CN208790329U - Spigot-and-socket fast-assembling pipeline integral box - Google Patents
Spigot-and-socket fast-assembling pipeline integral box Download PDFInfo
- Publication number
- CN208790329U CN208790329U CN201821293832.7U CN201821293832U CN208790329U CN 208790329 U CN208790329 U CN 208790329U CN 201821293832 U CN201821293832 U CN 201821293832U CN 208790329 U CN208790329 U CN 208790329U
- Authority
- CN
- China
- Prior art keywords
- welded
- box
- chamber door
- spigot
- frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Pallets (AREA)
Abstract
A kind of spigot-and-socket fast-assembling pipeline integral box, structure feature are that the both ends of upper beam and upper longitudinal beam are welded into one with four angle supporting devices, and centre is welded with top plate;The both ends of lower beam and lower stringer are welded into one with four bottom corner pieces, and centre is welded with bottom plate;The both ends of four edge columns are welded between angle supporting device and bottom corner piece respectively, and the both ends of two central posts are welded in respectively between upper and lower stringer;Front and back side chamber door is connect with edge column and central post respectively by hinge, and left and right sides chamber door is connect by hinge with edge column;Cabin interior is fixed with two fixed frames of bilateral symmetry, and frame is provided with the several big pallets and small pallet for capableing of plane push-and-pull.The integral box can also contain attachment and tool needed for pipeline in addition to storing steel pipe in size pallet, carry out transport use.So small using the integral box labor intensity, freight volume is big, when application, which looks for, tries to please easily, and work efficiency is high, General Promotion the guarantee performance of pipeline system and the timeliness of rescue and relief work.
Description
Technical field
The utility model relates to a kind of oil transportation, water delivery rapid rescue rescue aid to be specifically a kind of spigot-and-socket fast-assembling
Pipeline integral box.
Background technique
The repairing of domestic oil pipeline mostly uses the steel pipe that site welding is interim since its discharge pressure is higher, consumption
Take human and material resources, and the used time is longer, increases repairing period and difficulty.It is passed through when water conservancy rescue and relief work frequently with soft pipeline,
But due to soft pipeline it is light, it is resistance to force down, be easy destroyed, certain influence is also resulted in rescue and relief work.For
The deficiency of pipe connecting method when solution above-mentioned repairing, we have studied a kind of spigot-and-socket fast-assembling pipe connecting method, the party
Method connecting pipeline speed is fast, good seal performance, and durable tolerance is high, and high-volume is suitble to frequently to be laid with the pipe removed and receive replacement conveying place
Linear system system.But apply this kind of pipe connecting method, need by the connectors such as fast-assembling steel pipe, steel pipe connector, sealing element and specially
Construction site is transported to dismantling device.Currently, fast-assembling steel pipe, steel pipe connector, the connectors such as sealing element are transported and dedicated are torn open
Holding tool use transportation resources be: fast-assembling steel pipe mostly use greatly classification tie up or case dress after inner wrapping dispersion transport, using people
Work or the handling of fork truck single-piece, other connectors and specific purpose tool using single-piece, at random are deposited on transport vehicle.It is at random
It stacks and carries large labor intensity, freight volume is small, and when application, which looks for, takes difficulty, and working efficiency is low, is also easy to cause workpiece to collide with damage.
Summary of the invention
In order to solve the deficiencies in the prior art, the utility model provides a kind of spigot-and-socket fast-assembling pipeline integral box, using this
Device transport solves the technical problems such as storage, transport, handling, fast assembling-disassembling in pipeline rescue operations, General Promotion pipeline
The guarantee performance of system and the timeliness of rescue and relief work.
Realize the purpose of this utility model the technical solution adopted is that: a kind of spigot-and-socket fast-assembling pipeline integral box, including case
Body frame, column, chamber door, cabin, pallet;The box frame is by top of the box, the bottom of box, edge column and central post structure
At the upper beam of the top of the box and the both ends of upper longitudinal beam and four angle supporting devices are welded into one and surround rectangle, closed
Top plate, which is welded in rectangle, constitutes top of the box;The both ends of the lower beam of the bottom of box and lower stringer and four base angles
Part, which is welded into one, surrounds rectangle, and closed bottom plate, which is welded in rectangle, constitutes the bottom of box;It is vertical that the column is divided into side
The both ends of column and central post, four edge columns are welded between angle supporting device and bottom corner piece respectively, and the both ends of two central posts are welded respectively
Middle part between upper and lower stringer constitutes the box frame of cuboid;The chamber door is divided into front and back side chamber door and left and right sides case
Door, front and back side chamber door are connect with edge column and central post respectively by hinge, and left and right sides chamber door is connect by hinge with edge column;
The cabin interior is fixed with two fixed frames of bilateral symmetry, and fixed frame is equipped with energy in addition to exterior bottom, complementary space
The several big pallets and small pallet of enough plane push-and-pulls.
In application, opening each chamber door of surrounding, the bundles of steel pipe of packaging is packed into fixed frame exterior bottom, by all kinds of abnormity
Pipe, pipeline accessories, installation tool etc. are packed into large and small pallet, are shut each vertical door of locking, are carried out integral hoisting transport.It transports
Behind job location, chamber door is opened, construction operation can be carried out by taking out steel pipe and accessory and tool on demand.
The beneficial effects of the utility model are: due in the integral box be provided with storage fast-assembling steel pipe at and size pallet,
Steel pipe, special pipe, pipeline accessories, installation tool can be orderly packed into, carry out transport use.Changing petroleum pipeline, " single-piece dissipates
It is random, inefficient " traditional work mode, labor intensity is small, and freight volume is big, and when application, which looks for, tries to please easily, and work efficiency is high, General Promotion
The guarantee performance of pipeline system and the timeliness of rescue and relief work.
Detailed description of the invention
Fig. 1 is the external structure of the utility model spigot-and-socket fast-assembling pipeline header;
Fig. 2 is the internal layout of the utility model spigot-and-socket fast-assembling pipeline header;
Fig. 3 is the internal structure chart that the utility model spigot-and-socket fast-assembling pipeline header opens left and right chamber door;
Specific embodiment
In the accompanying drawings, a kind of spigot-and-socket fast-assembling pipeline header of the utility model, the integral box include box frame, column,
Chamber door, cabin, pallet;The box frame is made of top of the box, the bottom of box, edge column and central post, the case
The both ends of upper beam 1 and upper longitudinal beam 3 at the top of body and four angle supporting devices 2, which are welded into one, surrounds rectangle, the closed top of corrugated type
Plate 4, which is welded in rectangle, constitutes top of the box;The both ends of the lower beam 11 of the bottom of box and lower stringer 15 with four
Bottom corner piece 12, which is welded into one, surrounds rectangle, and closed bottom plate 16, which is welded in rectangle, constitutes the bottom of box;The column
It is divided into edge column 13 and central post 6, the both ends of four edge columns 13 are welded in respectively between angle supporting device 2 and bottom corner piece 12, in two
The both ends of column 6 are welded in the box frame that the middle part between upper and lower stringer constitutes cuboid respectively;The chamber door is divided into front and back
Side chamber door 5 and left and right sides chamber door 10, front and back side chamber door are connect with edge column 13 and central post 6 respectively by hinge 14, left and right sides
Chamber door is connect by hinge 14 with edge column 13;The front and back side chamber door 5 is arranged on front-back, has four fans right two-by-two respectively
It opens, left and right sides chamber door 10 is arranged on the face of left and right, has two fans split two-by-two respectively;The purpose that left and right sides chamber door 10 is arranged is easy for
The handling of steel pipe.The cabin interior is fixed with two fixed frames 7 of bilateral symmetry, fixed frame 7 in addition to exterior bottom,
Complementary space is equipped with the 40 big pallet 9 and small pallet 8 for capableing of plane push-and-pull.The exterior bottom of fixed frame 7 is used to contain steel pipe,
Being arranged symmetrically on fixed frame around 40 big pallet 9 and small pallet 8 in fixed frame 7 (can from attached drawing 2,3
To find out), opening front and back side chamber door can be loaded and unloaded into various objects in pallet according to the label posted on size pallet.Size support
Disk is using the box structure without top riveted after cold-rolling steel-plate punch, two sides dress heavy push-and-pull sliding rail, sliding rail front end
Equipped with set lever, push-and-pull and in place self-locking function may be implemented, pallet, which can be used for storing provisioned in fast-assembling pipeline projects, to be owned
Object.Quadrangle is the heavy corner fittings of standard vanning to cabinet up and down, and outer dimension matches with container special lockset, meets skeleton and drag
Bassinet structure requirement, meets domestic highway transportation requirement.
Spigot-and-socket fast-assembling steel pipe, the bis- sockets of 450mm that the spigot-and-socket fast-assembling pipeline integral box can contain different length are short
Pipe, 600mm double-bellmouth short tube, threeway, 300mm flange-bellmouth short tube, 300mm flange-socket short tube, 90 ° of elbows, 45 ° it is curved
Head, 30 ° of elbows, 15 ° of elbows, socket protection cap, bellmouth protection cap, steel lock ring, sealing ring, dismantling device are spring forceps, clear
Manage the objects such as hook, the packaging shelter of bellmouth.Pipeline needed for the integral box is integrated with 2 kilometers of pipelines and required object, it is sufficient to
Meet and temporarily speedily carries out rescue work and the needs of rescue task.
Claims (3)
1. a kind of spigot-and-socket fast-assembling pipeline integral box, including box frame, column, chamber door, cabin, pallet;The cabinet frame
Frame is made of top of the box, the bottom of box, edge column and central post, it is characterised in that: the upper beam (1) of the top of the box
It is welded into one with the both ends of upper longitudinal beam (3) and four angle supporting devices (2) and surrounds rectangle, closed top plate (4) is welded on rectangle
Interior composition top of the box;The lower beam (11) of the bottom of box and the both ends of lower stringer (15) are welded into one with four bottom corner pieces (12)
Rectangle is surrounded, closed bottom plate (16), which is welded in rectangle, constitutes the bottom of box;The column is divided into edge column (13)
With central post (6), the both ends of four edge columns (13) are welded in respectively between angle supporting device (2) and bottom corner piece (12), two central posts
(6) both ends are welded in the box frame that the middle part between upper and lower stringer constitutes cuboid respectively;The chamber door is divided into front and back side
Chamber door (5) and left and right sides chamber door (10), front and back side chamber door are connected with edge column (13) and central post (6) respectively by hinge (14)
It connects, left and right sides chamber door is connect by hinge (14) with edge column (13);The cabin interior is fixed with bilateral symmetry two admittedly
Determine frame (7), fixed frame (7) is in addition to exterior bottom, and complementary space is equipped with several big pallets (9) for being capable of plane push-and-pull and small
Pallet (8).
2. spigot-and-socket fast-assembling pipeline integral box as described in claim 1, it is characterised in that: described front and back side chamber door (5) cloth
It sets on front-back, has four fans split two-by-two respectively, left and right sides chamber door (10) is arranged on the face of left and right, has two fans right two-by-two respectively
It opens.
3. spigot-and-socket fast-assembling pipeline integral box as described in claim 1, it is characterised in that: in the fixed frame (7)
It is arranged symmetrically on fixed frame (7) around big pallet (9) and small pallet (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821293832.7U CN208790329U (en) | 2018-08-04 | 2018-08-04 | Spigot-and-socket fast-assembling pipeline integral box |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821293832.7U CN208790329U (en) | 2018-08-04 | 2018-08-04 | Spigot-and-socket fast-assembling pipeline integral box |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208790329U true CN208790329U (en) | 2019-04-26 |
Family
ID=66205318
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821293832.7U Expired - Fee Related CN208790329U (en) | 2018-08-04 | 2018-08-04 | Spigot-and-socket fast-assembling pipeline integral box |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208790329U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112097384A (en) * | 2020-08-27 | 2020-12-18 | 上海外高桥造船有限公司 | Multi-connected air brake integration box |
-
2018
- 2018-08-04 CN CN201821293832.7U patent/CN208790329U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112097384A (en) * | 2020-08-27 | 2020-12-18 | 上海外高桥造船有限公司 | Multi-connected air brake integration box |
CN112097384B (en) * | 2020-08-27 | 2022-03-22 | 上海外高桥造船有限公司 | Multi-connected air brake integration box |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101304930B (en) | Self-lifting/lowering transport container | |
CN2841573Y (en) | Tank type container for bulk product transport | |
CN205442548U (en) | Forklift truck cargo protection device | |
CN208790329U (en) | Spigot-and-socket fast-assembling pipeline integral box | |
CN206050548U (en) | A kind of logistics container of column with number identifying system | |
CN202439956U (en) | Super-wide material transporting device | |
CN105775174B (en) | Sunk type vacuum tank for environmental test | |
CN204078483U (en) | A kind ofly effectively prevent that cell piece is hidden to be split or the photovoltaic module packaging box of sliver | |
CN205525913U (en) | Packing box for elevator | |
CN205169028U (en) | Packing plant is used in active carbon production | |
CN211520234U (en) | Heavy article storage and transportation box | |
JP6214274B2 (en) | Container for waste containing PCB | |
CN208915919U (en) | A kind of container | |
CN201670413U (en) | Supporting shelf of forklift | |
CN106395084A (en) | Partitioned layered portable mechanical part assembly box | |
CN206377077U (en) | A kind of fuel tank | |
CN102815253B (en) | Chemical rescuing recovery vehicle | |
CN201784721U (en) | Van type truck carriage | |
WO2019128293A1 (en) | Powdery material transportation container | |
CN201634133U (en) | Improved container for liquid materials | |
CN201858492U (en) | Emergency response steel bottle transporting device and steel bottle support seat | |
CN203173194U (en) | Self-sealing and self-discharging sludge transport bucket | |
CN207208230U (en) | A kind of automobile rear cargo door structure | |
CN202124177U (en) | Turnover box | |
CN216970712U (en) | External packing box transportation parallel arrangement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190426 Termination date: 20200804 |