CN208733158U - A kind of production-process systems of mating converter preheating scrap briquetting - Google Patents
A kind of production-process systems of mating converter preheating scrap briquetting Download PDFInfo
- Publication number
- CN208733158U CN208733158U CN201821502458.7U CN201821502458U CN208733158U CN 208733158 U CN208733158 U CN 208733158U CN 201821502458 U CN201821502458 U CN 201821502458U CN 208733158 U CN208733158 U CN 208733158U
- Authority
- CN
- China
- Prior art keywords
- scrap
- preheating furnace
- preheating
- bundled
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Furnace Details (AREA)
- Carbon Steel Or Casting Steel Manufacturing (AREA)
Abstract
The utility model discloses a kind of production-process systems of mating converter preheating scrap briquetting, belong to field of metallurgy, the system comprises preheating furnace workshop, converter charging extend across and it is several transport bundled scrap preheating furnace trolley and scrap box;The preheating furnace workshop is for preheating the bundled scrap of different size, different materials;The converter charging is extended across to be added in converter for the bundled scrap after preheating;Bundled scrap after preheating provides Insulation by the frivolous broken material automatic discharge unit of setting steel scrap.Can solve the technical issues of bundled scrap charging temperature is low, the duration of heat is long, steel scrap oxidation increases using the utility model, make bundled scrap may be implemented high-volume, it is integrated, expeditiously produce, and system is simple, energy conservation and environmental protection, convenient operating maintenance.
Description
Technical field
The utility model belongs to metallurgy industry technical field more particularly to a kind of production of mating converter preheating scrap briquetting
Process system.
Background technique
Thoroughly banning for production capacity and " bar steel " is gone in a series of policies that country carries out in recent years, such as supply side reform,
The problems such as excess capacity have been effectively relieved.Wherein, strike " bar steel " causes scrap resources amount soaring, useless for China is continuously improved
Steel application percentage creates condition, and national correlation department is estimated before the end of the year 2018, by converter scrap ratio by 2016
11% is increased to 18%.
Based on the above situation, it would be desirable to which a kind of completely new scrap steel preheating production technology is transported for convenience and stored, on a small quantity
Give up in heavy (melting) scrap and major part, light scrap is that automotive is to steel production enterprise in the form of bundled scrap, then bundled scrap is again
Heap exist steel-making steel scrap across etc. converter to be added.But if bundled scrap adds converter after 700-800 DEG C of preheating, no
But moisture and surface debirs in steel scrap can be sufficiently removed, the air content in molten steel is reduced, is the subsequent refinery practice stage
Favourable conditions are provided;And the converter smelting time can be shortened, improve scrap ratio, reduce oxidation of the steel scrap in furnace, discharge
Fume amount will have biggish reduction, while decreasing the operating load of cleaner, there is preferable energy conservation and social ring
Protect benefit.The key of one technological development, while being to prove its technique and environmental benefit, also to prove its it is relatively convenient and
Without detriment to production efficiency.By retrieval, currently without relevant system and method.
Utility model content
In order to solve above-mentioned bundled scrap preheating, solution bundled scrap charging temperature is low, the duration of heat is long, steel scrap oxidation increases
The technical issues of adding, the utility model provide a kind of completely new whole process bundled scrap pre-heating technique and production decision, make to give up
Steel briquetting may be implemented high-volume, it is integrated, expeditiously produce, and system is simple, energy conservation and environmental protection, convenient operating maintenance.
The technical solution that the utility model solves technical problem is as follows:
The utility model is a kind of production-process systems of mating converter preheating scrap briquetting comprising at least one preheating
Furnace workshop, the converter being arranged at the end position of preheating furnace workshop charging extend across and several for transporting the pre- of bundled scrap
Hot stove trolley and scrap box;The preheating furnace workshop is disposed with preheating furnace body, preheating furnace turn-around along its width direction
Track and several bundled scrap supply lines are provided with several carriers on every bundled scrap supply line;The preheating
Furnace body rear and front end is respectively feed end and discharge end, is internally provided with trolley track in furnace, the preheating furnace trolley can
It advances on trolley track in furnace, enters from feed end, go out from discharge end;The preheating furnace carriage return trajectory is for preheating table
Garage is into top is aerial to be provided with several steel grasping machine discharging platforms, and preheating furnace trolley can be below steel grasping machine discharging platform certainly
By passing through, a steel grasping machine is set, for grabbing the bundled scrap on carrier on each steel grasping machine discharging platform;It is described pre-
The front-end and back-end of both hot stove ontology and preheating furnace carriage return trajectory pass through setting the first connection track connection and second respectively
Track connection is connected, the loop wire advanced for preheating furnace trolley is formed;On the first connection track and the second connection track
It is respectively arranged with a preheating furnace trolley ferry bus, wherein the preheating furnace trolley ferry bus on the first connection track will be for that will preheat
Table vehicle ferries from the front end of preheating furnace carriage return trajectory and connects the preheating furnace on track to the feed end of preheating furnace body, second
Trolley ferry bus is used to from the discharge end of preheating furnace body ferry preheating furnace trolley to the rear end of preheating furnace carriage return trajectory;Institute
It states on front side of the second connection track and rear side is respectively arranged with bundled scrap device for discharging and scrap box straddle carrier conveying track;It is described
Scrap box straddle carrier conveying track extends to converter charging and extends across place, is provided with scrap box straddle carrier and bundled scrap rail
Weigh weighing device in road, and one side is provided with the frivolous broken material automatic discharge unit of steel scrap;The scrap box straddle carrier will be for that will give up
Steel tank is transported at the second connection track rearward position, and the bundled scrap device for discharging is used to that preheating table herein will to be stopped
Interior preheated bundled scrap is offloaded in scrap box;Converter charging, which extends across, is provided with several high hang across scrap box
Run vehicle and low across remote control electromagnetic lifter driving of giving up again, across the scrap box lifting traffic of height is for handling equipped with the useless of bundled scrap
The scrap box of steel tank and sky, the low supplement driven a vehicle across the remote control electromagnetic lifter that gives up again for carrying out heavy (melting) scrap to scrap box;
Wherein, the preheating furnace trolley passes through trolley track in furnace, preheating furnace carriage return trajectory, the first connection track and the
Two connection track operations, the scrap box pass through scrap box straddle carrier conveying track and high across scrap box lifting traffic operation.
In the technical solution of the utility model, bundled scrap supply line described in each item forms bundled scrap transportation system,
Ensure timely, continuous seamless the supply of bundled scrap.
In the technical solution of the utility model, the feeding system of each steel grasping machine discharging platform composition bundled scrap,
The bundled scrap come is loaded to carrier in each bundled scrap supply line grab and in stacking to preheating furnace trolley.
In the technical solution of the utility model, the preheating furnace body, preheating furnace carriage return trajectory, first connection track,
Second connection track, preheating furnace trolley ferry bus and preheating furnace burning and fume extractor etc. constitute bundled scrap pre-heating system,
For being preheated to bundled scrap, after the completion of the bundled scrap stacking on preheating furnace trolley, by the preheating furnace trolley send to
At first track, the feed end of preheating furnace body is transported to by preheating furnace trolley ferry bus, it then will by preheating furnace trolley
Bundled scrap is transported from feed end toward discharge end, and the preheating of bundled scrap is completed during transporting, and after preheating, then is passed through second and is connected
The preheating furnace trolley is transported at the rear end of preheating furnace carriage return trajectory by the preheating furnace trolley ferry bus on integrating with to be unloaded
Material;The spy different based on bundled scrap ingredient multiplicity, density unevenness, gas permeability of preheating furnace body described in the technical program
The low-temperature tunnel kiln form for eliminating cooling section can be used in point, meets the needs of bundled scrap preheating.
In the technical solution of the utility model, the bundled scrap device for discharging constitutes bundled scrap discharge system,
By bundled scrap device for discharging by the bundled scrap after preheating from preheating furnace trolley loading and unloading material into scrap box.
It is frivolous broken by the way that steel scrap is arranged in scrap box straddle carrier conveying track side in the technical solution of the utility model
Expect that automatic discharge unit provides Insulation to the bundled scrap after preheating.
In the technical solution of the utility model, the scrap box straddle carrier conveying track, scrap box, scrap box cross across
Vehicle, converter charging extend across, high across scrap box lifting traffic and it is low across the compositions preheatings such as remote control electromagnetic lifter driving of giving up again after
Bundled scrap transportation system, it is ensured that the bundled scrap after preheating is sent into converter in time.
As the further improvement of technical solution, each steel grasping machine discharging platform has respectively corresponded a steel grasping machine and has unloaded
Expect positioning device and aerial setting is above preheating furnace carriage return trajectory, the steel grasping machine discharging positioning device can assist to grab steel
Machine is accurately by bundled scrap stacking on the position that preheating furnace trolley is set.
As the further improvement of technical solution, the bundled scrap device for discharging can be according to relieving capacity and practical need
It is set as steel-pushing type or tilt bed.
As the further improvement of technical solution, the steel grasping machine discharging platform in each preheating furnace workshop is 2,
In a steel grasping machine discharging platform closely the bundled scrap supply line is arranged in bundled scrap device for discharging is 3;It is described it is high across
Scrap box lifting traffic is 2.
As the further improvement of technical solution, the preheating furnace trolley ferry bus and scrap box straddle carrier pass through frequency conversion
Motor is driven.
As the further improvement of technical solution, the preheating furnace workshop is two, and passes through the scrap box straddle carrier
Conveying track is connected, and the converter charging, which extends across, to be arranged between the end in two preheating furnace workshops, and this two preheatings
Furnace workshop extends across center line symmetrical setting about converter charging, and the frivolous broken material automatic discharge unit of steel scrap is in steel scrap
Slot straddle carrier conveying track is ipsilateral to extend across center line symmetrically respectively setting one about converter charging.
Another technical solution of the utility model solution technical problem are as follows:
A kind of manufacturing technique method of mating converter preheating scrap briquetting of the utility model, by adopting the above technical scheme in
A kind of production-process systems of mating converter preheating scrap briquetting, include the following steps:
1), bundled scrap is transported by each carrier in preheating furnace workshop and by setting path and enters each steel scrap pressure
Block supply line waits in line discharging;
2) a preheating furnace trolley on preheating furnace carriage return trajectory, is controlled to run to the setting nearby of steel grasping machine discharging platform
Feeding area is carried out on preheating furnace trolley using the bundled scrap on the steel grasping machine crawl carrier on steel grasping machine discharging platform
Stacking;
3) it, after the completion of bundled scrap stacking on preheating furnace trolley, controls the preheating furnace trolley and runs to preheating furnace carriage return
Trajectory front end, and the preheating furnace trolley is transported to by preheating furnace sheet by the preheating furnace trolley ferry bus on the first connection track
At the feed end of body, then the preheating furnace trolley is sent into the intrinsic furnace of preheating furnace on trolley track, while to discharge end row
Into the preheating of Bian Jinhang bundled scrap, at the same time, the subsequent preheating furnace trolley cover of preheating furnace carriage return trajectory continue
Bundled scrap stacking;
4), the scrap box straddle carrier for being loaded with sky scrap box is advanced to operation at the second connection track in preheating furnace workshop
It is in the process one layer of frivolous broken material of steel scrap of scrap box shop fixtures using the frivolous broken material automatic discharge unit of steel scrap;
5) it after, scrap box straddle carrier reaches setting position, controls the preheating furnace trolley at discharge end and enters the second connection rail
Preheating furnace trolley ferry bus on road and the rear end for being transported to preheating furnace carriage return trajectory, at the same control at feeding end fill it is useless
The synchronous preheating furnace body that enters of the preheating furnace trolley of steel briquetting is preheated;
6), the bundled scrap on preheating furnace trolley is offloaded in scrap box using bundled scrap device for discharging;
7) the scrap box straddle carrier of scrap box of the control equipped with bundled scrap is useless on scrap box straddle carrier conveying track
It advances at steel briquetting track scale weighing device, again using the frivolous broken material automatic discharge unit of steel scrap to steel scrap in traveling process
The gap progress frivolous broken material of steel scrap of bundled scrap is filled up in slot, while carrying out the top heat preservation of bundled scrap paving, at the same time, control
Bundled scrap device for discharging processed is resetted, and control just unloaded bundled scrap still in the preheating furnace trolley of the condition of high temperature and
When march to steel grasping machine discharging platform nearby set feeding area carry out bundled scrap stacking;
8), using bundled scrap track scale weighing device to load bundled scrap scrap box carry out weighing and with set into
Converter weight is compared, if weight is insufficient, is augmented using low across the remote control electromagnetic lifter driving handling heavy (melting) scrap that gives up again, if weight
After amount qualification or supplement are qualified, the scrap box is hoisted to converter area progress bundled scrap using height across scrap box lifting traffic and is entered
Converter, at the same using another high across scrap box lifting traffic by scrap box be hoisted on scrap box straddle carrier;
9) it, is recycled by above-mentioned steps and carries out bundled scrap transport, feeding, preheating, unloading, keeps the temperature and enter furnace operation.
As the further improvement of technical solution, the bundled scrap layering on the preheating furnace trolley carries out stacking, distance
The nearest steel grasping machine discharging platform of bundled scrap device for discharging is responsible for the stacking of preheating furnace trolley bottom bundled scrap, other to grab
Steel machine discharging platform is responsible for the stacking of other layers of bundled scrap.
The technical solution that the utility model another kind solves technical problem is as follows:
A kind of manufacturing technique method of mating converter preheating scrap briquetting of the utility model, by adopting the above technical scheme in institute
A kind of production-process systems for the mating converter preheating scrap briquetting stated, the system include two preheating furnace workshops, including as follows
Step:
1), bundled scrap is transported by each carrier each useless to entering in two preheating furnace workshops and by setting path
Steel briquetting supply line waits in line discharging;
2) a preheating furnace trolley on preheating furnace carriage return trajectory, is controlled in two preheating furnace workshops respectively to run to grabbing steel
The feeding area that machine discharging platform is nearby set, using on the steel grasping machine crawl carrier on respective steel grasping machine discharging platform
Bundled scrap carries out stacking on preheating furnace trolley;
3), after the completion of bundled scrap stacking on two preheating furnace trolleys, two preheating furnace trolley operations are controlled respectively
To the preheating furnace carriage return trajectory front end in respective preheating furnace workshop, and pass through the preheating furnace trolley ferry bus on the first connection track
The preheating furnace trolley is transported at the feed end of preheating furnace body, it is intrinsic that the preheating furnace trolley is then sent into preheating furnace
In furnace on trolley track, while advance to discharge end, the preheating of Bian Jinhang bundled scrap, at the same time, respective preheating furnace turn-around
The subsequent preheating furnace trolley cover of track continues bundled scrap stacking;
4) it, will be transported at the scrap box straddle carrier for being loaded with sky the scrap box thereto second connection track in a preheating furnace workshop
It goes, it is one layer of steel scrap of scrap box shop fixtures that the frivolous broken material automatic discharge unit of steel scrap on its direction of travel is utilized in traveling process
Frivolous broken material;
5) after, scrap box straddle carrier reaches setting position, the preheating table at the discharge end in the preheating furnace workshop is controlled
Vehicle enters second and connects the preheating furnace trolley ferry bus on track and be transported to the rear end of preheating furnace carriage return trajectory, controls simultaneously
The synchronous preheating furnace body that enters of the preheating furnace trolley for filling bundled scrap at feeding end is preheated;
6), the bundled scrap on preheating furnace trolley is offloaded to using the bundled scrap device for discharging in the preheating furnace workshop useless
In steel tank;
7), the scrap box straddle carrier of scrap box of the control equipped with bundled scrap is advanced to another preheating furnace workshop, is traveled across
It is frivolous broken using gap progress steel scrap of the frivolous broken material automatic discharge unit of steel scrap to bundled scrap in scrap box again in journey
Particle is filled up, while carrying out the top heat preservation of bundled scrap paving, and at the same time, control bundled scrap device for discharging is resetted, and is controlled
System has just unloaded bundled scrap and has marched to the setting nearby of steel grasping machine discharging platform in time still in the preheating furnace trolley of the condition of high temperature
Feeding area carry out bundled scrap stacking;It is set when the scrap box straddle carrier marches to the second connection track in another preheating furnace workshop
When place is set in positioning, the discharging operations of the bundled scrap in the preheating furnace workshop, discharging process and previous preheating furnace workshop are carried out
The discharging process of bundled scrap is consistent, after the completion of the bundled scrap discharging in the preheating furnace workshop, controls this and bundled scrap is housed
Scrap box is advanced at the bundled scrap track scale weighing device on scrap box straddle carrier conveying track, sharp again in traveling process
It carries out the frivolous broken material of steel scrap to the gap of bundled scrap in scrap box with the frivolous broken material automatic discharge unit of steel scrap to fill up, together
Shi Jinhang bundled scrap spreads top heat preservation, and at the same time, control bundled scrap device for discharging is resetted, and is controlled just to have unloaded and be given up
Steel briquetting marches to the feeding area that steel grasping machine discharging platform is nearby set still in the preheating furnace trolley of the condition of high temperature in time and carries out
Bundled scrap stacking;
8), using bundled scrap track scale weighing device to load bundled scrap scrap box carry out weighing and with set into
Converter weight is compared, if weight is insufficient, is augmented using low across the remote control electromagnetic lifter driving handling heavy (melting) scrap that gives up again, if weight
After amount qualification or supplement are qualified, the scrap box is hoisted to converter area progress bundled scrap using height across scrap box lifting traffic and is entered
Converter, at the same using another high across scrap box lifting traffic by scrap box be hoisted on scrap box straddle carrier;
9) bundled scrap transport, feeding, preheating, the unloading, heat preservation for carrying out two preheating furnace workshops, are recycled by above-mentioned steps
And enter furnace operation.
Steel scrap pressure as the further improvement of technical solution, in each preheating furnace workshop on the preheating furnace trolley
Block, which is layered, carries out stacking, and the steel grasping machine discharging platform nearest apart from bundled scrap device for discharging is responsible for the preheating furnace trolley bottom
The stacking of bundled scrap, other steel grasping machine discharging platforms are responsible for the stacking of other layers of bundled scrap.
Compared with the existing technology, the production technology system of a kind of mating converter preheating scrap briquetting described in the utility model
System, it is novel in design, reasonable, cooperate the method, bundled scrap can be preheated to 700-800 DEG C of mean temperature, not only may be used
To improve pneumatic steelmaking scrap ratio, and can effectively solve bundled scrap charging temperature is low, the duration of heat is long, steel scrap oxidation increase
The technical issues of adding, make bundled scrap may be implemented high-volume, it is integrated, expeditiously produce, and system is simple, energy-saving ring
It protects, convenient operating maintenance.
Detailed description of the invention
Fig. 1 is a kind of structural representation of the production-process systems of mating converter preheating scrap briquetting described in the utility model
Figure;
In figure: 1, preheating furnace body;2, trolley track in furnace;3, feed end;4, discharge end;5, preheating furnace turn-around rail
Road;6, the first connection track;7, preheating furnace trolley ferry bus;8, the second connection track;9, steel grasping machine discharging platform;10, steel is grabbed
Machine;11, bundled scrap supply line;12, carrier;13, bundled scrap device for discharging;14, scrap box straddle carrier;15, steel is grabbed
Machine discharging positioning device;16, scrap box straddle carrier conveying track;17, preheating furnace trolley;18, scrap box;19, height is across scrap box
Lifting traffic;20, bundled scrap track scale weighing device;21, low across remote control electromagnetic lifter driving of giving up again;22, converter charging extends
Across;23, converter;24, preheating furnace workshop.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Unless otherwise defined, the technical term or scientific term used herein should be in disclosure fields and has
The ordinary meaning that the personage of general technical ability is understood.Used in disclosure patent application specification and claims
"upper", "lower", "left", "right", "inner", "outside", "front", "rear" etc. are only used for indicating relative positional relationship, when being described object
Absolute position change after, then the relative positional relationship also correspondingly changes.
Embodiment 1:
As shown in Figure 1, a kind of production-process systems of mating converter preheating scrap briquetting of the utility model, it includes at least
One preheating furnace workshop 24, the converter being arranged at 24 end position of preheating furnace workshop charging extend across 22 and several for transporting
The preheating furnace trolley 17 and scrap box 18 of bundled scrap are sent, refractory insulating layer is provided on the preheating furnace trolley 17 and for branch
Support the heat resisting steel supporting element of bundled scrap;The preheating furnace workshop 24 is disposed with preheating furnace body 1, pre- along its width direction
11,3 bundled scrap supply lines 11 of hot stove carriage return trajectory 5 and 3 bundled scrap supply lines are respectively 1# transport from outside to inside
Line, 2# supply line and 3# supply line are provided with several carriers 12, every steel scrap on every bundled scrap supply line 11
Carrier 12 on briquetting supply line 11 transports a kind of bundled scrap of size;1 rear and front end of the preheating furnace body difference
For feed end 3 and discharge end 4, be internally provided with trolley track 2 in furnace, the preheating furnace trolley 17 can in furnace trolley track
It advances on 2, enters from feed end 3, go out from discharge end 4;The preheating furnace carriage return trajectory 5 is advanced for preheating furnace trolley 17,
Its top is aerial to be provided with 2 steel grasping machine discharging platforms 9, respectively 1# steel grasping machine discharging platform and 2# steel grasping machine discharging platform,
Preheating furnace trolley 17 can have free passage below 2 steel grasping machine discharging platforms 9, and one is arranged on each steel grasping machine discharging platform 9
Steel grasping machine 10, for grabbing the bundled scrap on carrier 12;Each steel grasping machine discharging platform 9 has respectively corresponded one
Steel grasping machine discharging positioning device 15 simultaneously makes somebody a mere figurehead setting above preheating furnace carriage return trajectory 5, for assisting steel grasping machine 10 accurately
By bundled scrap stacking on the position that preheating furnace trolley 17 is set;5 liang of the preheating furnace body 1 and preheating furnace carriage return trajectory
The front-end and back-end of person pass through setting the first connection track 6 connection respectively and the second connection track 8 connects, and form one for preheating
The loop wire that table vehicle 17 is advanced;A preheating furnace trolley is respectively arranged on the first connection track 6 and the second connection track 8
Ferry bus 7, wherein the preheating furnace trolley ferry bus 7 on the first connection track 6 is used for preheating furnace trolley 17 from preheating furnace carriage return
The front end of trajectory 5 is ferried to the feed end 3 of preheating furnace body 1, and the second preheating furnace trolley ferry bus 7 connected on track 8 is used
In by preheating furnace trolley 17 from the ferry-boat of discharge end 4 of preheating furnace body 1 to the rear end of preheating furnace carriage return trajectory 5;Described second
8 front side of connection track and rear side are respectively arranged with bundled scrap device for discharging 13 and scrap box straddle carrier conveying track 16, described
Bundled scrap device for discharging 13 can be set as steel-pushing type or tilt bed according to relieving capacity and actual needs, and the present embodiment is to push away
Steel formula is described;2 steel grasping machine discharging platforms 9 are in setting, one of steel grasping machine discharging platform 9 closely steel scrap pressure
Block device for discharging 13 and front side setting, run to this in time convenient for the preheating furnace trolley 17 still in the condition of high temperature after discharging and grab
The stacking that bundled scrap is quickly carried out at steel machine discharging platform 9 quickly absorbs the complete preheating of rigid discharging using the bundled scrap of room temperature
High-temperature physics heat on the flame-proof thermal insulation material of table vehicle 17, prevents heat loss;The scrap box straddle carrier conveying track 16
It extends to converter charging to extend across at 22, is provided with scrap box straddle carrier 14 and bundled scrap track scale weighing device 20,
One side is provided with the frivolous broken material automatic discharge unit 25 of steel scrap;The scrap box straddle carrier 14 is for transporting scrap box 18
The loading of bundled scrap is carried out to the second connection 8 rearward position of track and is transported, and the bundled scrap device for discharging 13 is used for
Bundled scrap preheated in the preheating furnace trolley 17 of stop herein is offloaded in scrap box 18;The converter charging extends across
It is low remote control electromagnetic lifter driving 21,2 described high across useless across giving up again that across the scrap box lifting traffic 19 and 1 of 2 height is provided on 22
Steel tank lifting traffic 19 is respectively across the scrap box lifting traffic of 1# high and across the scrap box lifting traffic of 2# high, is respectively used to handling dress
Have the scrap box 18 and empty scrap box 18 of bundled scrap, it is described it is low across remote control electromagnetic lifter driving 21 of giving up again for scrap box 18
Carry out the supplement of heavy (melting) scrap.
In the present embodiment, the preheating furnace trolley ferry bus 7 and scrap box straddle carrier 14 are driven by variable-frequency motor
It is dynamic, quick, punctual and stable operation can be realized according to production needs.
In the present embodiment, bundled scrap supply line 11 described in each item forms bundled scrap transportation system, a transport vapour
After bundled scrap on vehicle 12 has been crawled, the timely cover of carrier 12 at rear, it is ensured that bundled scrap it is timely, continuous
Seamless supply.
In the present embodiment, each steel grasping machine discharging platform 9 forms the feeding system of bundled scrap, to each steel scrap pressure
Carrier 12 loads the bundled scrap come and grab and in stacking to preheating furnace trolley 17 in block supply line 11.
In the present embodiment, trolley track 2, preheating furnace carriage return trajectory 5, first connect rail in the preheating furnace body 1, furnace
Road 6, second connects track 8, preheating furnace trolley ferry bus 7 and preheating furnace burning and fume extractor etc. and constitutes bundled scrap preheating
System, for being preheated to bundled scrap, after the completion of the bundled scrap stacking on preheating furnace trolley 17, by the preheating table
Vehicle 17 is sent to the first connection track 6, the feed end 3 of preheating furnace body 1 is transported to by preheating furnace trolley ferry bus 7, then
Bundled scrap is transported from feed end 3 toward discharge end 4 by preheating furnace trolley 17, completes the pre- of bundled scrap during transporting
Heat after preheating, then connects the preheating furnace trolley ferry bus 7 on track 8 by second and the preheating furnace trolley 17 is transported to preheating
Discharging is carried out at the rear end of furnace carriage return trajectory 5;It is more that preheating furnace body 1 described in the technical program is based on bundled scrap ingredient
The different feature of sample, density unevenness, gas permeability can be used the low-temperature tunnel kiln form for eliminating cooling section, meet bundled scrap
The needs of preheating.
In the present embodiment, the bundled scrap device for discharging 13 constitutes bundled scrap discharge system, passes through steel scrap pressure
Block device for discharging 13 by the bundled scrap after preheating from 17 loading and unloading material of preheating furnace trolley into scrap box 18, the bundled scrap discharging
Device 13 is in use, ensure the thrust only heat resisting steel supporting element upload on bundled scrap and preheating furnace trolley 17 that it is generated
It passs, is not delivered on the flame-proof thermal insulation material and trolley ontology of preheating furnace trolley 17.
In the present embodiment, by the way that the frivolous broken material automatic discharging of steel scrap is arranged in 16 side of scrap box straddle carrier conveying track
Bundled scrap after 25 pairs of device preheatings provides Insulation, and before scrap box 18 loads bundled scrap, it is frivolous to first pass through steel scrap
Broken material automatic discharge unit 25 is 18 shop fixtures of scrap box, one layer of frivolous broken material of steel scrap, the frivolous broken material shop fixtures of steel scrap here
There are 2 purposes, causes radiation loss first is that shop fixtures prevents high temperature bundled scrap heat from conducting to scrap box 18 while protecting steel scrap
18 bottom steel plate of slot can effectively buffer steel scrap when pushing away steel discharging second is that the frivolous broken material of the steel scrap of shop fixtures has buffer function
Shock loading of the briquetting to 14 bearing of scrap box straddle carrier and car body.
In the present embodiment, the scrap box straddle carrier conveying track 16, scrap box 18, scrap box straddle carrier 14, converter
Charging extends across 22, high across scrap box lifting traffic 19 and low across useless the compositions preheatings such as remote control electromagnetic lifter driving 21 of giving up again after
Steel briquetting transportation system, it is ensured that the bundled scrap after preheating is sent into converter in time.
Embodiment 2:
On the basis of embodiment 1, the preheating furnace workshop 24 is set as two, and respectively 1# preheating furnace workshop and 2# is pre-
Hot stove workshop, and being connected by the scrap box straddle carrier conveying track 16, converter charging extend across 22 settings this two
Between the end in a preheating furnace workshop 24, and about converter charging, to extend across 22 center lines symmetrical in two preheating furnace workshops 24
Be arranged namely 2 preheating furnace workshops 24 in each section respectively about the converter charging extend across 22 center line symmetrical settings,
The frivolous broken material automatic discharge unit 25 of steel scrap extends in ipsilateral feed about converter of scrap box straddle carrier conveying track 16
Across 22 center lines, one, the respectively frivolous broken material automatic discharge unit of 1# steel scrap and the frivolous broken material of 2# steel scrap are symmetrically respectively set
Automatic discharge unit.The purpose that the present embodiment is arranged such is that the system described in the present embodiment is adopted in application, by calculating
Most with the corresponding 23 bundled scrap demand of a converter of corresponding 18 useful load of a scrap box of the bundled scrap amount of two preheating furnace trolleys 17
Rationally, efficiency highest, most energy saving, scrap box 18 are equipped with according to the design feature of converter, and generally elongated U-type groove uses it to
It returns and loads the bundled scrap after two preheating furnace workshops 24 preheat.
Embodiment 3:
A kind of manufacturing technique method of mating converter preheating scrap briquetting, using mating turn of one kind described in embodiment 1
The production-process systems of furnace preheating scrap briquetting, are illustrated by taking a preheating furnace workshop 24 as an example, specifically comprise the following steps:
1), by bundled scrap by entering 3 in the transport to preheating furnace workshop 24 of each carrier 12 and by setting path
Bundled scrap supply line 11 waits in line discharging;3 bundled scrap supply lines 11 transport three kinds of various sizes of steel scrap pressures respectively
Block improves conevying efficiency and subsequent loading efficiency;
2) it, controls and is set before an operation to steel grasping machine discharging platform 9 of preheating furnace trolley 17 on preheating furnace carriage return trajectory 5
Feeding area, using on steel grasping machine discharging platform 9 steel grasping machine 10 grab carrier 12 on bundled scrap preheating table
Stacking is carried out on vehicle 17;Steel grasping machine 10 is first directly removed bundled scrap, then by manually being operated from carrier 12
It is rotated by 90 ° and is piled up on preheating furnace trolley 17 under the assistance of steel grasping machine discharging positioning device 15, on a carrier 12
After bundled scrap has grabbed, the timely cover of subsequent carrier 12 realizes the continuity of bundled scrap feeding;In order to further
The utilization efficiency of bundled scrap stacking efficiency and subsequent 17 waste heat of preheating furnace trolley is improved, it is useless on the preheating furnace trolley 17
Steel briquetting can be layered carry out stacking, closely the steel grasping machine 10 on the 2# steel grasping machine discharging platform 9 of bundled scrap device for discharging 13
It is responsible for the crawl for the bundled scrap that carrier 12 loads on 1# supply line and as 17 bottom bundled scrap of preheating furnace trolley
Stacking is carried out, 1# steel grasping machine discharging platform 9 is responsible for the stacking of other layers of bundled scrap;When the bottom steel scrap of preheating furnace trolley 17
Whether after the completion of briquetting stacking, detecting at 1# steel grasping machine discharging platform 9 has other preheating furnace trolleys 17, if so, then waited,
If no, marching to the stacking that the feeding area set at 1# steel grasping machine discharging platform 9 carries out other layers of bundled scrap;
3), after the completion of bundled scrap stacking on preheating furnace trolley 17, the preheating furnace trolley 17 operation is controlled to preheating furnace
5 front end of carriage return trajectory, and transported the preheating furnace trolley 17 by the preheating furnace trolley ferry bus 7 on the first connection track 6
Charging is waited to the feed end 3 of preheating furnace body 1, when can feed, which is sent into preheating furnace body 1
Furnace on trolley track 2, while advance to discharge end 4, the preheating of Bian Jinhang bundled scrap, at the same time, preheating furnace turn-around
Subsequent 17 cover of preheating furnace trolley of track 5 continues bundled scrap stacking and is transported at feed end 3 to wait charging;It carries
When having 17 row of preheating furnace trolley to the discharge end 4 of bundled scrap, furnace demand is entered according to the bundled scrap of converter 23 and waits discharging;
4) when, can discharge, the scrap box straddle carrier 14 for being loaded with sky scrap box 18 is connected to the second of preheating furnace workshop 24
It integrates with and runs at 8, using the frivolous broken material automatic discharge unit 25 of steel scrap be one layer of 18 shop fixtures of scrap box useless in traveling process
The frivolous broken material of steel;
5), scrap box straddle carrier 14 reaches on scrap box straddle carrier conveying track 16 that track is corresponding sets with the second connection
Positioning postpones, and the preheating furnace trolley 17 at control discharge end 4 enters the preheating furnace trolley ferry bus 7 on the second connection track 8 simultaneously
It is transported to the rear end of preheating furnace carriage return trajectory 5, while it is same to control the preheating furnace trolley 17 for filling bundled scrap at feeding end 3
Stepping enters to preheat furnace body 1 and is preheated;
6), the bundled scrap on preheating furnace trolley 17 is offloaded in scrap box 18 using bundled scrap device for discharging 13;
7) the scrap box straddle carrier 14 of scrap box 18 of the control equipped with bundled scrap is to scrap box straddle carrier conveying track 16
On bundled scrap track scale weighing device 20 at advance, filled again using the frivolous broken material automatic discharging of steel scrap in traveling process
The gap for setting bundled scrap in 25 pairs of scrap box 18 carries out the frivolous broken material of steel scrap and fills up and carry out bundled scrap paving top guarantor simultaneously
Temperature, at the same time, control bundled scrap device for discharging 13 are resetted, and are controlled and just unloaded bundled scrap still in high temperature shape
The preheating furnace trolley 17 of state marches to the feeding area set in front of 1# steel grasping machine discharging platform 9 in time and carries out the bundled scrap bottom
Stacking;
8), using 20 pairs of bundled scrap track scale weighing device load bundled scraps scrap box 13 carry out weighing and with set
It is incorporated into converter weight to be compared, if weight is insufficient, be increased using low across the remote control electromagnetic lifter 21 handling heavy (melting) scraps of driving that give up again
It mends, if this to be fully loaded with to the scrap box of bundled scrap using across the scrap box lifting traffic 19 of 2# high after weight qualification or supplement are qualified
13 are hoisted at the converter 23 for needing to be added bundled scrap and feed into furnace, while utilizing across the scrap box lifting traffic of 1# high
19 by scrap box 13 be hoisted on scrap box straddle carrier 14;
9) it is recycled by above-mentioned steps and carries out bundled scrap transport, feeding, preheating, unloading, keeps the temperature and enter furnace operation.
In the present embodiment, each workshop section's runing time sequence can be set according to the production cycle of converter 23, realizes bundled scrap
Preheating is precisely controlled, and improves production efficiency.
Embodiment 4:
A kind of manufacturing technique method of mating converter preheating scrap briquetting, using a kind of mating converter as described in example 2
The production-process systems of preheating scrap briquetting, the present embodiment production process and embodiment 3 are almost the same, and difference is, this implementation
Preheating furnace workshop 24 is set as two in example, carries out bundled scrap by the corresponding two preheating furnace trolleys 17 of a scrap box 18
Unloading, so that bundled scrap preheating and entering that furnace is highly efficient, for the production work in single preheating furnace workshop 24 in the present embodiment
Sequence with and bundled scrap be offloaded to the weighing after scrap box 18 and enter consistent in furnaceman's sequence and embodiment 3, the specific steps are as follows:
1), by bundled scrap by entering in the transport to two preheating furnace workshops 24 of each carrier 12 and by setting path
Each bundled scrap supply line 11 waits in line discharging;
2) operation of preheating furnace trolley 17 on preheating furnace carriage return trajectory 5 in two preheating furnace workshops 24, is controlled respectively
The feeding area nearby set to steel grasping machine discharging platform 9 grabs fortune using the steel grasping machine 10 on respective steel grasping machine discharging platform 9
Bundled scrap on defeated automobile 12 carries out stacking on preheating furnace trolley 17;Together
Embodiment 3, the bundled scrap in each preheating furnace workshop 24 on the preheating furnace trolley 17 are layered progress
Stacking, the steel grasping machine discharging platform 9 nearest apart from bundled scrap device for discharging 13 are responsible for 17 bottom steel scrap pressure of preheating furnace trolley
The stacking of block, other steel grasping machine discharging platforms 9 are responsible for the stacking of other layers of bundled scrap;
3), after the completion of bundled scrap stacking on two preheating furnace trolleys 17, two preheating furnace trolleys 17 are controlled respectively
It runs to 5 front end of preheating furnace carriage return trajectory in respective preheating furnace workshop 24, and passes through the preheating table on the first connection track 6
The preheating furnace trolley 17 is transported at the feed end 3 of preheating furnace body 1 by vehicle ferry bus 7, then send the preheating furnace trolley 17
Enter to preheat in the furnace in furnace body 1 on trolley track 2, while advancing to discharge end, the preheating of Bian Jinhang bundled scrap is same with this
When, subsequent 17 cover of preheating furnace trolley of respective preheating furnace carriage return trajectory 5 continues bundled scrap stacking;
4) the second connection rail in the scrap box straddle carrier 14 of a sky scrap box 18 preheating furnace workshop 24 thereto will, be loaded with
It is run at road 8, it is scrap box 18 that the frivolous broken material automatic discharge unit 25 of steel scrap on its direction of travel is utilized in traveling process
One layer of frivolous broken material of steel scrap of shop fixtures;
5), scrap box straddle carrier 14 reaches corresponding with the second connection track 8 on scrap box straddle carrier conveying track 16
Behind setting position, controls the preheating furnace trolley 17 at the discharge end 4 in the preheating furnace workshop 24 and enter on the second connection track 8
Preheating furnace trolley ferry bus 7 and the rear end for being transported to preheating furnace carriage return trajectory 5, while controlling and filling steel scrap at feed end 3
The synchronous preheating furnace body 1 that enters of the preheating furnace trolley 17 of briquetting is preheated;
6), the bundled scrap on preheating furnace trolley 17 is unloaded using the bundled scrap device for discharging 13 in the preheating furnace workshop 24
It is loaded onto scrap box 18;After having unloaded, which is provided with the bundled scrap in 1/2 space;
7), the scrap box straddle carrier 14 of scrap box 18 of the control equipped with bundled scrap is advanced to another preheating furnace workshop 24,
It is carried out again using gap of the frivolous broken material automatic discharge unit 25 of steel scrap to bundled scrap in scrap box 18 in traveling process
The frivolous broken material of steel scrap is filled up, at the same carry out bundled scrap paving top heat preservation, at the same time, control bundled scrap device for discharging 13 into
Row resets, and control has just unloaded bundled scrap and marched to steel grasping machine discharging in time still in the preheating furnace trolley 17 of the condition of high temperature
The feeding area that platform 9 is nearby set carries out bundled scrap stacking, when the scrap box straddle carrier 14 marches to another preheating furnace workshop
The preheating furnace vehicle is carried out when setting position corresponding with the second connection track on scrap box straddle carrier conveying track 16 in 24
Between 24 bundled scrap discharging operations, the discharging process one of the bundled scrap in discharging process and previous preheating furnace workshop 24
It causes, after the completion of the bundled scrap discharging in the preheating furnace workshop 24, controls the scrap box 18 equipped with bundled scrap to scrap box mistake
It advances at bundled scrap track scale weighing device 20 on standdle carrier conveying track 16, it is frivolous broken using steel scrap again in traveling process
Particle automatic discharge unit 25 carries out the frivolous broken material of steel scrap to the gap of bundled scrap in scrap box 18 and fills up, while carrying out useless
The top heat preservation of steel briquetting paving, at the same time, control bundled scrap device for discharging 13 is resetted, and is controlled and just unloaded bundled scrap
March to the feeding area progress steel scrap of the setting nearby of steel grasping machine discharging platform 9 in time still in the preheating furnace trolley 17 of the condition of high temperature
Briquetting stacking;
8), using 20 pairs of bundled scrap track scale weighing device load bundled scraps scrap box 13 carry out weighing and with set
It is incorporated into converter weight to be compared, if weight is insufficient, be increased using low across the remote control electromagnetic lifter 21 handling heavy (melting) scraps of driving that give up again
Mend, if weight is qualified or supplement it is qualified after, using across the scrap box lifting traffic 19 of height by the scrap box 13 be hoisted to converter area into
Row bundled scrap enters converter, at the same using another high across scrap box lifting traffic 19 by scrap box 13 be hoisted to scrap box
On straddle carrier 14;
9) bundled scrap transport, feeding, preheating, the unloading, guarantor in two preheating furnace workshops 24 are carried out by above-mentioned steps circulation
Temperature and enter furnace operation.
In addition, due to the bundled scrap of bundled scrap especially thin material compacting, it is internal inevitably to contain on a small quantity
Paint and various organic components, when using conventional combustion modes, preheating furnace low-temperature prewarming band 200-400 DEG C i.e. it is gasifiable or
It evaporates and is discharged into atmosphere with flue gas by air-introduced machine, cause atmosphere pollution and environmental issue due to burning because that cannot aoxidize.To understand
The problem of certainly part bundled scrap contains organic matter, scrap steel preheating furnace use two kinds of combustion modes, and one is for without organic
The bundled scrap of object uses conventional combustion low-temperature smoke extraction mode (200 DEG C of exhaust gas temperature or so);One is for containing organic matter
The bundled scrap of thin material, using coal gas of converter, air high temperature Two-cuff Technique combustion mode.Preheating furnace is using coal gas, the double storages of air
Heat can make the organic matter oxygen for gasifying or evaporating by improving coefficient of excess air for hot arc (800-900 DEG C of furnace temperature) in its preheating
Change and burns totally.Therefore, in the present embodiment, the 1# in a kind of production-process systems of mating converter preheating scrap briquetting
Preheating furnace body in preheating furnace workshop uses conventional combustion low-temperature smoke extraction mode, and the preheating furnace body in 2# preheating furnace workshop uses
Coal gas, air Two-cuff Technique combustion mode may be implemented the preheating production of various bundled scraps, further increases the present embodiment preheating
Different sizes, the ability of different materials bundled scrap.
Place is not described in detail for the utility model, is the well-known technique of those skilled in the art of the present technique.
Claims (6)
1. a kind of production-process systems of mating converter preheating scrap briquetting, characterized in that it includes at least one preheating furnace vehicle
Between (24), the converter charging that is arranged at preheating furnace workshop (24) end position extend across (22) and several for transporting steel scrap
The preheating furnace trolley (17) and scrap box (18) of briquetting;The preheating furnace workshop (24) is disposed with preheating along its width direction
Furnace body (1), preheating furnace carriage return trajectory (5) and several bundled scrap supply lines (11);Two before and after the preheating furnace body (1)
End is respectively feed end (3) and discharge end (4), is internally provided with trolley track in furnace (2);The preheating furnace carriage return trajectory
(5) top is aerial is provided with several steel grasping machine discharging platforms (9), and a steel grasping machine is arranged on each steel grasping machine discharging platform (9)
(10);The front-end and back-end of preheating furnace body (1) and preheating furnace carriage return trajectory (5) the two pass through setting first respectively and connect
Integrate with (6) connection and the second connection track (8) connection;In first connection track (6) and the second connection track (8) respectively
It is provided with a preheating furnace trolley ferry bus (7);On front side of second connection track (8) and rear side is respectively arranged with bundled scrap
Device for discharging (13) and scrap box straddle carrier conveying track (16);The scrap box straddle carrier conveying track (16) extends to converter
Charging extends across at (22), is provided with scrap box straddle carrier (14) and bundled scrap track scale weighing device (20), one
Side is provided with the frivolous broken material automatic discharge unit (25) of steel scrap;It is provided on every bundled scrap supply line (11) several
Carrier (12);Converter charging, which extends across, is provided with several high across scrap box lifting traffics (19) and low across weighing on (22)
Useless remote control electromagnetic lifter driving (21);Wherein, the preheating furnace trolley (17) passes through trolley track (2), preheating furnace turn-around in furnace
Track (5), the first connection track (6) and the second connection track (8) operation, the scrap box (18) are transported by scrap box straddle carrier
Defeated track (16) and high across scrap box lifting traffic (19) operation.
2. a kind of production-process systems of mating converter preheating scrap briquetting according to claim 1, characterized in that each
The steel grasping machine discharging platform (9) has respectively corresponded a steel grasping machine discharging positioning device (15) and aerial setting is returned in preheating furnace
Above fare track (5).
3. a kind of production-process systems of mating converter preheating scrap briquetting according to claim 1, characterized in that described
Bundled scrap device for discharging (13) is steel-pushing type or tilt bed.
4. a kind of production-process systems of mating converter preheating scrap briquetting according to claim 1, characterized in that each
Steel grasping machine discharging platform (9) in the preheating furnace workshop (24) is 2, and one of steel grasping machine discharging platform (9) is closely given up
Steel briquetting device for discharging (13) setting, the bundled scrap supply line (11) are 3;Across the scrap box lifting traffic of height (19)
It is 2.
5. a kind of production-process systems of mating converter preheating scrap briquetting according to claim 1, characterized in that described
Preheating furnace trolley ferry bus (7) and scrap box straddle carrier (14) are driven by variable-frequency motor.
6. a kind of production-process systems of mating converter preheating scrap briquetting according to claim 1-5, special
Sign is that the preheating furnace workshop (24) is two, and is connected by the scrap box straddle carrier conveying track (16), the converter
Charging extend across (22) be arranged between the end of two preheating furnace workshops (24), and two preheating furnace workshops (24) about
Converter charging extends across (22) center line symmetrical setting, and the frivolous broken material automatic discharge unit (25) of steel scrap is in scrap box
Straddle carrier conveying track (16) is ipsilateral to extend across the symmetrically respectively setting one of (22) center line about converter charging.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821502458.7U CN208733158U (en) | 2018-09-13 | 2018-09-13 | A kind of production-process systems of mating converter preheating scrap briquetting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821502458.7U CN208733158U (en) | 2018-09-13 | 2018-09-13 | A kind of production-process systems of mating converter preheating scrap briquetting |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208733158U true CN208733158U (en) | 2019-04-12 |
Family
ID=66034590
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821502458.7U Active CN208733158U (en) | 2018-09-13 | 2018-09-13 | A kind of production-process systems of mating converter preheating scrap briquetting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208733158U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109055656A (en) * | 2018-09-13 | 2018-12-21 | 中冶华天工程技术有限公司 | A kind of production-process systems and its method of mating converter preheating scrap briquetting |
CN112593037A (en) * | 2020-12-10 | 2021-04-02 | 欧冶链金再生资源有限公司 | Method for efficiently utilizing dezincification waste heat of zinc-containing waste steel |
-
2018
- 2018-09-13 CN CN201821502458.7U patent/CN208733158U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109055656A (en) * | 2018-09-13 | 2018-12-21 | 中冶华天工程技术有限公司 | A kind of production-process systems and its method of mating converter preheating scrap briquetting |
CN112593037A (en) * | 2020-12-10 | 2021-04-02 | 欧冶链金再生资源有限公司 | Method for efficiently utilizing dezincification waste heat of zinc-containing waste steel |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101133139B (en) | Glowing red coke conveying device and method thereof | |
CN208733158U (en) | A kind of production-process systems of mating converter preheating scrap briquetting | |
CN103822489B (en) | Waste-steel continuous preheating method and waste-steel continuous preheating device | |
CN201249765Y (en) | Thermal insulating cover for hot delivery and hot charging of billets | |
CN107475483B (en) | Mobile online heating system for scrap steel | |
CN103433474A (en) | Two-way conveying system for blast furnace molten iron conveying process of conveying ladle to bottom without stopping | |
CN101957141B (en) | External heat treatment furnace blank loading and unloading device | |
CN109055656A (en) | A kind of production-process systems and its method of mating converter preheating scrap briquetting | |
JP4724546B2 (en) | Scrap pre-heat treatment apparatus and pre-heat treatment method | |
CN215827878U (en) | Three-dimensional discharging system of carbide pot and carbide pot material pouring system based on multi-pot overturning | |
CN103170612A (en) | Melting method of bonded iron on hot-metal ladle | |
CN211645307U (en) | Device for adding scrap steel into molten iron tank on molten iron transportation line | |
CN101735830B (en) | Process for lateral translation of coke dry quenching | |
CN207210482U (en) | A kind of push-down heat-treatment production line | |
CN201043859Y (en) | Recooling flat burning machine | |
JP4459839B2 (en) | Red hot coke transport apparatus and transport method thereof | |
CN201144528Y (en) | Configuration structure of anode calcination shop and carbon block storeroom | |
CN200940010Y (en) | Container with loading/unloading function | |
CN206478986U (en) | A kind of utilization sheet billet continuous casting waste heat dries the device of iron scale | |
CN112195303B (en) | Process arrangement structure of steelmaking workshop with horizontal continuous charging electric furnace | |
CN203837501U (en) | Continuous steel scrap preheating equipment | |
JP2010132913A (en) | Method for carrying red-hot coke | |
CN216445406U (en) | Automatic heating and preheating system for scrap steel | |
CN206445189U (en) | A kind of strand annealing process dries the device of iron scale | |
CN107062860A (en) | A kind of utilization sheet billet continuous casting waste heat dries the device and method of iron scale |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |