CN208763208U - Additional closure connection reinforcing bar without support assembled integral beam-column node structure - Google Patents
Additional closure connection reinforcing bar without support assembled integral beam-column node structure Download PDFInfo
- Publication number
- CN208763208U CN208763208U CN201821075448.XU CN201821075448U CN208763208U CN 208763208 U CN208763208 U CN 208763208U CN 201821075448 U CN201821075448 U CN 201821075448U CN 208763208 U CN208763208 U CN 208763208U
- Authority
- CN
- China
- Prior art keywords
- precast
- unit
- reinforcing bar
- column
- groove
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
A kind of additional closure connection reinforcing bar of the utility model without support assembled integral beam-column node structure, including precast beam unit and precast column unit, the setting of precast beam unit end is fluted, and beam-ends reinforcing bar is provided in groove;Precast column unit upper end is provided with bracket, each precast beam unit one end rides on bracket, it is provided with closure reinforced steel bar ring between contiguous prefabricated beam end, and has poured pea gravel concreten in the connecting node of the groove of precast beam unit, closure reinforced steel bar ring and precast column unit setting up and down.The utility model can effectively reduce the workload of site operation, site operation does not need to do temporary support simultaneously, field operation amount is smaller, while the pea gravel concreten of the high grade of intensity is poured after the use of node recess region, meets the design principle of " Qiang Jiedian, weak component ".The utility model site operation does not need setting temporary support, and easy for construction, good seismic performance can shorten the construction period, and is suitble to promote and apply in a wide range of.
Description
Technical field
The utility model relates to brick or concrete duct field, assembling without support for specifically a kind of additional closure connection reinforcing bar is whole
Formula beam-column node structure.
Background technique
In reinforced concrete frame structure, bean column node is the significant points for guaranteeing structural bearing capacity and ductility, beam column
Node undertakes and distributes moment of flexure and shearing, is the key position for guaranteeing structural integrity and preventing structure from occurring collapsing.Previous shake
Building damage investigation display afterwards, concrete beam and column node damage is the most serious, is the key that structural failure is caused even to be collapsed
Factor.Can concrete beam and column node region arrangement of reinforcement be complex simultaneously, guarantee that " Qiang Jiedian, weak component " is in design and construction
Limit assembly concrete popularization and application, especially middle high-intensity earthquake region popularization and application important restriction factor.
Reinforced concrete beam column node region is disposed with beam, column indulges muscle and stirrup, the reinforcing bar of node region are more and mutual
Staggeredly, cause available construction space narrow;Moreover, when being constructed using the form of construction work of precast assembly, precast beam
The connecting portion of column component is usually located at bean column node region, by being formed in prefabricated beam column concrete region domain after-pouring concrete
Concrete frame structure.Since reinforcing bar is more and construction space limits for bean column node region arrangement, template construction and coagulation is poured
Construction is more inconvenient when native, causes the concrete construction quality of node region lower, the performance requirement of " waiting cast-in-place " is not achieved.?
Existing beam-ends is reserved in the prefabrication and assembly construction concrete frame structure of keyway, and the space for reserving keyway is smaller, arranges bending reinforcing steel bar
Can effective reinforcing steel bar anchoring property, but difficulty of construction is larger, moreover, bending when arranging bending reinforcing steel bar
Connection reinforcing bar is easy to appear connection when deviation occurs in position due to disturbance when steel bar arrangement position deviation is larger or casting concrete
The problems such as reinforced steel bar strength cannot be met the requirements;When existing prefabrication and assembly construction concrete frame structure carries out construction and installation at the scene,
Beam column is required to the temporary support of temporary support, especially beam for the progress of serious limitation site operation, therefore solves prefabricated structure
Part temporary support in the construction process and installation are to promote the importance of building industrialization.
Utility model content
Purpose of utility model: in order to overcome the deficiencies in the prior art, the utility model provides a kind of additional closure
Connect reinforcing bar without support assembled integral beam-column node structure.
Technical solution: in order to solve the above technical problems, the utility model it is a kind of it is additional closure connection reinforcing bar without support
Assembled integral beam-column node structure, including precast beam unit and precast column unit, the setting of precast beam unit end is fluted, recessed
Beam-ends reinforcing bar is provided in slot;Precast column unit upper end is provided with bracket, and each precast beam unit one end rides on bracket, adjacent pre-
Be provided with closure reinforced steel bar ring between beam end processed, and the groove of precast beam unit, closure reinforced steel bar ring and on divide into
The connecting node for the precast column unit set has poured pea gravel concreten.
Wherein, it is provided with spacer bar above bracket both ends, the bottom portion of groove of precast beam unit is provided with and spacer bar
The location hole of cooperation.
Wherein, precast beam unit is composite beam, and precast beam unit top stirrup is open stirrups.
Wherein, groove position stirrup encrypts, and groove length is not less than 1 times of deck-molding.
Wherein, the sidewall thickness of groove is not less than 2 times of thickness of concrete cover or 50mm, and the thickness of bottom portion of groove is not
Less than 50mm, 6mm is not less than when the roughness of groove inner wall is measured using heap micromicrofarad.
Wherein, the strength grade of a pea gravel concreten grade higher than the concrete strength of precast beam unit and precast column unit
It is real.
Wherein, precast column unit forms skewered column by the more prefabricated posts connected from top to bottom, and bracket is set to each prefabricated
Column upper end.
The utility model has the advantages that the utility model has the following beneficial effects:
Using the groove arrangement beam-ends reinforcing bar of precast beam unit end, when site operation, can be to avoid template construction, effectively
Reduce bean column node casting concrete when workload, construct it is more convenient;Precast column unit can as a prefabricated components
Effectively to reduce lifting operation amount when site operation, accelerate construction progress;Prefabricated bracket and positioning is set in prefabricated post
Reinforcing bar, can be to avoid temporary support be arranged in hoisting process after beam installation is in place, and the connection reinforcing bar of precast beam unit is to close
Reinforced steel bar ring is closed, connection reinforcing bar is closure reinforced steel bar ring, and the two guarantees node connection using overlap joint or the form of uniform intervals arrangement
The overall performance of frame.The utility model can effectively reduce the workload of site operation, while site operation does not need to do
Temporary support, field operation amount is smaller, while the pea gravel concreten of the high grade of intensity is poured after the use of node recess region, meets
The design principle of " Qiang Jiedian, weak component ".The utility model site operation does not need setting temporary support, easy for construction, antidetonation
Better performances can shorten the construction period, and be suitble to promote and apply in a wide range of.
Detailed description of the invention
Fig. 1 precast beam unit schematic three dimensional views;
Fig. 2 precast column unit schematic three dimensional views;
The prefabricated beam column component connecting portion structural map of Fig. 3;
Fig. 4 assembling frame Structure Beam-column position of joints structural map;
The three-dimensional schematic elevation view of Fig. 5 assembly concrete frame precast beam construction;
Fig. 6 assembly concrete frame precast beam construction three dimensional top schematic diagram;
The prefabricated beam column component of Fig. 7 assembly concrete frame structure connects three-dimensional schematic elevation view;
The prefabricated beam column component of Fig. 8 assembly concrete frame structure connects three-dimensional schematic side view.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawing.
As shown in figures 1-8, a kind of additional closure connection reinforcing bar of the utility model without support assembled integral beam column section
Point structure, including precast beam unit 2 and precast column unit 1,2 end of precast beam unit are arranged fluted 6, are provided in groove 6
Beam-ends reinforcing bar 8;1 upper end of precast column unit is provided with bracket 3, and each 2 one end of precast beam unit rides on bracket 3, contiguous prefabricated beam
Be provided between 2 end of component closure reinforced steel bar ring 10, and the groove of precast beam unit 26, closure reinforced steel bar ring 10 and up and down
The connecting node 11 of the precast column unit 1 of setting has poured pea gravel concreten.Precast column unit 1 is by connect from top to bottom more
Prefabricated post forms skewered column, and bracket 3 is set to each prefabricated post upper end.Spacer bar 5, precast beam are provided with above 3 both ends of bracket
6 bottom of groove of component 2 is provided with and the cooperation of spacer bar 5.Precast beam unit 2 is composite beam, 2 top of precast beam unit hoop
Muscle is open stirrups.The encryption of 6 position stirrup of groove, 6 length of groove are not less than 1 times of deck-molding.The sidewall thickness of groove 6 is not less than 2
Thickness of concrete cover or 50mm again, the thickness of 6 bottom of groove are not less than 50mm, and the roughness of 6 inner wall of groove uses heap
It is not less than 6mm when micromicrofarad measures.Strong concrete of the strength grade of pea gravel concreten than precast beam unit 2 and precast column unit 1
It is real to spend a high grade.
When construction, concrete prefabricated beam 2 and precast column unit 1 are made;The prefabricated bracket in each 1 upper end of precast column unit
3, spacer bar 5 is set on bracket 3;It is attached muscle is indulged with column between upper and lower level precast column unit 1, single span precast beam structure
Part 2 is used as a prefabricated components, reserves groove 6 and location hole 9 at 2 end of precast beam unit, 6 inner wall of groove is set as in production
Rough surface;Precast beam unit 2 is composite beam, and for convenience of the construction of floor, the stirrup of 2 top of precast beam unit uses open stirrups
Muscle;The on-site hoisting of precast beam unit 2 and precast column unit 1;Precast beam unit 2 and precast column unit 1 are transported to construction site
Precast column unit 1 is attached with basis using grout sleeve, is then layered hoisting prefabricated beam by the assembly for carrying out prefabricated components
2 left and right ends of precast beam unit are respectively placed on the bracket 3 connecting with prefabricated post by component 2, while the positioning on bracket 3
Reinforcing bar 5 should be inserted into location hole 9, complete the lifting construction at prefabricated components scene;In the groove 6 of precast beam unit 2 and beam column section
The internal arrangement closure reinforced steel bar ring 10 of point, the connection length of closure reinforced steel bar ring 10 should meet the requirement of anchoring strength, be closed reinforced steel bar ring
10 area meets the requirement of moment capacity;It is closed the length of the beam-ends reinforcing bar 8 of reinforced steel bar ring 10 and the stretching of 2 end of precast beam unit
The requirement of anchoring should be met, the two is that uniform intervals are arranged or staggeredly bar splicing is arranged;Groove 6 and beam column nucleus pour
The pea gravel concreten of a high strength grade, and by pea gravel concreten vibration compacting;The construction of prestressing force laminated floor slab;Work as frame structure
After the completion of system construction, lifting prestressing force laminated floor slab is placed in 2 top of precast beam unit, and prestressing force laminated floor slab stretches out reinforcing bar
It is attached with the overlapping layers 7 of precast beam unit 2, then arranges that floor reinforced bar mesh, casting concrete complete floor slab construction.
The above is only the preferred embodiment of the utility model, it should be pointed out that: for the common skill of the art
For art personnel, without departing from the principle of this utility model, several improvements and modifications can also be made, these improve and
Retouching also should be regarded as the protection scope of the utility model.
Claims (7)
1. it is a kind of it is additional closure connection reinforcing bar without support assembled integral beam-column node structure, it is characterised in that: including prefabricated
Beam and precast column unit, the setting of precast beam unit end is fluted, and beam-ends reinforcing bar is provided in groove;On precast column unit
End is provided with bracket, and each precast beam unit one end rides on bracket, is provided with closure reinforcing bar between contiguous prefabricated beam end
Ring, and poured in the connecting node of the groove of precast beam unit, closure reinforced steel bar ring and precast column unit setting up and down
Pea gravel concreten.
2. it is according to claim 1 it is a kind of it is additional closure connection reinforcing bar without support assembled integral beam-column node structure,
It is characterized by: being provided with spacer bar above bracket both ends, the bottom portion of groove of precast beam unit is provided with matches with spacer bar
The location hole of conjunction.
3. it is according to claim 1 it is a kind of it is additional closure connection reinforcing bar without support assembled integral beam-column node structure,
It is characterized by: precast beam unit is composite beam, precast beam unit top stirrup is open stirrups.
4. it is according to claim 1 it is a kind of it is additional closure connection reinforcing bar without support assembled integral beam-column node structure,
It is characterized by: groove position stirrup encrypts, groove length is not less than 1 times of deck-molding.
5. it is according to claim 1 it is a kind of it is additional closure connection reinforcing bar without support assembled integral beam-column node structure,
It is characterized by: the sidewall thickness of groove is not less than 2 times of thickness of concrete cover or 50mm, the thickness of bottom portion of groove is not small
In 50mm, 6mm is not less than when the roughness of groove inner wall is measured using heap micromicrofarad.
6. it is according to claim 1 it is a kind of it is additional closure connection reinforcing bar without support assembled integral beam-column node structure,
It is characterized by: the strength grade of a pea gravel concreten grade higher than the concrete strength of precast beam unit and precast column unit
It is real.
7. it is according to claim 1 it is a kind of it is additional closure connection reinforcing bar without support assembled integral beam-column node structure,
It is characterized by: precast column unit forms skewered column by the more prefabricated posts connected from top to bottom, bracket is set to each prefabricated post
Upper end.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821075448.XU CN208763208U (en) | 2018-07-09 | 2018-07-09 | Additional closure connection reinforcing bar without support assembled integral beam-column node structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821075448.XU CN208763208U (en) | 2018-07-09 | 2018-07-09 | Additional closure connection reinforcing bar without support assembled integral beam-column node structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208763208U true CN208763208U (en) | 2019-04-19 |
Family
ID=66129042
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821075448.XU Active CN208763208U (en) | 2018-07-09 | 2018-07-09 | Additional closure connection reinforcing bar without support assembled integral beam-column node structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208763208U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109057046A (en) * | 2018-07-09 | 2018-12-21 | 常州市规划设计院 | The assembled integral beam-column node structure and construction method of additional closure connection reinforcing bar |
CN115573597A (en) * | 2022-11-02 | 2023-01-06 | 中铁建工集团有限公司 | Fully-assembled concrete canopy and construction method thereof |
-
2018
- 2018-07-09 CN CN201821075448.XU patent/CN208763208U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109057046A (en) * | 2018-07-09 | 2018-12-21 | 常州市规划设计院 | The assembled integral beam-column node structure and construction method of additional closure connection reinforcing bar |
CN115573597A (en) * | 2022-11-02 | 2023-01-06 | 中铁建工集团有限公司 | Fully-assembled concrete canopy and construction method thereof |
CN115573597B (en) * | 2022-11-02 | 2023-08-15 | 中铁建工集团有限公司 | Fully-assembled concrete canopy and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105625570B (en) | A kind of prefabricated beam column attachment means and preparation method thereof | |
CN109057046A (en) | The assembled integral beam-column node structure and construction method of additional closure connection reinforcing bar | |
CN105839823B (en) | A kind of hollow superposed floor of close rib of truss-like | |
CN106437031B (en) | The multilayer prefabricated post of one-pass molding with bracket and preparation method thereof and construction method | |
CN201883529U (en) | Shear wall structure building based on cross-hole prefabricated reinforced-concrete formwork | |
CN203808235U (en) | Integral fabricated precast special-shaped column structure | |
CN108252407A (en) | A kind of building with prefabricated reinforced concrete bearing | |
CN208763208U (en) | Additional closure connection reinforcing bar without support assembled integral beam-column node structure | |
CN207812741U (en) | Pre-manufactured steel structure overlapped shear wall | |
CN110905074A (en) | Independent node assembly type frame structure and construction method | |
CN108775085A (en) | The assembled integral concrete frame structure and its construction method of beam-ends connection | |
CN212656384U (en) | High-strength concrete connecting piece, high-strength concrete post-cast assembled frame system and support frame | |
CN202401667U (en) | Prefabricated column with reserved embedded column porous channel and embedded column type full-assembly anti-seismic building | |
CN205295909U (en) | Combination steel box girder structure of assembling fast | |
CN207525906U (en) | A kind of assembled frame-shear structure wall splitlevel connection structure | |
CN207812664U (en) | A kind of prefabricated post frame for assembled architecture | |
CN108775086A (en) | The additional assembled integral beam-column node structure and construction method for being closed connection reinforcing bar | |
CN206769201U (en) | A kind of reinforced concrete combination rod structure | |
CN206512923U (en) | Multilayer prefabricated post of the one-shot forming with bracket | |
CN208763209U (en) | The assembled integral concrete frame structure of beam-ends connection | |
CN208763207U (en) | The assembled integral beam-column node structure of additional closure connection reinforcing bar | |
CN204983213U (en) | Dark big board shear wall structure that supports in prefabricated assembled area | |
CN108360672A (en) | Assembled architecture with prefabricated reinforced concrete convex bearing | |
CN108301510A (en) | A kind of bean column node and its construction method | |
CN107023078A (en) | Assemble cast-in-place combined type superposed box mesh-beam floor system and construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |