CN206769201U - A kind of reinforced concrete combination rod structure - Google Patents

A kind of reinforced concrete combination rod structure Download PDF

Info

Publication number
CN206769201U
CN206769201U CN201720319857.9U CN201720319857U CN206769201U CN 206769201 U CN206769201 U CN 206769201U CN 201720319857 U CN201720319857 U CN 201720319857U CN 206769201 U CN206769201 U CN 206769201U
Authority
CN
China
Prior art keywords
plate
steel pipe
ring flat
pipe column
connection ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720319857.9U
Other languages
Chinese (zh)
Inventor
吴金兴
吴晓斌
吴晓峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN FUTIAN JIANAN CONSTRUCTION GROUP Co Ltd
Original Assignee
SHENZHEN FUTIAN JIANAN CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN FUTIAN JIANAN CONSTRUCTION GROUP Co Ltd filed Critical SHENZHEN FUTIAN JIANAN CONSTRUCTION GROUP Co Ltd
Priority to CN201720319857.9U priority Critical patent/CN206769201U/en
Application granted granted Critical
Publication of CN206769201U publication Critical patent/CN206769201U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

A kind of reinforced concrete combination rod structure is the utility model is related to, mainly including upper steel pipe column, lower steel pipe column, internal lining pipe, connection ring flat-plate, vertical connecting screw;Upper steel pipe column is connected with lower steel pipe column by internal lining pipe, steel pipe column surface, which is stayed, sets concrete air-vent and concrete pouring hole, and connection ring flat-plate is provided with upper and lower steel pipe column, connection ring flat-plate is shelved on cross-bar and the transverse screw on end plate is connected by ring flat-plate and anchors, while the fastening support of the U-shaped by being connected on cross-bar is laterally clamping;It is vertically connected with ring flat-plate to connect by vertical connecting screw, vertical connecting screw uses screw cap anchoring with being vertically connected with ring flat-plate, and has adjustment positioning jacking in vertical connecting screw end set;Steel pipe column periphery colligation beam column reinforcing bar and supporting module.Steel pipe column connected node shear behavior is strong up and down for the reinforced concrete combination rod structure that the utility model is related to, and each component simple installation, technical economic benefit protrude.

Description

A kind of reinforced concrete combination rod structure
Technical field
A kind of reinforced concrete combination rod structure is the utility model is related to, belongs to main structure construction technical field, is applicable In the construction for the steel pipe column concrete combination column that mode is connect using two layers or multilayer one.
Background technology
Steel pipe column concrete superposed column (steel tube-reinforced concrete column) refers to by section The post that portion's steel pipe column concrete and the outer reinforced concrete sandwich of steel pipe column form, abbreviation superposed column.It can be divided into square by section morphology Tee section and circular cross-section.The inside and outside part of superposed column can not simultaneous construction, also can simultaneous construction.Simultaneous construction refers to together When pours steel pipe column interior concrete and steel pipe column, and concrete, the superposed column of simultaneous construction can claim coupled column outside.
When steel pipe column concrete combination column is constructed, steel pipe column uses seamless steel tubing string, and non-scale is processed, steel pipe column connection Common practices is one layer one and connect, and concrete inside and outside steel pipe column can so be effectively ensured while pour, but the drawbacks of certain be present, Connect mode using one layer one steel pipe column must then to be cut off at the scene, then connect height again, considerably increase internal lining pipe dosage and Welding times, and steel pipe column connects high position and can not be located in beam column core space, must have part steel pipe column to use, it will significantly Increase cost, the construction period also greatly increases.If steel pipe column length is connect using two layers or three layer one, this kind of ask can be avoided Topic, but two layers or three layer one connect higher to lifting interim holding clamp requirement, need to use the fixture specially designed;Mixed in steel pipe column When coagulating native pouring construction, it need to shift to an earlier date to stay setting pouring hole on steel pipe column, concreting finishes to be blocked in time, plugging structure And close measure is also extremely important, construction speed can be greatly speeded up by effectively solving problem above, achieve good economic effect Benefit.
In consideration of it, steel pipe column is connect using two layers or three layer one in steel pipe column concrete combination column in the utility model, lifting Steel pipe column is connected using special mould clamp temporarily, and is provided with adjustment positioning jacking;During steel pipe column interior concrete pouring construction, Stayed in advance on steel pipe column and set pouring hole, concreting is finished and blocked in time using cutting off steel plate, easy to operate and pacify It is high to fill precision, construction and installation are reliable, and technical economic benefit is notable.
The content of the invention
The purpose of this utility model is to provide the steel that a kind of installation rate is fast, structural stability is good and economic benefit protrudes Reinforced concrete composite column structure.
To realize above-mentioned technical purpose, the utility model employs following technical scheme:
A kind of reinforced concrete combination rod structure, it is characterised in that the reinforced concrete combination rod structure mainly includes Upper steel pipe column, lower steel pipe column, internal lining pipe, upper connection ring flat-plate, lower connection ring flat-plate and vertical connecting screw;Upper steel pipe column and lower steel pipe Post is connected by internal lining pipe, and the steel pipe column surface of upper steel pipe column and lower steel pipe column, which is stayed, sets concrete air-vent and concreting Hole, is respectively arranged with connection ring flat-plate and lower connection ring flat-plate on upper steel pipe column, lower steel pipe column, and connection ring flat-plate is shelved on cross-bar The transverse screw above and by ring flat-plate connected on end plate anchors, while the fastening support of the U-shaped by being connected on cross-bar is horizontal clamping; Upper connection ring flat-plate and lower connection ring flat-plate are connected by vertical connecting screw, and vertical connecting screw uses with upper and lower connection ring flat-plate Screw cap anchoring, there is adjustment positioning jacking in vertical connecting screw end set;Steel pipe column periphery colligation beam column reinforcing bar simultaneously installs mould Plate.
Further, the steel pipe column concrete air-vent is symmetrical arranged in same absolute altitude, and concrete pouring hole is rectangle Square hole, using steel plate closing is cut off after concreting, cut off steel plate and anchor and be welded to connect by connecting plate with steel pipe column.
Spaced set has separate type to shelve end plate among the internal lining pipe, separate type shelve end plate side be provided with it is perpendicular To floor is reinforced, the width that separate type shelves end plate is identical with steel pipe column wall thickness.
The upper connection ring flat-plate and lower connection ring flat-plate are formed by two pieces of semi-circular sheet steels by ring flat-plate stud connection, surface Vertical connecting screw hole is reserved, connection ring flat-plate movable end sets annulate lamella connection end plate, and reserving ring flat-plate on ring flat-plate connection end plate connects Bolted end-plate hole is connect, connection ring flat-plate inwall is provided with rubber washer, and connection ring flat-plate bottom is provided with cross-bar and shelves groove.
Described cross-bar intersects temporarily to be located on steel pipe column concrete air-vent.
Described adjustment positioning jacking is arranged between vertical connecting screw end and steel pipe post jamb.
The construction method that the reinforced concrete combination rod structure same period described above pours, its main construction procedure are as follows:
1) preparation of construction:According to every erection of steel pipe column position, up opened up in advance at 1000mm absolute altitudes in each floor plate 100 × 200mm concreting mouth, and open up at every laminate top and bottom elevation diameter 20mm peep hole;
2) steel pipe column lifts, is interim in place:Steel pipe column is lifted using tower crane, and perpendicularity is carried out after the completion of head section liftings Verification;
3) internal lining pipe is installed:After head section erection of steel pipe column is in place, the qualified internal lining pipe of quality inspection is installed at the top of it, afterwards Before often connecing high one layer of steel pipe column, it is both needed to that internal lining pipe is installed on request at the top of a upper steel pipe column, and all internal lining pipes are connecing height It is welded to connect after the completion of steel pipe column with upper and lower steel pipe column;
4) steel pipe column is connected:Before connecing high steel pipe column, lower connection ring flat-plate is fixed on to the steel pipe column installed On, away from post upper end 400mm, and using transverse screw and U-shaped fastening support anchoring, installed after connecing high steel pipe column using same procedure Ring flat-plate is connected, then vertical connecting screw is installed, is tightened each nut after being adjusted using adjustment positioning jacking, repetition measurement hangs down again Straight degree and gap, and perpendicularity is checked using theodolite again in the two directions, after meeting requirement, by tower crane decoupling device, Continue next steel pipe column lifting operation;
5) reinforcing bar colligation and formwork erection:After erection of steel pipe column, reinforcing bar outside steel pipe column is carried out according to drawing in time and tied up Bundle and coupled column formwork erection;
6) combination column jecket inner concrete pours:Pipe inner concrete pours the method vibrated by hand using side-wall hole, pours After, use in time is cut off steel plate and blocked, and is welded again with carbon-dioxide arc welding after being anchored using bolt;
7) the outer concreting of column jecket is combined:The outer concrete of pipe need to carry out the outer concrete of pipe before pipe inner concrete initial set Cast, vibrating spear vibration compacting is applied during cast;
8) coupled column concrete curing:Concreting finishes, and uses plastic sheeting cloth after reaching some strength form removal Parcel is conserved.
The utility model has the characteristics of following and beneficial effect:
(1) steel pipe column is connect using two layers or three layer one in the utility model steel pipe column concrete combination column, is reinforced using band For the internal lining pipe of floor as connecting node, shearing strength is high, and overall structure efficiency of construction is high, is constructed compared to traditional group zygostyle, Cost also decreases, and economic technology benefit protrudes.
(2) ring flat-plate itself is connected in the utility model and is provided with hydro-expansive rubber, recycled after being anchored by end plate perpendicular Connected to screw rod, and positioning jacking is adjusted in vertical screw rod end set, bonding strength and the company of upper and lower steel pipe column is effectively ensured Connect precision.
(3) the utility model redesigns to the steel plate structure that cuts off of steel pipe column concrete pouring hole, is cutting off steel Plate connecting plate setting up and down, connecting plate can be with steel pipe post jamb anchor connections, and in concrete pouring construction, cutting off steel plate need not unload Carry, cause to lose, ensure efficiency of construction.
Brief description of the drawings
Fig. 1 is the utility model reinforced concrete combination post steel pipe column connection diagram;
Fig. 2 is profile after the utility model reinforced concrete combination post concreting;
Fig. 3 is internal lining pipe schematic diagram in the utility model;
Fig. 4 is the utility model connection ring flat-plate schematic diagram;
Fig. 5 is that the utility model cuts off schematic diagram after steel plate closing;
Fig. 6 is that the utility model cuts off schematic diagram before steel plate closing;
Fig. 7 is the colligation of the utility model reinforcing bar and formwork erection schematic diagram.
In figure:The upper steel pipe columns of 1-;2- adjustment positioning jackings;3-U shapes fastening support;4- fastening support hold-doun nuts;5- vertically connects Connect screw rod;6- internal lining pipes;7- transverse screws;Steel pipe column hold-doun nut under 8-;9- cross-baves;Steel pipe column under 10-;Connected under 11- Ring flat-plate;12- ring flat-plates connect end plate;Ring flat-plate is connected on 13-;The upper steel pipe column hold-doun nuts of 14-;The outer reinforced columns of 15-;16- Self-compacting concrete;17- concrete air-vents;18- separate types shelve end plate;19- vertically reinforces floor;20- ring flat-plates connection end Crab bolt hole;21- cross-baves shelve groove;22- ring flat-plate hinges;23- rubber washers;24- cuts off steel plate top connecting plate;25- is cut Except steel plate;26- cuts off steel plate lower connecting plate;27- cuts off Interal fixation nut;28- connecting plate hold-doun nuts;29- concrete Pouring hole;30- connecting plate preformed holes;31- beam body cage bars;32- beam body stirrups;33- beam body bearing rods;34- concrete column stirrups; 35- concrete column templates, the vertical connecting screw holes of 36-.
Embodiment
The prefabricated technological requirement of steel pipe column in present embodiment, connect the production and processing technical requirements of ring flat-plate, steel pipe column work Skill requirement, concreting technological requirement etc. repeat no more, and emphasis illustrates the reinforced concrete combination post that the utility model is related to The embodiment of structure.
Fig. 1 is the utility model reinforced concrete combination post steel pipe column connection diagram, and Fig. 2 is that the utility model reinforcing bar mixes Profile after the zygostyle concreting of solidifying local soil type, Fig. 3 are internal lining pipe schematic diagrames in the utility model, and Fig. 4 is that the utility model connects Ring flat-plate schematic diagram is connect, Fig. 5 is that the utility model cuts off schematic diagram after steel plate closing, and Fig. 6 is that the utility model cuts off steel plate closing Preceding schematic diagram, Fig. 7 are the colligation of the utility model reinforcing bar and formwork erection schematic diagram.
Reinforced concrete combination rod structure shown in 1 referring to the drawings, mainly by upper steel pipe column 1, lower steel pipe column 10, internal lining pipe 6th, the composition such as upper connection ring flat-plate 13, lower connection ring flat-plate 11 and vertical connecting screw 5.
As shown in Fig. 2 upper steel pipe column 1 is connected with lower steel pipe column 10 by internal lining pipe 6, upper steel pipe column 1 and lower steel pipe column 10 Steel pipe column surface stay and set concrete air-vent 17 and concrete pouring hole 29 (see Fig. 6), in upper steel pipe column 1, lower steel pipe column 10 On be respectively arranged with connection ring flat-plate 13 and it is lower connection ring flat-plate 11, connection ring flat-plate be shelved on cross-bar 9 and connected by ring flat-plate Transverse screw 7 on end plate 12 anchors, while the fastening of the U-shaped by being connected on cross-bar 9 support 3 is laterally clamping;Upper connection ring flat-plate 13 and it is lower connection ring flat-plate 11 connected by vertical connecting screw 5, vertical connecting screw 5 with it is upper and lower connection ring flat-plate use nut Anchoring, there is adjustment positioning jacking 2 in the vertical end set of connecting screw 5;Steel pipe column periphery colligation beam column reinforcing bar and supporting module.
Concrete air-vent 17 is symmetrical arranged in same absolute altitude, and concrete pouring hole 29 is rectangle square hole, is poured in concrete Closed after building using cutting off steel plate 25, cut off steel plate 25 and anchor and be welded to connect by connecting plate with steel pipe column.
As shown in figure 3,6 middle spaced set of internal lining pipe has separate type to shelve end plate 18, end plate 18 is shelved in separate type Side is provided with vertical reinforcing floor 19, and the width that separate type shelves end plate 18 is identical with steel pipe column wall thickness.
As shown in figure 4, upper connection ring flat-plate 13 and lower connection ring flat-plate 11 pass through ring flat-plate hinge 22 by two pieces of semi-circular sheet steels It is formed by connecting, vertical connecting screw hole 36 is reserved on surface, and connection ring flat-plate movable end sets annulate lamella connection end plate 12, ring flat-plate connection Ring flat-plate connection bolted end-plate hole 20 is reserved on end plate 12, connection ring flat-plate inwall is provided with rubber washer 23, and connection ring flat-plate bottom is set It is equipped with cross-bar and shelves groove 21.
Cross-bar 9 intersects temporarily to be located on steel pipe column concrete air-vent 17.
Adjustment positioning jacking 2 is arranged between the vertical end of connecting screw 5 and steel pipe post jamb.
Before construction, first according to every erection of steel pipe column position, 100 are up opened up in advance at 1000mm absolute altitudes in each floor plate × 200mm concreting mouth, and open up at every laminate top and bottom elevation diameter 20mm peep hole.
Steel pipe column is lifted using tower crane, and perpendicularity verification is carried out after the completion of head section liftings.Steel pipe column uses nothing without exception Stitch steel pipe, overall diameter 325mm.After head section erection of steel pipe column is in place, the qualified internal lining pipe 6 of quality inspection is installed at the top of it, it is interior Bushing pipe 6 uses strength grade prefabricated for Q345 steel plates, and thickness of pipe wall is not preferably less than 5mm, should typically use 6mm optimums, internal lining pipe 6 Slot reservation 2mm or so is advisable between seamless inside pipe wall.Before often connecing high one layer of steel pipe column afterwards, it is both needed in a upper steel pipe column top Internal lining pipe is installed in portion on request, and all internal lining pipes are welded to connect after the completion of high steel pipe column is connect with upper and lower steel pipe column.
Before connecing high steel pipe column, lower connection ring flat-plate 11 is fixed on the steel pipe column installed, away from post upper end 400mm, and anchored using transverse screw 7 and U-shaped fastening support 3, upper connection ring flat-plate 13 and the lower connection internal diameter of ring flat-plate 11 are 325mm, External diameter is 535mm, and 4 a diameter of 22mm screw hole is reserved on surface, and the ring flat-plate connection thickness control of end plate 12 is advisable in 8mm, high Spend for 85mm, same reserved diameter 16mm ring flat-plate connection bolted end-plate hole 20.It is 8mm to connect ring flat-plate one thickness of attached on inner walls The rubber washer 23 of left and right.Connect and connection ring flat-plate installed using same procedure after high steel pipe column, then vertical connecting screw 5 is installed, The vertical length of connecting screw 5 is 1000mm, is tightened each nut after being adjusted using adjustment positioning jacking 2, repetition measurement hangs down again Straight degree and gap, and perpendicularity is checked using theodolite again in the two directions, after meeting requirement, by tower crane decoupling device, Continue next steel pipe column lifting operation.
After erection of steel pipe column, reinforcing bar colligation and coupled column formwork erection outside steel pipe column are carried out according to drawing in time.Outside During frame beam steel bar colligation, longitudinal reinforcement must avoid steel pipe column in steel pipe column both sides by centre laying beam body bearing rod 33, protecting Demonstrate,prove four limbs stirrup.
After formwork erection, first carry out pipe inner concrete and pour, before concreting, concrete cast height is determined, every 20mm peep hole and steam vent is opened up on layer steel pipe column root, carries out absolute altitude control.10~20mm thickness should be first poured into a mould when pouring Subtracting stone cement mortar with strength grade of concrete identical, inserting vibrating spear out of pouring hole when pouring half storey is vibrated, Concrete is further allowed to reach closely knit with this.Beam bottom is poured into for the first time, after treating core space reinforcing bar and template construction, then is entered Row cast, pipe inner concrete are poured into plate top mark eminence.After pouring, use in time is cut off steel plate 25 and blocked, and uses Welded again with carbon-dioxide arc welding after bolt anchoring.
The outer concrete of pipe need to be carried out the outer concrete of pipe and poured into a mould before pipe inner concrete initial set, be shaken using vibrating spear during cast Puddling is real.Concreting finishes, and is conserved after reaching some strength form removal using plastic sheeting cloth parcel.

Claims (6)

1. a kind of reinforced concrete combination rod structure, it is characterised in that the reinforced concrete combination rod structure mainly includes upper Steel pipe column (1), lower steel pipe column (10), internal lining pipe (6), upper connection ring flat-plate (13), lower connection ring flat-plate (11) and vertical connecting screw (5);Upper steel pipe column (1) is connected with lower steel pipe column (10) by internal lining pipe (6), the steel of upper steel pipe column (1) and lower steel pipe column (10) Column surface, which stays, sets concrete air-vent (17) and concrete pouring hole (29), divides on upper steel pipe column (1), lower steel pipe column (10) Connection ring flat-plate (13) and lower connection ring flat-plate (11) are not provided with, and connection ring flat-plate is shelved on cross-bar (9) and connected by ring flat-plate Transverse screw (7) anchoring on end plate (12) is connect, while the fastening support of the U-shaped by being connected on cross-bar (9) (3) is laterally clamping; It is upper connection ring flat-plate (13) and it is lower connection ring flat-plate (11) by vertical connecting screw (5) connection, vertical connecting screw (5) with it is upper and lower Connection ring flat-plate uses screw cap anchoring, has adjustment positioning jacking (2) in vertical connecting screw (5) end set;Steel pipe column periphery Colligation beam column reinforcing bar and supporting module.
2. reinforced concrete combination rod structure according to claim 1, it is characterised in that the steel pipe column concrete is breathed freely Hole (17) is symmetrical arranged in same absolute altitude, and concrete pouring hole (29) is rectangle square hole, is used after concreting and is cut off steel Plate (25) is closed, and is cut off steel plate (25) and is anchored and be welded to connect by connecting plate with steel pipe column.
3. reinforced concrete combination rod structure according to claim 1, it is characterised in that among the internal lining pipe (6) etc. Spacing is provided with separate type and shelves end plate (18), and shelving end plate (18) side in separate type is provided with vertical reinforcing floor (19), The width that separate type shelves end plate (18) is identical with steel pipe column wall thickness.
4. reinforced concrete combination rod structure according to claim 1, it is characterised in that it is described it is upper connection ring flat-plate (13) and Lower connection ring flat-plate (11) is formed by connecting by two pieces of semi-circular sheet steels by ring flat-plate hinge (22), and vertical connecting screw is reserved on surface Hole (36), connection ring flat-plate movable end set annulate lamella connection end plate (12), ring flat-plate connection end are reserved on ring flat-plate connection end plate (12) Crab bolt hole (20), connection ring flat-plate inwall are provided with rubber washer (23), and connection ring flat-plate bottom is provided with cross-bar and shelves groove (21)。
5. reinforced concrete combination rod structure according to claim 4, it is characterised in that the cross-bar (9) is intersected temporarily It is located on steel pipe column concrete air-vent (17).
6. reinforced concrete combination rod structure according to claim 3, it is characterised in that the adjustment positioning jacking (2) sets Put between vertical connecting screw (5) end and steel pipe post jamb.
CN201720319857.9U 2017-03-29 2017-03-29 A kind of reinforced concrete combination rod structure Active CN206769201U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720319857.9U CN206769201U (en) 2017-03-29 2017-03-29 A kind of reinforced concrete combination rod structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720319857.9U CN206769201U (en) 2017-03-29 2017-03-29 A kind of reinforced concrete combination rod structure

Publications (1)

Publication Number Publication Date
CN206769201U true CN206769201U (en) 2017-12-19

Family

ID=60632966

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720319857.9U Active CN206769201U (en) 2017-03-29 2017-03-29 A kind of reinforced concrete combination rod structure

Country Status (1)

Country Link
CN (1) CN206769201U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106884502A (en) * 2017-03-29 2017-06-23 深圳市福田建安建设集团有限公司 A kind of reinforced concrete combination rod structure and same period pouring construction method
CN108204044A (en) * 2018-01-10 2018-06-26 兰州大学 A kind of construction method of round steel pipe constraint reinforced column

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106884502A (en) * 2017-03-29 2017-06-23 深圳市福田建安建设集团有限公司 A kind of reinforced concrete combination rod structure and same period pouring construction method
CN108204044A (en) * 2018-01-10 2018-06-26 兰州大学 A kind of construction method of round steel pipe constraint reinforced column

Similar Documents

Publication Publication Date Title
WO2018219024A1 (en) Steel-plate-encased precast concrete column foot joint and construction method therefor
CN106884502A (en) A kind of reinforced concrete combination rod structure and same period pouring construction method
CN105625570B (en) A kind of prefabricated beam column attachment means and preparation method thereof
CN207176717U (en) A kind of assembly concrete foot joint of encased steel plate
CN107100299A (en) A kind of non-dismantling formwork composite exterior wall and its method of construction
CN205954921U (en) Novel big board shear wall structure is secretly supported in bolted connection's prefabricated assembled area
CN109811878A (en) The shell integrated structure of the cast-in-place coinsiding die of assembled architecture and construction method
CN108425429A (en) The forming method of steel tube concrete beam and column cross connection node structure and composite structure
CN107476470A (en) Steel pipe built in assembled and GFRP pipe regeneration concrete compound shear walls and its construction method
CN109057046A (en) The assembled integral beam-column node structure and construction method of additional closure connection reinforcing bar
CN103821280A (en) Construction method for steel tube confined concrete composite columns
CN105525753A (en) Method and structure for simultaneously constructing constructional column and main body structure
CN206917087U (en) A kind of prefabricated assembling type reinforced concrete framework open tubular column and its making mould
CN206769201U (en) A kind of reinforced concrete combination rod structure
CN103806659B (en) Super thick prestressing force change-over panel individual layer comprehensively supports and splits temperature control construction technology with control
CN111188459B (en) Construction process for bonding prestressed reinforced concrete beam
CN114150766A (en) Prefabricated reinforced concrete column connecting joint and construction method thereof
CN208763208U (en) Additional closure connection reinforcing bar without support assembled integral beam-column node structure
CN107366355A (en) Add the bean column node and its construction method of new beam on existing reinforced concrete frame column
CN107217790A (en) A kind of prefabricated assembling type reinforced concrete framework open tubular column and its construction method
CN109881776A (en) A kind of assembling prefabricated reinforced concrete tubular column structure and construction method
CN206902913U (en) A kind of high-altitude long-span overhung structure
CN206220241U (en) A kind of steel is cut with reference to assembled-type house building system
CN105951987B (en) Node and construction method are poured after the secondary external permanent aluminium sheet external mold of frame
CN206205144U (en) Node is poured after the secondary external permanent aluminium sheet external mold of framework

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant