CN208803462U - Interlocking pile goes along with sb. to guard him the rectangular steel reinforcement cage positioning device of earlier stake - Google Patents

Interlocking pile goes along with sb. to guard him the rectangular steel reinforcement cage positioning device of earlier stake Download PDF

Info

Publication number
CN208803462U
CN208803462U CN201821410327.6U CN201821410327U CN208803462U CN 208803462 U CN208803462 U CN 208803462U CN 201821410327 U CN201821410327 U CN 201821410327U CN 208803462 U CN208803462 U CN 208803462U
Authority
CN
China
Prior art keywords
spacing plate
reinforcement cage
steel reinforcement
guard
positioning device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821410327.6U
Other languages
Chinese (zh)
Inventor
秦晓光
张中杰
晁东辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Urban Construction Design Research Institute Group Co Ltd
Original Assignee
Shanghai Urban Construction Design Research Institute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Urban Construction Design Research Institute Group Co Ltd filed Critical Shanghai Urban Construction Design Research Institute Group Co Ltd
Priority to CN201821410327.6U priority Critical patent/CN208803462U/en
Application granted granted Critical
Publication of CN208803462U publication Critical patent/CN208803462U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of interlocking piles to go along with sb. to guard him the rectangular steel reinforcement cage positioning device of earlier stake, including several brackets, cross spacing plate, vertical spacing plate and adjust bolt, several holder combinations are at rectangular parallelepiped structure, several holder combinations at rectangular parallelepiped structure at left and right sides of be symmetrically arranged with cross spacing plate, several holder combinations at rectangular parallelepiped structure front and rear sides be symmetrically arranged with vertical spacing plate, the cross spacing plate and vertical spacing plate by adjust bolt be adjusted.The utility model has the beneficial effects that quickly, efficiently and accurately complete the earlier pile driving construction pile of interlocking pile building enclosure rectangle steel reinforcement cage.

Description

Interlocking pile goes along with sb. to guard him the rectangular steel reinforcement cage positioning device of earlier stake
Technical field
The utility model relates to technical field of buildings more particularly to a kind of interlocking pile to go along with sb. to guard him the rectangular steel reinforcement cage positioning of earlier stake Device.
Background technique
Interlocking pile, which is gone along with sb. to guard him, goes along with sb. to guard him form as a kind of underground structure open-cut, obtains in many areas more and more extensive Using.Wherein cut cuts interlocking pile, is equipped with the construction of double-walled steel sleeve using full-sleeve full-rotation drill, bad with that can overcome Cast-in-situ bored pile pile is difficult under geological conditions, will not such as encounter in the soil body during collapse hole, lower digging when having sundries influence can be with The advantages such as it is purged with syzygies grab bucket.Hole-drilling interlocking pile is divided into earlier stake from process, and (steel reinforcement cage shape is the mixed of rectangle Solidifying soil stake) and the later period (steel reinforcement cage shape is circular concrete-pile).It needs to cut earlier stake when due to later period pile driving construction It cuts, if earlier stake rectangle reinforcing bar cage location offset encounters earlier stake rectangle steel reinforcement cage, shadow when easily causing later period stake steel bushing pipe construction Later period stake drilling is rung, occlusion thickness deficiency is in turn resulted in.Therefore it constructs to earlier pile cages and positions and lift required precision very It is high.
Currently used mode is to place pvc pipe for steel reinforcement cage limit, when later period pile driving construction in rectangle steel reinforcement cage two sides Concreting is completed after cutting PCV pipe by pile foundation.Steps are as follows for Specific construction:
1) surveying setting-out determines interlocking pile stake heart position;
2) construction interlocking pile concrete guide wall;
3) drilling machine is in place, pushes steel sleeve, soil taking hole forming;
4) rectangle steel reinforcement cage is hung, two sides prevent pvc pipe from positioning for rectangle steel reinforcement cage;
5) casing is pulled out while concrete perfusion, up to concreting to stake top;
6) pile is completed after concrete strength reaches requirement.
The defect of this construction is as follows:
It since pvc pipe hoop rigidity is limited, is not fixed easily, deficiency is limited to rectangle steel reinforcement cage, and pvc pipe specification is solid It is fixed, and generally require to adjust rectangle steel reinforcement cage size in regional area in practice of construction and then adjust occlusion thickness.
Therefore in technology fast development, artificial increasingly valuable, construction period anxiety and the increasing situation of environmental requirement Under, how fast and efficiently to complete the earlier stake rectangle steel reinforcement cage of interlocking pile and construction pile is accurately positioned, becomes to be engaged pile driving construction In must in face of the problem of.
Those skilled in the art are dedicated to solving above-mentioned technological deficiency.
Utility model content
In view of the above drawbacks of the prior art, the technical purpose of the utility model is exist in above-mentioned background technique Technological deficiency.
To realize the above-mentioned technical purpose, the utility model provides a kind of interlocking pile and goes along with sb. to guard him the rectangular steel reinforcement cage positioning of earlier stake Device, including several brackets, cross spacing plate, vertical spacing plate and adjusting bolt, several holder combinations are at cuboid knot Structure, several holder combinations at rectangular parallelepiped structure at left and right sides of be symmetrically arranged with cross spacing plate, several bracket groups The rectangular parallelepiped structure front and rear sides of synthesis are symmetrically arranged with vertical spacing plate, and the cross spacing plate and vertical spacing plate pass through tune Section bolt is adjusted.
Further, the bracket is specially steel bracket.
Further, the quadrangle of the bracket is provided with ring sleeve and connect with wall embedded bar is led, the annular sleeve The diameter of pipe matches with embedded bar diameter.
Further, the height of the cross spacing plate and vertical spacing plate is 500mm.
The utility model has the beneficial effects that
It is earlier can quickly, efficiently and accurately to complete interlocking pile building enclosure rectangle steel reinforcement cage for the device of the utility model Pile driving construction pile.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is that the utility model step 1 stake heart positions schematic diagram;
Fig. 3 is the utility model step 2 construction of guide wall schematic diagram;
Fig. 4 is that the utility model step 3 pile foundation takes native pile schematic diagram in place;
Fig. 5 is the utility model step 4 installation and adjustment positioning device schematic diagram;
Fig. 6 is that the utility model step 5 hangs steel reinforcement cage schematic diagram;
Fig. 7 is the utility model step 6 casting concrete schematic diagram;
Fig. 8 is that the utility model step 7 pile completes schematic diagram.
Figure label: 1- bracket;2- cross spacing plate;3- vertical spacing plate;4- adjusts bolt.
Specific embodiment
Make furtherly below with reference to technical effect of the attached drawing to the design of the utility model, specific structure and generation It is bright, to be fully understood from the purpose of this utility model, feature and effect.
It please refers to shown in Fig. 1, a kind of interlocking pile goes along with sb. to guard him the rectangular steel reinforcement cage positioning device of earlier stake, including several brackets 1, horizontal Rectangular parallelepiped structure, the length that 8 brackets 1 are combined into are combined into limit plate 2, vertical spacing plate 3 and adjusting 4,8 brackets 1 of bolt It is symmetrically arranged with cross spacing plate 2 at left and right sides of cube structure, rectangular parallelepiped structure front and rear sides are symmetrically arranged with vertical spacing plate 3, cross spacing plate 2 and vertical spacing plate 3 are adjusted by adjusting bolt 4.
Bracket 1 is specially steel bracket, and the quadrangle of bracket 1 is provided with the ring sleeve reinforcing bar 5 pre-buried with wall is led and connect, The diameter of ring sleeve matches with pre-buried 5 diameter of reinforcing bar.The height of cross spacing plate 2 and vertical spacing plate 3 is 500mm。
Referring to figure 2. shown in-Fig. 8, a kind of interlocking pile goes along with sb. to guard him the positioning pile side of the rectangular steel reinforcement cage positioning device of earlier stake Method, comprising the following steps:
Step 1, surveying setting-out determine interlocking pile stake heart location A;
Step 2, the construction of interlocking pile concrete guide wall, in stake early period pre-buried four reinforcing bars 5 of surrounding, reinforcing bar 5 is diagonally connected Intersection point is stake heart A;
Step 3, drilling machine is in place, pushes steel sleeve, soil taking hole forming;
Step 4 installs the positioning device 6 of rectangle steel reinforcement cage 7, is adjusted according to 7 size of rectangle steel reinforcement cage using bolt 4 is adjusted Save the relative distance of cross spacing plate 2 and vertical spacing plate 3;
Step 5 hangs rectangle steel reinforcement cage 7, and the positioning device 6 by leading wall top limits 7 position of rectangle steel reinforcement cage;
Step 6, concrete perfusion 8 whiles, pull out casing, until concrete eight is poured to stake top;
Step 7, the earlier stake pile of interlocking pile is completed after concrete eight intensity reaches requirement.
The utility model can quickly, efficiently and accurately complete the earlier pile driving construction of interlocking pile building enclosure rectangle steel reinforcement cage Pile.
The preferred embodiments of the present invention have been described in detail above.It should be appreciated that the ordinary skill people of this field Member according to the present utility model can conceive without creative work makes many modifications and variations.Therefore, all this technology necks Technical staff passes through logic analysis, reasoning or limited reality according to the design of the utility model on the basis of existing technology in domain Available technical solution is tested, it all should be within the scope of protection determined by the claims.

Claims (4)

1. a kind of interlocking pile goes along with sb. to guard him the rectangular steel reinforcement cage positioning device of earlier stake, it is characterised in that: including several brackets (1), laterally Limit plate (2), vertical spacing plate (3) and adjusting bolt (4), several brackets (1) are combined into rectangular parallelepiped structure, described rectangular It is symmetrically arranged with cross spacing plate (2) at left and right sides of body structure, the rectangular parallelepiped structure front and rear sides are symmetrically arranged with vertical limit Position plate (3), the cross spacing plate (2) and vertical spacing plate (3) are adjusted by adjusting bolt (4).
2. interlocking pile according to claim 1 goes along with sb. to guard him the rectangular steel reinforcement cage positioning device of earlier stake, it is characterised in that: the branch Frame (1) is specially steel bracket.
3. interlocking pile according to claim 1 goes along with sb. to guard him the rectangular steel reinforcement cage positioning device of earlier stake, it is characterised in that: the branch The quadrangle of frame (1) is provided with casing, and the ring sleeve reinforcing bar pre-buried with wall is led (5) is connect, the diameter of the ring sleeve with Pre-buried reinforcing bar (5) diameter matches.
4. a kind of interlocking pile according to claim 1 goes along with sb. to guard him the rectangular steel reinforcement cage positioning device of earlier stake, it is characterised in that: institute The height for stating cross spacing plate (2) and vertical spacing plate (3) is 500mm.
CN201821410327.6U 2018-08-30 2018-08-30 Interlocking pile goes along with sb. to guard him the rectangular steel reinforcement cage positioning device of earlier stake Active CN208803462U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821410327.6U CN208803462U (en) 2018-08-30 2018-08-30 Interlocking pile goes along with sb. to guard him the rectangular steel reinforcement cage positioning device of earlier stake

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821410327.6U CN208803462U (en) 2018-08-30 2018-08-30 Interlocking pile goes along with sb. to guard him the rectangular steel reinforcement cage positioning device of earlier stake

Publications (1)

Publication Number Publication Date
CN208803462U true CN208803462U (en) 2019-04-30

Family

ID=66236712

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821410327.6U Active CN208803462U (en) 2018-08-30 2018-08-30 Interlocking pile goes along with sb. to guard him the rectangular steel reinforcement cage positioning device of earlier stake

Country Status (1)

Country Link
CN (1) CN208803462U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108867628A (en) * 2018-08-30 2018-11-23 上海市城市建设设计研究总院(集团)有限公司 Interlocking pile goes along with sb. to guard him the rectangular steel reinforcement cage positioning device of earlier stake and its positioning pile making method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108867628A (en) * 2018-08-30 2018-11-23 上海市城市建设设计研究总院(集团)有限公司 Interlocking pile goes along with sb. to guard him the rectangular steel reinforcement cage positioning device of earlier stake and its positioning pile making method

Similar Documents

Publication Publication Date Title
CN105951747B (en) A kind of construction method of the pre-buried lattice column of contrary sequence method
WO2019128155A1 (en) Open caisson construction structure and method
CN103266600B (en) Construction method of occlusion pile of full reinforcement pile
JP6310198B2 (en) Pier construction method
CN106939595A (en) A kind of rotary digging bottom-enlarging filling pile construction technology
CN109577517A (en) Assembly of shear wall structure and construction method
CN107620311A (en) A kind of mud off pore-creating filling pile prevents the method that aperture casing sinks
CN105421445A (en) Construction method for non-prestressed centrifugal high-strength concrete pile planted pile
CN104564091A (en) Method and device for removing anchor rods from shield crossing area
CN208803462U (en) Interlocking pile goes along with sb. to guard him the rectangular steel reinforcement cage positioning device of earlier stake
CN103015427B (en) Hole pile underwater concrete pouring positioning device and positioning device thereof
CN107938675A (en) A kind of Vertical spots concrete placings technique and device
CN203685192U (en) Novel device for disassembling anchor rod in shield crossing zone
CN104196248B (en) Steel pipe column vertical locating device and construction method thereof is inserted after contrary sequence method
CN101250870B (en) Positioning device for filling pile reinforcement cage
CN205934931U (en) Lid is in same direction as foundation ditch structure of digging way of doing things construction
CN112814685A (en) Ultra-large section chamber tunneling blasting method
CN205444192U (en) Bridge stake is towards pile driving construction system
CN106930274A (en) The a full set of cylinder rotatory boring castinplace pile construction method that a kind of reinforcing bar cage location is fixed
CN108867628A (en) Interlocking pile goes along with sb. to guard him the rectangular steel reinforcement cage positioning device of earlier stake and its positioning pile making method
KR20190027402A (en) Low part cast in place pile construction method
CN209368877U (en) Contrary sequence method steel pipe column and the movable attachment device of steel reinforcement cage
CN108396734A (en) A kind of device of control Punching Borehole Cast-in-place Concrete Pile stake top concrete casting elevation
CN208346808U (en) A kind of device controlling Punching Borehole Cast-in-place Concrete Pile stake top concrete casting elevation
CN103205983B (en) Construction method of basement rear support system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant