CN208775915U - A kind of anti-clogging test tube conveying device - Google Patents

A kind of anti-clogging test tube conveying device Download PDF

Info

Publication number
CN208775915U
CN208775915U CN201821305162.6U CN201821305162U CN208775915U CN 208775915 U CN208775915 U CN 208775915U CN 201821305162 U CN201821305162 U CN 201821305162U CN 208775915 U CN208775915 U CN 208775915U
Authority
CN
China
Prior art keywords
test tube
bottom plate
transfer passage
outer diameter
panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821305162.6U
Other languages
Chinese (zh)
Inventor
王新运
陈世健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Erteng Intelligent Equipment Co., Ltd
Original Assignee
Guangzhou Teng Automation Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Teng Automation Technology Co Ltd filed Critical Guangzhou Teng Automation Technology Co Ltd
Priority to CN201821305162.6U priority Critical patent/CN208775915U/en
Application granted granted Critical
Publication of CN208775915U publication Critical patent/CN208775915U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filling Or Emptying Of Bunkers, Hoppers, And Tanks (AREA)

Abstract

The utility model discloses a kind of anti-clogging test tube conveying devices, including loading hopper, test tube transportation panel and cylinder pushing mechanism, the top of the test tube transportation panel is arranged in the loading hopper, several columned test tubes are placed in the loading hopper, the test tube transfer passage of S-shaped is provided in the test tube transportation panel, the outer diameter of the test tube transfer passage is greater than the outer diameter of test tube and is less than 3/2 times of the outer diameter of test tube, the outlet of the loading hopper and the inlet communication of the test tube transfer passage;The side of the test tube transportation panel is connected with the first support plate, and the other side is connected with the second support plate;The outlet of the test tube transfer passage is symmetrically arranged with the first bottom plate and the second bottom plate, the first test tube baffle is provided on first bottom plate, the second test tube baffle is provided on second bottom plate, the cylinder pushing mechanism is set between first bottom plate and the second bottom plate, and the cylinder pushing mechanism includes cylinder and test tube push plate.

Description

A kind of anti-clogging test tube conveying device
Technical field
The utility model relates to a kind of test tube conveying device more particularly to a kind of anti-clogging test tube conveying devices.
Background technique
Medical bone drill screw tap generally by disinfection after be placed in dedicated test tube, wait need using when again from dedicated Test tube takes out, and since the outer diameter of medical bone drill screw tap is smaller, a general test tube can accommodate 30 or more medical bone drills Screw tap mostly uses greatly manpower to put medical bone drill screw tap in dedicated test tube into now, but since every test tube needs to place The accurately quantity of medical bone drill screw tap, manually putting medical bone drill screw tap into dedicated test tube, it is easy to appear quantity Error and time-consuming and laborious.
The existing more efficient equipment that medical bone drill screw tap is packed into dedicated test tube is to utilize test tube conveying dress It sets and Special test tube is transported to specific position, place dedicated test tube on location using manipulator clamping, then One end of dedicated test tube is tamping with test tube cap again, the device that other put screw tap automatically is reused and puts screw tap into dedicated examination In pipe, dedicated test tube is sealed again after placement, is able to achieve higher automation, can not only save manpower but also energy Work efficiency is high for raising.Test tube conveying device generally comprises loading hopper and test tube transfer passage, and more dedicated test tubes are put It sets in loading hopper, dedicated test tube falls to specific position by test tube transfer passage, due to the dedicated examination of placement It manages more, easily occurs mutual detent between more test tubes in test tube transfer passage, cause test tube transfer passage to block, keep test tube defeated Device is sent to can not work normally.Further, since dedicated test tube is more fragile, it is easy to appear fragmentation from eminence whereabouts, it is dedicated Fragmentation, which occurs, in test tube not only will increase production cost, but also special staff is needed to go to clear up the residual of dedicated test tube The bones of the body cause production efficiency to decline and improve production cost.
Utility model content
For overcome the deficiencies in the prior art, the purpose of this utility model is to provide a kind of conveyings of anti-clogging test tube to fill It sets, test tube can be prevented to be blocked in test tube conveying device and be effectively prevented test tube and the case where fragmentation occur.
In order to achieve the above object, technical solution used by the utility model is as follows:
A kind of anti-clogging test tube conveying device, including loading hopper, test tube transportation panel and cylinder pushing mechanism, it is described into The top of the test tube transportation panel is arranged in funnel, and the loading hopper is for placing several columned test tubes, institute The test tube transfer passage that S-shaped is provided in test tube transportation panel is stated, the internal diameter of the test tube transfer passage is greater than the test tube 3/2 times of outer diameter and the outer diameter less than the test tube, the outlet of the loading hopper connect with the import of the test tube transfer passage It is logical;The side of the test tube transportation panel is connected with the first support plate, and the other side is connected with the second support plate;The test tube conveying The outlet in channel is symmetrically arranged with the first bottom plate and the second bottom plate, and the first test tube baffle is provided on first bottom plate, described Be provided with the second test tube baffle on second bottom plate, the cylinder pushing mechanism be set to first bottom plate and the second bottom plate it Between, the cylinder pushing mechanism includes cylinder and test tube push plate, and the cylinder is connect with the test tube push plate;Wherein, cylinder is used In driving test tube push plate to push the test tube fallen on the first bottom plate and the second bottom plate forward, until test tube is pushed into the first bottom plate With the edge of the second bottom plate so that the first test tube baffle on the first bottom plate and the second test tube baffle on the second bottom plate can will try Pipe blocks.
Further, test tube anti-clogging conveying device further includes gas source, and the first air inlet and are provided on the cylinder Two air inlets, first air inlet and the second air inlet pass through admission line respectively and connect with gas source.
Further, the side of the test tube transportation panel is provided with first panel through-hole, and the other side is provided with the second face Plate through-hole;The first connecting column is welded in first support plate, after first connecting column is inserted into the first panel through-hole It is fixedly connected with the test tube transportation panel, the second connecting column is welded in second support plate, second connecting column is inserted It is fixedly connected after entering the second panel through-hole with the test tube transportation panel.
Further, first bottom plate is greater than the outer diameter of the test tube to the distance of the outlet of the test tube transfer passage And twice of the outer diameter less than the test tube, the distance of second bottom plate to the outlet of the test tube transfer passage are greater than described Twice of the outer diameter of test tube and the outer diameter less than the test tube.
Further, the distance of the test tube push plate to the outlet of the test tube transfer passage is less than or equal to the test tube The half of outer diameter.
Further, the external diametrical extent of the test tube is 10mm-50mm.
Compared with prior art, the beneficial effects of the utility model are, the loading hopper setting is conveyed in the test tube The top of panel, the loading hopper is interior for placing several columned test tubes, is provided with S in the test tube transportation panel The test tube transfer passage of shape, the internal diameter of the test tube transfer passage are greater than the outer diameter of test tube and are less than 3/2 times of the outer diameter of test tube; Test tube is placed in loading hopper, and test tube is slid from test tube transfer passage to the first bottom plate and the second bottom plate using gravity, will Test tube transfer passage, which is arranged to S-shaped, so that test tube is slowly fallen, and preventing test tube from directly falling causes test tube fragmentation occur;Test tube is defeated It send the outer diameter in channel to be greater than the outer diameter of test tube and is less than 3/2 times of the outer diameter of test tube, more test tubes can be prevented in the process of whereabouts In, since the outer diameter of test tube transfer passage is excessive, two or two or more test tubes are blocked in test tube transfer passage, make test tube Transfer passage can not work normally, and seriously reduce working efficiency.The first test tube baffle is provided on first bottom plate, it is described Be provided with the second test tube baffle on second bottom plate, the cylinder pushing mechanism be set to first bottom plate and the second bottom plate it Between, the cylinder pushing mechanism includes cylinder and test tube push plate, and the cylinder is connect with the test tube push plate;Test tube is defeated from test tube After sending channel to fall on the first bottom plate and the second bottom plate, cylinder drives test tube push plate campaign, and test tube is pushed into the by test tube push plate The edge of one bottom plate and the second bottom plate, the first test tube baffle and the second test tube baffle can play the role of obstruction, prevent test tube from falling It falls.
Detailed description of the invention
Specific embodiment of the present utility model is described in further detail with reference to the accompanying drawing, in which:
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the structural schematic diagram of loading hopper described in the utility model and test tube transportation panel.
Fig. 3 is the structural schematic diagram of cylinder pushing mechanism described in the utility model.
In figure: 1- loading hopper, 2- test tube transportation panel, 4- test tube, the first bottom plate of 5-, the second bottom plate of 6-, 21- test tube are defeated Send channel, the first support plate of 22-, the second support plate of 23-, the first connecting column of 24-, the second connecting column of 25-, 31- cylinder, 32- examination Pipe push plate, the first test tube of 51- baffle, the second test tube of 61- baffle, the first air inlet of 311-, the second air inlet of 312-.
Specific embodiment
It is illustrated below in conjunction with preferred embodiment of the attached drawing to the utility model, it should be understood that described herein excellent It selects embodiment to be only used for describing and explaining the present invention, is not used to limit the utility model.
It is in the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", " perpendicular Directly ", the orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, and is only For ease of description the utility model and simplify description, rather than the device or element of indication or suggestion meaning must have it is specific Orientation, be constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.In addition, term " the One ", " second ", " third " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " is pacified Dress ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally Connection;It can be mechanical connection, be also possible to be electrically connected;Can be directly connected, can also indirectly connected through an intermediary, It can be the connection inside two elements.For the ordinary skill in the art, above-mentioned art can be understood with concrete condition The concrete meaning of language in the present invention.
As shown in Figure 1-3, a kind of anti-clogging test tube conveying device, including loading hopper 1, test tube transportation panel 2 and cylinder The top of the test tube transportation panel 2 is arranged in pushing mechanism, the loading hopper 1, and the loading hopper 1 is several for placing Root columned test tube 4 is provided with the test tube transfer passage 21 of S-shaped, the test tube transfer passage in the test tube transportation panel 2 21 internal diameter is greater than the outer diameter of the test tube 4 and is less than 3/2 times of outer diameter of the test tube 4, the outlet of the loading hopper 1 with The inlet communication of the test tube transfer passage 21;The side of the test tube transportation panel 2 is connected with the first support plate 22, the other side It is connected with the second support plate 23;The outlet of the test tube transfer passage 21 is symmetrically arranged with the first bottom plate 5 and the second bottom plate 6, institute It states and is provided with the first test tube baffle 51 on the first bottom plate 5, the second test tube baffle 61, the gas are provided on second bottom plate 6 Cylinder pushing mechanism is set between first bottom plate 5 and the second bottom plate 6, and the cylinder pushing mechanism includes cylinder 31 and test tube Push plate 32, the cylinder 31 are connect with the test tube push plate 32.
Wherein, cylinder 31 is for driving test tube push plate 32 that will fall in the test tube 4 on the first bottom plate 5 and the second bottom plate 6 forward It pushes, until test tube 4 to be pushed into the edge of the first bottom plate 5 and the second bottom plate 6, so that the first test tube baffle on the first bottom plate 5 51 and second the second test tube baffle 61 on bottom plate 6 test tube 4 can be blocked, prevent test tube 4 from falling.
Specifically, the test tube 4 conveyed will be needed to be placed in loading hopper 1, test tube 4 utilizes gravity from test tube transfer passage 21 slide to the first bottom plate 5 and the second bottom plate 6, and test tube transfer passage 21, which is arranged to S-shaped, can make test tube 4 slowly fall, and prevent Only test tube 4, which directly falls, causes test tube 4 fragmentation occur;The outer diameter of test tube transfer passage 21 is greater than the outer diameter of test tube 4 and is less than examination 3/2 times of the outer diameter of pipe 4 can prevent more test tubes 4 during the falling process, since the outer diameter of test tube transfer passage 21 is excessive, Two or two or more test tubes 4 are blocked in test tube transfer passage 21, can not work normally test tube transfer passage 21, seriously Reduce working efficiency.After test tube 4 is fallen on the first bottom plate 5 and the second bottom plate 6 from test tube transfer passage 21, cylinder 31 is driven Test tube push plate 32 moves, and test tube 4 is pushed into the edge of the first bottom plate 5 and the second bottom plate 6, the first test tube baffle 51 by test tube push plate 32 It can play the role of obstruction with the second test tube baffle 61, prevent test tube 4 from falling.The edge of first bottom plate 5 and the second bottom plate 6 is The specific position that test tube 4 reaches, after reaching specific position, manipulator or other automation equipments will pick up the progress of test tube 4 The work of next step, overall process is intelligent, greatly improves working efficiency.
Specifically, piston rod is provided on cylinder 31, piston rod is connect with test tube push plate 32, it is preferable that piston rod and examination Pipe push plate 32 is connected by screw to;When cylinder 31 starts, it is mobile that piston rod drives test tube push plate 32, so that test tube 4 be pushed to reach The position of setting, then piston rod drives test tube push plate 32 back to move, and test tube push plate 32 is pulled back, and test tube transfer passage 21 goes out Mouth reopens, and next test tube 4 falls from the outlet of test tube transfer passage 21, and piston rod drives test tube push plate 32 to move again, To push next test tube 4 to reach the position of setting, piston rod drives test tube push plate 32 to move reciprocatingly always, until test tube Anti-clogging conveying device stops working.
Specifically, test tube anti-clogging conveying device further includes gas source, and 311 He of the first air inlet is provided on the cylinder 31 Second air inlet 312, first air inlet 311 and the second air inlet 312 are connect by admission line with gas source respectively, preferably Ground, cylinder 31 select SMC series cylinder.
Specifically, the side of the test tube transportation panel 2 is provided with first panel through-hole, and the other side is provided with second panel Through-hole;The first connecting column 24 is welded in first support plate 22, it is logical that first connecting column 24 is inserted into the first panel Test tube transportation panel 2 described in Kong Houyu is fixedly connected, and is welded with the second connecting column 25 in second support plate 23, and described second Connecting column 25 is fixedly connected after being inserted into the second panel through-hole with the test tube transportation panel 2.
Specifically, the distance of first bottom plate 5 to the outlet of the test tube transfer passage 21 is greater than the outer of the test tube 4 The distance of twice of diameter and the outer diameter less than the test tube 4, the outlet of second bottom plate 6 to the test tube transfer passage 21 is big In the test tube 4 outer diameter and be less than twice of outer diameter of the test tube 4, since test tube 4 is from the outlet of test tube transfer passage 21 It falls on the first bottom plate 5 and the second bottom plate 6, so the first bottom plate 5 and the second bottom plate 6 arrive the outlet of test tube transfer passage 21 Distance should be greater than the outer diameter of test tube 4, but since test tube 4 has the risk of fragmentation in dropping process, so the first bottom plate 5 and The distance of two bottom plates 6 to the outlet of test tube transfer passage 21 cannot be too big, prevents test tube 4 from occurring fragmentation during the falling process Situation, so the distance controlling of the first bottom plate 5 and the second bottom plate 6 to the outlet of test tube transfer passage 21 is being greater than test tube 4 Outer diameter and be less than twice of outer diameter of test tube 4 it is more appropriate.
Specifically, the distance of the test tube push plate 32 to the outlet of the test tube transfer passage 21 is less than or equal to the test tube The half of 4 outer diameter, test tube push plate 32 not only play the role of that test tube 4 is pushed to reach setting position, can also play closure examination The effect of pipe transfer passage 21, after a test tube 4 is fallen on the first bottom plate 5 and the second bottom plate 6, test tube push plate 32 is in cylinder Test tube 4 is pushed to the edge of the first bottom plate 5 and the second bottom plate 6, i.e., specific position, test tube push plate 32 is pushing away under 31 drive Test tube transfer passage 21 is closed in dynamic process, prevents other test tubes 4 in test tube transfer passage 21 from falling, in test tube push plate After 32 reset, test tube transfer passage 21 is opened again, and next test tube 4 falls from test tube transfer passage 21, test tube push plate 32 Next test tube 4 is pushed to the edge of the first bottom plate 5 and the second bottom plate 6 under the drive of cylinder 31.
Preferably, outer diameter of the outer diameter of the outlet of test tube transfer passage 21 slightly than test tube 4 is big, makes test tube transfer passage 21 Outlet can only export a test tube 4 every time.
Specifically, the external diametrical extent of the test tube 4 is 10mm-50mm, and the external diametrical extent of test tube 4 can be according to 4 institute of test tube The quantity of the medical bone drill screw tap for needing to accommodate determines, can be set the test tube 4 there are many various outer diameter, but each Test tube 4 needs to be configured with corresponding test tube anti-clogging conveying device, prevents the test tube in test tube anti-clogging conveying device from conveying logical The outer diameter in road 21 is larger, and test tube 4 is blocked in anti-clogging conveying device, seriously reduces working efficiency.
The working principle of the present embodiment:
More test tubes 4 are placed in loading hopper 1, test tube 4 reaches the first bottom plate 5 and the by test tube transfer passage 21 On two bottom plates 6, since the outlet of test tube transfer passage 21 is smaller, so this can only export a test tube 4 every time, test tube 4 falls After on to the first bottom plate 5 and the second bottom plate 6, the piston rod on cylinder 31 drives test tube push plate 32 to move, so that test tube 4 be pushed To specific position, due to smaller with a distance from outlet of the test tube push plate 32 from test tube transfer passage 21, so test tube push plate 32 exists The outlet of test tube transfer passage 21 is closed indirectly during pushing test tube 4, prevents test tube push plate 32 in the mistake for pushing test tube 4 Journey is having other test tubes 4 to fall, after the piston rod on cylinder 31, which completes a complete movement, to be resetted, test tube transfer passage 21 Outlet be opened again, next test tube 4 falls to the first bottom plate 5 and the second bottom plate 6 from the outlet of test tube transfer passage 21 On, piston rod on cylinder 31 drives test tube push plate 32 to move, so that next test tube 4 is pushed to specific position, week and It renews, until closing anti-clogging test tube conveying device.
It will be apparent to those skilled in the art that can make various other according to the above description of the technical scheme and ideas Corresponding change and deformation, and all these changes and deformation all should belong to the protection of the utility model claims Within the scope of.

Claims (6)

1. a kind of anti-clogging test tube conveying device, it is characterised in that: including loading hopper (1), test tube transportation panel (2) and cylinder Pushing mechanism, loading hopper (1) setting is at the top of the test tube transportation panel (2), and the loading hopper (1) is for putting Several columned test tubes (4) are set, the test tube transfer passage (21) of S-shaped is provided in the test tube transportation panel (2), it is described The internal diameter of test tube transfer passage (21) is greater than the outer diameter of the test tube (4) and is less than 3/2 times of the outer diameter of the test tube (4), institute State the outlet of loading hopper (1) and the inlet communication of the test tube transfer passage (21);The side of the test tube transportation panel (2) It is connected with the first support plate (22), the other side is connected with the second support plate (23);The outlet pair of the test tube transfer passage (21) Title is provided with the first bottom plate (5) and the second bottom plate (6), and the first test tube baffle (51) is provided on first bottom plate (5), described The second test tube baffle (61) is provided on second bottom plate (6), the cylinder pushing mechanism is set to first bottom plate (5) and Between two bottom plates (6), the cylinder pushing mechanism includes cylinder (31) and test tube push plate (32), the cylinder (31) and the examination Pipe push plate (32) connection;Wherein, cylinder (31) is for driving test tube push plate (32) that will fall in the first bottom plate (5) and the second bottom plate (6) test tube (4) on pushes forward, until test tube (4) is pushed into the edge of the first bottom plate (5) and the second bottom plate (6), so that the The first test tube baffle (51) on one bottom plate (5) and the second test tube baffle (61) on the second bottom plate (6) can keep off test tube (4) Firmly.
2. a kind of anti-clogging test tube conveying device according to claim 1, it is characterised in that: it further include gas source, the gas The first air inlet (311) and the second air inlet (312), first air inlet (311) and the second air inlet are provided on cylinder (31) Mouth (312) is connect by admission line with gas source respectively.
3. a kind of anti-clogging test tube conveying device according to claim 1, it is characterised in that: the test tube transportation panel (2) side is provided with first panel through-hole, and the other side is provided with second panel through-hole;It is welded on first support plate (22) Have the first connecting column (24), first connecting column (24) is inserted into after the first panel through-hole and the test tube transportation panel (2) it is fixedly connected, is welded with the second connecting column (25) on second support plate (23), second connecting column (25) is inserted into institute It is fixedly connected after stating second panel through-hole with the test tube transportation panel (2).
4. a kind of anti-clogging test tube conveying device according to claim 1, it is characterised in that: first bottom plate (5) is arrived The distance of the outlet of the test tube transfer passage (21) is greater than the outer diameter of the test tube (4) and is less than the outer diameter of the test tube (4) Twice, second bottom plate (6) to the test tube transfer passage (21) outlet distance be greater than the test tube (4) outer diameter And twice of the outer diameter less than the test tube (4).
5. a kind of anti-clogging test tube conveying device according to claim 1, it is characterised in that: the test tube push plate (32) is arrived The distance of the outlet of the test tube transfer passage (21) is less than or equal to the half of the outer diameter of the test tube (4).
6. a kind of anti-clogging test tube conveying device according to claim 1, it is characterised in that: the outer diameter of the test tube (4) Range is 10mm-50mm.
CN201821305162.6U 2018-08-13 2018-08-13 A kind of anti-clogging test tube conveying device Active CN208775915U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821305162.6U CN208775915U (en) 2018-08-13 2018-08-13 A kind of anti-clogging test tube conveying device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821305162.6U CN208775915U (en) 2018-08-13 2018-08-13 A kind of anti-clogging test tube conveying device

Publications (1)

Publication Number Publication Date
CN208775915U true CN208775915U (en) 2019-04-23

Family

ID=66156783

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821305162.6U Active CN208775915U (en) 2018-08-13 2018-08-13 A kind of anti-clogging test tube conveying device

Country Status (1)

Country Link
CN (1) CN208775915U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112960363A (en) * 2021-02-04 2021-06-15 湖州泰能物联科技有限公司 High-efficient directional conveyor of connector who prevents blocking up

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112960363A (en) * 2021-02-04 2021-06-15 湖州泰能物联科技有限公司 High-efficient directional conveyor of connector who prevents blocking up

Similar Documents

Publication Publication Date Title
CN104843204B (en) Grain collecting device
CN104843203B (en) Cereal bagging device
CN208775915U (en) A kind of anti-clogging test tube conveying device
CN203781396U (en) Batching system for refractory materials
CN105539897A (en) Automatic facial mask filling device
CN209291527U (en) A kind of oxygen automation magnetic powder conveying device
CN203753991U (en) Blockage blowing device of pneumatic conveyer
CN204057270U (en) A kind of drum type device for discharging and pneumatic conveying material transmission system thereof
CN110905208A (en) Mud transfer device for construction
CN205293143U (en) Medicinal cream filling system
CN210761575U (en) Automatic packing apparatus of biological feed
CN206024835U (en) Pet toy processing machinery
CN203865124U (en) Automatic bag opening station for small bags
CN206915345U (en) A kind of automatic transceiving cabinet for material pneumatic conveyer system
CN205132144U (en) Cement silo
CN105466210B (en) A kind of hermetically sealed roller kilns of atmosphere protection
CN209583106U (en) A kind of buffer unit for conveying grain into storehouse
CN207463746U (en) A kind of pipe-dredging system
CN203306313U (en) Automatic charging device of bagged dry powder
CN207208615U (en) A kind of vacuum aspiration type Chinese medicine sorting equipment in bulk
CN206395503U (en) Eel transport conveyer
CN204816419U (en) Automatic material conveying device of silica powder
CN205953045U (en) Integral type powdery material material loading conveying system
CN206108384U (en) Capsule pneumatic conveyer
CN206216942U (en) A kind of banbury

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 510700 First Floor of Building No. 30, 828 Maogang Road, Huangpu District, Guangzhou City, Guangdong Province

Patentee after: Guangzhou Erteng Intelligent Equipment Co., Ltd

Address before: 510700 First Floor of Building No. 30, 828 Maogang Road, Huangpu District, Guangzhou City, Guangdong Province

Patentee before: Guangzhou Teng Automation Technology Co. Ltd.

CP01 Change in the name or title of a patent holder