CN208748821U - Assemble type concrete slab connecting node - Google Patents
Assemble type concrete slab connecting node Download PDFInfo
- Publication number
- CN208748821U CN208748821U CN201821333547.3U CN201821333547U CN208748821U CN 208748821 U CN208748821 U CN 208748821U CN 201821333547 U CN201821333547 U CN 201821333547U CN 208748821 U CN208748821 U CN 208748821U
- Authority
- CN
- China
- Prior art keywords
- reinforcing bar
- trapezoidal
- concrete
- reserved
- pour
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model relates to assemble type concrete slab connecting nodes, belong to building structure technology field.Be respectively provided among the interface end of concrete prefabricated board isosceles trapezoid it is reserved after pour trapezoidal shearing slot, two sides are trapezoidal shear connector;The alignment of two block concrete prefabricated boards, and its interface end is opposite, is arranged reserved intermediate post-cast strip between the two, reinforcing bar back bending set, total tune connection reinforcing bar extend to the concrete prefabricated board of opposite side it is reserved after pour in trapezoidal shearing slot, pour rear pouring concrete band.The effect and advantage of the utility model are that connection type is simple and easy, simplify construction;Connection is reliable, good integrity, has superior anti-seismic performance, and rigidity is obviously improved, and reduces resource and energy consumption, and generalization may be implemented, and standardizes.The attended operation for efficiently solving prefabricated concrete structure is complicated, and the series of problems such as plate body globality, stress performance significantly improves.
Description
Technical field
The utility model belongs to building structure technology field, more particularly to assemble type concrete slab connecting node.
Background technique
It is that main passes through site-assembled side that assembly concrete building, which refers to the concrete prefabricated element of the factorial production,
The concrete structure class building construction of formula design-build.The assembly method of component pours overlapping layer concrete, steel after generally having scene
Sleeve grouting connection, welding, mechanical connection and reserving hole overlap joint can be used in pouring concrete connection etc. after muscle anchoring, reinforcing bar connection
The ways such as connection.
With the quickening of China " building industrialization, housing industrialization " process, the trend day of housing industry industrialization gets brighter
It is aobvious.The application of prefabricated concrete structure becomes current research hot spot again, and all parts of the country continue to bring out out residential housing assembly
The new technology of formula concrete structure, new model.Precast reinforced concrete structure is the important directions of China's building structure development
One of, it is conducive to the development of China's building industrialization, and raising production efficiency is energy saving, develop Green environmental-protection building, and
Be conducive to improve and guarantee construction engineering quality.Compared with cast-in-situ construction method, assembled reinforced concrete structure is conducive to green construction, because
The saving land of green construction, energy conservation, section material, water-saving and environmental protection etc. can more be met for fabricated construction to require, reduced to environment
Negative effect, including reduce noise, prevent fugitive dust, reduce environmental pollution, clean transport, reduce place interfere, saving water,
The resources such as electricity, material and the energy, it then follows the principle of sustainable development.Moreover, fabricated construction can be completed continuously in order
Multiple or whole processes of engineering, to reduce the engineering machinery type and quantity marched into the arena, that eliminates procedure connection rests the time,
It realizes interchange operation, reduces construction personnel, to improve work efficiency, reduce supplies consumption, reduce environmental pollution, applied for green
Work provides safeguard.In addition, fabricated construction, which largely reduces building waste, (accounts for about the 30%-of municipal refuse total amount
, such as steel scrap muscle, waste iron wire, useless bamboo wood material, discarded concrete 40%).
Assembly concrete building can be divided into full assembly and part assembly two major classes according to assembling degree height.Full assembly
Building is generally limited to low layer or the lower tier building of requirements for fortification against earthquake;Part assembly concrete construction main member is general
It is connected using prefabricated components, at the scene by cast-in-place concrete, forms the building of cast in place and precast construction.
North America region is mainly main since prefabricated/prestressed concrete association (PCI) studies for a long period of time with America & Canada
With popularization pre-cast building, the Specification of precast concrete also improves very much so its assembly concrete Application in Building is non-
It is often universal.The pre-cast building of North America mainly includes building prefabrication exterior wall and the big series of structure prefabricated components two, and prefabricated components are total to
It is that enlargement and prestressing force combine and can optimize structural reinforcement and connecting structure with feature.Reduce production and installation workload, contracting
The short Yi work duration fully demonstrates industrialization, standardization and Technical Economy feature.In 20th century, the pre-cast building of North America is main
For the non-antidetonation fortified defence area of low layer.Due to the earthquake effect in California area, antidetonation and on the middle and senior level prefabricated is paid much attention in recent years
The engineer application technical research of structure.PCI has published " precast concrete Aseismic Design " book recently, from theory and practice
The Aseismic Design problem for analyzing to angle system pre-cast building, the newest section for summarizing many precast construction Aseismic Designs are ground into
Fruit has very strong directive significance to instructing precast construction design and engineer application to promote.
Europe is the cradle of pre-cast building, and the road of building industrialization has been begun to early in the 17th century.Second of the world is big
After the war, due to human resources shortage, Europe further research and probe building industrialization mode.Either economically developed north
Europe, West Europe or Eastern Europe underdeveloped, always all in the design and construction side for actively carrying out prefabrication and assembly construction concrete construction
Formula.The design and construction experience for having accumulated many pre-cast buildings forms various special precast building systems and standardized general
Pre-manufactured product series, and a series of precast concrete engineering specifications and application manual have been worked out, to promotion precast concrete complete
The application in the world plays the role of very important.
Japan and South Korea have used for reference American-European successful experience, on the basis of exploring the standardized designs construction of pre-cast building.
In conjunction with oneself requirement.Breakthrough is achieved in terms of precast construction system globality antidetonation and shock design.With representative
Property achievement two 58 floor for being Japan 2008 and being built up using prefabrication and assembly construction frame structure Tokyo Tower.Meanwhile it is Japanese pre-
Concrete construction System Design processed, production and the standard criterion of construction are also very perfect, and prefabricated specification used at present has " prefabricated mixed
Solidifying geotechnique's journey } (JASSl0) and " concrete curtain wall) (JASSl4).
China from five sixties of 20th century begin one's study assembly concrete build design and construction technology, form one
Serial assembly concrete building system, more typical building system have assembled single storey industry workshop building system, assembly
Formula multistory frame building system, assembled large panel building system etc..The application built to assembly concrete the 1980s
Reach the period of full bloom, many places in the whole nation all form the integrated assembly concrete industry of design, production and construction and installation
Change architectural mode assembly concrete building and two kinds of most important building bodies are become using the masonry building of prefabricated hollow floor
System, application popularization rate is up to 70% or more.To mid-term the 1990s, assembly concrete building is gradually by complete cast-in-place coagulation
Native building system replaces, at present except assembled single storey industry workshop building system is using in addition to wide.Other are prefabricated assembled to build
The engineer application of building body system is few.The globality of precast construction antidetonation and the specialized research of management in design and operation are inadequate, cause
Its Technical Economy is poor.It is the basic reason for causing precast construction to stagnate for a long time.
Utility model content
To solve the above-mentioned problems, the utility model provides a kind of assemble type concrete slab connecting node, mainly solves
The overall coordination performance of assembly concrete sandwich wall improves energy-efficient performance, dark without heat bridge technology and enhancing using entirety
Cylinder system significantly improves anti-seismic performance, and connector quantity is greatly reduced, and simplifies construction, is obviously improved it and industrializes efficiency, pushes away
Dynamic China's assembly concrete high residential building industrialized development process, reduces resource and energy consumption.Full assembly concrete wall
It is connected at floor, floor shear resistance wretched insufficiency will cause shock resistance wretched insufficiency.
The technical solution adopted in the utility model is as follows:
Assemble type concrete slab connecting node, including concrete prefabricated board, stress and overlap joint connection reinforcing bar, reinforcing bar back bending
Set, total tune connection reinforcing bar, reinforcing bar fourth of the twelve Earthly Branches button, it is reserved after pour trapezoidal shearing slot, reserved intermediate post-cast strip, trapezoidal shear connector, oblique
Notch, rear pouring concrete band;
Be respectively provided among the interface end of the concrete prefabricated board isosceles trapezoid it is reserved after pour trapezoidal shearing slot, big opening end
In outer end, the two sides that trapezoidal shearing slot is poured after reserved are trapezoidal shear connector, and the two is by skew notch transition;
The plate body direction of concrete prefabricated board is evenly arranged stress and overlap joint connection reinforcing bar, and pours trapezoidal cut after reserved
Power slot stretches out, and extend to respectively another block concrete prefabricated board it is reserved after pour in trapezoidal shearing slot, in outer end setting reinforcing bar
Back bending set, reinforcing bar fourth of the twelve Earthly Branches button cover reinforcing bar back bending locked;The mouth alignment of reinforcing bar back bending set, total tune connection reinforcing bar pass through steel one by one
Muscle back bending set;
The alignment of two block concrete prefabricated boards, forms straight line, and its interface end is opposite, pours after reserved centre is arranged between the two
Band, reinforcing bar back bending set, total tune connection reinforcing bar extend to the concrete prefabricated board of opposite side it is reserved after pour in trapezoidal shearing slot;
Pouring concrete band after being poured in post-cast strip among pouring trapezoidal shearing slot after reserving, reserving.
The beneficial effects of the utility model are:
The beneficial effects of the utility model and advantage are that connection type is simple and easy, simplify construction;Connection is reliable, globality
It is good, there is superior anti-seismic performance, rigidity is obviously improved, and reduces resource and energy consumption, and generalization may be implemented, standard
Change.The attended operation for efficiently solving prefabricated concrete structure is complicated, the series of problems such as plate body globality, and stress performance is significant
It improves.
Detailed description of the invention
Fig. 1 is assemble type concrete slab connecting node assembly schematic diagram.
Fig. 2 is A-A diagrammatic cross-section.
Fig. 3 is that assemble type concrete slab connecting node pours rear schematic diagram.
In figure, 1 is concrete prefabricated board;2 be stress and overlap joint connection reinforcing bar;3 be reinforcing bar back bending set;4 be total tune
Connect reinforcing bar;5 detain for the reinforcing bar fourth of the twelve Earthly Branches;6 be to pour trapezoidal shearing slot after reserving;7 be reserved intermediate post-cast strip;8 be trapezoidal shear connector;9
For skew notch;10 be rear pouring concrete band.
Specific embodiment
In order to further illustrate the utility model, the utility model is retouched in detail with reference to the accompanying drawings and embodiments
It states, but they cannot be interpreted as to the restriction to scope of protection of the utility model.
Embodiment: as shown in Fig. 1 ~ Fig. 3, a kind of assemble type concrete slab connecting node of the utility model, including concrete
Prefabricated board 1, stress and overlap joint connection reinforcing bar 2, reinforcing bar back bending set 3, total tune connection reinforcing bar 4, reinforcing bar fourth of the twelve Earthly Branches button 5, it is reserved after pour
Trapezoidal shearing slot 6, reserved intermediate post-cast strip 7, trapezoidal shear connector 8, skew notch 9, rear pouring concrete band 10;
Be respectively provided among the interface end of concrete prefabricated board 1 isosceles trapezoid it is reserved after pour trapezoidal shearing slot 6, big opening end exists
Outer end, the two sides that trapezoidal shearing slot 6 is poured after reserved are trapezoidal shear connector 8, and the two is by 9 transition of skew notch;
The plate body direction of concrete prefabricated board 1 is evenly arranged stress and overlap joint connection reinforcing bar 2, and pours after reserved trapezoidal
Slot 6 is sheared to stretch out, and extend to respectively another block concrete prefabricated board 1 it is reserved after pour in trapezoidal shearing slot 6, in outer end setting
Reinforcing bar back bending set 3, reinforcing bar fourth of the twelve Earthly Branches button 5 lock reinforcing bar back bending set 3;The mouth alignment of reinforcing bar back bending set 3, total tune connect reinforcing bar 4
Reinforcing bar back bending set 3 is passed through one by one;
The alignment of two block concrete prefabricated boards 1, forms straight line, and its interface end is opposite, pours after reserved centre is arranged between the two
Band 7, reinforcing bar back bending set 3, total tune connection reinforcing bar 4 extend to the concrete prefabricated board 1 of opposite side it is reserved after pour trapezoidal shearing slot 6
It is interior;
Pouring concrete band 10 after being poured in post-cast strip 7 among pouring trapezoidal shearing slot 6 after reserving, reserving.
The above is only the preferred embodiment of the utility model, it is noted that for the common skill of the art
For art personnel, without departing from the principle of this utility model, several improvements and modifications can also be made, these improve and
Retouching also should be regarded as the protection scope of the utility model.
Claims (1)
1. assemble type concrete slab connecting node, including concrete prefabricated board (1), stress and overlap joint connection reinforcing bar (2), reinforcing bar return
Curved set (3), total tune connection reinforcing bar (4), the reinforcing bar fourth of the twelve Earthly Branches buckle (5), it is reserved after pour trapezoidal shearing slot (6), reserve centre post-cast strip
(7), trapezoidal shear connector (8), skew notch (9), rear pouring concrete band (10), it is characterised in that:
Be respectively provided among the interface end of concrete prefabricated board (1) isosceles trapezoid it is reserved after pour trapezoidal shearing slot (6), big opening end exists
Outer end, the two sides that trapezoidal shearing slot (6) is poured after reserved are trapezoidal shear connector (8), and the two is by skew notch (9) transition;
The plate body direction of concrete prefabricated board (1) is evenly arranged stress and overlap joint connection reinforcing bar (2), and pours after reserved trapezoidal
Slot (6) are sheared to stretch out, and extend to respectively another block concrete prefabricated board (1) it is reserved after to pour trapezoidal shearing slot (6) interior, outside
End setting reinforcing bar back bending set (3), (5) are detained at the reinforcing bar fourth of the twelve Earthly Branches, and reinforcing bar back bending set (3) is locked;The mouth of reinforcing bar back bending set (3) is aligned, whole
Coordinate connection reinforcing bar (4) and passes through reinforcing bar back bending set (3) one by one;
The alignment of two block concrete prefabricated boards (1), forms straight line, and its interface end is opposite, and reserved intermediate post-cast strip is arranged between the two
(7), reinforcing bar back bending set (3), total tune connection reinforcing bar (4) extend to the concrete prefabricated board (1) of opposite side it is reserved after pour it is trapezoidal
It shears in slot (6);
Rear pouring concrete band (10) is poured in post-cast strip (7) among pouring trapezoidal shearing slot (6) after reserving, reserving.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821333547.3U CN208748821U (en) | 2018-08-18 | 2018-08-18 | Assemble type concrete slab connecting node |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821333547.3U CN208748821U (en) | 2018-08-18 | 2018-08-18 | Assemble type concrete slab connecting node |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208748821U true CN208748821U (en) | 2019-04-16 |
Family
ID=66080630
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821333547.3U Expired - Fee Related CN208748821U (en) | 2018-08-18 | 2018-08-18 | Assemble type concrete slab connecting node |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208748821U (en) |
-
2018
- 2018-08-18 CN CN201821333547.3U patent/CN208748821U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106121107B (en) | Assemble type concrete slab and its plate dry type connection method | |
CN106149937B (en) | Assembly concrete beam and its dry type connection method | |
CN103541433B (en) | Assembly concrete hook-hang type node | |
CN103541495B (en) | Connecting box assembly concrete beam | |
CN209468856U (en) | A kind of assembly concrete column beam connecting node | |
CN107816126A (en) | A kind of embedded prefabricated post of assembly concrete and prefabricated balcony | |
CN108978853A (en) | Assemble type concrete slab connecting node | |
CN208748821U (en) | Assemble type concrete slab connecting node | |
CN206016002U (en) | Assembly concrete beam | |
CN106284681B (en) | Assembly concrete is whole without heat bridge board wall and the connection method of running-on floor | |
CN206016048U (en) | Assemble type concrete slab | |
CN103541478B (en) | Lattice superposed beam and plate and construction method thereof | |
CN106638956A (en) | Concrete wallboard and ribbed slab dry type connection node | |
CN206616695U (en) | A kind of concrete panel and girt strip floor dry type connecting node | |
CN103541434B (en) | The complete cross Combined concrete node of assembled | |
CN103541435B (en) | With the cross node of full assembling of steel plate concrete Cantilever Beams | |
CN209369023U (en) | The connecting node of dry construction bilayer core plate thermal insulation concrete wallboard and floor | |
CN208167949U (en) | A kind of embedded prefabricated post of assembly concrete and prefabricated balcony | |
CN208578154U (en) | Assembled shear connector concrete parapet | |
CN108678259A (en) | Dry construction bilayer core plate thermal insulation concrete roof boarding | |
CN109296074A (en) | A kind of assembly concrete column beam connecting node | |
CN208578229U (en) | Dry construction bilayer core plate thermal insulation concrete roof boarding | |
CN108678149A (en) | The wallboard wall connecting node of dry construction bilayer core plate thermal insulation concrete wallboard | |
CN109296067A (en) | Assembly concrete girder and secondary beam dry type connecting node | |
CN208777441U (en) | Shear load-bearing wall panel and its vertical connecting node of threading in keyway room |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190416 Termination date: 20210818 |
|