CN208762525U CN201821521415.3U CN201821521415U CN208762525U CN 208762525 U CN208762525 U CN 208762525U CN 201821521415 U CN201821521415 U CN 201821521415U CN 208762525 U CN208762525 U CN 208762525U
Authority
CN
China
Prior art keywords
pipeline
fixedly installed
outside
blast furnace
nozzle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821521415.3U
Other languages
Chinese (zh)
Inventor
王计平
田朋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baotou Ande Kiln Furnace Technology Co Ltd
Original Assignee
Baotou Ande Kiln Furnace Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baotou Ande Kiln Furnace Technology Co Ltd filed Critical Baotou Ande Kiln Furnace Technology Co Ltd
Priority to CN201821521415.3U priority Critical patent/CN208762525U/en
Application granted granted Critical
Publication of CN208762525U publication Critical patent/CN208762525U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pipe Accessories (AREA)

Abstract

The utility model relates to blast furnace grouting technical fields, and disclose the hot face grouting anti-channeling material device of blast furnace, including internal pipeline, top outside the internal pipeline is fixedly installed with leakproof nozzle, entrance is fixedly installed at the top of the top of the leakproof nozzle and internally positioned pipeline, the outside of the internal pipeline and the bottom for being located at leakproof nozzle are fixedly installed with pipeline and agree with nozzle, and the pipeline agrees with the left and right side inside nozzle and offers the reserved fixing groove of pipeline.Be in the milk anti-channeling material device in the blast furnace hot face, by the way that leakproof lantern ring material is selected as high-strength alloy, and itself and internal pipeline junction are high strength industrial glue and bolt fastening structure, it can be effectively reduced and carrying out the case where operation outlet material leakage occurs and alters material, to which the hot face grouting equipment of effective solution is more rare, and its related complementary sleeves equipment is also the problem of more missing.

Description

Be in the milk anti-channeling material device in blast furnace hot face
Technical field
The utility model relates to blast furnace grouting technical field, be in the milk anti-channeling material device in specially a kind of hot face of blast furnace.
Background technique
Grouting be by certain curing materials, as cement and lime or other chemical materials pour into it is a certain range of under basis In ground ground, to clog crack and the hole in ground, foundation leakage is prevented, improves ground globality, strength and stiffness, In the water retaining structures such as lock, dam and dike, common grouting method constructs foundation anti-seepage curtain, is the main basement process of hydraulic structure Measure, grouting are to be required the slurries with mobility and gelling according to a certain ratio by drilling (or built-in pipe), indentation Cementing hardening is integral in stratum or the gap of building, reaches the engineering purpose of antiseepage, consolidation and enhancing.
Grouting can be divided into grout curtain, consolidation grouting, rockfill grouting, surface grouting, joint grouting, reinforcement filling by its effect Slurry and glued crack etc. can be divided into cement grout, clay grouting, asphalt grouting and chemical material grouting etc. by grouting material, high After furnace is gone into operation, the carbon ramming mass between cooling wall and carbon brick can be shunk, and with the raising of temperature of the furnace hearth, each position of blast furnace The factors such as cooling equipment leak, will cause between carbon brick and cooling wall between the coefficient of expansion difference and normal production period of material Gap is generated, to eliminate gap, improves heat transfer efficiency, the method for unique feasible is to fill using Heat Conduction Material to the hot face of blast furnace crucibe Slurry processing.
But because being also likely to be present gap between cooling wall and furnace shell, slurry is easy to scurry into when hot face is in the milk, and furnace shell drum occurs The adverse effect such as swollen and material leakage, and at present on the market, hot face grouting equipment is more rare, and its related complementary sleeves equipment is also Missing is many, so propose a kind of hot face grouting anti-channeling material device of blast furnace solve the problems, such as it is above-mentioned proposed in.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of hot face grouting anti-channeling material device of blast furnace, has anti- The advantages that material leakage anti-channeling material, solve that hot face grouting equipment is more rare, and what its related complementary sleeves equipment was also missing from asks Topic.
(2) technical solution
For the purpose for realizing above-mentioned material leak-proof anti-channeling material, the utility model is provided the following technical solutions: the hot face grouting of blast furnace Anti-channeling material device, including internal pipeline, the top outside the internal pipeline are fixedly installed with leakproof nozzle, the leakproof nozzle Top and internally positioned pipeline at the top of be fixedly installed with entrance, the outside of the internal pipeline and be located at leakproof nozzle Bottom be fixedly installed with pipeline and agree with nozzle, the pipeline agrees with the left and right side inside nozzle, and to offer pipeline reserved Fixing groove, the outside and is located at pipeline and agrees with the bottom of nozzle and be fixedly installed with pipeline fixed ring, the pipeline fixed ring Left and right side be movably installed with fixed collar bolt, the bottom of the pipeline fixed ring and outside of internally positioned pipeline is solid Dingan County is equipped with external pipe, and the outside of the bottom of the external pipe and internally positioned pipeline is fixedly installed with Outer Tube activity Ring is movably installed with cock bolt on the left of the Outer Tube loose collar, is movably installed on the right side of the Outer Tube loose collar Motion bar, the outside of the internal pipeline and the bottom for being located at Outer Tube loose collar are fixedly installed with interior interface tube, described in two There is the internal activity of interior interface tube to be connected with the interface fixing bolt extended to outside internal pipeline, the outside of the internal pipeline And the bottom for being located at Outer Tube loose collar is fixedly installed with interface protection ring, the top and bottom of the interface fixing bolt are living Dynamic to be equipped with the protection ring bar extended to outside interface protection ring, the external activity of two protection ring bars is equipped with fixing sleeve Ring, the right side of the retaining collar and the external activity for being located at protection ring bar are equipped with clevis bolt, the bottom of the external pipe Portion and the outside of internally positioned pipeline are fixedly installed with outer tube fixed ring, the left and right side of the outer tube fixed ring activity peace Equipped with outer tube bolt, the bottom of the outer tube fixed ring and outside of internally positioned pipeline is fixedly installed with leakproof lantern ring is described The bottom of internal pipeline is fixedly installed with pipe outlet, and the bottom of the pipe outlet is fixedly installed with Pipe installing screwed pipe.
Preferably, the leakproof nozzle and internal pipeline installation offer preformed groove, and the fixed peace in the two sides of preformed groove Equipped with high temperature-proof leakproofing material.
Preferably, the fixed collar bolt is single side nut structure, and nut is located at the bottom side of fixed collar bolt, and material can For stainless steel.
Preferably, the inside of the external pipe and outside of internally positioned pipeline is fixedly installed with a large amount of leakproofing materials, And inner tube surface is coated with high temperature-proof material.
Preferably, the motion bar on the right side of the Outer Tube loose collar is bascule, and loose collar can beat the fixed spiral shell of interface Bolt quantity is ten, and is replaced by 12 reinforced fixed structures.
Preferably, the motion bar on the right side of the Outer Tube loose collar is bascule, and loose collar is openable.
Preferably, the leakproof lantern ring material is high-strength alloy, and itself and internal pipeline junction are high strength industrial Glue and bolt arrangement.
(3) beneficial effect
Compared with prior art, the utility model provides a kind of hot face grouting anti-channeling material device of blast furnace, and having following has Beneficial effect:
1, the hot face grouting anti-channeling material device of the blast furnace is offered reserved by setting leakproof nozzle and internal pipeline installation Slot, and the two sides of preformed groove are fixedly installed with high temperature-proof leakproofing material, have reached when carrying out the grouting of hot face, entrance will not leak The effect of material is single side nut structure by fixed collar bolt, and nut is located at the bottom side of fixed collar bolt, and material can be stainless Steel can make its joint fixation.
2, be in the milk anti-channeling material device in the blast furnace hot face, is fixedly installed with a large amount of leakproofing materials by the inside of external pipe, And inner tube surface is coated with high temperature-proof material, can effectively avoid the device from material leakage occur and alter material, passes through Outer Tube activity Motion bar on the right side of ring is bascule, and loose collar is openable, can effectively enhance the flexibility of device dismounting, pass through by Leakproof lantern ring material is selected as high-strength alloy, and itself and internal pipeline junction are high strength industrial glue and bolt arrangement, energy It is enough effectively reduced carrying out operation and the case where outlet material leakage alters material occurs, so that the hot face grouting equipment of effective solution is more dilute The problem of few, and its related complementary sleeves equipment is also missing from.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the schematic enlarged-scale view of the utility model A.
In figure: 1 internal pipeline, 2 leakproof nozzles, 3 entrances, 4 pipelines agree with nozzle, 5 pipelines reserve fixing groove, 6 pipes Road fixed ring, 7 fixed collar bolts, 8 external pipes, 9 Outer Tube loose collars, 10 cock bolts, 11 motion bars, interface tube in 12, 13 interface fixing bolts, 14 interface protection rings, 15 protection ring bars, 16 retaining collars, 17 clevis bolts, 18 outer tube fixed rings, 19 Outer tube bolt, 20 leakproof lantern rings, 21 pipe outlets, 22 Pipe installing screwed pipes.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Be in the milk anti-channeling material device in blast furnace hot face referring to FIG. 1-2, including internal pipeline 1, the top outside internal pipeline 1 It is fixedly installed with leakproof nozzle 2, leakproof nozzle 2 and the installation of internal pipeline 1 offer preformed groove, and the two sides of preformed groove are fixed High temperature-proof leakproofing material is installed, the top of the top of leakproof nozzle 2 and internally positioned pipeline 1 is fixedly installed with entrance 3, The outside of internal pipeline 1 and the bottom for being located at leakproof nozzle 2 are fixedly installed with pipeline and agree with nozzle 4, and pipeline agrees with inside nozzle 4 Left and right side offer pipeline reserve fixing groove 5,1 outside and be located at pipeline agree with nozzle 4 bottom be fixedly mounted There is pipeline fixed ring 6, the left and right side of pipeline fixed ring 6 is movably installed with fixed collar bolt 7, and fixed collar bolt 7 is single Face nut structure, nut are located at the bottom side of fixed collar bolt 7, and material can be stainless steel, the bottom of pipeline fixed ring 6 and are located at The outside of internal pipeline 1 is fixedly installed with the external fixed peace of external pipe 8, the inside of external pipe 8 and internally positioned pipeline 1 Equipped with a large amount of leakproofing materials, and 1 surface of internal pipeline is coated with high temperature-proof material, the bottom of external pipe 8 and internally positioned pipe The outside in road 1 is fixedly installed with Outer Tube loose collar 9, and the left side of Outer Tube loose collar 9 is movably installed with cock bolt 10, outer tube The right side of road loose collar 9 is movably installed with motion bar 11, and the motion bar 11 on 9 right side of Outer Tube loose collar is bascule, and living Rotating ring is openable, the outside of the internal pipeline 1 and bottom for being located at Outer Tube loose collar 9 is fixedly installed with interior interface tube 12, and two There is the internal activity of interior interface tube 12 to be connected with the interface fixing bolt 13 extended to outside internal pipeline 1, interface fixing bolt 13 quantity are ten, and are replaced by 12 reinforced fixed structures, the outside of internal pipeline 1 and are located at Outer Tube loose collar 9 Bottom be fixedly installed with interface protection ring 14, the top and bottom of interface fixing bolt 13, which are movably installed with, extends to interface Protection ring bar 15 outside protection ring 14, the external activity of two protection ring bars 15 are equipped with retaining collar 16, retaining collar 16 Right side and be located at protection ring bar 15 external activity clevis bolt 17, the bottom of external pipe 8 and internally positioned pipe are installed The outside in road 1 is fixedly installed with outer tube fixed ring 18, and the left and right side of outer tube fixed ring 18 is movably installed with outer tube bolt 19, the outside of the bottom of outer tube fixed ring 18 and internally positioned pipeline 1 is fixedly installed with leakproof lantern ring 20,20 material of leakproof lantern ring For high-strength alloy, and itself and 1 junction of internal pipeline are high strength industrial glue and bolt arrangement, the bottom of internal pipeline 1 It is fixedly installed with pipe outlet 21, the bottom of pipe outlet 21 is fixedly installed with Pipe installing screwed pipe 22, and the hot face of the blast furnace fills Anti-channeling material device is starched, a large amount of leakproofing materials are fixedly installed with by the inside of external pipe 8, and 1 surface of internal pipeline is coated with High temperature-proof material can effectively avoid the device from material leakage occur and alter material, and the motion bar 11 by 9 right side of Outer Tube loose collar is to live Dynamic structure, and loose collar is openable, can effectively enhance the flexibility of device dismounting, by the way that 20 material of leakproof lantern ring to be selected as High-strength alloy, and itself and 1 junction of internal pipeline are high strength industrial glue and bolt arrangement, can be effectively reduced and are carrying out There is outlet material leakage the case where altering material in operation, so that the hot face grouting equipment of effective solution is more rare, and its correlation is mating The problem of bushing installation is also missing from.
The anti-channeling material device in conclusion the hot face of the blast furnace is in the milk, is opened by setting leakproof nozzle 2 and the installation of internal pipeline 1 Equipped with preformed groove, and the two sides of preformed groove are fixedly installed with high temperature-proof leakproofing material, have reached when carrying out the grouting of hot face, have entered Mouthful will not material leakage effect, be single side nut structure by fixed collar bolt 7, nut is located at the bottom side of fixed collar bolt 7, and material Matter can be stainless steel, can make its joint fixation.
Also, be in the milk anti-channeling material device in the blast furnace hot face, is fixedly installed with a large amount of leakproof materials by the inside of external pipe 8 Material, and 1 surface of internal pipeline is coated with high temperature-proof material, can effectively avoid the device from material leakage occur and alter material, pass through Outer Tube The motion bar 11 on 9 right side of loose collar is bascule, and loose collar is openable, can effectively enhance the flexible of device dismounting Property, by the way that 20 material of leakproof lantern ring is selected as high-strength alloy, and its with 1 junction of internal pipeline be high strength industrial glue and Bolt arrangement can be effectively reduced carrying out operation and the case where outlet material leakage alters material occur, so that the hot face of effective solution fills The problem of slurry equipment is more rare, and its related complementary sleeves equipment is also missing from.
It should be noted that the terms "include", "comprise" or its any other variant are intended to the packet of nonexcludability Contain, so that the process, method, article or equipment for including a series of elements not only includes those elements, but also including Other elements that are not explicitly listed, or further include for elements inherent to such a process, method, article, or device. In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including the element Process, method, article or equipment in there is also other identical elements.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (7)

1. be in the milk anti-channeling material device in blast furnace hot face, including internal pipeline (1), it is characterised in that: internal pipeline (1) outside Top is fixedly installed with leakproof nozzle (2), the fixed peace in the top of the leakproof nozzle (2) and the top of internally positioned pipeline (1) Equipped with entrance (3), the outside of the internal pipeline (1) and be located at leakproof nozzle (2) bottom be fixedly installed with pipeline contract It closes nozzle (4), the left and right side that the pipeline agrees with nozzle (4) inside offers pipeline and reserves fixing groove (5), described interior The outside of portion's pipeline (1) and it is located at pipeline and agrees with the bottom of nozzle (4) and be fixedly installed with pipeline fixed ring (6), the pipeline is solid The left and right side for determining ring (6) is movably installed with fixed collar bolt (7), the bottom of the pipeline fixed ring (6) and is located at interior The outside of portion's pipeline (1) is fixedly installed with external pipe (8), the bottom of the external pipe (8) and internally positioned pipeline (1) Outside is fixedly installed with Outer Tube loose collar (9), is movably installed with cock bolt on the left of the Outer Tube loose collar (9) (10), it is movably installed with motion bar (11) on the right side of the Outer Tube loose collar (9), the outside and position of the internal pipeline (1) Interior interface tube (12) are fixedly installed in the bottom of Outer Tube loose collar (9), have the inside of interior interface tube (12) living described in two Dynamic be connected with extends to the external interface fixing bolt (13) of internal pipeline (1), the outside of the internal pipeline (1) and is located at outer The bottom of pipe movable ring (9) is fixedly installed with interface protection ring (14), the top and bottom of the interface fixing bolt (13) It is movably installed with and extends to the external protection ring bar (15) of interface protection ring (14), the outside of two protection ring bars (15) It is movably installed with retaining collar (16), the right side of the retaining collar (16) and the external activity installation for being located at protection ring bar (15) Have clevis bolt (17), the bottom of the external pipe (8) and the outside of internally positioned pipeline (1) is fixedly installed with outer tube and fixes The left and right side of ring (18), the outer tube fixed ring (18) is movably installed with outer tube bolt (19), the outer tube fixed ring (18) outside of bottom and internally positioned pipeline (1) is fixedly installed with leakproof lantern ring (20), the bottom of the internal pipeline (1) It is fixedly installed with pipe outlet (21), the bottom of the pipe outlet (21) is fixedly installed with Pipe installing screwed pipe (22).
2. be in the milk anti-channeling material device in blast furnace according to claim 1 hot face, it is characterised in that: the leakproof nozzle (2) with Internal pipeline (1) installation offers preformed groove, and the two sides of preformed groove are fixedly installed with high temperature-proof leakproofing material.
3. be in the milk anti-channeling material device in the hot face of blast furnace according to claim 1, it is characterised in that: the fixed collar bolt (7) For single side nut structure, nut is located at the bottom side of fixed collar bolt (7), and material can be stainless steel.
4. be in the milk anti-channeling material device in the hot face of blast furnace according to claim 1, it is characterised in that: the external pipe (8) The outside of internal and internally positioned pipeline (1) is fixedly installed with a large amount of leakproofing materials, and internal pipeline (1) surface is coated with anti-height Adiabator.
5. be in the milk anti-channeling material device in the hot face of blast furnace according to claim 1, it is characterised in that: the Outer Tube loose collar (9) motion bar (11) on the right side of is bascule, and loose collar is openable.
6. be in the milk anti-channeling material device in the hot face of blast furnace according to claim 1, it is characterised in that: the interface fixing bolt (13) quantity is ten, and is replaced by 12 reinforced fixed structures.
7. be in the milk anti-channeling material device in the hot face of blast furnace according to claim 1, it is characterised in that: leakproof lantern ring (20) material Matter is high-strength alloy, and itself and internal pipeline (1) junction are high strength industrial glue and bolt arrangement.
CN201821521415.3U 2018-09-18 2018-09-18 Be in the milk anti-channeling material device in blast furnace hot face Active CN208762525U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821521415.3U CN208762525U (en) 2018-09-18 2018-09-18 Be in the milk anti-channeling material device in blast furnace hot face

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821521415.3U CN208762525U (en) 2018-09-18 2018-09-18 Be in the milk anti-channeling material device in blast furnace hot face

Publications (1)

Publication Number Publication Date
CN208762525U true CN208762525U (en) 2019-04-19

Family

ID=66135926

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821521415.3U Active CN208762525U (en) 2018-09-18 2018-09-18 Be in the milk anti-channeling material device in blast furnace hot face

Country Status (1)

Country Link
CN (1) CN208762525U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113088592A (en) * 2021-04-08 2021-07-09 包头市安德窑炉科技有限公司 Online grouting process for cold and hot surfaces of blast furnace

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113088592A (en) * 2021-04-08 2021-07-09 包头市安德窑炉科技有限公司 Online grouting process for cold and hot surfaces of blast furnace

Similar Documents

Publication Publication Date Title
CN104389623B (en) Shield tunnel prefabricated tunnel segment lining back stratum grouting device
CN103374926A (en) Prefabricated assembly-type reinforced concrete inspection well
CN110388531A (en) A kind of the reinforcing structure and its reinforcement means of pipeline
CN208762525U (en) Be in the milk anti-channeling material device in blast furnace hot face
CN205908935U (en) Thermal -insulated stagnant water does not have thrust sleeve compensator
CN106522990A (en) Tunnel lining end template structure with waterproofing and drainage functions
CN208778877U (en) Non- preset water string device
CN206299921U (en) Pipeline
CN110552378A (en) Underground space roof subsides post-cast strip and seals structure in advance
CN112555522A (en) Steel socket composite reinforced concrete lining glass fiber reinforced plastic drain pipe and preparation method thereof
CN1546842A (en) Construction method of leakage waterstop for shield tunnel concrete structure segments
CN208901644U (en) A kind of hot-blast stove furnace foundation hot wind leakage plugging structure
CN104912068B (en) Improve the hollow round table screw type energy pilework of heat transfer efficiency
CN208381548U (en) A kind of RC pipejacking tube coupling connector
CN208295326U (en) Full corrosion-proof lining formula Prestressed concrete cylinder pipe
CN208136954U (en) Precast splice type Pipe rack
CN206449315U (en) A kind of antiseep glass steel pipe lined with reinforced concrete
CN110241825B (en) Backfill grouting construction method and structure for reservoir lining pipeline
CN113653511A (en) Leaking stoppage and grouting method for shield tunnel joint
CN201400938Y (en) Grouting sleeve joint node
CN209443463U (en) Spiral heat pipe ring-like ribs first drain grouting behind shaft or drift lining bamboo joint pile
CN208565880U (en) A kind of municipal pipeline junction preventing water leakage embedded structure
CN211623450U (en) Construction structure for treating water seepage of tunnel
CN104154324B (en) Anchor block integrally mixes Method for Installation with valve well
CN108253202A (en) Pipeline and preparation method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Blast furnace hot surface grouting anti channeling device

Effective date of registration: 20230602

Granted publication date: 20190419

Pledgee: Shanghai Pudong Development Bank Co.,Ltd. Baotou Branch

Pledgor: BAOTOU ANDE KILN TECHNOLOGY Co.,Ltd.

Registration number: Y2023150000076