CN208790329U - Spigot-and-socket fast-assembling pipeline integral box - Google Patents

Spigot-and-socket fast-assembling pipeline integral box Download PDF

Info

Publication number
CN208790329U
CN208790329U CN201821293832.7U CN201821293832U CN208790329U CN 208790329 U CN208790329 U CN 208790329U CN 201821293832 U CN201821293832 U CN 201821293832U CN 208790329 U CN208790329 U CN 208790329U
Authority
CN
China
Prior art keywords
welded
box
chamber door
spigot
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821293832.7U
Other languages
Chinese (zh)
Inventor
常春梅
王玉民
王薇
程勇
郝丽娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HULUDAO SHOUGANG DONGHUA MACHINERY CO Ltd
Original Assignee
HULUDAO SHOUGANG DONGHUA MACHINERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HULUDAO SHOUGANG DONGHUA MACHINERY CO Ltd filed Critical HULUDAO SHOUGANG DONGHUA MACHINERY CO Ltd
Priority to CN201821293832.7U priority Critical patent/CN208790329U/en
Application granted granted Critical
Publication of CN208790329U publication Critical patent/CN208790329U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pallets (AREA)

Abstract

A kind of spigot-and-socket fast-assembling pipeline integral box, structure feature are that the both ends of upper beam and upper longitudinal beam are welded into one with four angle supporting devices, and centre is welded with top plate;The both ends of lower beam and lower stringer are welded into one with four bottom corner pieces, and centre is welded with bottom plate;The both ends of four edge columns are welded between angle supporting device and bottom corner piece respectively, and the both ends of two central posts are welded in respectively between upper and lower stringer;Front and back side chamber door is connect with edge column and central post respectively by hinge, and left and right sides chamber door is connect by hinge with edge column;Cabin interior is fixed with two fixed frames of bilateral symmetry, and frame is provided with the several big pallets and small pallet for capableing of plane push-and-pull.The integral box can also contain attachment and tool needed for pipeline in addition to storing steel pipe in size pallet, carry out transport use.So small using the integral box labor intensity, freight volume is big, when application, which looks for, tries to please easily, and work efficiency is high, General Promotion the guarantee performance of pipeline system and the timeliness of rescue and relief work.

Description

Spigot-and-socket fast-assembling pipeline integral box
Technical field
The utility model relates to a kind of oil transportation, water delivery rapid rescue rescue aid to be specifically a kind of spigot-and-socket fast-assembling Pipeline integral box.
Background technique
The repairing of domestic oil pipeline mostly uses the steel pipe that site welding is interim since its discharge pressure is higher, consumption Take human and material resources, and the used time is longer, increases repairing period and difficulty.It is passed through when water conservancy rescue and relief work frequently with soft pipeline, But due to soft pipeline it is light, it is resistance to force down, be easy destroyed, certain influence is also resulted in rescue and relief work.For The deficiency of pipe connecting method when solution above-mentioned repairing, we have studied a kind of spigot-and-socket fast-assembling pipe connecting method, the party Method connecting pipeline speed is fast, good seal performance, and durable tolerance is high, and high-volume is suitble to frequently to be laid with the pipe removed and receive replacement conveying place Linear system system.But apply this kind of pipe connecting method, need by the connectors such as fast-assembling steel pipe, steel pipe connector, sealing element and specially Construction site is transported to dismantling device.Currently, fast-assembling steel pipe, steel pipe connector, the connectors such as sealing element are transported and dedicated are torn open Holding tool use transportation resources be: fast-assembling steel pipe mostly use greatly classification tie up or case dress after inner wrapping dispersion transport, using people Work or the handling of fork truck single-piece, other connectors and specific purpose tool using single-piece, at random are deposited on transport vehicle.It is at random It stacks and carries large labor intensity, freight volume is small, and when application, which looks for, takes difficulty, and working efficiency is low, is also easy to cause workpiece to collide with damage.
Summary of the invention
In order to solve the deficiencies in the prior art, the utility model provides a kind of spigot-and-socket fast-assembling pipeline integral box, using this Device transport solves the technical problems such as storage, transport, handling, fast assembling-disassembling in pipeline rescue operations, General Promotion pipeline The guarantee performance of system and the timeliness of rescue and relief work.
Realize the purpose of this utility model the technical solution adopted is that: a kind of spigot-and-socket fast-assembling pipeline integral box, including case Body frame, column, chamber door, cabin, pallet;The box frame is by top of the box, the bottom of box, edge column and central post structure At the upper beam of the top of the box and the both ends of upper longitudinal beam and four angle supporting devices are welded into one and surround rectangle, closed Top plate, which is welded in rectangle, constitutes top of the box;The both ends of the lower beam of the bottom of box and lower stringer and four base angles Part, which is welded into one, surrounds rectangle, and closed bottom plate, which is welded in rectangle, constitutes the bottom of box;It is vertical that the column is divided into side The both ends of column and central post, four edge columns are welded between angle supporting device and bottom corner piece respectively, and the both ends of two central posts are welded respectively Middle part between upper and lower stringer constitutes the box frame of cuboid;The chamber door is divided into front and back side chamber door and left and right sides case Door, front and back side chamber door are connect with edge column and central post respectively by hinge, and left and right sides chamber door is connect by hinge with edge column; The cabin interior is fixed with two fixed frames of bilateral symmetry, and fixed frame is equipped with energy in addition to exterior bottom, complementary space The several big pallets and small pallet of enough plane push-and-pulls.
In application, opening each chamber door of surrounding, the bundles of steel pipe of packaging is packed into fixed frame exterior bottom, by all kinds of abnormity Pipe, pipeline accessories, installation tool etc. are packed into large and small pallet, are shut each vertical door of locking, are carried out integral hoisting transport.It transports Behind job location, chamber door is opened, construction operation can be carried out by taking out steel pipe and accessory and tool on demand.
The beneficial effects of the utility model are: due in the integral box be provided with storage fast-assembling steel pipe at and size pallet, Steel pipe, special pipe, pipeline accessories, installation tool can be orderly packed into, carry out transport use.Changing petroleum pipeline, " single-piece dissipates It is random, inefficient " traditional work mode, labor intensity is small, and freight volume is big, and when application, which looks for, tries to please easily, and work efficiency is high, General Promotion The guarantee performance of pipeline system and the timeliness of rescue and relief work.
Detailed description of the invention
Fig. 1 is the external structure of the utility model spigot-and-socket fast-assembling pipeline header;
Fig. 2 is the internal layout of the utility model spigot-and-socket fast-assembling pipeline header;
Fig. 3 is the internal structure chart that the utility model spigot-and-socket fast-assembling pipeline header opens left and right chamber door;
Specific embodiment
In the accompanying drawings, a kind of spigot-and-socket fast-assembling pipeline header of the utility model, the integral box include box frame, column, Chamber door, cabin, pallet;The box frame is made of top of the box, the bottom of box, edge column and central post, the case The both ends of upper beam 1 and upper longitudinal beam 3 at the top of body and four angle supporting devices 2, which are welded into one, surrounds rectangle, the closed top of corrugated type Plate 4, which is welded in rectangle, constitutes top of the box;The both ends of the lower beam 11 of the bottom of box and lower stringer 15 with four Bottom corner piece 12, which is welded into one, surrounds rectangle, and closed bottom plate 16, which is welded in rectangle, constitutes the bottom of box;The column It is divided into edge column 13 and central post 6, the both ends of four edge columns 13 are welded in respectively between angle supporting device 2 and bottom corner piece 12, in two The both ends of column 6 are welded in the box frame that the middle part between upper and lower stringer constitutes cuboid respectively;The chamber door is divided into front and back Side chamber door 5 and left and right sides chamber door 10, front and back side chamber door are connect with edge column 13 and central post 6 respectively by hinge 14, left and right sides Chamber door is connect by hinge 14 with edge column 13;The front and back side chamber door 5 is arranged on front-back, has four fans right two-by-two respectively It opens, left and right sides chamber door 10 is arranged on the face of left and right, has two fans split two-by-two respectively;The purpose that left and right sides chamber door 10 is arranged is easy for The handling of steel pipe.The cabin interior is fixed with two fixed frames 7 of bilateral symmetry, fixed frame 7 in addition to exterior bottom, Complementary space is equipped with the 40 big pallet 9 and small pallet 8 for capableing of plane push-and-pull.The exterior bottom of fixed frame 7 is used to contain steel pipe, Being arranged symmetrically on fixed frame around 40 big pallet 9 and small pallet 8 in fixed frame 7 (can from attached drawing 2,3 To find out), opening front and back side chamber door can be loaded and unloaded into various objects in pallet according to the label posted on size pallet.Size support Disk is using the box structure without top riveted after cold-rolling steel-plate punch, two sides dress heavy push-and-pull sliding rail, sliding rail front end Equipped with set lever, push-and-pull and in place self-locking function may be implemented, pallet, which can be used for storing provisioned in fast-assembling pipeline projects, to be owned Object.Quadrangle is the heavy corner fittings of standard vanning to cabinet up and down, and outer dimension matches with container special lockset, meets skeleton and drag Bassinet structure requirement, meets domestic highway transportation requirement.
Spigot-and-socket fast-assembling steel pipe, the bis- sockets of 450mm that the spigot-and-socket fast-assembling pipeline integral box can contain different length are short Pipe, 600mm double-bellmouth short tube, threeway, 300mm flange-bellmouth short tube, 300mm flange-socket short tube, 90 ° of elbows, 45 ° it is curved Head, 30 ° of elbows, 15 ° of elbows, socket protection cap, bellmouth protection cap, steel lock ring, sealing ring, dismantling device are spring forceps, clear Manage the objects such as hook, the packaging shelter of bellmouth.Pipeline needed for the integral box is integrated with 2 kilometers of pipelines and required object, it is sufficient to Meet and temporarily speedily carries out rescue work and the needs of rescue task.

Claims (3)

1. a kind of spigot-and-socket fast-assembling pipeline integral box, including box frame, column, chamber door, cabin, pallet;The cabinet frame Frame is made of top of the box, the bottom of box, edge column and central post, it is characterised in that: the upper beam (1) of the top of the box It is welded into one with the both ends of upper longitudinal beam (3) and four angle supporting devices (2) and surrounds rectangle, closed top plate (4) is welded on rectangle Interior composition top of the box;The lower beam (11) of the bottom of box and the both ends of lower stringer (15) are welded into one with four bottom corner pieces (12) Rectangle is surrounded, closed bottom plate (16), which is welded in rectangle, constitutes the bottom of box;The column is divided into edge column (13) With central post (6), the both ends of four edge columns (13) are welded in respectively between angle supporting device (2) and bottom corner piece (12), two central posts (6) both ends are welded in the box frame that the middle part between upper and lower stringer constitutes cuboid respectively;The chamber door is divided into front and back side Chamber door (5) and left and right sides chamber door (10), front and back side chamber door are connected with edge column (13) and central post (6) respectively by hinge (14) It connects, left and right sides chamber door is connect by hinge (14) with edge column (13);The cabin interior is fixed with bilateral symmetry two admittedly Determine frame (7), fixed frame (7) is in addition to exterior bottom, and complementary space is equipped with several big pallets (9) for being capable of plane push-and-pull and small Pallet (8).
2. spigot-and-socket fast-assembling pipeline integral box as described in claim 1, it is characterised in that: described front and back side chamber door (5) cloth It sets on front-back, has four fans split two-by-two respectively, left and right sides chamber door (10) is arranged on the face of left and right, has two fans right two-by-two respectively It opens.
3. spigot-and-socket fast-assembling pipeline integral box as described in claim 1, it is characterised in that: in the fixed frame (7) It is arranged symmetrically on fixed frame (7) around big pallet (9) and small pallet (8).
CN201821293832.7U 2018-08-04 2018-08-04 Spigot-and-socket fast-assembling pipeline integral box Expired - Fee Related CN208790329U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821293832.7U CN208790329U (en) 2018-08-04 2018-08-04 Spigot-and-socket fast-assembling pipeline integral box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821293832.7U CN208790329U (en) 2018-08-04 2018-08-04 Spigot-and-socket fast-assembling pipeline integral box

Publications (1)

Publication Number Publication Date
CN208790329U true CN208790329U (en) 2019-04-26

Family

ID=66205318

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821293832.7U Expired - Fee Related CN208790329U (en) 2018-08-04 2018-08-04 Spigot-and-socket fast-assembling pipeline integral box

Country Status (1)

Country Link
CN (1) CN208790329U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112097384A (en) * 2020-08-27 2020-12-18 上海外高桥造船有限公司 Multi-connected air brake integration box

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112097384A (en) * 2020-08-27 2020-12-18 上海外高桥造船有限公司 Multi-connected air brake integration box
CN112097384B (en) * 2020-08-27 2022-03-22 上海外高桥造船有限公司 Multi-connected air brake integration box

Similar Documents

Publication Publication Date Title
CN101304930B (en) Self-lifting/lowering transport container
CN2841573Y (en) Tank type container for bulk product transport
CN205442548U (en) Forklift truck cargo protection device
CN208790329U (en) Spigot-and-socket fast-assembling pipeline integral box
CN206050548U (en) A kind of logistics container of column with number identifying system
CN202439956U (en) Super-wide material transporting device
CN105775174B (en) Sunk type vacuum tank for environmental test
CN204078483U (en) A kind ofly effectively prevent that cell piece is hidden to be split or the photovoltaic module packaging box of sliver
CN205525913U (en) Packing box for elevator
CN205169028U (en) Packing plant is used in active carbon production
CN211520234U (en) Heavy article storage and transportation box
JP6214274B2 (en) Container for waste containing PCB
CN208915919U (en) A kind of container
CN201670413U (en) Supporting shelf of forklift
CN106395084A (en) Partitioned layered portable mechanical part assembly box
CN206377077U (en) A kind of fuel tank
CN102815253B (en) Chemical rescuing recovery vehicle
CN201784721U (en) Van type truck carriage
WO2019128293A1 (en) Powdery material transportation container
CN201634133U (en) Improved container for liquid materials
CN201858492U (en) Emergency response steel bottle transporting device and steel bottle support seat
CN203173194U (en) Self-sealing and self-discharging sludge transport bucket
CN207208230U (en) A kind of automobile rear cargo door structure
CN202124177U (en) Turnover box
CN216970712U (en) External packing box transportation parallel arrangement

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190426

Termination date: 20200804