realization above embodiment.
It is apparent to those skilled in the art that for convenience and simplicity of description, the system of foregoing description
, can be with reference to the corresponding process in preceding method embodiment with the specific work process of device, details are not described herein.
It, can be with if above-mentioned function is realized in the form of SFU software functional unit and when sold or used as an independent product
It is stored in a computer readable storage medium.Based on this understanding, the technical solution of the disclosure is substantially in other words
The part of the part that contributes to existing technology or the technical solution can be embodied in the form of software products, the meter
Calculation machine software product is stored in a storage medium, including some instructions are used so that a computer equipment (can be a
People's computer, server or network equipment etc.) execute all or part of step of each embodiment above method of the disclosure
Suddenly.And storage medium above-mentioned includes: USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), deposits at random
The various media that can store program code such as access to memory (RAM, Random Access Memory), magnetic or disk.
Finally, it should be noted that embodiment of above, the only specific embodiment of the disclosure, to illustrate the disclosure
Technical solution, rather than its limitations, the protection scope of the disclosure are not limited thereto, although referring to aforementioned embodiments to this public affairs
It opens and is described in detail, it should be understood by those skilled in the art that: anyone skilled in the art is in this public affairs
It opens in the technical scope of exposure, can still modify to technical solution documented by aforementioned embodiments or can think easily
To variation or equivalent replacement of some of the technical features;And these modifications, variation or replacement, do not make corresponding
The essence of technical solution is detached from the spirit and scope of disclosure embodiment technical solution, should all cover the protection model in the disclosure
Within enclosing.Therefore, the protection scope of the disclosure should be subject to the protection scope in claims.
Claims (10)
1. a kind of high-speed magnetic floating operation control system characterized by comprising central control system, operation control system and more
A zone controller;
The central control system and the operation control system are all set in dispatching control center;The central control system and
The operation control system communication connection;
The multiple zone controller is respectively arranged at corresponding traction subregion;The zone controller and the corresponding traction
The trailer system of subregion is connected with track switch conversion locking control system;
The operation control system communicates to connect respectively with the multiple zone controller;
The operation control system and the zone controller, the central control system distinguish wired connection.
2. high-speed magnetic floating operation control system according to claim 1, which is characterized in that the operation control system includes
At least one communication server, the communication server and the central control system communicate to connect.
3. high-speed magnetic floating operation control system according to claim 1, which is characterized in that the operation control system includes
At least one communication server, the communication server and wireless communication networks core equipment communicate to connect, the wireless communication networks
The base station of core equipment and high speed magnetically suspended train line controls transmission device communication connection.
4. high-speed magnetic floating operation control system according to claim 2 or 3, which is characterized in that the operation control system
It further include Core server, interchanger, router and storage medium.
5. high-speed magnetic floating operation control system according to claim 2 or 3, which is characterized in that including two communications
Server is arranged in a manner of two-node cluster hot backup.
6. high-speed magnetic floating operation control system according to claim 4, which is characterized in that the router passes through redundancy light
It is fine to be communicated to connect with the zone controller.
7. high-speed magnetic floating operation control system according to claim 3, which is characterized in that the wireless communication networks core is set
Standby to be communicated to connect by slack and the communication server, the wireless communication networks core equipment is passed by optical fiber and base station
Defeated control equipment connection.
8. high-speed magnetic floating operation control system according to claim 1-3, which is characterized in that further include: it is vehicle-mounted
Operation control system and communication system;
The operation control system is communicated to connect by the communication system and the on-board running control system.
9. high-speed magnetic floating operation control system according to claim 8, which is characterized in that the on-board running control system
It is separately connected with onboard control device, vehicle positioning system.
10. high-speed magnetic floating operation control system according to claim 8, which is characterized in that the communication system is 38GHz
Millimeter-wave Wireless Communication System or 4G LTE wireless communication system.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821647148.4U CN208813225U (en) | 2018-10-12 | 2018-10-12 | High-speed magnetic floating operation control system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821647148.4U CN208813225U (en) | 2018-10-12 | 2018-10-12 | High-speed magnetic floating operation control system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208813225U true CN208813225U (en) | 2019-05-03 |
Family
ID=66279453
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821647148.4U Active CN208813225U (en) | 2018-10-12 | 2018-10-12 | High-speed magnetic floating operation control system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208813225U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111688768A (en) * | 2020-06-28 | 2020-09-22 | 湖南中车时代通信信号有限公司 | Automatic train operation method and system based on magnetic suspension system |
CN112550366A (en) * | 2020-12-10 | 2021-03-26 | 中国铁路设计集团有限公司 | Operation control method and device for high-speed maglev train and electronic equipment |
CN112937645A (en) * | 2021-04-23 | 2021-06-11 | 湖南中车时代通信信号有限公司 | Magnetic levitation vehicle control method, device and system and readable storage medium |
CN113859322A (en) * | 2020-06-30 | 2021-12-31 | 株洲中车时代电气股份有限公司 | Master-slave distribution method and device of ground traction control equipment |
-
2018
- 2018-10-12 CN CN201821647148.4U patent/CN208813225U/en active Active
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111688768A (en) * | 2020-06-28 | 2020-09-22 | 湖南中车时代通信信号有限公司 | Automatic train operation method and system based on magnetic suspension system |
CN113859322A (en) * | 2020-06-30 | 2021-12-31 | 株洲中车时代电气股份有限公司 | Master-slave distribution method and device of ground traction control equipment |
CN113859322B (en) * | 2020-06-30 | 2022-10-21 | 株洲中车时代电气股份有限公司 | Master-slave distribution method and device of ground traction control equipment |
CN112550366A (en) * | 2020-12-10 | 2021-03-26 | 中国铁路设计集团有限公司 | Operation control method and device for high-speed maglev train and electronic equipment |
CN112937645A (en) * | 2021-04-23 | 2021-06-11 | 湖南中车时代通信信号有限公司 | Magnetic levitation vehicle control method, device and system and readable storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109383568A (en) | High-speed magnetic floating operation control system | |
CN208813225U (en) | High-speed magnetic floating operation control system | |
CN110901693B (en) | Train operation control system based on 5G and cloud computing technology | |
CN109693690B (en) | Magnetic suspension running control system | |
CN113320575B (en) | TACS system supporting backup vehicle control mode and manual fault handling mode | |
CN108146471B (en) | Running method for coping with tidal passenger flow by CBTC (communication based train control) system based on train-vehicle communication | |
CN113264086B (en) | Train interval protection control method and device based on TACS (train operating System) | |
CN113353128B (en) | High-speed magnetic levitation running control system | |
US20140130700A1 (en) | Suspended coach drive bogie | |
CN106915367A (en) | A kind of train control system | |
CN113335350A (en) | Train autonomous operation system for interconnection, intercommunication, collinear operation and overline operation | |
CN109278807B (en) | Train jump stopping method based on train-vehicle communication train control system | |
CN114148383B (en) | Method for realizing backup control mode of TACS system | |
CN102616252A (en) | Railway travelling operation control method and railway travelling operation control system | |
CN113602323A (en) | Method and system for realizing train occupation and integrity check and train control by using transponder | |
CN101791989A (en) | Traffic information network architecture system of self-controlling dispersion track | |
CN114611726A (en) | Urban rail transit data fusion control system based on cloud platform | |
CN110329320A (en) | A kind of tramcar route control method of based on LTE vehicle continuous communiction | |
CN101592948A (en) | A kind of regional computer interlocking control method with terrain control | |
CN108082222A (en) | It is a kind of be used in the synthesis running control system that floats of low freight volume single track/magnetic | |
CN105691419A (en) | Computer interlocking control method and device capable of achieving region control function | |
CN113665630B (en) | VOBC and TCMS integrated train control equipment | |
CN105882689B (en) | Expanding element in inter-city passenger rail autonomy-oriented row control vehicle-mounted system | |
CN108327747A (en) | A kind of interface method of MTU depot controlled central system and signal system | |
CN109857104A (en) | A kind of unmanned technology based on highway virtual rail |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |