CN208791059U - Tower crane main rope rope supporting device - Google Patents

Tower crane main rope rope supporting device Download PDF

Info

Publication number
CN208791059U
CN208791059U CN201821431671.3U CN201821431671U CN208791059U CN 208791059 U CN208791059 U CN 208791059U CN 201821431671 U CN201821431671 U CN 201821431671U CN 208791059 U CN208791059 U CN 208791059U
Authority
CN
China
Prior art keywords
arm body
trolley
rope
support rope
lifting arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821431671.3U
Other languages
Chinese (zh)
Inventor
吴玉水
张春
窦少林
姚玉婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Industrial Co ltd Of China Construction Second Engineering Bureau
Original Assignee
China Construction Chongqing Machinery Leasing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Chongqing Machinery Leasing Co Ltd filed Critical China Construction Chongqing Machinery Leasing Co Ltd
Priority to CN201821431671.3U priority Critical patent/CN208791059U/en
Application granted granted Critical
Publication of CN208791059U publication Critical patent/CN208791059U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to tower crane technical field, specifically disclose a kind of tower crane main rope rope supporting device, including lifting arm body and the trolley being slidably mounted on lifting arm body, it further include Tuo Sheng mechanism, the Tuo Sheng mechanism includes several support rope rollers for being set to crane arm body lower part, support rope roller one end is hinged on lifting arm body, being equipped at the hinge joint of support rope roller and lifting arm body makes support rope roller be located at the revolving structure on the downside of wirerope, and the trolley is equipped with the trigger architecture of driving support rope roller rotation.This programme enables trolley to pass through Tuo Sheng mechanism by setting trigger architecture and revolving structure, and Shi Tuosheng mechanism will not interfere with the normal operation of trolley.And the support rope roller in this programme is set to crane arm body lower part, and total compact, structure is simple, loads small.

Description

Tower crane main rope rope supporting device
Technical field
The utility model belongs to tower crane technical field more particularly to a kind of tower crane main rope rope supporting device.
Background technique
Tower crane, i.e. " derrick crane " abbreviation, also known as " tower crane ".It is for one of construction lifting equipment.With Being increasing for skyscraper and Large Scale Construction Engineering, the demand to large-scale derrick crane also accordingly increases.Currently, some The jib length of large-scale derrick crane has reached 80 meters, also, the biggest lifting capacity is also increasing, hoist rope Diameter also overstriking therewith.In this way, it is excessive to lead to the problem of hoist rope sagging amount of deflection in tower crane zero load.Such as figure Shown in 1, relative to a length of 80 meters of the tower crane of crane arm, the sagging amount of deflection H of maximum of hoist rope may reach 10 meters or more. In this case, not only danger can be brought to construction;Withdrawing rope time when also will increase lifting reduces tower crane construction effect Rate.
It is all often that more large-scale derrick cranes and other Architectural Equipments work at the same time, each other in Large Scale Construction Engineering Between work range be overlapping.It is asked in order to avoid generating interference between each tower crane and between other Architectural Equipments or building Topic, the conventional method of use is exactly to increase tower crane tower body height, this undoubtedly will increase equipment cost, meanwhile, it can also increase tower crane The risk of running;It is constant in other factors if reducing the sagging amount of deflection of hoist rope using the method for increasing suspension hook weight In the case where, and the biggest lifting capacity of tower crane will certainly be reduced.
Utility model content
The purpose of this utility model is to provide a kind of structures simply, the lesser tower crane main rope rope supporting device of load.
In order to achieve the above object, the base case of the utility model are as follows: tower crane main rope rope supporting device, including lifting Arm body and the trolley being slidably mounted on lifting arm body, further include Tuo Sheng mechanism, the Tuo Sheng mechanism includes several It is set to the support rope roller of crane arm body lower part, support rope roller one end is hinged on lifting arm body, support rope roller and crane arm Being equipped at the hinge joint of ontology makes support rope roller be located at the revolving structure on the downside of wirerope, and the trolley is equipped with driving support rope The trigger architecture of roller rotation.
The working principle and beneficial effect of this base case are: in tower crane operational process, the main steel of trolley two sides Cord is respectively positioned on the support rope roller of lifting arm body, and support rope roller holds the wirerope of trolley two sides, can be to avoid lifting The steel wire rope sag amount of deflection of trolley two sides is excessive.Trigger architecture applies one to support rope roller and turns when trolley is close to Tuo Sheng mechanism Dynamic power makes support rope roller rotation, i.e. support rope roller is detached from the downside of wirerope, and support rope roller, which is located in the middle part of trolley, at this time runs rail The side of mark enables trolley to pass through Tuo Sheng mechanism.After trolley passes through Tuo Sheng mechanism completely, support rope roller is lost The power for going trigger architecture to apply it, support rope roller resets under the action of revolving structure to be again positioned on the downside of wirerope, and support is made to restrict Roller continues to be supported wirerope.This programme enables trolley to pass through by setting trigger architecture and revolving structure Tuo Sheng mechanism, Shi Tuosheng mechanism will not interfere with the normal operation of trolley.And the support rope roller in this programme is set to lifting Arm body lower part, total compact, structure is simple, loads small.
Further, the revolving structure includes the central axis being fixedly mounted on lifting arm body, rotates peace on central axis The first elastic component for driving rotary sleeve to reset is equipped with equipped with rotary sleeve, between rotary sleeve and central axis, the support rope roller is solid Surely be connected on rotary sleeve, under original state, support rope roller under the action of the first elastic component with the running track phase of trolley Mutually vertical, rotary sleeve is rotatably equipped with trigger wheel close to the side of support rope roller.So set, the first elastic component guarantee support rope roller with The running track of trolley is mutually perpendicular to, and support rope roller is enable to hold main rope.
Further, the trigger architecture includes the frizzen being fixedly mounted on trolley, the both ends difference of frizzen Positioned at the two sides of trolley, the both ends of frizzen are wedge shape, and the inclined-plane of wedge shape end and trigger wheel face.So Setting, frizzen end chamfer and trigger wheel are able to drive rotary sleeve rotation when contacting.
Further, the frizzen includes the fixed link being fixedly mounted on trolley and the work set on fixed link both ends Lever, two are equipped with buffer part between motion bar and fixed link, the buffer part by motion bar and is consolidated by the second elastic component Fixed pole connection.So set, can be offset to reaction force of the trigger wheel to frizzen by the second elastic component, guarantee The operation stability of weight trolley.
Further, first elastic component is torsional spring, and second elastic component is spring, and spring and torsional spring are in the market The resource being easy to get, and it is cheap.
Further, hoisting mechanism is additionally provided on the lifting arm body, the hoisting mechanism includes two and is rotatably installed in Screw rod on lifting arm body, two screw rods are located at the two sides of central axis, are equipped with lift lever, lift lever on two screw rods It is equipped with the nut cooperated with screw rod, there are two turns respectively with two screw coaxial settings for rotation connection on lifting arm body Ring is fixedly connected to slide bar in two changes, and two lift levers are slidably connected on two slide bars respectively, rotate on central axis The first partial gear being fixedly connected with rotary sleeve is installed, being fixedly installed on two screw rods can be with the first incomplete tooth The first transmission gear of engagement is taken turns, change is located at the top of rotary sleeve, and lift lever and support are restricted when lift lever and change contact Roller is located at same level, and the second partial gear being fixedly connected with rotary sleeve, two changes are rotatably equipped on central axis On be fixedly installed with the second transmission gear that can be engaged with the second partial gear.So set, passing through support in trolley Main rope can be lifted up upwards by hoisting mechanism when rope roller, guarantee that support rope roller can be without hindrance on the downside of main rope It withdraws.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model tower crane main rope rope supporting device embodiment 1;
Fig. 2 is the cross-sectional view of B-B in Fig. 1;
Fig. 3 is the structural schematic diagram of embodiment 2;
The cross-sectional view of A-A in Fig. 4 Fig. 3;
Fig. 5 is that trolley passes through the process schematic of support rope roller in embodiment 2.
Specific embodiment
The utility model is described in further detail below by specific embodiment:
Description of symbols: trolley 1, frizzen 2, supporting beam 3, support rope roller 4, trigger wheel 5, lift lever 6, slide bar 7, Second transmission gear 8, rotary sleeve 9, central axis 10, the second partial gear 11, central sill 12, bottom beam 13, reinforcing beam 14, king wire Rope 15, T-shaped slider 16, the first transmission gear 17, the first partial gear 18, screw rod 19.
Embodiment 1
As shown in Figure 1 and Figure 2, a kind of tower crane main rope rope supporting device, including lifting arm body, it is slidably mounted on lifting Trolley 1 on arm body and the Tuo Sheng mechanism being arranged on lifting arm body.Lifting arm body includes two mutually flat Capable lower boom is fixedly installed with several supporting beams 3 between two lower booms.Trolley 1 include two vertical struts, two It is fixedly connected with bottom beam 13 between root strut lower end, is fixedly connected with central sill 12, bottom beam 13 and central sill between two struts middle parts Two reinforcing beams 14 arranged in a crossed manner are fixedly connected between 12, two strut upper ends are slidably mounted on two lower booms respectively On, there are spacing between central sill 12 and supporting beam 3, the line wheel group for folding and unfolding main rope 15 is fixedly installed on central sill 12.
If Tuo Sheng mechanism includes dry care rope roller 4, if dry care rope roller 4 is respectively arranged on the lower surface of several supporting beams 3, support It restricts and is equipped with swing mechanism between roller 4 and supporting beam 3, swing mechanism includes the central axis 10 for being fixedly mounted on 3 lower surface of supporting beam, Central axis 10 is vertically arranged and 10 lower end of central axis is located at 12 top of central sill, is rotatably equipped with rotary sleeve 9 on central axis 10, is rotated The first elastic component for driving rotary sleeve 9 to reset is equipped between set 9 and central axis 10, support rope 4 one end of roller is fixedly connected on rotation On pivoted housing 9 and support rope roller 4 is horizontally disposed, and the first elastic component is torsional spring, under original state, makes support rope roller 4 and support by torsional spring Beam 3 is parallel to each other.Rotary sleeve 9 is rotatably equipped with trigger wheel 5 close to the side of support rope roller 4.It is fixed on the central sill 12 of trolley 1 Frizzen 2 is installed, frizzen 2 is parallel to each other with lower boom, and the both ends of frizzen 2 are located at the two sides of trolley 1, touching Sending out bar 2 includes fixed link and two motion bars, and fixed link and motion bar are rectangular shaft, and fixed link is fixedly mounted on central sill 12 On, the both ends of fixed link offer sliding chamber, and two motion bars are slidably mounted on respectively in the cunning chamber at fixed link both ends, motion bar It is spring with chamber is slided far from the second elastic component, the second elastic component is fixedly connected between one end of motion bar.Two motion bars End is equipped with inclined-plane, and inclined-plane and 5 face of trigger wheel towards trigger wheel 5 on one side.
When it is implemented, the main rope 15 of 1 two sides of trolley is respectively positioned on support rope roller 4.Trolley 1 is in crane arm On ontology during movement, when trolley 1 is close to support rope roller 4, the frizzen 2 on trolley 1 connects with trigger wheel 5 first Touching, frizzen 2 apply the power for moving it to 1 traffic direction of trolley to trigger wheel 5, connect since trigger wheel 5 rotates It connects on rotary sleeve 9, and the rotational installation of rotary sleeve 9 is on the center shaft 10, so 5 stress of trigger wheel will drive rotary sleeve 9 in Mandrel 10 rotates, and since support rope roller 4 is fixedly connected on rotary sleeve 9, so support rope roller can be as rotary sleeve 9 be by perpendicular to master 15 direction of wirerope is rotated to main rope 15 is parallel to, and trolley 1 continues to move ahead, and torsional spring ensures that trigger wheel 5 is close to triggering Bar 2, until support rope roller 4 is completely parallel to main rope 15, so that trolley 1 be made to pass through.When frizzen 2 and trigger wheel When 5 contact, trigger wheel 5 can apply a reaction force to frizzen 2, since frizzen 2 includes fixed link and motion bar, fix It is equipped with spring between bar and motion bar and is slidably connected, frizzen 2 is applied so trigger wheel 5 can be offset by the deformation of spring The reaction force added guarantees stationarity of the trolley 1 in moving process.
Embodiment 2
As shown in figure 3, figure 4 and figure 5, the present embodiment the difference from embodiment 1 is that, be additionally provided with elevator in supporting beam 3 Structure, hoisting mechanism include two screw rods 19 being rotatably installed on 3 lower surface of supporting beam, and two screw rods 19 are located at central axis 10 two sides, and screw rod 19 is located at side of the central axis 10 far from support rope roller 4, is equipped with lift lever 6 on two screw rods 19, is promoted Bar 6 is equipped with the nut cooperated with screw rod 19, is additionally provided with two changes in supporting beam 3, two changes are located at central axis 10 Two sides, and two changes are coaxially disposed with two screw rods 19 respectively, and change upper surface is equipped with T-shaped slider 16, in supporting beam 3 The T shape sliding slot of annular is offered, T-shaped slider 16 is slidably connected in T shape sliding slot, connects between T-shaped slider 16 and T shape chute wall It is connected to elastic piece.It is fixedly connected to slide bar 7 in two changes, the cunning cooperated with slide bar 7 is offered on two lift levers 6 Hole, two lift levers 6 are slidably connected at respectively on two slide bars 7.The first partial gear 18 is rotatably equipped on central axis 10, First partial gear 18 is fixedly connected with rotary sleeve 9, and the first partial gear 18 is located at the lower section of rotary sleeve 9, two spiral shells The first transmission gear 17 that can be engaged with the first partial gear 18 is fixedly installed on bar 19.Change is located at rotary sleeve 9 Top, and lift lever 6 and support rope roller 4 are located at same level when lift lever 6 and change contact.It is rotatablely installed on central axis 10 There is the second partial gear 11, the second partial gear 11 is located at 9 top of rotary sleeve and is fixedly connected with rotary sleeve 9, and two turn The second transmission gear 8 that can be engaged with the second partial gear 11 is fixedly installed on ring.
During frizzen 2 pushes support rope roller 4 and rotary sleeve 9 to rotate, due to being rotatably equipped with first on central axis 10 Partial gear 18, and the first partial gear 18 is fixedly connected with rotary sleeve 9, so rotary sleeve 9 will drive first when rotating Partial gear 18 rotates, due to being fixedly installed with the first transmission gear that can be engaged with the first partial gear 18 on screw rod 19 17, so the first partial gear 18 can drive 19 turns of screw rod of left side by first transmission gear 17 in left side when rotating Dynamic, the first partial gear 18 is not engaged with first transmission gear 17 on right side at this time, is driven when screw rod 19 rotates by nut The lift lever 6 in left side moves upwards, and can lift up upwards main rope 15 when lift lever 6 moves upwards, and keeps support rope roller 4 suitable Benefit main rope 15 is rotated and left on the downside of main rope 15, when lift lever 6 is resisted by change lift lever 6 no longer on It rises, screw rod 19, lift lever 6 and change at this time constitutes an entirety, and lift lever 6 is concordant with support rope roller 4, and support rope roller 4 rotates When will drive lift lever 6 and rotated together with slide bar 7, so that lift lever 6 is left 15 downside of main rope.In 9 rotation process of rotary sleeve Can be driven by the second partial gear 11 another lift lever 6 from perpendicular to 15 direction of main rope to being parallel to main rope 15 rotations, make the lift lever 6 on right side will not interfere with the movement of trolley.After trolley 1 passes through, rotary sleeve 9 is in torsional spring Effect is lower to be resetted, and resets lift lever 6 and support rope roller 4, support rope roller 4 continues to hold main rope 15.
Above-described is only the embodiments of the present invention, and the common sense such as well known specific structure and characteristic are herein in scheme It does not describe excessively.It should be pointed out that for those skilled in the art, in the premise for not departing from the utility model structure Under, several modifications and improvements can also be made, these also should be considered as the protection scope of the utility model, these all will not influence The effect and patent practicability that the utility model is implemented.This application claims protection scope should be with the content of its claim Subject to, the records such as specific embodiment in specification can be used for explaining the content of claim.

Claims (6)

1. tower crane main rope rope supporting device, including lifting arm body and the trolley being slidably mounted on lifting arm body, It is characterized by also including Tuo Sheng mechanism, the Tuo Sheng mechanism includes several support rope rollers for being set to crane arm body lower part, institute It states support rope roller one end to be hinged on lifting arm body, being equipped at the hinge joint of support rope roller and lifting arm body makes support rope roller be located at steel Revolving structure on the downside of cord, the trolley are equipped with the trigger architecture of driving support rope roller rotation.
2. tower crane main rope rope supporting device according to claim 1, it is characterised in that: the revolving structure includes fixing The central axis being mounted on lifting arm body is rotatably equipped with rotary sleeve on central axis, is equipped with and uses between rotary sleeve and central axis In the first elastic component that driving rotary sleeve resets, the support rope roller is fixedly connected on rotary sleeve, and under original state, support rope roller exists It is mutually perpendicular under the action of first elastic component with the running track of trolley, side rotational installation of the rotary sleeve close to support rope roller There is trigger wheel.
3. tower crane main rope rope supporting device according to claim 2, it is characterised in that: the trigger architecture includes fixing The frizzen being mounted on trolley, the both ends of frizzen are located at the two sides of trolley, and the both ends of frizzen are Wedge shape, and the inclined-plane of wedge shape end and trigger wheel face.
4. tower crane main rope rope supporting device according to claim 3, it is characterised in that: the frizzen includes fixed peace Fixed link on trolley and the motion bar set on fixed link both ends, two be equipped between motion bar and fixed link it is slow Portion is rushed, motion bar is connect by the buffer part by the second elastic component with fixed link.
5. tower crane main rope rope supporting device according to claim 4, it is characterised in that: first elastic component is to turn round Spring, second elastic component are spring.
6. tower crane main rope rope supporting device according to claim 5, it is characterised in that: also set on the lifting arm body There is hoisting mechanism, the hoisting mechanism includes two screw rods being rotatably installed on lifting arm body, and two screw rods are located at The two sides of central axis, are equipped with lift lever on two screw rods, and lift lever is equipped with the nut cooperated with screw rod, on lifting arm body Rotation connection is fixedly connected to slide bar in two changes, two mention there are two the change respectively with the setting of two screw coaxials Rising stem is slidably connected on two slide bars respectively, and the incomplete tooth of first be fixedly connected with rotary sleeve is rotatably equipped on central axis It takes turns, is fixedly installed with the first transmission gear that can be engaged with the first partial gear on two screw rods, change is located at rotary sleeve Top, and when lift lever and change contact, lift lever and support rope roller are located at same level, are rotatably equipped on central axis The second partial gear being fixedly connected with rotary sleeve is fixedly installed with and can be engaged with the second partial gear in two changes The second transmission gear.
CN201821431671.3U 2018-08-31 2018-08-31 Tower crane main rope rope supporting device Active CN208791059U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821431671.3U CN208791059U (en) 2018-08-31 2018-08-31 Tower crane main rope rope supporting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821431671.3U CN208791059U (en) 2018-08-31 2018-08-31 Tower crane main rope rope supporting device

Publications (1)

Publication Number Publication Date
CN208791059U true CN208791059U (en) 2019-04-26

Family

ID=66207990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821431671.3U Active CN208791059U (en) 2018-08-31 2018-08-31 Tower crane main rope rope supporting device

Country Status (1)

Country Link
CN (1) CN208791059U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108706480A (en) * 2018-08-31 2018-10-26 中建重庆机械租赁有限公司 Tower crane main rope rope supporting device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108706480A (en) * 2018-08-31 2018-10-26 中建重庆机械租赁有限公司 Tower crane main rope rope supporting device

Similar Documents

Publication Publication Date Title
CN101357739B (en) Column crane special for movable arm type group tower
CN201473232U (en) Double-arm type rotating arm
CN208791059U (en) Tower crane main rope rope supporting device
CN211895785U (en) Hoisting machine for building construction
CN201214598Y (en) Column crane special for movable arm type tower erection
CN202296907U (en) Suspension arm balanced movable arm tower crane capable of luffing based on steel rope traction
CN102303821A (en) Luffing tower crane with balanced type suspension arm based on traction luffing of steel rope
CN108002249A (en) Substation equipment maintenance and repair small space boom hoisting
CN202744232U (en) Tower crane long suspension arm lifting steel rope supporting device
CN107355069A (en) A kind of climbing frame falling proof mechanism and the climbing frame falling proof seat in the plane lock based on the mechanism
CN202323771U (en) Installation and maintenance system for highway bridge
CN202575785U (en) Portal crane and four-connecting-rod system thereof
CN108706480A (en) Tower crane main rope rope supporting device
CN216512394U (en) Crane with anti-swing device
CN209127923U (en) A kind of small-sized single armed of rotational automatic formula is hung
CN201099575Y (en) Hanging cradle rotating type material lift equipment
CN215402707U (en) Auxiliary device for hoist
CN206720600U (en) A kind of tower crane of high stability
CN202483988U (en) Integral stroke detector for lug hydro-cylinder
CN115258945A (en) Tower crane jack-up automatic control stable form system
CN211971573U (en) Double-arm tower crane
CN203295075U (en) Derrick mast device of crane and crane with same
CN206569924U (en) A kind of route-variable height beam for crane room is driven a vehicle
CN201785145U (en) Operating device of step-changing hanging plate
CN205894838U (en) Pole is embraced in full -automatic rotation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: No. C32-02/01-01, Changhe Area, Luohuang Town Industrial Park, Jiangjin District, Chongqing City, 402260

Patentee after: Chongqing Industrial Co.,Ltd. of China Construction Second Engineering Bureau

Address before: 5-2, No. 27 Jiangbei City West Street, Jiangbei District, Chongqing 400020

Patentee before: CHINA CONSTRUCTION CHONGQING MACHINERY LEASING Co.,Ltd.

CP03 Change of name, title or address