CN208738619U - HGIS equipment applied to double-bus outlet - Google Patents

HGIS equipment applied to double-bus outlet Download PDF

Info

Publication number
CN208738619U
CN208738619U CN201821395830.9U CN201821395830U CN208738619U CN 208738619 U CN208738619 U CN 208738619U CN 201821395830 U CN201821395830 U CN 201821395830U CN 208738619 U CN208738619 U CN 208738619U
Authority
CN
China
Prior art keywords
bus
casing
outlet
phase
built
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201821395830.9U
Other languages
Chinese (zh)
Inventor
鲁晓莉
孔丹晖
王亮
王文静
陆东
李晗
黄青
王继伟
夏屹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU KENENG ELECTRIC ENGINEERING CONSULTATION Co Ltd
Original Assignee
JIANGSU KENENG ELECTRIC ENGINEERING CONSULTATION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU KENENG ELECTRIC ENGINEERING CONSULTATION Co Ltd filed Critical JIANGSU KENENG ELECTRIC ENGINEERING CONSULTATION Co Ltd
Priority to CN201821395830.9U priority Critical patent/CN208738619U/en
Application granted granted Critical
Publication of CN208738619U publication Critical patent/CN208738619U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of HGIS equipment applied to double-bus outlet;The technical issues of solution: for existing substation using during HGIS equipment, using tube type bus, for the safe distance requirement for meeting main bus-bar operating maintenance, using breaker dually arrayed pattern, substation takes up a large area, project cost is high, the unreasonable technical problem of substation's technology, economic indicator.The technical solution of use: applied to the HGIS equipment of double-bus outlet, including 1M bus casing, 2M bus casing, GIL tracheae, HGIS equipment built in #1 outlet, HGIS equipment, #1 outlet casing tube and #2 outlet casing tube built in #2 outlet.The built-in HGIS equipment of two outgoing line intervals shares one group of bus casing.Advantage, this equipment have adapted to the further development of power grid, have made full use of limited land resource, reduced the occupied area of substation;Equipment size is optimized, casing quantity is reduced, construction investment is reduced, meets power grid security, reliability service.

Description

HGIS equipment applied to double-bus outlet
Technical field
The utility model designs a kind of HGIS equipment applied to double-bus outlet, belongs to field of electrical equipment;It is related to becoming The equipment at the tube type bus and main equipment in power station, specifically the 2 of biserial outlet interval, the built-in HGIS of 2 outgoing line intervals are set It is standby to share one group of bus casing.
Background technique
With the continuous promotion of the electric power manufacture level of miniaturization power equipment, more and more substations are set using HGIS It is standby, to reduce the occupied area of substation.HGIS equipment need to use external tube type bus, using double-bus, biserial breaker Substation's longitudinal size is relatively large when arrangement.
Utility model content
The technical problem to be solved by the utility model is to being adopted for existing substation using during HGIS equipment With tube type bus, for the safe distance requirement for meeting main bus-bar operating maintenance, using breaker dually arrayed pattern, substation is accounted for Ground area is big, and project cost is high, the unreasonable technical problem of substation's technology, economic indicator.
The purpose of this utility model is to propose a kind of HGIS equipment applied to double-bus outlet, and it is flat to optimize substation Face layout pattern has compressed the occupied area of substation, reduces the quantity of HGIS equipment outlet sleeve, realizes substation's skill Art, economic indicator are optimal.
In order to solve the above technical problems, the technical solution adopted in the utility model is:
A kind of HGIS equipment applied to double-bus outlet, including #1 outlet casing tube, 1M bus casing, built in #1 outlet HGIS equipment, #2 outlet casing tube, 2M bus casing and HGIS equipment built in #2 outlet, #1 outlet casing tube, 1M bus casing, #2 go out Thread casing and 2M bus casing pass through equipment supporter and are fixed on place, connect #1 between #1 outlet casing tube and 1M bus casing HGIS equipment built in outlet connects HGIS equipment built in #2 outlet, 1M bus casing between #2 outlet casing tube and 2M bus casing Drawn between 2M bus casing by GIL tracheae and is connect;
#1 outlet casing tube and #2 outlet casing tube are made of A phase outlet casing tube, B phase outlet casing tube and C phase outlet casing tube,
1M bus casing and 2M bus casing are made of A phase bus casing, B phase bus casing and C phase bus casing,
HGIS equipment built in HGIS equipment built in #1 outlet and #2 outlet as built in A phase outlet HGIS equipment, in B outlet HGIS equipment built in HGIS equipment and C outlet is set to constitute,
A phase bus casing in 1M bus casing and the first GIL points of setting between the A phase bus casing in 2M bus casing Bronchus and the 2nd GIL branch tracheae, the first GIL points bronchial one A phase bus casings terminated in 2M bus casings, first A phase bus casing in GIL points of bronchial other end access 1M bus casings goes out with the A phase built in #1 outlet in HGIS equipment Built in line between HGIS equipment;A phase bus casing in 2nd GIL points of bronchial termination 1M bus casings, the 2nd GIL points A phase bus casing in bronchial other end access 2M bus casing in the A phase outlet built in #2 outlet in HGIS equipment It sets between HGIS equipment;
B phase bus casing in 1M bus casing and the 3rd GIL points of setting between the B phase bus casing in 2M bus casing Bronchus and the 4th GIL branch tracheae, the 3rd GIL points bronchial one B phase bus casings terminated in 2M bus casings, third B phase bus casing in GIL points of bronchial other end access 1M bus casings goes out with the B phase built in #1 outlet in HGIS equipment Built in line between HGIS equipment;B phase bus casing in 4th GIL points of bronchial termination 1M bus casings, the 4th GIL points B phase bus casing in bronchial other end access 2M bus casing in the B phase outlet built in #2 outlet in HGIS equipment It sets between HGIS equipment;
C phase bus casing in 1M bus casing and the 5th GIL points of setting between the C phase bus casing in 2M bus casing Bronchus and the 6th GIL branch tracheae, the 5th GIL points bronchial one C phase bus casings terminated in 2M bus casings, the 5th C phase bus casing in GIL points of bronchial other end access 1M bus casings goes out with the C phase built in #1 outlet in HGIS equipment Built in line between HGIS equipment;C phase bus casing in 6th GIL points of bronchial termination 1M bus casings, the 6th GIL points C phase bus casing in bronchial other end access 2M bus casing in the C phase outlet built in #2 outlet in HGIS equipment It sets between HGIS equipment.
The characteristics of technical solutions of the utility model arbitrarily draw female connector pipe by GIL tracheae, by the built-in HGIS of bus two sides Equipment connects, and on the basis of not changing double bus scheme principle, realizes that bus, outlet casing tube arrange on demand, finally will Tetra- groups of casings of HGIS are arranged by the arrangement of " outlet-bus-bus-outlet ".Wherein each interval outlet casing tube and bus Casing forms " c-type ", and two outgoing line intervals form bis- " c-type " shapes.
Technical solutions of the utility model, two outgoing line intervals share a set of bus casing, save the quantity of bus casing, The distance between different outgoing line interval bus casings are had compressed, investment and the longitudinal size of substation are saved.
Preferably, HGIS equipment built in the outlet of A phase, HGIS equipment built in B outlet and HGIS equipment built in C outlet include 1M bus bar side disconnecting switch, 2M bus bar side disconnecting switch, breaker, current transformer, outgoing line side disconnecting switch and mutual induction of voltage Device, the input terminal of 1M bus bar side disconnecting switch connect bus casing, and the output end of 1M bus bar side disconnecting switch connects 2M bus bar side The output end and breaker of disconnecting switch, the output end of 2M bus bar side disconnecting switch connect breaker, and it is mutual that breaker connects electric current Sensor, current transformer connect outgoing line side disconnecting switch, and outgoing line side disconnecting switch connects outlet casing tube and voltage transformer.
The utility model compared with prior art, the beneficial effect is that:
1, the utility model device has adapted to the further development of power grid, has made full use of limited land resource, reduced change The occupied area in power station.
2, the utility model device optimizes equipment size, reduces the quantity of casing and support insulator, reduces engineering and throws Money.
3, the utility model device accordingly reduces the quantity of HGIS equipment bus casing, the work such as field test, debugging Amount is minimized, and can satisfy the timing node requirement of engineering construction.
4, the utility model device is applied to double bus scheme pattern, meets reliability, the safety of operation of power networks.
Detailed description of the invention
Fig. 1 is the wiring schematic diagram of the utility model device.
Fig. 2 is the floor plan of the utility model device.
Fig. 3 is the section layout drawing of the utility model device.
Fig. 4 is the 220kV HGIS equipment section layout drawing in embodiment.
Specific embodiment
Technical solutions of the utility model are described in detail below, but the protection scope of the utility model is not limited to The embodiment.
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing 1-4 and reality Example is applied, the present invention will be further described in detail.It should be appreciated that specific embodiment described herein is only to explain The utility model is not used to limit the utility model.
Embodiment:
The utility model is described in further detail for being applied to 220kVHGIS equipment for the present embodiment.
As shown in Fig. 2, being applied to the HGIS equipment of double-bus outlet, including #1 outlet casing tube 7,1M bus in the present embodiment HGIS equipment 9, #2 outlet casing tube 10,2M bus casing 11 and HGIS equipment 12, #1 built in #2 outlet built in casing 8, #1 outlet Outlet casing tube 7,1M bus casing 8, #2 outlet casing tube 10 and 2M bus casing 11 are fixed on place by equipment supporter, #1 HGIS equipment 9 built in #1 outlet, #2 outlet casing tube 10 and 2M bus casing 11 are connected between outlet casing tube 7 and 1M bus casing 8 Between connect #2 outlet built in HGIS equipment 12, drawn between 1M bus casing 8 and 2M bus casing 11 by GIL tracheae and connect.It is logical The characteristics of GIL tracheae arbitrarily draws female connector pipe is spent, the built-in HGIS equipment of bus two sides is connected, is connect not changing double-bus On the basis of line principle, realizes that bus, outlet casing tube arrange on demand, tetra- groups of casings of HGIS are finally pressed into " outlet-bus-bus- The arrangement of outlet " arranges.
As shown in Fig. 2, #1 outlet casing tube 7 and #2 outlet casing tube 10 are gone out by A phase outlet casing tube, B phase outlet casing tube with C phase Thread casing is constituted, and 1M bus casing 8 and 2M bus casing 11 are by A phase bus casing, B phase bus casing and C phase bus casing Constitute, HGIS equipment 12 built in HGIS equipment 9 built in #1 outlet and #2 outlet as built in A phase outlet HGIS equipment, in B outlet HGIS equipment built in HGIS equipment and C outlet is set to constitute.
As shown in figure 4, HGIS equipment built in A phase outlet in the present embodiment, in HGIS equipment and C outlet built in B outlet Setting HGIS equipment includes 1M bus bar side disconnecting switch 1,2M bus bar side disconnecting switch 2, breaker 3, current transformer 4, outlet The input terminal of side disconnecting switch 5 and voltage transformer 6,1M bus bar side disconnecting switch 1 connects bus casing, and 1M bus bar side is kept apart The output end and breaker 3 of 1 output end connection 2M bus bar side disconnecting switch 2 are closed, the output end of 2M bus bar side disconnecting switch 2 connects Breaker 3 is connect, breaker 3 connects current transformer 4, and current transformer 4 connects outgoing line side disconnecting switch 5, and outgoing line side is kept apart Close 5 connection outlet casing tubes and voltage transformer 6.
As shown in figure 3, the outlet casing tube of each outgoing line interval and bus casing form " c-type ", two outgoing line intervals are formed Bis- " c-type " shapes.
As shown in Fig. 2, the A phase bus casing in 1M bus casing 8 and between the A phase bus casing in 2M bus casing 11 First GIL branch tracheae 13 and the 2nd GIL branch tracheae 14, a termination 2M bus casing of the first GIL branch tracheae 13 are set Interior A phase bus casing, the A phase bus casing that the other end of the first GIL branch tracheae 13 accesses in 1M bus casing 8 go out with #1 Built in A phase outlet built in line in HGIS equipment 9 between HGIS equipment;One termination 1M bus sheath of the 2nd GIL branch tracheae 14 A phase bus casing in pipe, the other end of the 2nd GIL branch tracheae 14 access A phase bus casing and # in 2M bus casing 11 Built in A phase outlet built in 2 outlets in HGIS equipment 12 between HGIS equipment.
As shown in Fig. 2, the B phase bus casing in 1M bus casing 8 and between the B phase bus casing in 2M bus casing 11 3rd GIL branch tracheae 15 and the 4th GIL branch tracheae 16, a termination 2M bus casing of the 3rd GIL branch tracheae 15 are set B phase bus casing in 11, the other end of the 3rd GIL branch tracheae 15 access B phase bus casing and #1 in 1M bus casing 8 Built in B phase outlet built in outlet in HGIS equipment 9 between HGIS equipment;One termination 1M bus of the 4th GIL branch tracheae 16 B phase bus casing in casing, the other end of the 4th GIL branch tracheae 16 access the B phase bus casing in 2M bus casing 11 With #2 outlet built in built in B phase outlet in HGIS equipment 12 between HGIS equipment.
As shown in Fig. 2, the C phase bus casing in 1M bus casing 8 and between the C phase bus casing in 2M bus casing 11 5th GIL branch tracheae 17 and the 6th GIL branch tracheae 18, a termination 2M bus casing of the 5th GIL branch tracheae 17 are set C phase bus casing in 11, the other end of the 5th GIL branch tracheae 17 access C phase bus casing and #1 in 1M bus casing 8 Built in C phase outlet built in outlet in HGIS equipment 9 between HGIS equipment;One termination 1M bus of the 6th GIL branch tracheae 18 C phase bus casing in casing, the other end of the 6th GIL branch tracheae 18 access the C phase bus casing in 2M bus casing 11 With #2 outlet built in built in C phase outlet in HGIS equipment 12 between HGIS equipment.
As shown in figure 4, the built-in HGIS equipment of two outgoing line intervals in the present embodiment shares one group of bus casing.Every group Outgoing line interval reduces by 3 bus casings, and whole equipment reduces by 6 bus casings.
The HGIS equipment of the present embodiment, double bus scheme pattern, double outgoing line intervals share same group of bus casing;It solves When double bus scheme, bus casing is respectively set in outgoing line interval, and place takes up a large area, it is difficult to compress substation's longitudinal size Problem.Dual-breaker interval common bus casing has compressed the distance between different outgoing line interval casings, saves substation Longitudinal size.
The HGIS equipment of the present embodiment has adapted to the further development of power grid, has made full use of limited land resource, reduce The occupied area of substation;Equipment size is optimized, casing quantity is reduced, reduces construction investment;Corresponding field test, debugging Etc. workloads be also minimized, can satisfy the timing node requirement of engineering construction, meet reliability, the safety of operation of power networks Property.
As described above, although the utility model has been indicated and described referring to specific preferred embodiment, it must not It is construed to the limitation to the utility model itself.In the spirit and scope for not departing from the utility model that appended claims define Under the premise of, it can various changes can be made in the form and details to it.

Claims (2)

1. a kind of HGIS equipment applied to double-bus outlet, which is characterized in that including #1 outlet casing tube (7), 1M bus casing (8), HGIS equipment (9), #2 outlet casing tube (10), 2M bus casing (11) and HGIS equipment built in #2 outlet built in #1 outlet (12), #1 outlet casing tube (7), 1M bus casing (8), #2 outlet casing tube (10) and 2M bus casing (11) pass through equipment supporter It is fixed on place, HGIS equipment (9) built in #1 outlet, #2 outlet is connected between #1 outlet casing tube (7) and 1M bus casing (8) HGIS equipment (12), 1M bus casing (8) and 2M bus built in #2 outlet are connected between casing (10) and 2M bus casing (11) Drawn between casing (11) by GIL tracheae and is connect;
#1 outlet casing tube (7) and #2 outlet casing tube (10) are by A phase outlet casing tube, B phase outlet casing tube and C phase outlet casing tube structure At,
1M bus casing (8) and 2M bus casing (11) are by A phase bus casing, B phase bus casing and C phase bus casing structure At,
HGIS equipment (12) HGIS equipment, B as built in A phase outlet go out built in HGIS equipment (9) built in #1 outlet and #2 outlet HGIS equipment built in HGIS equipment built in line and C outlet is constituted,
A phase bus casing in 1M bus casing (8) and it is arranged first between the A phase bus casing in 2M bus casing (11) GIL branch tracheae (13) and the 2nd GIL branch tracheae (14), the one of the first GIL branch tracheae (13) terminate in 2M bus casing A phase bus casing, the first GIL branch tracheae (13) the other end access 1M bus casing (8) in A phase bus casing and #1 Built in A phase outlet built in outlet in HGIS equipment (9) between HGIS equipment;One termination 1M of the 2nd GIL branch tracheae (14) A phase bus casing in bus casing, the other end of the 2nd GIL branch tracheae (14) access the A phase in 2M bus casing (11) Bus casing with built in the A phase outlet built in #2 outlet in HGIS equipment (12) between HGIS equipment;
B phase bus casing in 1M bus casing (8) and third is set between the B phase bus casing in 2M bus casing (11) GIL branch tracheae (15) and the 4th GIL branch tracheae (16), a termination 2M bus casing of the 3rd GIL branch tracheae (15) (11) the B phase bus casing in, the other end of the 3rd GIL branch tracheae (15) access the B phase bus sheath in 1M bus casing (8) Manage with built in the B phase outlet built in #1 outlet in HGIS equipment (9) between HGIS equipment;The one of 4th GIL branch tracheae (16) The B phase bus casing in 1M bus casing is terminated, other end access 2M bus casing (11) of the 4th GIL branch tracheae (16) is interior B phase bus casing with built in the B phase outlet built in #2 outlet in HGIS equipment (12) between HGIS equipment;
C phase bus casing in 1M bus casing (8) and setting the 5th between the C phase bus casing in 2M bus casing (11) GIL branch tracheae (17) and the 6th GIL branch tracheae (18), a termination 2M bus casing of the 5th GIL branch tracheae (17) (11) the C phase bus casing in, the other end of the 5th GIL branch tracheae (17) access the C phase bus sheath in 1M bus casing (8) Manage with built in the C phase outlet built in #1 outlet in HGIS equipment (9) between HGIS equipment;The one of 6th GIL branch tracheae (18) The C phase bus casing in 1M bus casing is terminated, other end access 2M bus casing (11) of the 6th GIL branch tracheae (18) is interior C phase bus casing with built in the C phase outlet built in #2 outlet in HGIS equipment (12) between HGIS equipment.
2. being applied to the HGIS equipment of double-bus outlet as described in claim 1, which is characterized in that HGIS built in A phase outlet HGIS equipment built in HGIS equipment built in equipment, B outlet and C outlet include 1M bus bar side disconnecting switch (1), 2M bus bar side every Leave pass (2), breaker (3), current transformer (4), outgoing line side disconnecting switch (5) and voltage transformer (6), 1M bus bar side every The input terminal connection bus casing of pass (1) is left, the output end of 1M bus bar side disconnecting switch (1) connects 2M bus bar side disconnecting switch (2) output end of output end and breaker (3), 2M bus bar side disconnecting switch (2) connects breaker (3), breaker (3) connection Current transformer (4), current transformer (4) connect outgoing line side disconnecting switch (5), and outgoing line side disconnecting switch (5) connects lead collar Pipe and voltage transformer (6).
CN201821395830.9U 2018-08-28 2018-08-28 HGIS equipment applied to double-bus outlet Withdrawn - After Issue CN208738619U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821395830.9U CN208738619U (en) 2018-08-28 2018-08-28 HGIS equipment applied to double-bus outlet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821395830.9U CN208738619U (en) 2018-08-28 2018-08-28 HGIS equipment applied to double-bus outlet

Publications (1)

Publication Number Publication Date
CN208738619U true CN208738619U (en) 2019-04-12

Family

ID=66031488

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821395830.9U Withdrawn - After Issue CN208738619U (en) 2018-08-28 2018-08-28 HGIS equipment applied to double-bus outlet

Country Status (1)

Country Link
CN (1) CN208738619U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109066320A (en) * 2018-08-28 2018-12-21 江苏科能电力工程咨询有限公司 HGIS equipment applied to double-bus outlet

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109066320A (en) * 2018-08-28 2018-12-21 江苏科能电力工程咨询有限公司 HGIS equipment applied to double-bus outlet
CN109066320B (en) * 2018-08-28 2023-12-12 江苏科能电力工程咨询有限公司 HGIS equipment applied to double-bus outgoing line

Similar Documents

Publication Publication Date Title
CN104897973A (en) Single-phase distribution transformer loss online monitoring apparatus
CN209860353U (en) Grounding component of power transformation and distribution device
CN208738619U (en) HGIS equipment applied to double-bus outlet
CN109066320A (en) HGIS equipment applied to double-bus outlet
CN106329459B (en) A kind of high voltage cable branch box
CN208078653U (en) Double-bus and single busbar mixing wiring high voltage distribution installation
CN208209364U (en) Integrated form HGIS equipment application is in the distribution structure of single busbar
CN203481922U (en) Distribution automation remote measuring and control device for distribution monitoring
CN103390897A (en) Low-voltage distribution area dispersion reactive compensation method based on wireless network
CN201985528U (en) Series compensation system adopting line iron towers
CN203014185U (en) Line connecting structure for crossed matching of incoming lines and outgoing lines of 500kV power distribution device
CN205863765U (en) Double bus scheme structure based on disconnecting switch segmentation in GIS power distribution equipment
CN206685710U (en) A kind of new distribution device applied to severe cold area transformer station
CN208738618U (en) Distribution structure applied to double-bus outlet
CN203774631U (en) High-voltage distribution device with dual circuit breakers in single bus sectionalizing mode
CN207504574U (en) A kind of electric power system of based superconductive circuit
CN207442446U (en) Traction substation incoming power ring goes out construction into ring
CN205944874U (en) 220kV compact distribution device based on miniaturized HGIS equipment
CN205864047U (en) A kind of outdoor 10kV Switching Station four supplies two for electric power system
CN206023027U (en) Indoor 10kV high-voltage metering cubicles
CN105680359B (en) A kind of anti-error locking device of switch cabinet bus grounding car and anti-error locking medium
CN208479185U (en) A kind of substation's spare phase quick-switching system
CN104362519A (en) Medium-voltage power distribution system
CN204012230U (en) For being incorporated into series winding connecting structure in nearly long term of the GIS32 main transformer inlet wire of 500kV
CN202340084U (en) Novel intelligent civil engineering power distribution substation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20190412

Effective date of abandoning: 20231212

AV01 Patent right actively abandoned

Granted publication date: 20190412

Effective date of abandoning: 20231212