CN208777297U - A kind of mud and the foundation structure after Soft Soil Layer in-situ solidifying in conjunction with pile foundation - Google Patents
A kind of mud and the foundation structure after Soft Soil Layer in-situ solidifying in conjunction with pile foundation Download PDFInfo
- Publication number
- CN208777297U CN208777297U CN201820345260.6U CN201820345260U CN208777297U CN 208777297 U CN208777297 U CN 208777297U CN 201820345260 U CN201820345260 U CN 201820345260U CN 208777297 U CN208777297 U CN 208777297U
- Authority
- CN
- China
- Prior art keywords
- layer
- mud
- foundation
- pile
- soft soil
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of mud and the foundation structure after Soft Soil Layer in-situ solidifying in conjunction with pile foundation, including the hardened layer, cured layer and mud set gradually from top to bottom, plug several pile foundations vertically in the mud.The hardened layer of the utility model surface roadbed can be used bull-dozer and pave, mud and soft soil foundation in-situ solidifying replace the various bed courses in conventional procedure, project cost is effectively reduced, it economizes on resources, the bearing behavior of different pile foundations is played simultaneously, it wherein can be adapted for a variety of different base treatments on the upside of cured layer, such as the construction of the gradation layer of sand of roadbed, the inorganic bed of material, concrete layer etc., the foundation structure of the utility model have wide applicability.
Description
Technical field
The utility model relates to foundation treatment technology fields, and in particular to after a kind of mud and Soft Soil Layer in-situ solidifying with stake
The foundation structure that base junction is closed.
Background technique
In recent years, it awaited development utilization as a large amount of Marine shoal and dredging and reclamation are formed by soft soil foundation, and
The method of traditional mud and Soft Ground, the period is long, cost is high, foundation bearing capacity is low, need strange land have bad luck lot of materials into
Line replacement both destroys ecological environment, and durability is poor, and especially some engineerings are with need to being built in deep mud and weak soil
Area leads to mud and Soft Soil Layer compressibility is big, shearing strength is low and poor permeability, so needing to deep mud and weak soil
Layer is reinforced.
Currently, be a kind of composite pile foundation to the reinforcing of deep mud and Soft Soil Layer, but composite pile foundation before work,
Surface must reach the bearing capacity of pile foundation walking, so compressibility is high when encountering surface layer mud and Soft Soil Layer water content is big
When silt soil, it cannot construct in process face.Currently used processing mode is vacuum preloading and changes the method filled out, but true
The time of empty precompressed is long, and cannot achieve the effect that anticipation, and the later period will also put into some sandstones and be laid with temporary construction road,
The somewhat expensive filled out is changed, in recent years, due to a large amount of exploitations of mountain stone, causes the in short supply of resource, material cost is high;Mountain is caused simultaneously
The natural calamity of body landslide, mud-rock flow etc..And the transportation cost of material is also higher, to cause the cost of such processing method
It is higher.It also will cause waste in transportational process, different degrees of pollution can be also caused to environment on the way.
In consideration of it, be badly in need of it is a kind of can not only meet ground requirement for bearing capacity, but also can guarantee ground uniform settlement, rapid construction
The foundation structure of mud and Soft Soil Layer in-situ solidifying in conjunction with pile foundation.
Utility model content
The utility model aims to solve at least one of the problems of the prior art.
The purpose of this utility model is that proposing a kind of mud and the ground base junction after Soft Soil Layer in-situ solidifying in conjunction with pile foundation
Structure reduces mud and Soft Ground expense to improve the bearing capacity of mud and soft soil foundation, with guaranteeing mud and weak soil
The uniform settlement of base.
The mud of embodiment according to the present utility model and the foundation structure after Soft Soil Layer in-situ solidifying in conjunction with pile foundation, packet
The hardened layer, cured layer and mud set gradually from top to bottom is included, plugs several pile foundations vertically in the mud.
In addition, according to the mud of the utility model above-described embodiment and the ground after Soft Soil Layer in-situ solidifying in conjunction with pile foundation
Structure can also have following additional technical feature:
One embodiment according to the present utility model, the hardened layer include grey soil layer, metalling, the inorganic bed of material and mix
Solidifying soil layer.
One embodiment according to the present utility model, the ash soil layer is 37 lime earth.
One embodiment according to the present utility model, the pile foundation are the combination of rigid pile and flexible pile.
One embodiment according to the present utility model, the cured layer with a thickness of 0.5-8m, and the cured layer is anti-
Compressive Strength is 0.2-2.1MPa.
One embodiment according to the present utility model, the hardened layer are board-like composite foundation structure.
Compared with the existing technology, the beneficial effects of the utility model are:
It is thick can to play reduction for hardened layer above by using template foundation structure for the utility model in-situ solidifying layer
The effect for spending or substituting a part of hardened layer, effectively reduces engineering cost;And cementation zone is paved using bull-dozer, is become silted up
Mud and Soft Soil Layer in-situ solidifying utilize mud in-situ solidifying blender to spray curing agent and surface mud and Soft Soil Layer in design
Completion is once stirred at thickness, can be replaced the various bed courses in conventional procedure, be reduced project cost, economize on resources, play simultaneously
The bearing behavior of different pile foundations;The cured layer formed after mud and the processing of Soft Soil Layer in-situ solidifying is soil body curing agent and native chats
The plate body that chemical reaction is formed occurs for object, has certain cohesiveness, can give full play to soil characteristics between pile foundation, load-carrying properties mention
Height can satisfy artificial and mechanical equipment bearing capacity, provide job platform for the development of subsequent construction.
The bearing capacity of mud and soft soil foundation can be improved in the utility model, reduces mud and Soft Ground expense,
Guarantee the uniform settlement of mud and soft soil foundation, there is wide applicability.
Detailed description of the invention
Following drawings are only intended to schematically illustrate and explain the present invention, does not limit the model of the utility model
It encloses.Wherein:
Fig. 1 is the mud and the knot of the foundation structure after Soft Soil Layer in-situ solidifying in conjunction with pile foundation of the utility model embodiment
Structure schematic diagram.
In figure: 1- hardened layer, 2- cured layer, 3- pile foundation, 4- mud.
Specific embodiment
With reference to the accompanying drawings and examples, the utility model is further described.In the following detailed description, only pass through
Bright mode describes certain exemplary embodiments of the utility model.Undoubtedly, those skilled in the art can be with
It recognizes, it, can be with a variety of different modes to described without departing from the spirit and scope of the utility model
Embodiment is modified.Therefore, attached drawing and description are regarded as illustrative in nature, rather than the protection for limiting claim
Range.
As shown in Figure 1, according to the mud of the utility model embodiment and the ground after Soft Soil Layer in-situ solidifying in conjunction with pile foundation
Based structures, including being set gradually from top to bottom as the hardened layer 1 of roadbed, in-situ solidifying layer 2 and as 3 supporting layer of pile foundation
Mud 4 plugs several pile foundations 3 in the mud 4 vertically.
Using the in-situ solidifying layer 2 of the utility model by using template foundation structure, can be risen for hardened layer 1 above
To the effect of reduction thickness or a part of hardened layer 1 of substitution, engineering cost is effectively reduced;And mud and Soft Soil Layer are solid in situ
Curing agent can be sprayed using mud in-situ solidifying blender by changing once stirs at the thickness of design with surface mud and Soft Soil Layer
It completes, the various bed courses in conventional procedure can be replaced, project cost is reduced, economize on resources;At mud and Soft Soil Layer in-situ solidifying
The cured layer 2 formed after reason is that the plate body that chemical reaction is formed occurs for soil body curing agent and native Minerals, has certain adhesive aggregation
Property, soil characteristics between pile foundation can be given full play to, load-carrying properties improve, and can satisfy artificial and mechanical equipment bearing capacity, after being
The development of continuous construction provides job platform.Preferably, the pile foundation 3 is equally spacedly set in the mud 4.
Further, the hardened layer 1 includes grey soil layer, metalling, the inorganic bed of material and concrete layer.Pass through setting ash
1 bearing strength of hardened layer can be improved in soil layer, metalling, the inorganic bed of material and concrete layer;Wherein, cementation zone 1 can be used
Bull-dozer paves.
Further, the grey soil layer is 37 lime earth.Wherein 37 lime earth be with lime, clay be formulated have compared with
High-intensitive construction material, can resist dynamic load and soil pressure as roadbed or road surface by using 37 lime earth, moreover it is possible to play
The effect only seeped.
Further, the pile foundation 3 is the combination of rigid pile and flexible pile.Preferably, wherein flexible pile can be cement
Mixing pile or other cement earth piles, rigid pile can be prefabricated pile, in situ concrete pile or plastic sleeve concrete pile;Wherein stake
Base 3 is the combination of rigid pile and flexible pile, can play the bearing behavior of rigid pile Yu flexible pile difference pile foundation 3 simultaneously.
Further, the cured layer 2 with a thickness of 0.5-8m, and the compression strength of the cured layer 2 is 0.2-
2.1MPa。
Further, the hardened layer 1 is board-like composite foundation structure.
The bearing capacity of mud and soft soil foundation can be improved in the utility model, reduces mud and Soft Ground expense,
Guarantee the uniform settlement of mud and soft soil foundation, there is wide applicability.
The above descriptions are merely exemplary embodiments of the present utility model, the model being not intended to limit the utility model
It encloses.Any those skilled in the art, made equivalent change under the premise of not departing from the conceptions and principles of the utility model
Change and modify, should belong to the range of the utility model protection.
Claims (3)
1. a kind of mud and the foundation structure after Soft Soil Layer in-situ solidifying in conjunction with pile foundation, it is characterised in that: including from top to bottom
Hardened layer, cured layer and the mud set gradually plugs several pile foundations in the mud vertically;The hardened layer is plate
Formula composite foundation structure;In-situ solidifying layer uses template foundation structure, and cementation zone is paved using bull-dozer;The hardened layer
Including grey soil layer, metalling, the inorganic bed of material and concrete layer;The ash soil layer is 37 lime earth.
2. mud according to claim 1 exists with the foundation structure after Soft Soil Layer in-situ solidifying in conjunction with pile foundation, feature
In: the pile foundation is the combination of rigid pile and flexible pile.
3. mud according to claim 1 exists with the foundation structure after Soft Soil Layer in-situ solidifying in conjunction with pile foundation, feature
In: the cured layer with a thickness of 0.5-8m, and the compression strength of the cured layer is 0.2-2.1MPa.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820345260.6U CN208777297U (en) | 2018-03-13 | 2018-03-13 | A kind of mud and the foundation structure after Soft Soil Layer in-situ solidifying in conjunction with pile foundation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820345260.6U CN208777297U (en) | 2018-03-13 | 2018-03-13 | A kind of mud and the foundation structure after Soft Soil Layer in-situ solidifying in conjunction with pile foundation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208777297U true CN208777297U (en) | 2019-04-23 |
Family
ID=66145567
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820345260.6U Active CN208777297U (en) | 2018-03-13 | 2018-03-13 | A kind of mud and the foundation structure after Soft Soil Layer in-situ solidifying in conjunction with pile foundation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208777297U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110886287A (en) * | 2019-09-29 | 2020-03-17 | 中交第一航务工程勘察设计院有限公司 | Shallow soft soil foundation curing structure and construction method thereof |
CN111877302A (en) * | 2020-08-25 | 2020-11-03 | 广东劲拓建设工程有限公司 | Foundation construction method for in-situ solidification of surface soil and pile combined bearing |
-
2018
- 2018-03-13 CN CN201820345260.6U patent/CN208777297U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110886287A (en) * | 2019-09-29 | 2020-03-17 | 中交第一航务工程勘察设计院有限公司 | Shallow soft soil foundation curing structure and construction method thereof |
CN111877302A (en) * | 2020-08-25 | 2020-11-03 | 广东劲拓建设工程有限公司 | Foundation construction method for in-situ solidification of surface soil and pile combined bearing |
CN111877302B (en) * | 2020-08-25 | 2021-09-10 | 广东劲拓建设工程有限公司 | Foundation construction method for in-situ solidification of surface soil and pile combined bearing |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Patel | Geotechnical investigations and improvement of ground conditions | |
CN101368383B (en) | Method for treating soft soil roadbed by artificial composite crust layer | |
US20140314497A1 (en) | Polymer grouting method for constructing gravel pile | |
CN105386433B (en) | A kind of microorganism soil-fixing CFG pile composite foundations and construction method | |
CN100386484C (en) | New type cement soil pile and its construction method | |
CN204898658U (en) | Be used for consolidating little biological glue knot sand pile of soft soil foundation | |
CN102021906A (en) | Method for reinforcing soft soil foundation at deep mixing pile | |
CN105019422B (en) | Topsoil is cured in situ the foundation construction method that carrying is combined with stake | |
TR201807541T4 (en) | Hybrid basic structure and the method for constructing this structure. | |
CN105625294A (en) | Composite foundation and construction method thereof | |
CN101967794A (en) | New technology for treating vehicle bump at bridge ends | |
CN208777297U (en) | A kind of mud and the foundation structure after Soft Soil Layer in-situ solidifying in conjunction with pile foundation | |
CN105019425A (en) | Construction method of drainage body and solidified layer combined foundation structure | |
CN1743561A (en) | Column-hammer forced tamping substitution method | |
CN111676987A (en) | Construction method for backfilling construction of construction fertilizer tank by vibrating, slurry-flushing and ramming method | |
CN104293354B (en) | A kind of anti-thin power soil stabilizer and preparation method and application | |
CN105780764A (en) | Light cemented soil composite mixing pile | |
CN113445527A (en) | Method for treating leakage of grouting waterproof curtain in underground platform of rail transit | |
CN100355991C (en) | Method for constructing composite foundation of piles and ground interactive slurry bonded dispersed body material | |
CN208183722U (en) | A kind of mud and soft soil foundation in-situ solidifying foundation structure | |
US20220048817A1 (en) | Low buoyancy cellular concrete | |
CN207017095U (en) | One kind is using the stable Subsidence Land in Coal Mining Area road basis of high-pressure-double-liquid slip casting filling | |
CN112195909A (en) | Method for reinforcing soft foundation of road and parking lot | |
CN204875831U (en) | Top layer soil solidifies on spot and closes foundation structure that bears with pile cluster | |
CN101704649A (en) | Slurry formula of pile-sinking technique of non-soil borrowing lead-hole prestress pipe pile or prefabricated square pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |