CN208732429U - A kind of host runs through bolt hoisting fixture - Google Patents
A kind of host runs through bolt hoisting fixture Download PDFInfo
- Publication number
- CN208732429U CN208732429U CN201820860335.4U CN201820860335U CN208732429U CN 208732429 U CN208732429 U CN 208732429U CN 201820860335 U CN201820860335 U CN 201820860335U CN 208732429 U CN208732429 U CN 208732429U
- Authority
- CN
- China
- Prior art keywords
- bolt
- host
- round tube
- hanging ring
- runs
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
A kind of host runs through bolt hoisting fixture, there is host through bolt and laterally disposed strip round tube, host has Anti-collision cap through the lower end of bolt, in round tube center, it is welded with two hanging rings, there are spacing between two hanging rings, one end that hanging ring is connected with the round tube is square, one end far from the round tube is rounded, and the round nose of hanging ring is provided with a through-hole, and the side of two hanging ring adjacent side plates is equipped with stiffening plate.Tube ends are fixed with rectangle side plate, and the plate face of side plate is opened there are two circular hole, and steel wire sequentially passes through the circle and the host through bolt.The utility model can repeatedly use, and avoid original form of construction work buckled using cloth, and the host of Liftable two of this tooling one time runs through bolt, it improves work efficiency and construction quality, host runs through the screw thread free of losses of bolt, save a large amount of material resources, installation cost is reduced, it is economic and environment-friendly.
Description
Technical field
The present invention relates to ship machinery installing areas, and in particular to a kind of host runs through bolt hoisting fixture.
Background technique
In shipbuilding industry, need to install host in bolt, assembling process in host installation, construction quality
Superiority and inferiority directly affect period of cost and construction.Appearance quality problems then will lead to product and reprocess or even scrap, and make to be built into
Originally it is significantly increased, seriously affects construction speed.Therefore the construction quality for improving host through bolt assembly is even more important.
Traditional construction method is to be buckled to run through after bolt bundlees host with cloth to cooperate crane to install again, such
Mode can only once install a host through bolt, and working efficiency is low, and bolt end easily collides, and screw thread is caused to damage
Influence construction.This form of construction work working efficiency is low, and waste of manpower, material resources while influences construction efficiency, and production cost is caused to increase
Add.
Summary of the invention
To solve the above problems, the present invention provides a kind of host through bolt hoisting fixture, it is intended to which reaching tooling can be repeatedly
It uses, one time Liftable multiple main frames run through bolt, the purpose of working efficiency is improved, used technical solution is:
There is host through bolt and laterally disposed strip round tube, the host has anticollision through the lower end of bolt
Cap, the Anti-collision cap is cylindrical, and Intermediate Gray is fluted, and the groove is adapted with the host through bolt lower end, described
Anti-collision cap is buckled in the host through bolt lower end;
In the round tube center, be welded with two hanging rings, there are spacing between two hanging rings, the hanging ring with
One end that the round tube is connected is square, and one end far from the round tube is rounded, and the round nose of the hanging ring is provided with one
The side of through-hole, two hanging ring adjacent side plates is equipped with stiffening plate;
The tube ends are fixed with rectangle side plate, and the plate face of the side plate is opened there are two circular hole, and steel wire sequentially passes through
The circular hole and the host run through bolt.
The width of the side plate is greater than the diameter of the round tube.Two hanging rings, two side plates, described in two plus
Strong plate is symmetrical arranged.
Fixed on round tube there are two symmetrical hanging rings, and the messenger wire of crane passes through hanging ring, slings tooling, symmetrical using two
This structure of hanging ring, there is stronger stability, in the construction process, guarantees that host runs through the installation quality of bolt.Due to
Host is sling through bolt by steel wire in the side plate that tube ends have, side plate lower end, and two hosts of once mounting Liftable pass through
Bolt is worn, is improved work efficiency.Hanging ring side is equipped with stiffening plate, makes hanging ring is stronger to be fixed on round tube.Host passes through
Bolt lower end is worn with Anti-collision cap, prevents host to be collided during the installation process through bolt, causes screw thread to lose, influence to apply
Work efficiency rate.
The present invention can repeatedly use, and avoid original form of construction work buckled using cloth, Liftable of this tooling
Two hosts run through bolt, improve work efficiency and construction quality, host run through the screw thread free of losses of bolt, save a large amount of
Material resources, reduce installation cost, it is economic and environment-friendly.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention;
Fig. 2 is side structure schematic view of the present invention;
Fig. 3 is overlooking structure diagram of the present invention;
Fig. 4 is the structural schematic diagram of Anti-collision cap in the present invention;
Fig. 5 is the structural schematic diagram that this tooling lifting host runs through bolt;
Wherein: round tube 1, hanging ring 2, side plate 3, Anti-collision cap 4, the through-hole 5 on hanging ring, steel wire 6, host are through bolt 7, reinforcement
Plate 8.
Specific embodiment
This invention is described further in conjunction with attached drawing, as shown in Figs. 1-5, a kind of host runs through bolt hoisting fixture,
There is a horizontal positioned strip round tube 1,1 both ends of round tube are fixed with side plate 3, and the plate face of side plate 3 opens that there are two symmetrical circular holes.Circle
1 center of pipe is set there are two hanging ring 2, and there are spacing between two hanging rings 2, one end that hanging ring 2 is connected with the round tube 1 is in just
Shape, one end far from the round tube 1 is rounded, and the round nose of the hanging ring 2 is provided with a through-hole 5,2 adjacent side plates 3 of hanging ring
Side is equipped with stiffening plate 8.Host has annulus on bolt 7, and the plate face of side plate 3 is opened there are two circular hole, and steel wire 6 sequentially passes through
Side plate circular hole and host run through bolt, sling host through bolt 7.Host has Anti-collision cap 4, Anti-collision cap 4 through bolt lower end
For cylinder, Intermediate Gray is fluted, and the groove of Anti-collision cap 4 is adapted with host through 7 lower end of bolt, and Anti-collision cap 4 is buckled in host
Through 7 lower end of bolt.
Crane slings tooling by hanging ring, this tooling during the installation process, can once sling two hosts through bolt, mention
High working efficiency and construction quality, host run through the screw thread free of losses of bolt, save a large amount of material resources, reduce and be mounted to
This, it is economic and environment-friendly.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto,
Anyone skilled in the art within the technical scope of the present disclosure, according to the technique and scheme of the present invention and its
Inventive concept is subject to equivalent substitution or change, should be covered by the scope of protection of the present invention.
Claims (3)
1. a kind of host runs through bolt hoisting fixture, it is characterised in that: there is host through bolt (7) and laterally disposed strip
Round tube (1), the host have Anti-collision cap (4) through the lower end of bolt (7), and the Anti-collision cap (4) is cylindrical, and centre has
Groove, the groove are adapted with the host through bolt (7) lower end, and the Anti-collision cap (4) is buckled in the host through spiral shell
Bolt (7) lower end;
In the round tube (1) center, it is welded with two hanging rings (2), there are spacing between two hanging rings (2), described
One end that hanging ring (2) is connected with the round tube (1) is square, and one end far from the round tube is rounded, the circle of the hanging ring
Shape end is provided with a through-hole (5), and the side of two hanging ring adjacent side plates is equipped with stiffening plate (8);
Round tube (1) both ends are fixed with rectangle side plate (3), and the plate face of the side plate (3) is opened there are two circular hole, steel wire (6)
The circular hole and the host are sequentially passed through through bolt (7).
2. a kind of host as described in claim 1 runs through bolt hoisting fixture, it is characterised in that: the width of the side plate (3)
Greater than the diameter of the round tube (1).
3. a kind of host as described in claim 1 runs through bolt hoisting fixture, it is characterised in that: two hanging rings (2), two
A side plate (3), two stiffening plates (8) are symmetrical arranged.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820860335.4U CN208732429U (en) | 2018-06-05 | 2018-06-05 | A kind of host runs through bolt hoisting fixture |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820860335.4U CN208732429U (en) | 2018-06-05 | 2018-06-05 | A kind of host runs through bolt hoisting fixture |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208732429U true CN208732429U (en) | 2019-04-12 |
Family
ID=66023384
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820860335.4U Active CN208732429U (en) | 2018-06-05 | 2018-06-05 | A kind of host runs through bolt hoisting fixture |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208732429U (en) |
-
2018
- 2018-06-05 CN CN201820860335.4U patent/CN208732429U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208732429U (en) | A kind of host runs through bolt hoisting fixture | |
CN206654649U (en) | A kind of simply adjustable shaped steel lifting card construction equipment | |
CN209259472U (en) | A kind of wind-driven generator casting wheel hub special hoisting turning tool | |
CN207331035U (en) | Steel construction tower galvanizing equipment | |
CN211338510U (en) | Lifting mechanism for screw main machine | |
CN208732444U (en) | A kind of molten copper adds copper suspender | |
CN210825081U (en) | Be suitable for multi-functional hoist of finite space hoist and mount steel reinforcement cage | |
CN208603571U (en) | A kind of template hook gear | |
CN203558771U (en) | Crane boom | |
CN202766088U (en) | Lifting device during shot blasting of large workpiece | |
CN202284115U (en) | Device for lifting side wall of automobile | |
CN203889870U (en) | Specific lifting device for cylinder module of large flotation machine | |
CN204980791U (en) | Shrouding about door of detachable elevator glass layer | |
CN209974102U (en) | Corrosion-resistant gallows for pickling bath | |
CN202897785U (en) | Furnace shell hanger | |
CN201008927Y (en) | Automatic discharge mechanism of section bar cylinder rolling machine | |
CN202554971U (en) | Orifice plate holder | |
CN217377007U (en) | Special lifting appliance for reverse balance flange wind power tower cylinder | |
CN204958138U (en) | Hoist of handling modularization roof truss | |
CN208071099U (en) | A kind of Special H section steel fixture | |
CN205906925U (en) | Auxiliary hook of electronic lifting hook | |
CN204847779U (en) | Radiator product is with swiftly hoisting fastening means | |
CN204265220U (en) | A kind of aluminium alloy bars special hanger | |
CN220056004U (en) | Lifting hook capable of adjusting posture of shield tunneling machine component | |
CN209052279U (en) | A kind of steel pipe bundle suspender |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 116411 Wulu town Wulu village, Zhuanghe City, Dalian City, Liaoning Province Patentee after: China Shipbuilding Dalian Shipyard Industry Development Co.,Ltd. Address before: 116000 Wulu town Wulu village, Zhuanghe City, Dalian City, Liaoning Province Patentee before: DALIAN SHIPBUILDING INDUSTRY STEEL STRUCTURE MANUFACTURING Co.,Ltd. |